Loading...
HomeMy WebLinkAboutCasa Meridiana CUP MERIDIAN PLANNING & ZONING MEETING APPLICANT Insight Architects CUP 05-060 March 16, 2006 REQUEST Continued Public Hearing from March 2, 2006 - Conditional Use Permit for 032 unil mulli-family develapmenl in a proposed R- J 5 Zone for Coso Meridiana - J 777 Victory Road ~GENCY ITEM NO. 5 COMMENTS CITY CLERK: CITY ENGINEER: See Previous Item Packet / Minutes in Al Packet CITY PLANNING DIRECTOR: CITY ATTORNEY See Staff Comments in Al Packet / Memo CITY POLICE DEPT: CITY FIRE DEPT: ~ t)\.° ~~-I'\~ «>(\) ~ / CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS'IRRIGATlON: IDAHO POWER: INTERMOUNTAIN GAS: OTHER: See attached REVISED Site Plan Contacted: Emailed: Date: Phone: Staff Initials: Materials presented at public meetings shall become property of the City of Meridian. -- CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET DATE March 2,2006 ITEM # 6,7 PROJECT NUMBER AZ 05-067, CUP 05-060 PROJECT NAME NAME (PLEASE PRINT) FOR AGAINST NEUTRAL Casa Meridiana Meridian Planning Department Memo To: Planning and Zoning Commission .. ...w,", -." ---- l{}j:~ \._~~ ...._-, ""i'-' \? "I "~ ~ _i_,.j ~ i From: Anna Canning, AICP Planning Director cc: Joe Guenther, Associate City Planner Date: Re: March 13,2006 Casa Meridiana Private 5teets ;"jrJ. ,'- , ;ii,)ji~J'; ~_ì,i, i ¡ ~-,': ~~-:: Ç), "~:~ '",. ': r: ' ,,",: r:: --" . As the rasa Meridiana project has progressed through the review process, I am increasingly concerned about the proposed private streets. The purpose of this memo is to document my concerns related to: 1) The intent of the current private street provisions; 2) The previous (prior to UDC) private street provisions; 3) The interconnected street system; and 4) The applicant's stated desire to have gated streets. The intent of the current private street provisions As the UDC was being developed, we recognized the need for a means to address apartment complexes and commercial projects that did not have internal street systems. For example, it is very difficult for emergency responders to quickly identify an apartment unit that may have a Franklin address, but is actually tucked at the back of a complex that may have a hundred units. You'll notice that the standards for private streets are essentially the same as a parking lot drive aisle. In apartment complexes you would typically have a drive aisle with 90 degree parking off the drive aisle. This was the original intent of the Provisions. We later expanded the private street provisions to accommodate mews developments. In that instance it essentially allowed homes to take access from an alley. Again, private streets were allowed 50 that we could get addresses on those homes. Casa Meridiana is being processed as a multi-family development because there are multiple attached and detached homes and townhomes on a single lot. The intent of the developer is to submit a condominium plat to create homes for individual sale. I am very concerned about the precedent this project may set regarding the use of private streets for (essentially) single family homes. The previous private street provisions Prior to the UDC, the zoning code did allow for private streets. Private streets standards mimicked the ACHD requirements for a reduced right-of-way street: 29 feet back-of-curb to back-of-curb with sidewalks on both sides in a residential district. (This allowed parking on one-side of the street.) The standards were purposefully based on ACHD requirements 50 that you did not have developers choosing private streets in order to avoid the higher construction standards. Most developers opted to use public streets. The rasa Meridian design has a 24 foot back-of-curb to back-of-curb with sidewalk on one side for a portion of the project. am very concerned about the precedent this project may set regarding the use of private streets in order to have reduced construction and development standards. The interconnected street system As you know, the comprehensive plan strongly encourages an interconnected street system so that people can travel within a section without having to get onto the section line road system. Generally those section line roads are arterials roadways. In this case they are currently classified as collectors, but we anticipate that as more land gets developed to the south, both Victory and Locust Grove will likely be upgraded to arterial roadways. The applicant's original proposal was for an L-shaped circulation pattern that connected to both collector streets and did not stub to either of the adjoining undeveloped properties to the south and to the east. ACHD has pointed out that this is very similar to the Sageland Subdivision circulation pattern that we struggled with for months trying to devise traffic calming solutions to discourage cut-through traffic. (I would also like to point out that with Sageland, there were not opportunities for other circulation patterns. The surrounding area had been developed without stub streets across a large irrigation feature.) The applicant has presented a revised site design that now addresses the interconnectivity issues, but now we have new issues. We have had two pre-application meetings with the property owners to the south of rasa Meridiana, and we anticipate they will submit an application soon. For a homeowner in that subdivision that is headed east, the shortest path will be to use the Casa Meridiana private street and then turn right onto Victory. Clearly tht homeowner should be traveling on a public, not private roadway. I am very concerned about the precedent this project may set regarding a private street that connects two different public streets. The applicants stated desire to have gated streets Although gates are not specifically noted on the current plans, the vision of the applicant for this project includes gated streets. Staff acknowledges that the gates will address staff concerns about cut-through traffic and about a private street connecting two public streets. However, gates are not an acceptable solution. The UDC specifically prohibits gated streets. The applicants have not submitted a text amendment. The amendment to allow gated streets would not comply with the Comprehensive Plans emphasis on an interconnected street and circulation pattern within each mile section. Because the only way this project "works" is with private streets is to have gates on them, I am very concerned about the precedent this project may set regarding gated streets within the City of Meridian. . Page 2 CITY OF MERlDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 STAFF REPORT Planning & Zoning Commission Hearing Date: February 16, 2006 Continued to: March 2, 2006 Continued to: March 16, 2006 P&Z Commission î: J -- 1 . " liw' "1"" ~'" '~"--;,.i ~ p /'" I,'", ;:'fii "~\:.: \...-/Vlt:J7il¡âJl .\;'\~ \" II},\H~' t:' , , j!' -\¿~;:,'~, ?-j)J~;'"'\: :i<':(', "i"--",, "'-- '::t J: i:~,'&'1 ,,~ I ." 1;- "", , ,........,,""-l;c_--. ,£'" ,~, I V'I II ""', --"""'-"""-L_,f N ,,',:; Joseph Guenther, Associate City Planner" ,:-;:' :?Da[ Casa Meridiana--".. :i, <' ,"" tvfn~-=' Fd Ü ¡ [\ J AZ-OS-067 - Annexation and Zoning of6.9 acres from RUT to R-15T~~à¡--~ni~' '-:-'~:- i~--: high Density Residential) CUP-OS-060 - Conditional Use Pennit for Multifamily development PS-05-003 - Private Street for providing frontage to multifamily site. 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST TO: FROM: SUBJECT: The applicant, Insight Architects, is requesting approval of a Conditional Use Pennit (CUP) to construct multifanùly development on 6.9 acres within the future Casa Meridiana condominium development located at the southeast comer of Victory Road and Locust Grove Road. The site design is showing thirty one (31) multifamily units and one clubhouse/activity center on one parcel which requires a conditional use pennit in an R-15 district. The applicant has requested all internal circulation to be designed as private streets, and the site plan shows one access to Victory Road as an entry point. 2. SUMMARY RECOMMENDATION On February 16, 2006, the Commission continued the Casa Meridiana project to the March 2,2006 hearing due to over-scheduling of the agenda and with the applicant's consent. The applicant's initial request included gated streets which are prohibited with the Meridian Unified Development Code. ACHD has commented on the report and has made a special notice including a recommendation that the streets be public roadways, provide stub streets east and south, and will promote cut-through traffic. ACHD has not commented on the revised drawing dated March 6, 2006. Staff has reviewed the design dated March 6, 2006 and all comments have been incorporated into this report. Staff still holds concerns that the overall design of the site would exceed the capacity of the private streets as designed. The applicant has reduced the street sections from a 26'interal roadway to a 24' wide section for the entire site. The multifamily development will receive detailed approval with this application; however there are still several items to be addressed through conditioning. Staff would support moving the application to the City Council for approval with a redesign that would show compliance with all requirements of the UDC as detailed in this report. Staff is recommending approval with a redesign of the subject applications (AZ-05-067, PS-05-003 and CUP-05-060) subject to the conditions noted in this report. PROPOSED MOTIONS (to be considered after the public hearing) Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Numbers AZ-05-067 and CUP-05-060 as presented in the staff report for the hearing date of March 16, 2006, with the following modifications to the proposed development agreement: (add any proposed modifications.) Casa Meridiana AZ-OS-067PS-OS-OO3/CUP.OS-060 Page I CITY OF MERIDIAN PLANNING DEP AR TMENT STAFF REPORT FOR THE HEARING DA TE OF 03/16/06 Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Numbers AZ-05-067 and CUP-05-060 as presented in the staff report for the hearing date of March 16, 2006, for the following reasons: (you should state specific reasons for denial of the annexation request.) Continuance After considering all staff, applicant and public testimony, I move to continue File Numbers AZ-O5-067 and CUP-O5-060 to the hearing date of (insert continued hearing date here) for the following reason(s): (you should state specific reason(s) for continuance.) 3. APPLICATION AND PROPERTY FACTS a. Site Address/Location: SE comer of Victory Road and Locust Grove Road Township 3N, Range lB, Section 29 b. Owners Oaas Laney, LLC 519 W. Front Street Boise Id, 83702 c. Applicant: Insight Architects 2238 Broadway Ave Boise Id 83706 d. Representative: Russ Phillips, Insight Architects e. Present Zoning: RUT-Ada County f. Present Comprehensive Plan Designation: Medium Density Residential- 2002 Comprehensive Future Land Use Map g. Description of Applicant's Request: 1. See Exhibit Al (prepared by Insight Architects) for a copy of the site plan which depicts the lot layout, building, parking and access locations with adjoining subdivisions, Exhibit A2 shows the proposed landscape plan, and Exhibit A3 shows detailed elevations. h. Applicant's Statement/Justification: The application notes that the Medium Density Residential designation provides for the overall site to be developed in a unique configuration that attracts a new market of customers to this area. The applicant notes that the site is an ideal location for a condominium/multifamily complex and will provide the additional landscaping along drive aisles, the design review for structures, and develop the new private streets to limit traffic movement in the area. 4. PROCESS FACTS a. The subject application will in fact constitute an annexation and zoning as detennined by City Ordinance. By reason of the provisions of the Unified Development Code Title 11 Chapter 5 Article B Section 3, a public hearing is required before the City Council on this matter. The subject application will in fact constitute a conditional use I multifamily development as detennined by City Ordinance. By reason of the provisions of the Unified b. Casa Meridiana AZ-05-067PS~O5-003/CUP-O5-060 Page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING-DATE OF 03/16/06 c. Development Code Title 11 Chapter 5 Article B Section 6, a public hearing is required before the City Council on this matter. Newspaper notifications published on: February 13 and February 27, 2006 Radius notices mailed to properties within 300 feet on: February 8, 2006 Applicant posted notice on site by: January 17, 2006 d. e. 5. LAND USE a. Existing Land Use(s): Bare land, single family residence along Victory Road. b. Description of Character of Surrounding Area: Large lot residential to the south, infill residential north of the site and agricultural east and west of the site. c. Adjacent Land Use and Zoning 1. North: Sageland Subdivision, Zoned R-8 with a Planned Development 2. West: Undeveloped small lot agricultural, Ada County RUT 3. South: Tuscany Lakes Subdivision zoned Meridian City R-4 and undeveloped Ada County RUT 4. East: Undeveloped Ada County RUT d. History of Previous Actions: The Commission heard this item on March 2,2006. At that hearing they directed to applicant to redesign the site to meet the following concerns: provide one stub street to the south, elinùnate the Locust Grove access, and consider making the streets public. e. Existing Constraints and Opportunities 1. Public Works Location of sewer: of this property. Location of water: Water is located in the full frontage of both S. Locust Grove Road and Victory Road. Issues or concerns: High ground water and wetlands. Stonn drain disposal will be problematic with the high groundwater. 2. Vegetation: AgriculturallIrrigated There is sewer in Victory Road near the northwest comer 3. Flood plain: N/ A 4. Canals/Ditches Irrigation: Several ditches/canals cross the site. These laterals appear to be for drainage as well as local user groups. 5. Hazards: High groundwater 6. Size of Property: 6.9 acres 7. Description of Use: Attached townhouse and associated residential amenities, front accessed products with no internal fencing. f. Landscaping I. Width of street buffer(s): per the Future Land Use Map, both Victory Road and Locust Grove Road are designated as "Collector Roadways." As such, the UDC (Table 11-2B-3) requires a 20-foot wide street buffer adjacent to both roadways. The Casa Meridiana AZ-OS-O67PS-OS.OO3/CUP-OS-O60 Page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING-DATE OF 03/16/06 landscape plan (Sheet L~ 1) proposes a 20-foot wide buffer along these roadways. 2. Percentage of site as open space: The open space contained in the residential uses is not calculated on the site/landscape plan. UDC Il-3G~3A requires a minimum of 5% open space, the site plan includes several water features and internal open spaces which would appear to be consistent with the required 5% open space. The calculation should be reduced to not include any landscape buffers and would be required if approved. The applicant shall clarify these calculations to be consistent with the amenity standards found in ODC Chapter 3, Article G. 3. Other landscaping standards: The landscape buffer along Locust Grove Road and Victory Road should be constructed in accordance with UDC Chapter 3, Article B. This would include the modification of the evergreen trees shown on the landscape plan, UDC Il-3B- 7C~3c as evergreen trees shall be used sparingly and in clusters. 4. Fencing - The applicant is proposing a solid block (stucco) fence around the site with limited access points which will be controlled by iron gates. The walking paths to connecting multi~use pathways are also proposed as gated. The applicant is not proposing internal fencing with the exception of limited three foot stucco fences will enclose the private open spaces and four or six foot iron fences will enclose the pool and activity center uses. g. Conditional Use Infonnation: 1. Non-residential square footage: To be detennined, 3,128 square feet shown for the activity Center 2. Proposed building height: 23.5 feet (Sheet A.30) R~15 allows 40 feet 3. Percentage of site devoted to building coverage: Not defined 4. Percentage of site devoted to landscaping: required IIÙnimum of 5% 5. Percentage of site devoted to paving: Not derIDed 6. Percentage of site devoted to other uses: Not defined 7. Number of Residential units: 32 h. Amenities - The applicant is providing a clubhouse, recreational facilities behind the activity center and additional open space for the residential amenities with multiple water features and internal pathways. UDC 11 ~4~3.27D-2b requires three onsite amenities with one from each category. UDC 11~4-3.27D - ~ a. Quality of life amenity- Clubhouse (activity center) ~ b. Open Space - Water Amenity - c. Recreation ~ Walking trails and Sports courts i. Off-Street Parking (residential uses) - provided within the R~15, to meet the mu1ti~family standards set forth in UDC II~4-3.27. The conceptual design appears to meet these standards which will be certified through the certificate of zoning compliance process. The site layout provides for two garage stalls for each dwelling unit which at maximum will be designed for 2,400 square-foot units with a 20~foot x 20~foot parking pad. Fifteen ofthe thirty~one parking pads currently do not meet the 20~foot x 20~foot standard as required by Table 11 ~3C~2. The applicant shall certify that a 20-foot x 20~foot parking pad has been planned for each unit in front of the required two enclosed spaces. Casa Meridiana AZ-05-067PS-05-003/CUP-05-060 Page 4 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING_DATE OF 03116/06 The applicant is also proposing ten parking stalls (one handicap) for the activity center. Standard gathering places require one space per 500 square feet and of the approximate 3,128 sq/ft activity center; this would require six parking stalls. The applicant has met the minimum standard for the most restrictive district. j. Proposed and Required Residential Standards - R-15 and R-15 bulk standards apply as found in UDC 11-2A. R-15 (Standards) Setbacks (*all streets private) Proposed Street Setback to Living Area ** 0 Street Setback to Garage** 15 Side 4 Rear (unit 19) 6 Frontage 0 Lot Size 0 Maximum building height 23.5 Required 10 20 4 12 0 2,400 40 ** As measured :fi-om back of sidewalk Staff has concerns that the applicant, by using a private street system for essentially attached single residential, that they do not meet the intent of the district or the associated setback standards. n. Summary of Proposed Streets and/or Access (private, public, common drive, etc.): The applicant is proposing all streets, public connections and internal circulation to be private streets. The applicant is proposing one new access point to Victory Road to serve the Casa Meridiana project at approximately 520' east of the Victory/Locust Grove Intersection. This request is not supported by UDC 11-3F-4.4 Standards for Private streets: Gates: Gates or other obstacles shall not be allowed. A variance may not be granted to this standard. Variances can only be applied toward relief from a dimension standard. Variances may not be used to approve a use, such as a gated street, which is otherwise prohibited. The applicant has been infonned that the only mechanism to allow gated streets would be to request a zoning ordinance text amendment. They have not submitted such an amendment. If the gates are not approved, as recommended, staff is concerned that the applicant is creating a competing street network with these private streets. ACHD has issued the following statement: Special Notice to the City of Meridian . The applicant is proposing to construct the transportation network within the subdivision as private streets. By constructing these roadways as private streets, the District and the City of Meridian lose any chance of obtaining connectivity in this area. Essentially, this comer would be an enclave that is completely separated from all of the sulTounding neighborhoods. District staff strongly recommends that the internal streets be required to be public roadways that can provide stub streets to the east and to the south to provide Casa Meridiana AZ-OS-067PS-OS-003/CUP-OS-060 Page S CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 interconnectivity. The connectivity to the surrounding parcels would provide additional access for emergency services, eliminate multiple access points to major roadways (collector and arterial roadways), reduce vehicle miles traveled, connect neighborhoods and have the ability to increase the sense of community in the area. The "L-shaped" roadway that the applicant is proposing is similar to what was proposed with Sageland Subdivision. When Sageland Subdivision proposed a similar roadway network, the City of Meridian was very concerned with potential cut through traffic and required the installation of landscape islands. This proposal may promote cut through traffic on a private roadway network. For a detailed report on ACHD's actions and comments, please see the letters/reports submitted with the application materials Staff is recommending the applicant consider eliminating the access to Locust Grove Road and providing a public road to Amity Road with a public stub street to the property south of the site. The internal roadways may be allowed as private streets if approved. . 6. AGENCY COMMENTS MEETING On January 27,2006, staff held an agency comments meeting. The agencies and departments present included: Meridian Fire Department, Meridian Police, Meridian Public Works Department, and the Sanitary Services Company. Staff has included all comments and recommended actions as Conditions of Approval in Exhibit C. 7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Medium Density Residential' on the Meridian Comprehensive Plan Future Land Use Map and the applicant has generally drawn the annexation request for the R-15 district to follow the Medium Density Residential District. In Chapter VII of the Comprehensive Plan, medium density is defined as areas including single-family homes at densities ofthree to eight dwelling units per acre. The proposed density (4.6 d.u./acre) is within minimum target density on to 8 d.u./acre for Medium Density Residential, staff finds that the proposal conforms to this stated purpose and intent. Staff finds the following Comprehensive Plan policies to be applicable to this property and apply to the proposed development (staff analysis in italics below policy): . Require that development projects have planned for the provision of all public services. (Chapter VII, Goal III, Objective A, Action 1) When the City established its Area of City Impact, it planned to provide City services to the subject property. The City of Meridian plans to provide municipal services to the lands proposed to be annexed in the following manner: . The subject lands currently lie within the jurisdiction of the Meridian Rural Fire District. Once annexed the lands will be under the jurisdiction of the Meridian City Fire Department, who currently shares resource and personnel with the Meridian Rural Fire Department. The subject lands currently lie within the jurisdiction of the Ada County Sheriff's Office. Once annexed the lands will be serviced by the Meridian Police Department (MPD). The roadways adjacent to the subject lands are currently owned and maintained by the Ada County Highway District (ACHD). This service will not change. The subject lands are currently serviced by the Meridian School District #2, This service will not change. . . . Casa Meridiana AZ-OS-067PS-OS-003/CUP-OS-060 Page 6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 . The subject lands are currently serviced by the Meridian Library District. This service will not change and the Meridian Library District should suffer no revenue loss as a result of the subject annexation. Municipal, fee-supported, services will be provided by the Meridian Building Department, the Meridian Public Works Department, the Meridian Water Department, the Meridian Wastewater Department, the Meridian Planning Department, Meridian Utility Billing Services, and Sanitary Services Company. . Chapter VII, Goal N, Objective D: Encourage appropriate land uses along transportation corridors. Staff believes that the proposed residential land uses are appropriate along the adjoining transportation corridors . Chapter VII, Goal N, Objective D, Action 2: Restrict curb cuts and access points on collectors and arterial streets. The A CHD evaluates access points in their analysis; no direct access is allowed to any of the collector roadways. The proposed access points to the arterial streets generally comply with ACHD's standards. Please see the ACHD staff report and Exhibit B for the conditions from ACHD. Locust Grove and Victory Roads are classified as collector roadways. The applicant is proposing access from both public roadways with internal circulation being private. Public connection to adjacent residential developments is proposed from gated micro paths and sidewalks which will provide future connection to residential areas west and south of the site. Staff believes that the design as shown limits the existing and planned residential areas in the vicinity by constraining adjacent properties to extend sewer and water services in the rights of way, requires future development to obtain the offset access points, and does not facilitate interconnectivity between parcels. Protect existing residential properties from incompatible land use development on adjacent parcels (Chapter VII, Goal N, Objective C, Action 1) . The properties adjacent to the subject site are designated for residential uses. North of the site is existing medium high residential uses at approximately 5.5 dwelling units to the acre, east of the site is vacant, and west and south of the site are medium density residential uses and expected to continue these uses as per the Comprehensive Plan Future Land Use Map. The project provides a transition from the less dense Tuscany development to higher density R-15 District which would be compatible with the smaller parcel development occurring closer to the intersection of Locust Grove and Victory. The applicants have included residential to residential fencing along the south and east boundaries as well as by providing amenities and open space connections. . . Chapter VII, Goal N, Objective D, Action 5: Require appropriate landscape and buffers along transportation corridor (setback, vegetation, low walls, benns, etc.). The applicant is proposing to construct appropriate buffers along all of the adjacent collector roads. By ordinance, a minimum 20-foot wide landscape buffer is required adjacent to collector roadways. The landscape plan shows the appropriate landscape buffers. Staff also finds the following 2002 Comprehensive Plan text policies to be applicable to this application: Casa Meridiana AZ-05-067PS-05-003/CUP-05-060 Page 7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 . "Require all new parking lots to provide landscaping in internal islands." (Chapter V, Goal III, Obj. D, #3, page 43) "Eagle Road is the major north-south arterial in Ada County. The capacity of this arterial should be protected by minimizing the number and location of private driveway access connections to this important roadway. The City should recognize, adopt, and help implement the Eagle Road Access Control Study, prepared by ACHD in 1997." (Chapter VI, page 71) "The capacity of arterial. . .roadways can be greatly diminished by excessive driveway connections to the roadways. The City should cooperate with AClID to minimize access points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page 72) "Develop methods, such as crosswaccess agreements, frontage roads, to reduce the number of existing access points on to arterial streets." (Chapter VI, Goal II, Obj. A, #12, page 79). "Identify transitional zones to buffer commercial and residential uses, to allow uses such as offices and other low intensity uses." (Chapter VII, Goal I, Obj. B, #7, page 102) "Restrict curb cuts and access points on. . . arterial streets." (Chapter VII, Goal N, Obj. D, #5, page 107) . . . . . 8. UNIFIED DEVELOPMENT CODE a. Allowed Uses in the Residential Districts: UDC Table 11-2A-2lists multifamily development uses as conditional uses in the R-15 zoning district. b. Purpose Statement of Zone: MEDIUM-HIGH DENSITY RESIDENTIAL DISTRICT (R-15) the purpose of the residential districts is to provide for a range of housing opportunities consistent with the Meridian Comprehensive Plan. Connection to the City of Meridian water and sewer systems is a requirement for all residential districts. Residential districts are distinguished by the allowable density of dwelling units per acre and colTesponding housing types that can be accommodated within the density range. Residential land uses are also allowed within the a-T, TN-C, and TN-R districts as set forth in Chapter 3 Article D. c. General Off-Street Parking Standards (from UDC ll-3C-5): The following standards shall apply for off-street vehicle parking for nonresidential uses: In all Commercial Districts the requirement shall be one (I) space for every five hundred (500) square feet of 2fOSS floor area. Although the use is not in a commercial district the general standard for non-residential uses may be applied. The applicant has provided adequate off street parkingfor the amenity. d. Multifamily Development (UDC 11-4-3.27) The following standards shall apply for the multifamily units, including standards for Site Design, Common Open Space, Site Amenities, Architectural Character, Landscaping, and Maintenance. Architectural Character-Multifamily Development (11-4-3.27.E): All structures in Multifamily Development are subject to the design standards listed in this section. The overall elevation shall be reviewed by staff and shall be approved prior to issuance of a Certificate of Zoning Compliance. Landscaping (1l-4-3.27.F) Additional landscaping standards for street facing elevations apply to this site. Casa Meridiana AZ-OS-067PS-OS-003/CUP-OS-O60 Page 8 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 11-4-3.27.G All multifamily developments shall record legally binding documents that state the maintenance and ownership responsibilities for the management of the development, including but not limited to structures, parking, common areas, and other development features. e. Outdoor storagelrefuse areas (l1.3A-12): Outdoor utility meters, HV AC equipment, trash dumpsters, trash compaction and other service functions shall be incorporated into the overall design of buildings and landscaping so that the visual and acoustic impacts of these functions are fully contained and out of view trom adjacent properties and public streets. 9. ANALYSIS 9a. Analysis of Facts Leading to Staff Recommendation The AZ/CUP/PS application appears to substantially comply with the Unified Development Code. However, there are several areas of clarification and some modifications required to both the site plan, cross access, and public road design prior to a recommendation of approval. Below are several special considerations for the P&Z Commission to review at the public hearing: Analysis of Facts Leading to Staff Recommendation 1. AZ Application (AZ-05.067): Based on the policies and goals contained in the Comprehensive Plan and the general compliance of the proposed development with the Zoning Ordinance, Staff believes that this is a good location for the proposed development. Please see Exhibit D for detailed analysis of the required facts and findings for a Zoning Amendment. The annexation legal description submitted with the application (stamped on 11/28/2005 by Delson Brown, PLS) shows the property as contiguous to the existing corporate boundary of the City of Meridian. The applicant will be responsible for all costs associated with the sewer and water service extension. Any existing domestic wells and/or septic systems within this project will have to be removed trom their domestic service when services are available from the City of Meridian. Wells may be used for non-domestic purposes such as landscape irrigation. All future development of the subject property shall be constructed in accordance with City of Meridian ordinances in effect at the time of development. All future uses shall not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. UDC 11-5B.3D provides the P&Z Commission and City Council the authority to require a property owner to enter into a Development Agreement with the City of Meridian that may require some written commitment for all future uses. Due to the close proximity of existin¡z and future residential uses and the submission of a conditional use reQuest. staff believes that a Development Agreement is not necessary to ensure that this property is developed in a fashion that is consistent with the comprehensive plan desie:nation and does not ne¡zatively impact nearby properties. Casa Meridiana AZ-O5-067PS-O5-003/CUP-O5-060 Page 9 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Staff believes that a Development Agreement should not be required with this application as the applicant has submitted a conditional use request which would address all the implications of the annexation. Special Considerations: Sidewalks: The applicant is proposing to construct 5-foot wide attached sidewalks on the internal streets/drive aisles. The applicant is proposing to plant trees on the back side of the sidewalks, but staff believes that additional trees should be planted at the driveway cuts and closer to the curb to provide the pedestrians with cover and to make the streetscape more attractive. Land Use Buffers: UDC requires landscape buffers between different land uses. Per UDC 11-3B-9, a 20-foot wide landscape buffer along collector streets. The applicant is showing a IS-foot wide setback buffer between the condominium homes and the future potentially detached single family residential lots. Staff feels that the perimeter landscaping serves as a buffer and shall contain materials in accordance with UDC 11-3B-9 and not include impervious surfaces such as parking areas or driveways. The proposed pathway connections east and south shall be landscaped in accordance with UDC 11-3B~12. See Exhibit B below. ACHD: The ACHD staff report submitted for this application specifically requests the Planning Commission and Council to consider amending the design to provide for interconnectivity between the other three parcels in the near vicinity to the comer of Locust Grove and Victory Roads. Staff supports ACHD's request but would add that the access point to Locust Grove Road had potential to be moved to the parcel south of this site with a stub street from this property to the south. The parcel to the south would then be required to stub services and a public street to the east. These changes would meet ACHD's concerns for interconnectivity. Lastly, the Planning Commission and Council should consider that ACHD would prefer these streets to be public. Private Streets: The design dated March 6, 2006 shows the private streets to connect from Victory Road and stubbing to the property south of the site. Staff feels that either design stretches the intent of the private street standards for providing access to multifamily units. Staff would recommend that the applicant consider eliminating the Victory Road access after construction is completed in the following fashion: 1.) The Victory Road access point would become an emergency drive similar as to the approval for Sageland subdivision on the north side of Victory Road, these emergency accesses would align and provide an escape route recommended by Emergency Services. 2.) Staff anticipates the property south of the site to have access to Locust Grove Road and would prefer the private street connection to a local road and not a collector/section line road. This design would accomplish the applicant's goal of achieving exclusiveness and seclusion on the comer as well as meet ACHD's requirements that the private streets not be a competing road system. 3.) Staff would also request the applicant eliminate the cuI-de-sac turnarounds and loop the private streets to increase the area around the perimeter of the site as to allow more common open space and less paved surfaces, only if the access point to Victory Road is restrained to emergency services only. Casa Meridiana AZ-05.067PS-05-003/CUP-05-060 Page 10 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 CUP Application (CUP-O5-060): The proposed Conditional Use request substantially complies with the Zoning Ordinance. 1. Elevations: The applicant has submitted building elevations of the proposed structures. The application lists the proposed building materials, including stone, brick, stucco and timber to be accented with chrome, aluminum and gloss painted trims. UDC 11-4.3 requires multifamily structures to comply with the design standards listed in this section. Staff feels the elevations submitted with the CUP significantly meet the requirements of the design standards listed in UDC 11-3A-19. The elevations will need to be reviewed prior to issuance of CZC to comply with the following ordinance standards: a. All building elevations shall have a minimum portion of the elevation devoted to architectural features designed to provide articulation and variety. These features shall include, but are not limited to windows, bays and offsetting walls that extend at least two (2) feet; recessed entrances; and changes in material types. Changes in material types shall have a minimum dimension of two feet (2 ') and minimum area of twenty-five (25) square feet. b. Main entrances, which are the primary point(s) of entry where the majority of building users will enter and leave, shall be designed as an obvious entrance and focal point of the building through architectural treatment, lighting, and address identification. c. Entrances shall be adequately covered, recessed, or treated with a pennanent architectural feature in such a way that weather protection is provided. d. Roof fonns shall be distinctive and include variety and detail when viewed from the street. Sloped roofs shall have a significant pitch. Flat roofs should include distinctive cornice treatments. e. Exterior building materials and finishes shall convey an impression of pennanence and durability. Materials such as masonry, stone, stucco, wood, terra cotta, and tile are encouraged. f. Windows are required to allow views to exterior activity areas or vistas. Windows shall be provided on any building facing any common area used for children's recreation. g. All roof and wall-mounted mechanical, electrical, communications, and service equipment should be screened from public view from the adjacent public streets and properties by the use of parapets, walls, fences, enclosures, or by other suitable means. 2. Refuse/Service Area Screen: Neither the Site Plan nor Landscape Plan call-out how or if the refuse/service area on the north side ofthe activity center building will be screened. UDC 11-3A-12 requires the visual and acoustic impacts ofthese functions are fully contained and out of view from adjacent properties and public streets. The applicant's CZC application must clearly demonstrate how this standard is met. Casa Meridiana AZ-05-067PS-05-003/CUP-O5-060 Page 11 CITY OF MERIDIAN PLANNING DEPARTMENT STAFFREPORT FOR THE HEARING DATE OF 03/16/06 3. Cross Access: The property to the south will be providing a point of access to Locust Grove Road and an access is also proposed from this site. The applicant has provided a revised design with the access point to the south as a private street. 4. Private Streets: The applicant is proposing to use private streets to provide future access to Locust Grove and Victory Roads. The applicant has submitted a Private Street application as required by UDC 11-3F-3. The private street standards are listed in UDC 11-3F. The applicant shall design and construct the private streets in compliance with the standards listed for Private Streets in UDC 11- 3F Private Streets if allowed. See Exhibit B. The Meridian Fire and Police Departments are requesting a minimum of 24' paved sections for the private streets. These standards would not allow on street parking which the Meridian Police Department has considered inadequate for this size of development. 5. Conunon/Open Space: The applicant has a qualified application meeting the requirements of UDC 11-3G and UDC 11-4.3.27c. The proposal is showing centrally located open space which appears to be a minimum of 5%. The applicant shall certified that qualified open space in the residential district which meets the requirements of a minimum of 5% open space has been provided with the final approval of the Certificate of Zoning Compliance. See condition of approval!.1.3 6. Multi~Use Pathway: The applicant is required to install a micro pathway connection into the site to the east as shown. The pathway along the Ten-Mile Creek is the major pedestrian connection to sites west and north of the site. 7. Amenities: The applicant is required to provide three amenities for multifamily developments with 20 to 75 units. The applicant is showing qualified site amenities as follows: 11-3G-3C-I - Quality oflife amenities - Clubhouse 11~3G-3C-2 - Open Space amenities - Open grassy area, ponds/water features 11-3G-3C-3 - Recreation amenities - Pool, walking trails, sports courts Amenities are generally located in centrally accessible locations. These conunon areas shall be maintained by the Casa Meridiana (Home or Users) Owners Association. The landscape architect shall certify that one tree per 8,000 square feet of lawn has been provided on the landscape plan. PS~O5-003 Private Street Design Standards: The private streets shall be placed in a permanent easement as the site is not projected to be platted. ACHD shall approve all points of access. If the private streets are denied then the applicant shall contact ACHD to determine the method of transfer of any public streets. The private street shall provide sufficient maneuvering area for emergency vehicles as detennined and approved by the Meridian Fire Department. The Meridian Fire has conunented below. Gates or other obstacles shall not be allowed. Street Names: The private streets shall have street names as determined by the Ada County Street Naming Committee. The street names shall be approved prior to issuance of a Czc. Casa Meridiana AZ-OS-067PS-OS-OO3/CUP-O5-060 Page 12 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Fire Lanes: The revised 24' roadway shall be defined and signed as a fire lane with no parking allowed. 9b. Staff Recommendation: Based on the above analysis, staff fmds the AZ/CUPIPS applications may confonn with the Comprehensive Plan policies and UDC standards. As noted under "Special Considerations," we recommend the Commission consider requiring the applicant to make certain concessions to make the private streets safer for internal traffic. Staff recommends approval of the AZCUP/PS application subject to the conditions of approval listed in Exhibit B. Staff has provided findings consistent with a recommendation for approval. 10. EXHŒITS A. Drawings 1. Site Plan (AS.!, REVISED dated March 6, 2006) 2. Landscape Plan (L-1, stamped REVISED dated March 6, 2005) 3. Elevations (A3.0, dated November 23, 2005) B. Legal Descriptions C. Conditions 1. Planning Department 2. Public Works 3. Fire Department 4. Police Department 5. Parks Department 6. Sanitary Services 7. ACHD D. Required Findings from UDC - 1. Annexation 2. Conditional Use Permit 3. Private Street Casa Meridiana AZ-OS-067PS-OS-OO3/CUP-OS-O60 Page 13 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Exhibit AI: SitePlan (AS.!, REVISED dated March 6,2006) ",'.',"";:r'::¡""'~;':"'H' '" :¡, ,',:, " \ . ( : ':: ..' " " " ",;: ,1 ~ I, " ¡~ ", ,,' = , , , :-- , , ",*' ti:f '" ':~' ,J; ¡;:j, '~ ¡ , " " :- ',' :ii~, .- " ,", .., '. ~, !r - (). ,'," --c' ~ ¡¡ Ì\. , , I '" ' "Ii'! ~ i¡'j ,~ "" ;-< '~ '>- i'" ¡; ~) :" -'\"\. J' ~ I, t, I " i I , J ,01 Î ';',:, ,:,j -fi:)'J in , ' '" , ':i " , /: ;¡, ; I: .~~ , : i! ':J ",.. "'" ,.' ,{, \, c--- '" :~~ , , :1 '1:\ ,- --.. ,-,-, , ----- -,--, " '1",' , " , , " ",I ~> ¡ ,,: " i , - -,~' ~o ~T\-...r~~: , ' <"~I:) ')""~n ,-,<\ ' , " I' '" , 'i"i ~ \ ¡ ",'" \ 1 ' " ~ ' ¡f' I' , - -, ,- - - - - -- ',',-, ,', ; "E':, :" "-¡C.' ",,1-"" i\ " i " c: '. "'--'\ ' , >."" \,V' ~ D~::";";'~-'tiO""", ",' '--"""-' ,;[::":"" !,INSIGHT"., :i, "I, '" ,-". Casa Meridiana Exhibit A Page 1 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Exhibit A2: Landscape Plan (L~l, stamped REVISED dated March 6,2005) ._,-- --_. ~-" ~=W~ð9:~'i~J(D:~~~=; --zè,J , ~.-' '",-10)-<1' ,.i ~. ',-:_1",,--'0:\;, U' "(J~"-" (:.. iI" 0':;-- ';~'.; >,,[ jJ ¡'¡, ."£~ pJr ~-,~ ',L, . r)J':~/: ¡¡ ',"~; .), ~,,{ ,]1'.. J: t' . /ti I'Vø~ /'( Qt"',(J%,;.: "I ¡ I., ad,- =, ¡<}/";,, ",iO'\~\:"('¡ I' I'll, ':¡;¡ \7\ C8,' ~', ,~tj¿;¿5/ {)IJJ'q, :1 ~ ¡ < @ ¡ ,', {J:J¡ IlC¡~\j/ ',' '(,'!<"~,I ¡' j ~~l-~l:: I!~ ¡ if.~?71c6\ / ~ I:' :1: : j ! "1 t6' (~-) 0"""",,, ._'---"IIõ1 . "[':AlitL'L 1...:.1' ,"'1-"-'/,,, j '---I fl" jC'"I., ¿:-'Á l~"'~-?-) \ 'lX)¡i' ;~ ¡' ( """'~'-~/"'~"'\(~}: ;:-li!'-~ '-\8ì ! í' f'-. " CCJ~('} '~ìIJ(r '-". " : \, ,>'---~ 1 I' ; t ~'--"':P\, . '~"",, (i) Tr-:- ",i{:'; ;IÒf~QgQ\-)¡},. , I ':~"r-~ \-',,: i ,',." .r' ",~"t_,~;-:~~:/ <,,:,-~;~,:; '~-'-,:.¡~~~,. I ¡; , ";,, " ' E":) I" r-':"::~-"- i~~j :¡::~~('F'i~;I' .:-_~. i- ",,:~ ~l}~";~ld l~'l:q -'><]tl V !¡I II!¡Ü"-~'Y' \~"l;~~" .,..J Ii . I, ,¡' II 'i . 'I ~ j:_~WbJ i ,:: ~~"~.~ :1 ¡!' II ;!I ß', ,i I ii' ,l, \! ij 1/1 I 'I: ", 1,1 - : ¡: /~. i "" ",. ¡¡! ¡ \ 1/ ,¡ i; ;) in! .1" ~"l~ ~,;;; 'j } ò, C,-.I",;;, GRün. ""Å" ,u... .- - ---- - - ---, , - ,-_.., ..",,- ,- .--.--- - --- ¡ / "~¡i¡~I-~-~--i.i¡1 J¡îiinIW;t¡mj::~; . H II . '11' In ¡jo ! I 'iJlfeJ ili ~I¡!I! ': '¡¡;ìJI, I¡ ,I:I ¡If!lhll'!::~' t : ¡. I" ,.I! II' I.'~!!, b ,. ë .j 'I I ..i' I "t,. ' !i ,:I'!'II' ~ !¡IJ¡!¡:n . ¡ I i ¡ ¡ I ~ ~I! ~. I I I ¡ ! ¡'I¡ ~: Ii ..! 1 I ,: . I f .1 , l' 0 Q r.:.' .1 ,- ~ .i;! . . .. ( : ""i,I' ii, ¡1Ufl~ !jà~ '¡I"h'i; i'i ¡I: 11,1~!lJ / "a i¡lllfL "., ¡II/~r i'~ ¡¡tn' ¡;: I r I . t., ,,' s-rJ.. r;- "I ¡II ;":",~~;.."w~,,'. "" --1-- 'II_P~~~~,~~"::':' ,.1' Casa Meridiana Exhibit A Page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 ExhibitA3: Elevations (A3.0, dated November 23,2005) '", f : I'i~;, ';;ii' ,"'=, 'il ... i'i ,..ill " w I: '-:¡~ ! ¡;i1l ; r --,Ii'\ ¡, ;¡~~ ¡~::j)1 \ '1,\1/\ I;': Iii "ø, (JII/I .;: ¡filþ 1 ,1 Ii I[ I j~ II! ~l ~ I' 1b'1f 0 , 1~1!1 '\ I t: U}!, "r:-::;:-: '" "'i "', i r ~~ ! I ! I /I I î q I I I i .¡:.. :i~ " ~ ~ 1"~j'II!IIT~ILOCUsT(3ROve-"'-- '~'O_-J"--~J' ~'--f~'F"'- """~-"'--~"'-~"""~--'--~"-""""--, , l'; II i.II' , , i I, , COMIllUNITYDEVELOPIllENT I II ~-:;::'~'INSIGH"¡'Irj~Hf",,(;~ ,-','¿¿, , 6 I'¡I',' II ' '~) "', -'- ;' i r~'- '.f...;~:,,;:;;.:',r;;!::;.i:.",;~;,;; J ~4 """"" ~""'-"""?' ,- ~ 1- --In_. ": "'-C' " ----~ ",,'" :0:"":..1 Casa Meridiana Exhibit A Page 3 ..~ CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Exhibit B: Legal Description- Annexation I ".J,".' U...¡". 11",;,1" I': , lib-.." "", "h I" "<':"-': . HtH¡NUAH'iHUXTor'l ()N A pared oi /:¡nd si!uated in a'.: lJür(¡'v,,~::1. :'~ of1h(: nùrHl\\'u:o, ~" of ~n;tia/J 29, Tmynshi[" :.\ North, R'\1I!,\-' I t:,¡¡i;l, Bobe Merid¡'m, A.!¡¡ C ,un!y, J..1üI10, IIH:>rC partklllarly described it;; tallows: ßI~GINNrN(; at the nactbwc$( camel' of said Seclian 29. from which carner, the \1.; ()01ll(;1' COmmon to Sections 29 anrJ ;:10 bcar~, S.OooOO'24"E., 2645,69 feel; thcuc:o, along the nor!h IiI!() of said Section 2<), I) l) S.89"49' I I"E" 620.22 fee!; !lienee, ¡¡long a line parallel with the westerly (¡Ill! of said sL-'Ction., S.OooOO'24"E., 532.61 ft:el; thcllœ, along a fine parallel with the 1100therJy line of said section, N.89"49'II"W" 620.22 fect (0 a p"int olllhe westerly line of said section; (hence, along sHid westerly line, N.OO"OO'24"W., 532.61 £cello the POINT OF BE(~INNING. 3) 4) SAn) PARCJi;L containing 7.58 acres, 1H()rc ur ("55. SUBJECT TO, all Covenants, Rights, Rights-of-Way, Ea.~emen!s of Record, and Encllrnbrallctls, EXffi8IT "8" attached, and by this reference, lI1ade a part hcreo( r::'c'llR\O,UÜ91!)""".¡.,,, r",;" d", Casa Meridiana Exhibit B Page 1 tT1(l &B; -,'"' g:~ t¡;¡' ~, '"Oe; ~ ~ n '"' tV EXHIBIT ::3 >-J -< 0 "1'j $; tT1 ~ S! >- Z '"0 " >- Z Z Z 0 0 tT1 '"0 >- :::0 >-J ~ tT1 Z >-J "B" A PARCEL OF LAND SITUATED IN THE NW1/4 OF THE NW1/4 OF SECTION 29, TOWNSHIP 3 NORTH, RANGE 1 EAST, BOISE MERIDIAN, ADA COUNTY, IDAHO, IDAHO. 2005 19 20 VICTORY ROAD ~-____S!9'49'1!.E 1340.26' W 1/16 '~OR ao I ~ - ~:=---=-=-+ w J i - - e: I I J It I ~ ~i ~ ~ ~ I~ 0" 7.58 ACRES 'I Q:; I I w . ~ ~ ~I I>" i *1 113 u lEI 8 ~."'~ '"' p~ I Š g --Ñãi4'e'i1"'1 -6'2õ:22-----J tóg ! ao-L9 I t I I 1 UJ --3 >- "1'j "rj :::0 tT1 '"0 0 :::0 >-J "r'I 0 :::0 --3 ::r:: tT1 ::r:: t'I1 >- :::0 Z P 0 >- --3 tT1 0 "rj 0 w --- 0 '00 200 400 , 600 BROKAW SURVEYING & lL'i.??l'G 11056 LQne Star, Rd., NOf;!pa. !D. 208-24S-D47P ~ ,-.'UL'iR\~ \",-ò ÖO'"""r tnl'lo.o,q ù\TL:"-1'.-O,7 ""~.;ê,':",: 0\ --- 0 0\ CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/I6/06 \;' . Ejj/¡ (::j>:',', ::,UH'!\ j.liilyH; r:'I',i1i" BOIL /:';,/¡;) P{¡¡M'¡ 1224 PI.' ¡¡<'hl,"t ~r:",h:i¡,'w('!I ¡r' 1Ift'flil¡'i'l.I;£:lil[~.¡ OF '¡¡lit! Oil!. 1-; J.'¡/:'" '. ,. IIIIUlm¡lIf ml~IM¡¡WI 1 ~ ili 1.(6(";J-;'[<.<. Order NI>,: AO5J66S') WARRANTY 1)[1'0 POR V ALU£ IŒCFJVI;;U, tll" reNi )1 Rlld suff¡c.k (} ,:of whid. 'IW hereby a~kno\Vh:dgcd, RUSSELL v. [ (DOELL, alllJrUXlarl'ied malt, de¡,lill~ "1(11 h;~ '.,e,k and separate pH'perry, the "Grant-or," does hereby !'.l'iJnl, bargain self and C"'IVI':y unIt; OAAS J..A~EY, LLC, an Iduho limited liability comp'ln)'. whose current addrðS$ is 519 W F'o'lt Street. Boi<e. ill 83702. Ihe "Grantee," the fúllilwing desc.ribed premi~~s, in Ad.t ColInl,-, Idaho, TO wn, Beginni"g at the Northwe" com", of tho NorthwM' Quart,,!" of the Nolthwes! Quan~r of Se,~r"),, 29, Towns"j!, 3 North, Rø)\ge fEast, I'IOi9'" Meridian, Ada County, Idaho which palm will b. known a. lli~ REAL rOINT OF BEGINNING; !honce Soulh 89"49' ElIOt 61().22 fe~t a((lnE the Northern boundary of ><lid Northwest Quarter of ¡lIe NOIthwesr Quarter of said Section 19 to a point; thence due South 532.6] fc()t ülong a [in" paraflel to the We.!ody boundary of said Northwest QMncr of !h~ Northwest Qtll¡rt('f of s",id Section 29 to it point; thence North &9°49' We5t 620 22 feer along II line pataUe! tn tho said Northern bound..,y to a point on said Western boundary; thence. Northerly 5J2.6( fçç¡ aloog said WeSten¡ bouodary III t'he REAL POINT OF BEGfNNING EXCEPT the following parceL Beginning at the No...hweat comer oflhe Northwest Qtlarkr of the Northwest Qnarter of Section 29, Township 3 NOI1h, Range 1 East, Bo;se Meridian, Ada Co"my, Idaho; thence South 119"49' Ea!! 390.22 feet along the Northern bouodðry of s.jd NorthwesT Qualter onlle Northwest Quarter of .aid Section 2.9 10 a poiut, which pOint will bel<.nown iIS the R(\i\L !'amT OF BEGfNNlNG; thence South 89°49' East 111& feet along tJ)c] Nor!hern boundary of said Northwest Quart...r onhe Northwest Quarter of said SectÎoo 29 to a f¡oint; thence due South 167 feet aJong a line parallel to the We.rerly l>o,whry of said Northwest Quaner ofthc :-':orthwest Qnal1e, of said Section 29 to a point; thence North 89°49' We5t 186 tì:et along a Ime paraJlellO the said Nonhem boundary to a point; thence Northerly 167 feet along Jlline parallel to the WöSterly boundary of said Northwest Quarte! offhe Northwest Quarter of said Section 29 to said N0I1hcm boundary of said Northwe~' Quarter of the Northwest Quarter of said Section 29 to [he REAL POINT or' VICTOR Y RESIDENCE PROPERTY BEGINNING. 'r.. -""""-:1 ,) 11 i ie:,' , ','i';:;) ',.',,>.'...', "I" 'c.:, . c r .':" n Casa Meridiana Exhibit B Page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 (:,<;r"i:C,~~:¡~:;~:_,r,,:i:~~:,.';(.; i~\'.r ';;',1,',; ,;;,~,',:;,:-~';,ì,','~\~,¡~j;:"!::¡"~J~;~::jlj",.',:;;;',;¡:;:':,;,,::;:¡:,;,iJ '1J;mle"',t""th:-L'IJ""""":'I';hk'-';""I-,¡",'t,'"Údp'em;,-~""j";¡[¡"\ar.tl"'fI--,,,'il r~"' ;rnbl~~,e," F_\CFI"J jfJl:""'- c-¡jc;¡J<"bran,'c,; ~;(" kif¡h "";'f~~,Ú~ iI ,,\ at;~~ h;-~¡-he~~1.-":"-.d ~hJt', ~ tall II,rl,:',:L t'J whIch till,' '-l>It""',I'<Hh':,C n ""p"'\<I..\ I'""d,- '",Ii,' ðCl :'",d th.-"", made- ~"'-l;'r"d or .Ic"wc ) th, ('''In'"'', tlJ ,1 ""I,I),,:-,t I.-, "II ~.\";IJI'" f'ltI,--", r<",'TI'3Ii',)n>. "'\(lllCni', rlgh¡(~) of "',II', IJrotceu\'" rOVÇW'IU<, zCI"mg urJinauw", and iI J¡'hç'lIbk b"¡I,jin,,, cod~,;, 1a1\'51!tld re¡:ul;;¡i'}l'r., general u~~s "", """',"m~-llts, mduJi"g ¡"'¡1Mb... 'HId utiht} ,,,is,,,,,,,,,,,, (if ¡my) (;" 'íh" curr',:l11 }~al, "IH~,' """ rkt d<l~ and f"'y"hk ;m.- ¡h,,! 1¡,..;"lm' w-ill """Hili "lid defulld th" "11111", f"'lll ail lawful dalm> "habn~'Cf- J (J~[e~~ \\;}If'(;>o<;. . R!T..~~/ State ofJdaho County of Ada Or! this~-i~f FebJ'118ry, 2005. before me, tile Imdel'siglled. a Nolary Public, pt:rsollaU,Y appeared Rus~ell [,lildt\lI. known to me or pr<.>vcn 10 mc 011 lire ¡a.>i.~ of satisfactory evidence to be the p~rso" who.~ I ~ I~ lIb"cI'iÞ~d to Ih" ",¡¡hi,., iIlS"Ulllc"t and 'I<;know edged to m", Ihar he eX(>Clltedjge ' mc- _-1-6" ,,{,'" ;;~~N'K~;~~~ Notary Public ,l:;%::~"";'.. ~ Residing at: 4~ Ii"" ~ {~O~.':'~ \ i My commission ~xp;r"¡¡: rD/S/ip ,J -I< \ \:~ i :~:.. "I'u,&" ~ 'c, <f'!" "......' ~""1 ,..".,:,,~ T" O\' ,.,¿." -, !""J-""'" -,', :",.. '-' I ,\ -;C"";!, ë;';c'C :C";;,""':~,:'fJ'_'é- ,~'" ;:," <T,,:"<,"¡ Casa Meridiana Exhibit B Page 4 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 C. Conditions of Approval 1. Planning Department SITE SPECIFIC REQUIREMENTS- (Casa Meridiana) 1.1.1 1.1.2 1.1.3 1.104 1.1.5 1.1.6 1.1.7 1.1.8 The site plan labeled as AS.l prepared by Insight Architects, dated revised March 6, 2006, shall be redesigned (if required) as detailed by the conditions listed herein and the conunents received at the March 16, 2006 hearing. The applicant shall complete conditions of approval 1.1.3 and 1.104 and submit the required copies to the Planning Department a minimum of 10 days prior to the scheduled City Council hearing. The landscape plan prepared by Insight Architects, labeled Sheet L-I, is not approved with these applications. A landscape plan consistent with UDC 1I-3B shall be submitted with the amended site plan which reflects any redesign required of the subdivision consistent with the hearing date of March 16, 2006. The following should be included in a revised landscape plan: . The applicant shall certify that one tree per 8,000 square feet of lawn has been provided, exclusive of Rights of Way. The applicant shall certify on the landscape plan that a minimum of 5% square footage of the site is provided as open space, exclusive of required landscape buffers. All interior private street landscape trees shall be Class IT trees, consistent with parkway standards. A written certificate of completion shall be prepared by the landscape architect, designer, or qualified nurseryman responsible for the landscape plan and submitted prior to City Council signature of the Final Plat. All standards of installation shall apply as listed in UDC 1I-3B-I4. . . . The site design shall be amended to meet the following multiuse residential standards: The applicant shall provide a 20x20 parking pad for all units. UDC 1I-3C-6 The fencing plan shall show all conunon space separated from Victory Road and Locust Grove Road by a minimum of a four foot barrier. UDC II-4.3.27-Co4 All units, including overhangs shall be shown outside of required landscape buffers. Units may encroach into setbacks as allowed by UDC 1I-2A-3D The applicant shall contact ACHD to detennine that the private roads are not deemed a competing road system. The applicant shall certify on ACHD letterhead that this finding can be met prior to the City Council hearing. The applicant shall detail the groundwater monitoring in this area. As high groundwater may affect the required drainage and construction standards of the City of Meridian. A detailed fencing plan shall be submitted consistent with the site plan dated January 18, 2006 for clearer detrition of fencing along the perimeter of the subdivision. The applicant is not proposing a fence along Locust Grove and Victory Roads, however all conunon open space may require fencing to provide a barrier as required by UDC 11-4.3.27-Co4. Prior to issuance of any certificate of occupancy the perimeter landscaping and fencing shall be installed or a surety agreement shall be in place. Construction or bonding for the multi-use pathway shall also be completed prior to issuance of any certificate of occupancy for Casa Meridiana. . . . CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 1.1.9 Maintenance of all common areas shall be the responsibility of the Casa Meridiana BusinesslHome Owners Association(s). 1.1.10 The applicant shall comply with the outdoor lighting standards shown in UDC 11-3A-11 for all common areas and street lighting. 1.1.11 1.1.12 Comply with UDC ll-3A-12 regarding a screen for the refuse/service area. No ilTigation pump station or facility is shown on the Site Plan. However, if one is proposed for the site, it must be located outside of any required street buffer. Impervious surfaces are prohibited in said buffers. Provide cross access/cross parking agreement(s) for all lots in Casa Meridiana Subdivision. All cross access drive aisles shall only approach the ACHD approved points of access to the public street system. Maintenance of the aisle and parking areas shall be provided for in a note on the face ofthe [mal plat, AND/OR in a document such as CCR's. Other than the points of access approved by ACHD, direct lot access to public roads are prohibited. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Pennitting that may be required by the Environmental Protection Agency. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 1.1.13 1.1.14 1.1.15 1.1.16 1.1.17 GENERAL REQUIREMENTS-PRELIMINARY PLAT 1.1.18 Sidewalks shall be installed within the subdivision and on the perimeter of the subdivision pursuant to City Code. Where the applicant has submitted a preliminary landscape plan and where staff has reviewed such plan, the landscaping shall be consistent with the preliminary plan with modifications as proposed by staff. All areas approved as open space shall be free of wet ponds or other such nuisances. All stonnwater detention facilities incorporated into the approved open space are subject to ODC 11- 3A-18 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated surface materials shall not be used in open space lots, except as pennitted under UDC 11-3A-18. If the stonnwater detention facility cannot be incorporated into the approved open space and still meet the standards of ODC ll-3A-18, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of final construction. 1.1.21 The applicant shall submit a detailed fencing plan with the final plat application for the subdivision. If pennanent fencing is not provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building pennit. All fencing should be installed in accordance with City Code. 1.1.22 Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be mitigated. 1.1.19 1.1.20 2.6 2.7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 1.1.23 All ilTigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled, unless otherwise approved by the lITigation District(s). Plans will need to be approved by the appropriate ilTigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. IfIateral users association approval can not be obtained, alternate plans will be reviewed and approved by the City Engineer prior to final plat signature. 1.1.24 Staffs failure to cite specific ordinance provisions or terms of the approved annexation/conditional use does not relieve the applicant of responsibility for compliance. 1.1.25 Conditional Use approval shall be subj ect to the expiration provisions set forth in UDC 11-5. 2. Public Works Department 2.1 Sanitary sewer service to tills development is being proposed via extension mains in Victory Road. The applicant shall install all mains necessary to provide service; applicant shall coordinate main size and routing with the Public Works Department, and execute standard fonns of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in confonnance of City of Meridian Public Works Departments Standard Specifications. Water service to tills site is being proposed via extension of mains in S. Locust Grove road and Victory Road. The applicant shall be responsible to install water mains to and through tills development, coordinate main size and routing with Public Works. A second water connection in S. Locust Grove Road may be required to achîeve adequate fire flows, decision will be made at the time of construction plan review. No sewer manholes or water valves shall be allowed in the landscape islands in the cul-de-sacs. If water or sewer mains are to be routed under the landscape islands then no tress shall be allowed in the islands. The applicant shall be responsible for confonnance with any and all regulations of the u.S. Anny Corps of Engineers regarding developing in or near classified wetlands. The applicant shall submit all approval letters to the Public Works Department for review. ill discussions with the applicant's engineer they have indicated that they may employ ACHD's road side swale design to dispose of stann drainage. If this is the case the applicant's engineer shall be responsible for inspection of the facility, and shall be required to submit a stamped signed document stating that the swale was installed per design prior to certificate of occupancy for each building. Due to relatively high existing groundwater levels, applicant shall submit a Master Grading and Drainage plan as part of the development plans to be submitted with each phase of this development. The Master Grading and Drainage plan shall include at a minimum the following: a. Groundwater contours for this development at peak seasonal high depth. b. Finish floor elevation for all houses in this development. c. Elevation of crawl space for all houses in this development. d. Finish grade elevation at each lot comer. e. Drainage flow patterns on all lots. If structural fill is to be placed on any lot, material specifications and compaction requirements 2.2 2.3 2.4 2.5 2.13 2.14 2.15 2.16 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 031I6/06 2.8 2.9 shall be detailed and submitted to Public Works and the Building Department. If slab-on~grade construction is utilized in coIliunction with typical footings, builders of each lot shall comply with all requirements contained in the futemational Building Code regarding slab- on-grade construction. The builder of each lot shall provide fill material gradation certification and a minimum of one compaction testing report per 500 square feet of fIrst floor area (including garage) and provide such reports to the Meridian Building Department prior to commencement of any framing. The Master Grading and Drainage Plan must be approved by the Public Works Department prior to overall plan approval. Builders must provide finish floor and crawl space elevation certification for each house prior to issuance of certificate of occupancy. Send updated groundwater report conCUITent with construction plan submittal. The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easements shall be recorded as a separate document using the City of Meridian's standard forms. Submit an executed easement (supplied by Public Works), a legal description, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. 2.10 Prior to building pennits the applicant shall submit a recorded document to the Public Works Department, that details ownership and maintenance of the private streets. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. The reason for this is to attempt to ensure that the bottom elevation of the crawl spaces of homes is at least l~foot above that groundwater elevation. The applicant has indicated the pressure inigation system in this proposed development is to be an extension of the system in the Tuscany Development to the south. It shall be the responsibility of the developer to acquire the necessary easements to extend the system to this development. A letter of plan approval form Nampa and Meridian Irrigation District shall be submitted prior to scheduling of a pre-construction meeting. 2.11 2.12 The City of Meridian requires that pressurized inigation systems be supplied by a year-round source of water (UDC 11-3A-6). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single~point cO1Ulection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to signature on the fmal plat by the City Engineer. Any existing domestic wells and/or septic systems within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non- domestic purposes such as landscape irrigation. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to issuance of building permits. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm water 2.21 2.22 2.23 2.24 2.25 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 2.17 treatment and disposal shall be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, and road base approved prior to applying for building permits. All development improvements, including but not limited to sewer, fencing, micro.paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. Developer shall coordinate mailbox locations with the Meridian Post Office. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. One hundred watt, high-pressure sodium streetlights shall be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior to conunencing installations. 2.18 2.19 2.20 3. Meridian Fire Department 3.1 3.2 3.3 Acceptance of the water supply for fire protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testing. One and two family dwellings will require a fire-flow of 1,000 gallons per minute available for duration of2 hours to service the entire project. Fire hydrants shall be placed an average of 500 feet apart. International Fire Code Appendix C. Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works spec. d. Locations with fITe hydrants shall have the curb painted red 10' to each side of the hydrant location. e. Fire Hydrants shall be placed on comers when spacing permits. f. Fire hydrants shall not have any vertical obstructions to outlets within 10'. CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 g. Fire hydrants shall be place 18" above finish grade. h. Fire hydrants shall be provided to meet the requirements ofthe!FC Section 509.5. 1. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet of the project. 3.4 All cornman driveways shall be straight or have a turning radius of 28' inside and 48' outside and shall have a clear driving surface which is 20' wide. 3.5 For all Fire Lanes, provide signage "No Parking Fire Lane" 3.6 Operational fITe hydrants, temporary- or pennanent street signs and access roads with an all weather surface are required before combustible construction is brought on site. 3.7 The proposed 32-unit subdivision with an estimated 2.9 residents per household would have a total estimated population of 100 residents at build out. 3.8 Maintain a separation of 5' from the building to the dumpster enclosure. 3.9 Provide a Knox box entry system for the complex prior to occupancy. 3.10 The Fire Dept. has concerns about the ability to address the project and have the addresses visible from the street which the project is addressed off of Please contact Vicki Heugly at 898-5500 to address this concern prior to the public hearing. 3.11 All aspects of the building systems (including exiting systems), processes & storage practices shall be required to comply with the International Fire Code. 3.12 All portions of the buildings located on this project must be within 150' of a paved surface as measured around the perimeter of the building. 3.13 Provide exterior egress lighting as required by the International Building & Fire Codes. 3.14 Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fITe hydrants and mains shall be provided where required by the code official. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). a. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). b. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). 3.15 This proj ect will be required to provide a 20' wide swing or rolling emergency access gate. The gate shall be equipped with a Knox box Padlock which has to be ordered thru the Meridian Fire Department. 3.16 Emergency response routes and fITe lanes shall not be allowed to have speed bumps. 3.17 Pool chemicals shall be stored in compliance with the International Fire Code. CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/]6/06 4. 4.1 Police Department The Prior to release of building pennits, the applicant shall submit a parking plan for all off-street parking in the multi-family development to the Planning and Zoning Department. All parking spaces shall be assigned to a specific dwelling unit or for guest use. The parking space identification shall use a different numbering system than the dwelling units The proposed multi-family development shall limit landscaping shrubs and bushes to species that do not exceed three feet in height. 4.2 4.3 Any interior fencing shall allow visibility from the street or shall not exceed four feet in height if solid fencing is used. Parks Department Standard for Mitigation of trees: The standard established in the City of Meridian Landscape Ordinance ll-3B will be followed. 5. 5.1 5.2 Standard Plan for Protection of Existing Trees during Construction: The standard established in the City of Meridian Landscape Ordinance Sanitary Service Company Please contact Bill Gregory at SSC (888-3999) for detailed review of your proposal and submit stamped (approved) plans with your certificate of zoning compliance application. 6. 6.1 7. ACHD -NOT REVISED based on the March 6, 2006 revised site plan. When received ACHD amended conditions of approval shall also be considered conditions of approval for this report. Site Specific Conditions of Approval 7.1 7.2 7.3 7.4 7.5 Dedicate 3S-feet of right-of-way from the centerline of Victory Road abutting the parcel by means of recordation of a final subdivision plat or execution of a walTanty deed prior to issuance of a building pennit (or other required pennits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Victory Road is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties. Dedicate 3S-feet of right-of-way from the centerline of Locust Grove Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building pennit (or other required pennits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Locust Grove Road is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties Construct Victory Road as one half of a 46.foot street section with vertical curb, gutter and a 5- foot detached (or 7-foot attached) concrete sidewalk. Construct Locust Grove Road as one half of a 46-foot street section with vertical curb, gutter and a S-foot detached (or 7.foot attached) concrete sidewalk. Construct a 26-foot wide private road that intersects Victory Road approximately 92-feet west of the east property line, as proposed. Pave the private roadway a minimum of 20 to 24.feet wide 7.13 7.14 7.15 7.16 7.17 7.18 7.19 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 and at least 30-feet into the site beyond the edge of pavement of Victory Road and install 15-foot curb radii abutting the existing roadway edge. 7.6 Construct a 26-foot wide private road that intersects Locust Grove Road approximately 90.feet north of the south property line, as proposed. Pave the private roadway a minimum of 20 to 24. feet wide and at least 30-feet into the site beyond the edge of pavement of Locust Grove Road and install15-foot curb radii abutting the existing roadway edge. 7.7 Provide a minimum of 50. feet of storage from the edge of pavement of Victory Road and Locust Grove to the proposed gate. 7.8 Comply with all Standard Conditions of Approval. Standard Conditions of Approval 7.9 Any existing irrigation facilities shall be relocated outside ofthe right-of-way. 7.10 Private sewer or water systems are prohibited ftom being located within any ACHD roadway or right-of-way. 7.11 All utility relocation costs associated with improving street ftontages abutting the site shall be borne by the developer. 7.12 Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction oftbe proposed development. Contact Construction Services at 387-6280 (with file number) for details. Comply with the District's Tree Planter Width Interim Policy. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. The applicant shall submit revised plans for staff approval, prior to issuance of building pennit (or other required pennits), which incorporates any required design changes. Construction, use and property development shall be in confonnance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Impact Fee Ordinance. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 7.20 No change in the tenus and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confinuation of any change ITom the Ada County Highway District. 7.21 Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Exhibit D. Required Findings from Zoning Ordinance UDC Ilw5B-3E. AnnexationlRezone Findings: The commission and council shall review the particular facts and circumstances of each proposed zoning amendment in terms of the following standards and shall find adequate evidence answering the following questions about the proposed zoning amendment: A. The map amendment complies with the applicable provisions of the comprehensive plan; The applicant is proposing to zone the subject property to R-15. Staff finds that the proposed zoning map amendment complies with the applicable provisions of the comprehensive plan. In Chapter VII of the Comprehensive Plan, 'medium density' is derIDed as areas including single-family homes at densities of three to eight dwelling units per acre. Staff finds that the requested residential zoning designation, R-15, is harmonious with and in accordance with the 2002 Comprehensive Plan and Future Land Use Map, which designates the SE comer of Locust Grove and Victory Roads to be "Medium Density Residential". The density proposed with the multifamily development is consistent with previous Commission and Council actions and generally conforms to the goals, objectives, and action items contained in the Comprehensive Plan for single family residential developments in a medium density residential neighborhood. The proposed density also is consistent with surrounding developments. Staff finds that the proposed zoning is in general conformance with the comprehensive plan (please see Section 7 of the Staff Report for detailed analysis of specific comprehensive plan action items that apply to this development). B. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; Concurrent with the annexation and zoning application, the applicant has submitted a preliminary that proposes single family residential products on a single lot for the subject site (CUP-05-060) which qualifies as a multifamily development. Staff does not anticipate that the applicant plans to rezone the subject property in the future if the accompanying CUP application is approved. Staff finds that the various proposed residential uses would be allowed (pennitted) within the requested R.15 zone with conditional approval and subject to the specific use multifamily standards. The site is being proposed as one product of medium density residential and upon build out staff would not anticipate changes of usage for this site. C. The map amendment shall not be materially detrimental to the public health, safety, and welfare; The applicant has submitted elevations for the proposed residential units and has agreed to use the design guidelines for multifamily projects when designing building facades. The submitted designs are consistent with the design criteria listed in the specific use standards for multifamily developments. Staff finds that the proposed R w 15 zone with the proposed residential uses, if designed, constructed and operated in accordance with adopted city ordinances, should be harmonious and appropriate in appearance with the intended character of the vicinity. The site is intended for residential uses which, based on the Comprehensive Plan description, includes multifamily/condominium developments. CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 Staff finds that the proposed development will change the existing character of the area; which is largely urbanizing. ACHD has commented that thi~ proj ect may impede future surrounding developments to the south and east of the site and the internal private street system may not be in the best interests of the City of Meridian. Staff finds that the applicant should consider redesigning the project to accommodate better interconnectivity (allowing the adjacent parcels to have public road access to Locust Grove and Victory Roads) of the four parcels lying in the south east comer of Locust Grove and Victory Roads. The Commission and Council should rely on public testimony (oral and written) to detennine whether or not the proposed use will be disturbing or hazardous to the existing or future neighboring uses. Staff does not anticipate that the proposed uses will be disturbing to future or existing neighbors as the presented design will severely limit the interconnectivity to the east and south. Further, staff does not anticipate that the proposed uses will be hazardous as long as the applicant complies with the conditions of revision contained in Exhibit C and all City Code provisions. D. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the City including, but not limited to, school districts; and, The applicant will be responsible for the extension of all utilities necessary to serve this proposed development. The applicant will be responsible for the extension of utilities to and through this proposed development. Sizing and routing shall be coordinated with the Public Works Department. Other urban services, such as water, are near to this site and the applicant should be able to extend such services to the site. Staff finds that the subject site is proposed for development in a fashion similar to other properties in the area. The applicant and/or future property owners will be required to pay park and highway impact fees. On February 10, 2005, a joint agency/department comments meeting was held with representatives of key service providers to this property. Based on the joint agency/department meeting and other comments received from agencies/departments, staff finds that except for sanitary sewer, the public services listed above can be made available to accommodate the proposed development. The Commission and Council should reference any written and/or verbal testimony submitted by any public service provider, regarding their ability to adequately service this project. If approved, the developer will be financing the extension of sewer, water, local street infrastructure, utilities and irrigation services to serve the project. The primary public costs to serve the future residents will be fire, police and school facilities and services. Staff [lids there will not be excessive additional requirements at public cost and that the proposed zoning and subsequent development will not be detrimental to the community's economic welfare. E. The annexation is in the best of interest of the City (UDC 11-SB-3E). Staff finds that the annexation and zoninQ: of this property to R -15 with the Proposed multifamily desÜm. subject to the conditions of approval. would be in the best interest of the City. Conditional Use Findings UDC 1l-SB-6E CITY OF MERIDiAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/[6/06 The Commission and Council shall review the particular facts and circumstances of each proposed conditional use in tenus of the following, and may approve a conditional use Mnnit if they shall find evidence presented at the hearing(s) is adequate to establish: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. Staff finds that the site is 6.9 acres and is large enough to accommodate all required parking, landscaping, loading and other standard regulations required by the UDC. 2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this Title. Staff finds that the proposed residential uses meets the objectives of the Comprehensive Plan as listed in Section 7 of this report. Some of the standards of the ODC are not culTently being shown by the applicant's site plan and building elevations. Specifically, the site plan needs to reflect intercormectivity desired by ACHD and the City of Meridian. If the applicant makes these changes, this finding will be met. 3. That the design, construction, operation and maintenance will he compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. Staff finds that the proposed residential uses complies with the uses pennitted in the R-15 zone and those uses are consistent with the single family development of the general area. The building height, parking layout, landscape buffer widths and other dimensional standards shown in the application generally comply with the UDC. The applicant will be required to construct the proposed landscape buffers on Locust Grove and Victory Roads. 4. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity. Staff fmds that the proposed development will not adversely affect other property in the vicinity ifthe applicant complies with all CUP/ AZ conditions and constructs all improvements and operates the use in accordance with the UDC standards. Traffic volumes will significantly increase. However, ACHD has yet to review the amended application and staff anticipates special conditions to be placed on the applicant. These standards may include lighting, screening, landscaping and other areas intended to mitigate potentially hannful effects. 5. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools, parks, police and fire protection, drainage structures, refuse disposal, water, and sewer. Staff finds that sanitary sewer, domestic water and irrigation are available to the subj ect property. All other agencies have made comment that services are available to the proposed use. CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 03/16/06 6, That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of t4e community. Staff finds that the applicant will pay to extend the sanitary sewer and water mains into the site. No additional capital facility costs are expected from the City. The applicant and/or future property owners will be required to pay highway impact fees. 7. That the proposed use will not involve activities or processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. Staff finds that the proposed development will not involve uses that will create nuisances that would be detrimental to the general welfare ofthe surrounding area. Staff recognizes the fact that traffic and noise will increase with the approval of this subdivision; however, staff does not believe that the amount generated will be detrimental to the general welfare of the public. 8. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. The applicant will be required to comply with all state and local ordinances regarding conveyance of water and maintaining historic points of access. The Ada County Historic Preservation Council's Site Inventory does not show any structures or places listed for the subject property. We are unaware of any other scenic or historic features. Private Street - UDC 11-3F-5 A. The Design of the private street meets the requirements of this Article; The applicant will have to certify that the Ada County Street Naming Committee has accepted the private street names. The design of the streets meets the standards as set forth in UDC 11- 3F-4, no gates are allowed. Roadway and stonn drainage shall be contained on site. The street width shall be a minimum of 24 feet of paved surface for all private streets other than alleys. The current request continues for a gated site which is not consistent with these standards, however the applicants revised drawing of March 6, 2006 does not show gates on the site plan as required. B. Granting approval of the private street would not cause damage hazard, or nuisance, or other detriment to persons property, or uses in the vicinity; and Staff does not anticipate any hazard, nuisance or other detriment from the private streets if they are installed and maintained as designed. C. The use and location of the private street shall not conflict with the comprehensive plan and/or the regional transportation plan. ACHD has made comment on the proposed interconnectivity. The applicant shall contact ACHD to make the Eroding that this is not a competing road system to the public roads. Meridian Planning & Zoning March 2, 2006 Page 15 of 90 property line. And another addition is that all perimeter fencing along the school property line will be open vision. Did I capture everything? Newton-Huckabay: Did you want to make the June 6 -- Borup: Yeah. Mr. Chairman. That was what 1-- was on that point 13. Was your motion to delete the whole -- that whole -- whole section? Zaremba: That's the way 1 noted it, but if that's not correct, what should it be? 1.2.13 you're talking about? Borup: Mr. Wilson, you say you're acceptable with the applicant's wording of that? Wilson: We were, with the one change that they had noted January 1 st, 2007, and -- Borup: Change it to June 1 st. Wilson: June 1 st, 2006. Zaremba: Okay. And, then, I'd change my motion that 1.2.13 accepts the applicant's wording. Okay. That means the date is January 6th -- or I mean the date is July 2006. Borup: June 1 st. Zaremba: June 1 st. What did I say? June 1 st, 2006. Okay. End of motion. Borup: Second. Rohm: It's been moved and seconded that we forward onto City Council recommending approval of AZ 05-058 and PP 05-060. All those in favor say aye. Opposed same sign? Motion carries. Thank you very much. MOTION CARRIED: ALL AYES. Item 6: Continued Public Hearing from February 16, 2006: AZ 05-067 Request for Annexation and Zoning of 6.9 acres from Ada County RUT to R-15 Medium-High Density Residential zone for Casa Meridiana by Insight Architects - 1777 Victory Road: Item 7: Continued Public Hearing from February 16, 2006: CUP 05-060 Request for a Conditional Use Permit for a 32-unit multi-family development in a proposed R-15 Medium-High Density Residential District for Casa Meridiana by Insight Architects - 1777 Victory Road: Meridian Planning & Zoning March 2, 2006 Page 16 of 90 Rohm: At this time I'd like to open the continued Public Hearing from February 16, 2006, for AZ 05-067 and CUP 05-060. Both of these items relating to Casa Meridiana or something like that. In any case -- and start with the staff report. Guenther: Thank you, Mr. Chairman, Members of the Commission. This is Casa Meridiana Subdivision -- it is not a subdivision. Casa Meridiana multi-family request. It's, actually, being requested as a 6.9 acre annexation. It is in the southeast corner of Victory and Locust Grove. We lost a piece of our presentation tonight. North road Victory. South -- north-south road is Locust Grove. This has a 32 unit single family residential attached product that would be with this. This is relative of a condominium plat, which we would see in the future. The second -- or the third request would be that these are private streets; they are designed as a 26-foot wide road section. As your staff report details, staff is in support of the multi-family type of units and the elevations detailed with this as shown. However, ACHD and staff do agree there is a lack of interconnectivity with this type of development, mainly because when the Locust Grove Overpass goes in, Locust Grove will most likely be operating at an arterial/evel of traffic, especially with the number of units that have yet to be developed in that north -- in that north-south corridor. It's currently listed as a collector road and staff does anticipate that that level of traffic to increase significantly and, therefore, the access point to Locust Grove is recommended to be eliminated and a stub street to the south be provided in a location to be determined by ACHD. ACHD staff report does recommend that the applicant provide an east-west connection, but if you look at the overall -- let me go back to the presentation. There are only four parcels in this location and what staff would anticipate would be that the parcel to the south would provide an east-west connection and, then, there would only be one other future connection to Victory Road in a north-south location. There is, as you can see, several water features proposed on this -- actually, you probably can't see. It's pretty small. There is a pond located in the northwest corner. A type of a stream. There are some existing wetland features. They are not designated wetlands and are not going to be required for mitigation on this site, but with those types of features you can anticipate high ground water. We do have -- this is another area that we have high ground water issues and staff is recommending that the Commission take those into consideration. Let me try and get back to where I'm going. I guess it does not go as far south as I had hoped. Just immediately south of Tuscany Lakes Subdivision is the Bellingham Park Subdivision that had significant issues with ground water as well and the Commission did institute some restrictions on building type due to the -- the lack of desirability of any type of ground water to be occurring in crawl spaces for future development. So, that would be a consideration that we would like the Public Works to make sure that the drainage of these types of roadways would be adequate. Provided the applicant is currently showing attached sidewalks on this site. This is proposed to change to a type of detached sidewalk with a drainage swale, obviously, to further help address the high ground water issues in this area. The applicant does have a very amenity laden product where there is a pool and clubhouse in the southwest corner. There would be parking provided for the pool and clubhouse. There is a pathway and many water features as amenities to this site. A walking path would connect to the east and are shown to be connecting to the south, but the north-south connection would be proposed as a public Meridian Planning & Zoning March 2, 2006 Page 17 of 90 street. Now, with the staff report the recommendation is for a redesign, but the staff is asking this Commission in order to give better guidance as how you would like to proceed. ACHD has made some special notices to the City of Meridian. Now, I will tell you that the ACHD staff members have pretty much -- two of them, their major staff members, have been -- have left ACHD and any type of recommendation and -- if you do table this, we will want ACHD to look at it and it may slow this project down significantly due to their lack of staff at ACHD to review these types of projects. The applicant does -- is showing gates on these sites. Gates are not allowed on private streets, which is a major concern, but is not -- it's not an option at this time. The applicant has indicated that they would be proposing or possibly be coming forward in front of this Commission with another request for a UDC text amendment. Staff is not going to comment on that, because we do not have anything at this time to comment on. That is up to the applicant to determine at a latter date. At this time staff has presented Findings for a -- consistent with denial, but we are recommending that this project be redesigned and reevaluated as to its -- being in the best interest of the City of Meridian for the overall site design. And with that I will stand for questions, but most likely your questions are for the applicant. Rohm: Thank you very much. Any questions of staff? Would the applicant like to come forward, please? Phillips: Mr. Chairman, Commissioners, I'm Russ Phillips with Insight Architects, 2238 Broadway Avenue, Boise, Idaho. We have got an exciting project here and we also have a short PowerPoint presentation that we'd like to refer to at this point. It should be under Casa Meridiana. And, please, don't get hung up on that name. It's -- we found it a little difficult to run out smoothly, so right now we'd like to keep it filed under that name, but we are reevaluating the name of the project. To start out with, while this comes up, the -- you know, I moved to the Treasure Valley when I was 22 and Meridian was a little blip on the radar screen and, obviously, it's grown a lot. We have all seen what's happened and part of what the community has been very good at picking up is that there is a chance of identity loss and through the Comprehensive Plan and many other -- many other positive things; I think Meridian is taking care of a lot of these issues and establishing its identity. One of the main things that we want to present tonight is a community -- a very small community, but a community that will respond to the diversity that is mentioned many times throughout the Comprehensive Plan. Diversity in lifestyles, residential living environment. This is a project that really has been thoughtfully looked out by Oaas Laney. Oaas Laney is a development -- a developer that is local based and has promoted projects that have been beneficial to communities in different ways and we have seen this community as a good example of how to create and bring to Meridian some diversity and in its residential environment. The next slide, please. This site was brought to us a year ago and it's taken a year of thoughtfulness to look at what type of development makes the most sense here. It's a site that can stand alone, we believe, with -- mainly because it's 6.9 acres. It has access on two collectors and it can stand alone in this type of configuration. The market originally was looked at to -- when we talk about diversity, is a -- was a market of say empty nesters, couples that have reached the point where they would like to -- the kids are out of the house, Meridian Planning & Zoning March 2, 2006 Page 18 of 90 their homes have appreciated beyond their imagination, so that they could, then, move into a very high quality environment to live in and, then, in -- it would be secure in that it's a small environment and also the gates we viewed as really key in providing security, so that when the residents are gone on a trip that they maintain a sense of security over their homes, not only with neighbors, but also with traffic flow. As we went through many focus groups, we found that also dual income young professionals also are looking for this type of housing alternative, where, essentially, the homeowners association takes care of -- of the outdoor areas and, yet, you still have a home that's roughly 22, 23 hundred square feet. The amenities that Joe mentioned include -- we are working with -- due to the high ground water, trying to play with the water in some different areas. We have got a plan we have been working with, our civil engineers, and Meridian's public works as far as retaining the water. The ground water is somewhat artificial in that the irrigation is affecting that, so we have been monitoring that and we are trying to get some better analysis here during the next couple months. Other amenities is this is built on a -- kind of a Mediterranean style of homes, which the next slides will show. Hence, the name Casa, it will be a collection of casa homes. Some are detached homes, single family, as in this -- a couple of these. Three of these. Others are attached in pairs and some in threes. We are looking in keeping with a Tuscany or a -- not to be confused with the subdivision, like with a Mediterranean feel. The architecture, as you will see, reflects -- truly reflects this type of housing style with clay tile roofs, stucco, simplistic, but undulations in the building to create shadows in its massing. We are looking at the activity center besides the pool and courts and we are even looking at landscaping as far as types of olive trees that will grow in this climate. So, we are trying to look at this site all the way into the building. Each residential unit will be a condominium. It will be owned outright. We have a standard downstairs plan, which is 1,500 square feet, two bedroom, as planned upstairs, trying to look at custom -- from the customer point custom designs. We have got four different alternatives for upstairs, including a rec room option with baths, master bedroom suite, and a library and den type situation. A third bedroom. So, first time owners will have a variety of really a pallet to look at as far as kind of customizing their own home. We also have interior designs, one which will be traditional, kind of Old World in feel and the other will be a metro feel, to appeal to different age groups or lifestyles. In addition, outdoors, although we have got roughly 40 percent in open kind of common areas, each unit will have a patio which is trellised, you will have an outdoor kitchen with an outdoor fireplace and -- so that's another amenity there. The main concern -- there seems to be two concerns. One is the private streets. We did meet with ACHD in the very beginning and, then, again, during a tech review period and the initial -- the initial concept hasn't changed much and ACHD really was kind of -- they didn't have an issue at that time with private streets. They did bring up connectivity that that's something that Meridian has been looking at. In meeting with Meridian city planners, connectivity was discussed. We discussed vehicular connectivity and pedestrian connectivity. We opted to go with pedestrian connectivity to the south and to the east and not consider the vehicular connectivity. After reviewing the staff report and meeting with staff yesterday, if there truly is a desire on the city's part for vehicular connectivity to the south, then, we certainly would look at a redesign of this area in here. We certainly -- we've spent a year thoughtfully going through the project and we would like to do what we can to work Meridian Planning & Zoning March 2, 2006 Page 19 of 90 with staff to continue through the process and not backtrack and I feel that we could work with ACHD and staff to reach a solution, depending on what the Commission and City Council looked at. Eric Oaas with Oaas Laney is also here tonight and I believe he'd like to say a couple things after we show a quick slide. This is a rendering of what the casa collection would look like from the street side. Next. And, then, we have a series of slides, you can just go through, Joe, that shows the -- kind of the inspiration, the catalyst for the design of this type. Clay tile roofs, stucco, simplistic design, but, again, in this type of climate with lots of sun, the shadows and massing really provide the buildings with their character. We do have a fence on -- which, if you can imagine around the perimeter we have a six foot fence, which will be the same type of materials as the buildings, they will be a concrete block wall with stucco and the detailing and, then, the gates will be cast iron. It's a little hard to see, but this is perhaps the best slide we could find in a hurry that conveys the type of wall we are looking at. The trellised area over the patios and the gazebo would look something like the last slide right here. So, do you have any questions before I have our client say a few words? Rohm: I think not. Let's-- Phillips: Okay. Oaas: Thank you, Russ. Commissioner Rohm and Planning and Zoning Commission. I'm Eric Oaas with Oaas Laney, 519 West Front in Boise. And just a couple quick items. I know you're very busy tonight, but just to give you an idea of the type of projects that we have done here in the valley, we have built a number of class A office buildings over in Nampa near the Idaho Center. We also are -- refurbished an old warehouse building on front street in Boise and it's, actually, the first -- we are very proud to be the first Leed certified commercial building in the state of Idaho. We were just granted our certification by the U.S. Green Building Council here just last week, so we are -- we like to think of ourselves as being sort of on the forefront of not only good development, but progressive thinking. Another development we are working on in downtown Boise is the Ada County Family Justice Center that will be a processing center for victims of sexual abuse and child abuse. So, we are -- we try to focus on projects that we think are not only valuable from a development standpoint, but also valuable to the community. Here in the Meridian area our predecessor company developed the Generations Plaza project. We are also in the process of finishing up the Double 0 site out on the corner of Victory and Locust Grove and we are in the process of demolishing that ugly silo building down on Main Street where Double D used to be located and we plan to put a very nice -- probably a mixed use retail office development on that site. So, beginning of next week we should see that coming down as well. We see the casa project here at Ten Mile Creek as being a continuation of what we really like to do as -- in terms of high quality projects that really are adding more to the community than taking away and we respectfully request you to consider seriously, but also consider what we have done to consider, really, what we are about. And if the Commission decides that there is additional work by way of staff's recommendations with regard to access, we would respectfully request approval with an understanding that we would go back and work these out. We think that the staff has presented some very workable solutions and we Meridian Planning & Zoning March 2, 2006 Page 20 of 90 are quite willing to move forward, but we would prefer, because this has been in process for well over a year, we would prefer to move forward with the project without delay. Thank you very much. Any questions? Rohm: Commissioner Moe. Moe: Based on what you just said, then, I would anticipate that the stub street to the south would be okay for you, if, in fact, we were to require having the stub street to the south, as well as removal of the gates? Basically, just noting what the UDC code and whatnot is. Quite frankly, the UDC is not that old, so, therefore, we are not really -- I'm not amenable, I should say, to changing rules out of the UDC when we just have really adopted it and started working with it now. So, I'm just curious as far as those two items. You say that you will work with staff and those would be items that you could work with. Gaas: Commissioner Moe, I guess I would like to sort of bifurcate those two issues and, one, the stub street to the south we think staff has come up with some reasonable suggestions for how we might be able to address that. We do, however, feel that -- that the gates in this community, although it is a UDC requirement that's recently been adopted, we feel that that's very very important to the look and feel and workings of this development. I guess it's our -- it's our feeling that the UDC ordinance with regard to gates was primarily focused on commercial developments and because -- and because of that, it sort of got spilled over into the residential area as well and in doing so there is a portion of the diversity that Russ Phillips spoke to, a diversity of the -- of the environment and residential community here in Meridian that's being -- that's not being addressed and people who are desirous of living in those communities are either going to Boise or going elsewhere and Meridian, in some respects, is eliminating itself from consideration of people who are interested in that -- in that type of living. We would strongly encourage the Commission to reconsider that and we would be more than willing to -- and, in fact, we plan to submit an application for modification to the ordinance and spell out specifically why we think it's important from a residential standpoint to adopt changes to the code to allow gates in certain circumstances, because -- because of the fact that Meridian is driving that segment of the population away. Rohm: Thank you. Zaremba: Mr. Chairman? Rohm: Commissioner Zaremba. Zaremba: Thank you. I picked up on your comment about the Leeds certified building. Those are not part of our new UDC, so we can't require it, but we certainly encourage it. Are you planning to apply any of those principals to these buildings? Meridian Planning & Zoning March 2, 2006 Page 21 of 90 Oaas: Commissioner Zaremba, we have found that the Leeds concepts, being what we consider to be on the forefront of this activity or this movement, has been very enlightening for us. The project that we just -- that we completed and that's where our offices are, the Front Five building down on Front Street, is the Leed certified building and the first -- by the way, the first one in the state of Idaho, but -- but because we were on the front end of that development, the Leeds -- adopting the Leeds concepts made it more expensive and we think that, you know, that's understandable when you're on the front end, because a lot of the materials that are required for Leeds buildings and sustainable buildings are not readily accessible and available in the area. However, a lot of the concepts of bringing daylighting into buildings and water conservation measures and looking at -- at bringing fresh air into buildings when the CO2 levels rise to the fact that -- or rise to the level where people are becoming more lethargic and the fact of light pollution. You know, if you drove by our building downtown on Front Street at night you would notice that there is very very little light that shines up into the air that's causing, you know, light pollution. The lights that we have shine downward. So, from our perspective it's easy to look at adopting a lot of these same ideas, even though it may not be, quote, a Leeds certified project, we'd like to -- we'd like to bring these ideas into our projects, because we think they make sense. Zaremba: Good. Thank you. Newton-Huckabay: Mr. Chair? Rohm: Commission Newton-Huckabay. Newton-Huckabay: I think that we should probably move on with public testimony and get this hearing going. Rohm: Thank you. Oaas: All right. Thank you. Rohm: Thank you. There is no nobody else signed up to this, but at this point in time we certainly are open to public testimony. Please come forward. Walsh: Thank you. My name is Paul Walsh. My address is 2655 South Simsbury in Boise. I live over in the Muirwood Subdivision, almost Meridian. Wish I was. I'm working with the development group that has the parcel just to the south of this project. Okay. We have a small parcel, 6.53 acres. We ended up getting two stub roads. We got the one to the east requested and, then, also the one -- would be our north boundary, their south boundary, okay? A couple comments that I have as far as, one, the gates in there, I think lends real well to the subdivision and it would also avoid a cut- through that we see in the subdivision I live in in Meridian -- or in Muirwoods. We have that on the corner of Victory and Cloverdale. I have a friend that lives there, he had the police come out, they issued 17 citations in a four hour period for cut-throughs in this same configuration. So, I think the gates would alleviate some of that problem. Okay? Meridian Planning & Zoning March 2, 2006 Page 22 of 90 Then, as far as the stub road coming in, in the event there was a gate there, it doesn't lend to the exclusiveness of the project. Okay. Also, secondly, the linear footage that I have along that north-south boundary there is limited and to add the dimension of an additional road in there just isn't conducive to our project on the other end either. My thought was is -- I understand for emergency access. There is plenty of access. I'm only doing 26 lots. So, it's a small project. And with their 32 lots, the need for an additional or an emergency access is limited and my thought was the pedestrian path that was shown that's connecting the two projects, if emergency access was a concern, if we turn that into an emergency entrance with breakaways, that would limit through traffic, would maintain the exclusiveness of their project, and would reduce our footage and, then, we could kill, basically, two birds with one stone, get the pedestrian cross- through that we are looking for to get over to the regional pathway that we are installing along Ten Mile Creek and I think it would just lend well to both projects where we are working together, basically, so -- Rohm: Thank you. Interesting. I appreciate your comments. At least from an adjacent property perspective, that kind of ties in with what they are saying. So, thank you very much. Any questions? Borup: Just clarification. Mr. Walsh, you support their project just as they have designed it it sounds like. Walsh: Yes. Borup: Other than adding the pathway. Walsh: Correct. I think that would be a good alternative for emergency access if that was a concern. Borup: Okay. Thank you. Rohm: Thank you. Borup: Just maybe one other question, Mr. Chairman. Did you say you had talked to ACHD on a preliminary basis -- Walsh: I have not. We are just starting our drawings. Borup: Okay. So, you are not planning a stub street to your north, then, at this point? Walsh: I think my engineer is drafting one, because staff requested it. As I talk with her -- I didn't make that meeting. As I talk with her I'd like to find an alternative solution to that stub street. Borup: Okay. But you're definitely planning to the east. Meridian Planning & Zoning March 2, 2006 Page 23 of 90 Walsh: Yes. That's been requested. Borup: Yeah. Walsh: I didn't care for that one either, but -- Borup: Well-- Walsh: -- I understand -- I understand the purpose of that one, okay, and then -- so, we are not going to battle with it and we can see -- you know, I want to try and design it to where I don't create a cut-through, because that seems to be the big concern. Borup: And you can do that with road designs easily. Walsh: Right. And so we are working towards that. Borup: Thank you. Moe: One question. Are you anticipating, then, to take -- for a road to go out onto Locust Grove as well -- into your property as well? Walsh: Yes, sir. Moe: Okay. Walsh: For about -- we are that parcel just to the north of the canal, so we have -- I'm not sure the frontage on there. We were going to bring one in off of Locust Grove, meander it though, and, then, take the stub to the east. I got a real limited size there -- I got about a hundred feet of frontage on that east boundary, so we are working through that. I kind of felt that the small parcel owners got left with all the stubs. You know, we had Tuscany was a large parcel, they could absorb some of their footage a little better and the way it went in that the small parcels got left with all the stub roads. So, it really - - with the way things are moving now, it leaves us with limited lots to make the project feasible, but we are working through those. So, I just -- looking for my project along with two stub streets on five acres and 26 lots, it eats you up pretty fast. Moe: Well, I guess I'm not going to speak for staff and whatnot, but I would anticipate that the reason, more or less, for the stub street to the south for this project that we are hearing tonight is the fact that I'm not so sure they'd like to see any access onto Locust Grove off that property to the south, because you're going have, you know, two streets coming out of Locust Grove right in that same area right there. You don't have much frontage along Locust Grove from our site that we are hearing tonight, so I think the intent was that that stub street take care of your development with no access onto Locust Grove. Meridian Planning & Zoning March 2, 2006 Page 24 of 90 Walsh: In their defense, I think that, you know, we are looking six to eight thousand square foot single families. Nice project, similar to Tuscany Village across the street with Craftsman style homes, where their property is so exclusive as to the design, they have put a lot of care into the design of the structures, the values that are going to be there, to have a subdivision that I feel is on a lower -- you know, it's not built to those type of price per square footages, it wouldn't -- if I had that project over there, I wouldn't want another subdivision dumping in on mine and creating all that traffic through there, because it's going to affect the marketing of their project. Moe: I understand that. But the same point now we are dumping off a whole bunch more traffic into Locust Grove in two access points. That's another concern I had. Walsh: Right. Understood. Moe: Thank you. Rohm: Thank you. Is there anybody else that would like to testify to this application? Okay. Seeing none, discussion? Zaremba: Mr. Chairman? Rohm: Commissioner Zaremba. Zaremba: A couple of points that come to mind and almost all of them in support of the staff report. I would confirm Commissioner Moe's instinct that both ACHD's idea and the city's idea would be to have fewer accesses to Locust Grove. I think one of the things we are going to discover, when the Locust Grove overpass is built and, therefore, Locust Grove is connected, the two halves of Locust Grove connected north and south, this is going to become the relief valve of choice for people who need to move north and south in or through Meridian and don't want to be on Eagle Road or Meridian Road. This -- I'm willing to bet that within hours of that bridge being open, that whole corridor, the whole Locust Grove corridor, will exceed its 20 year design capacity. Probably within minutes, maybe hours. Therefore, this is very likely -- Locust Grove is very likely to be a very major thoroughfare. I'm sure it will need to be upgraded from a collector to an arterial at some point. Probably not too far off. And, therefore, I very much support the idea of not having the property we are talking about have an access to Locust Grove, and also the two properties in combination with the gentleman that provided the very good comments, that there should not be two accesses there. I think the access should be done through the stub street, as staff has recommended, and precisely for that reason. And I also would like to comment on the gate situation. I was on the committee that helped write the UDC and gates were discussed at length. I'll have to admit that my personal opinion is that they give a false sense of security. They slow fire and police down more than they slow thieves down, who can get around them anyhow, and I joined in the majority who wrote into the UDC the no gates and we did mean residential subdivisions for that purpose. That being said, I can also understand the applicant's discussion that it's the desire of Meridian to have a variety of housing types Meridian Planning & Zoning March 2, 2006 Page 25 of 90 and we usually interpret that to mean that we need to have more affordable housing. But there are also people on the other end of the scale who, as the applicant points out and other people have pointed out in other hearings, are well to do empty nesters, they want to down size the house and maintenance that they are living, but they don't necessarily want to cheapen how they live, and those people have the opinion that a gate provides them with some security and I don't think it's in the best interest of Meridian to force those people to go live in Eagle. We should make provision for them also. The current ordinance does not allow us to approve a gate. So, there really isn't any question about whether we can approve the gate, we can't. I would suggest to the applicant if they wish to pursue a change to the ordinance, there are a couple of elements that need to be included. The gate needs to be far enough from the major road, either a collector or an arterial, that three or four cars could stack before getting to the gate. There also needs to be a turnaround or an escape, so that somebody that turns in and discovers there is a closed gate, doesn't have to back out onto the arterial to escape. There needs to be a turnaround before the gate. And I would encourage them, if they are going to apply for a change to the ordinance, include those elements. The other issue is a very small one. I have lived in places that had decorative olive trees and they are very pretty for part of the year, but I have not -- I'm not aware of a fruitless olive tree and they make a terrible mess. They are not good for humans to eat without being processed. Birds will eat them, but the fruit drops and stains and I would urge them to reconsider that, unless they have found a fruitless olive tree. Those are my points. Rohm: Thank you, Commissioner Zaremba. Anybody else have some comments on this application? Newton-Huckabay: Mr. Chair? Rohm: Commissioner Newton-Huckabay. Newton-Huckabay: I just have a couple of comments regarding access to Locust Grove. There we go. We have access here. We are looking for access here. We are going to have to have an access for this piece of property here. Probably access over here off of these ones, but I think it's going to be critical that we limit -- limit the access on Locust Grove for the reasons mentioned, but -- and if we don't, we are going to get -- we have all these pieces of property that would like to have access onto Locust Grove -- in my mind, the only one that can reasonably have it would be this parcel here. So, I would be in support of -- one, I'm in support of the stub street to the south property and the only access into the development from the Victory Road property. Victory Road. North. Right there. Other than that, I think it's a nice development. Zaremba: Mr. Chairman, I, actually, have discovered I had a question that I would like to ask of the applicant. Rohm: By all means. Meridian Planning & Zoning March 2, 2006 Page 26 of 90 Zaremba: And have staff listen in as well. Mr. Phillips, if you'd come back up. And that is one of the new provisions of the UDC, which we are all trying to learn this new thing, but I just want to make sure you're aware of it. In multi-family developments there is a requirement to actually have a storage building for maintenance and landscaping materials and equipment and stuff like that and I didn't see that on the drawing, but is that something that knowing that there is a provision that that's required, can you add that someplace? And I would ask that it be made of similar materials to the rest of the -- Phillips: Chairman Rohm and Commissioners, in lieu of having a separate storage building, which, as you saw, was a very small site, what we have done is we have oversized the garages and, hopefully, this will satisfy the requirements -- in our view it did. These garages are approximately 28 feet long. Standard garages are normally 22, maybe 24 feet. So, we have got, essentially, six feet all across the back and we have also increased the width, so that we have an extra two feet on each side, so when car doors open that there will still be two feet on each side, plus six feet all across the back. So, we felt that this should more than accommodate storage. Exterior storage. Inside the -- each of the residences we also have, essentially, a storage room and that's roughly, I believe, maybe seven or eight by ten, but -- does that address your -- Zaremba: I appreciate the first part of your statement as increasing personal storage for the people that would live there. My question was more directed to the second part of your statement that came in at the end about the storage for what would be the association or the maintenance of the common property and the point that was discussed in the group that was writing the UDC was that in subdivisions of multi-family dwellings that don't have a separate storage building, then, maintenance materials end up being left out in a parking stall and, you know, if you have your own lawn mower, that ends up sitting out in the parking stall. So, the requirement is more aimed at equipment and supplies owned by the association or whoever is doing the maintenance. Phillips: All right. I understand. No, we don't have a separate building at this time, but we will definitely take a look at that. Zaremba: Okay. Thank you. Phillips: Thank you. Newton-Huckabay: Mr. Chair? Rohm: Commissioner Newton-Huckabay. Newton-Huckabay: I would request that we take a poll of the Commissioners in where we are heading towards tabling this for redesign; I would prefer not to get into one of our infamous redesign two hour public hearings if we could avoid it this evening. Not to be blunt. Rohm: Well, that -- the point is -- yeah, I don't have any problem with that. Meridian Planning & Zoning March 2, 2006 Page 27 of 90 Zaremba: Mr. Chairman, I would be happy to lead off. I think it's an excellent project. I think it would be a nice addition to Meridian. I do think it needs to have the changes that are mentioned in the staff report and a few other things we have met. But I would consider those tweaking to some extent, but I think being respectful to the applicant's request to move it on, unfortunately, we have been burned by redesigns a few times that didn't get to the City Council looking like what we thought we recommended. So, this Commission is uncomfortable approving something that's going to be changed. At least I personally am and I think I felt that from the others. So, my intention would be to continue this with some specific changes that need to be made and hear it again, but with the attitude that it will be approved at some point. Rohm: Thank you. Borup: Mr. Chairman? Rohm: Commissioner Borup. Borup: Point of clarification. Don't we still need to see a preliminary plat? Guenther: Mr. Borup, with this -- again, I want to point out one major fact, is that ACHD did recommend that this would be public streets. If this was public streets, then, we would have a plat. Borup: Okay. Guenther: We are still -- staff is still recommending that these remain private streets and meet ACHD's conditions. Now, ACHD is going to need to review this with the redesign. However, by the redesign of the staff -- city staff's conditioning, that would still be sent back to ACHD, but we are not going to get a new staff report or new staff comments from ACHD for quite awhile as what we would anticipate. Now, if we brought it in for a plat, it's only going to be for a condo plat. If we require those to be public streets, that's going to require a plat in itself and this design is not going to be conducive to public streets as it's currently shown. Even if you required the connections to be public, we would still need to have some mechanism in order to transfer that property as right of way to ACHD, which this site would not be conducive of. Borup: So, Mr. Phillips, this is strictly a condo, so the ownership is of the building itself, not of any of the property around it? There are not any deeded lots? Is that what you're saying? Phillips: That's correct. Borup: Okay. Well, continuing on with the other comments, I agree with Commissioner Zaremba, I like the diversity; I like to see something different like this. I mean we have had gated communities in the past -- maybe that's another question. Have there been Meridian Planning & Zoning March 2, 2006 Page 28 of 90 serious problems with any of our other gated -- well, actually, I can only think of one, but has there been problems with any other gated communities in Meridian? Zaremba: The two that I know of are at the south end of Bear Creek and about one block from where I live. Borup: Off of Linder? Zaremba: It's off of Talamore, which is the street -- it's not actually on the arterial, which is Black Cat, it's maybe a quarter of a mile in on a collector street, if you're visualizing the area -- Borup: The question was has there been problems? Zaremba: That has not been a problem. It's not on an arterial, but that has been no problem at all. When we discussed Bear Creek -- and I believe their gate was approved -- it was with a requirement that there be enough stacking depth and that there be an escape and I haven't heard anything from the fire or police. Borup: ACHD did address the gates. They said that a minimum of 50 feet. Zaremba: Yeah. Borup: But they didn't mention anything about the escape or turnaround or anything. Zaremba: Then we had one other that was right next to the high school and we recommended a disapproval of the gates and don't know what City Council did with that. Borup: Well, the comment was made that, you know, it's a nice project and -- but it's not going to be the same project if we change it. And I guess I'm not sure which direction I'm going, but, again, you know, if we start adding the stub streets and eliminate the gates, it's not the same project. Newton-Huckabay: I'd like to see a redesign. Rohm: Commissioner Moe. Moe: Pretty much just as I spoke earlier and I'm in agreement with Commissioner Zaremba. Quite frankly, I would like to see a redesign in regards to the stub street, as well as the gating. Phillips: Mr. Chairman and Commissioners, if I may go ahead and speak. You know, again, we would -- we have met with staff yesterday and we believe that we discussed the private street issue and it seemed to us that we have -- we are pretty close on -- we are on the same wave length as far as how to resolve that issue. The gates we are preparing a text amendment, which we will be presenting to City Council and the Mayor Meridian Planning & Zoning March 2, 2006 Page 29 of 90 and we feel like at this point that the feedback we have gotten from the neighborhood meeting, from working with staff and ACHD and other folks, that Wß are really close and what we really prefer, if you would go along with us, is to sit down and just work out, really, a few details and that way we don't need to alter the entire development. Rohm: And I think that echoed throughout the Commission here that we want to see those before we move forward and even though you're close to coming to some sort of an agreement with staff, before we make any recommendation onto City Council, we want to see what you come up with and I don't think that we can -- we don't want to be in a position to redesign your project and, like Commissioner Borup said, if, in fact, we sat here and started talking about your private roads and your gates and things such as that, that that's -- in essence, we would be redesigning your project. So, from our perspective we think that it's best for you to take it back to staff and work with them with the comments that you have heard from the Commission tonight and taking those into consider, come back, and we will continue this to a later hearing and we will act on it at that time and probably, if I had just one question of you, is how long do you think that it will take you to come up with an alternative to the current configuration that will meet staff's expectations and we will just continue this hearing to a date certain that you feel that you can comply with staff's recommendations. Phillips: Well, I believe we are close enough that we could turn that around within -- we could be at your next hearing date, which is, what, two weeks? Rohm: On the 16th that will -- let me ask staff if they concur with -- Borup: Review time. Guenther: If we have the materials ten days prior to the hearing, we can, typically, turn it around. With this type of a development, I -- we have got most of the staff report already written, it would just be a modification, which doesn't take as much time. I feel that if the conditions listed in the staff report were redesigned and we could have the redesign within that ten days time limit, we should be able to do it at the next hearing. If it goes over the ten days, we have got enough hearing items for the 16th that I wouldn't recommend it at all. Zaremba: Mr. Chairman, interpreting what staff just said, they would have to have final drawings by next Monday in order to have ten days before the next hearing. So, my question to both staff and applicant is can you finalize the changes that are being requested and have it in a final form to staff by Monday? Phillips: Yes, we can. But what we would like to do is just meet with staff one more time and -- you know, we look to you as far as if you have any specific, you know, conditions that you would like to be seen, then, we need to be sure to incorporate those. With those, we can meet that time frame. Meridian Planning & Zoning March 2, 2006 Page 30 of 90 Rohm: I think the one thing that Commissioner Zaremba brought up is we, as a Commission, cannot move forward with a gated community, because it's not in agreement with ordinance and so that, in and of itself, would have to be dropped from any proposal that comes back to this board until such time that that ordinance changes. Anyway, that's the way as I see it. Zaremba: Mr. Chairman, my comment on that would be, though, that anticipating that they are determined enough to have gates that they are going to take the step of making an application to change the ordinance, they would need to design the roadway to incorporate the elements, so that if and when they put in a gate, there was a wide enough space to have a u-turn escape and that the gate would be located far enough from the arterials and they could design those elements into what we see without the gates -- Rohm: Fair enough. That's acceptable from my perspective. The gates, as far as this application, just wouldn't be included. Okay. Borup: One final comment, I guess, I'd have is -- and I think I feel as strong as anybody about interconnectivity, except for I can see this as one development where I don't know that it necessarily applies. You know, the emergency access through a pathway would take care of any public safety concerns and beyond that I think it's taking away from the project that they are proposing. Rohm: Okay. The draft agenda for the 16th already has 17 items on it and I guess that I'd ask that -- could you give us the next two weeks and move it to April 6th, so I -- I don't know that we are going to be able to get through the agenda that we already have set for March 16th. And the value to moving it to April 6th gives you and staff more time to work out these details and we would have a project that we could move forward more aggressively at the April 6th meeting. If you can live with that, we'd certainly appreciate that. Phillips: Just one moment. Borup: Well, if not, they have got one day to meet with staff and one day to prepare the drawings, if they have to have it Monday. Rohm: Well -- and that's the point. Borup: That's only two days. Rohm: That doesn't give them much time for creativity. Borup: Busy weekend. Meridian Planning & Zoning March 2, 2006 Page 31 of 90 Zaremba: Well, I think the applicant has made the point we are only talking, really, about redesign of a small southwest portion of this project. The rest of it wouldn't change just because a stub road needs to go -- Rohm: It's your call. Phillips: All right. Thank you, Mr. Chairman and Commissioners. We would really prefer a continuance to the next -- the next Public Hearing, at which time, you know, we would meet the -- I'm certain we can meet the time frame. Rohm: Fair enough. Thank you. Phillips: All right. Zaremba: Well -- and the issues are known, so it should be a short discussion when it comes back. If they comply and work it out with staff it should be easy for us. Rohm: Thank you very much. Zaremba: Thank you. Mr. Chairman? Rohm: Commissioner Zaremba. Zaremba: I move we continue AZ 05-067 and CUP 05-060 to our regularly scheduled meeting of March 16th, 2006, to give applicant and staff time to work out issues that have been raised, as well as those already presented in the staff report. Moe: Second. Rohm: It's been moved and seconded that we continue Items AZ 05-067 and CUP 05- 060 to the regularly scheduled meeting of March 16th, 2006. All those in favor say aye. Opposed same sign? Thank you very much. MOTION CARRIED: ALL AYES. Item 8: Public Hearing: AZ 06-005 Request for Annexation and Zoning of 58.56 acres from RR to R-4 (32.86 acres), TN-C (14.54 acres) and C-C (11.16 acres) for Knight Sky Estates Subdivision by Sea 2 Sea, LLC - northwest corner of Chinden Boulevard and Linder Road: Item 9: Public Hearing: PP 06-004 Request for Preliminary Plat approval of 126 residential lots (22 townhouse lots and 102 detached single-family lots), 7 commercial lots and 26 common lots on 55.83 acres in a proposed R-4, TN-C and C-C zones for Knight Sky Estates Subdivision by Sea 2 Sea, LLC - northwest corner of Chinden Boulevard and Linder Road: CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET DATE March 16, 2006 4,5 ITEM # PROJECT NUMBER AZ 05..067 and CUP 05-060 PROJECT NAME Casa Meridiana NAME; (PLEASE PRINT) FOR AGAINST NEUTRAL \/f/AÎt< ;1~~'J "Y)¿Î/éi;/JI} k:.' C' +- _J\LE8> "Z>oP ---- -----,-- --- -~ ~ CUP 05-060 MERIDIAN PLANNING & ZONING MEETING APPLICANT Insight Architects March 2, 2006 ITEM NO. 7 REQUEST Continued Public Hearing from February 16,2006 - Conditional Use Permit for a 32 unit multi-family development in a proposed R-15 zone for Coso Meridiana - 1777 Victory Road AGENCY COMMENTS CITY CLERK: See Previous Item Packet / Minutes in Al Packet CITY ENGINEER: CITY PLANNING DIRECTOR: YL 'Sttt« fifo { + ; ~ A Z ß.6~ Cõ fl~-l ~ Pj-IJ --I-v 'J-l? -Db D?-Ofl7 :::':-0 CITY ATTORNEY CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTlERS'IRRIGATION: - " \ , 'J IDAHO POWER: INTERMOUNTAIN GAS: OTHER: Contacted: Emailed: Date: Phone: Staff Initials: Materials presented at public meetings shall beçome property of the City of Meridian. -,;;a.a.. Right-of-Way & Development Services f.¿::f~i.\ Planning Review Division .".. ~"-- .- Committed to This application does not require Commission action and is approved at the staff level on Tuesday January 31, 2006. Tech Review for this item was held with the applicant on January 27, 2006. Please refer to the attachment for appeal guidelines. Staff contact: Andrea N. Tuning, 208-387-6177-phone, 208-387-6393-fax, atunina@achd.ada.id.us File Numbers: MCUP-O5-060 REl e E IVE FC'B2 8 .D . J:'ø ':Jnnt' CJ tv 0 ,cwo err)!' CL~ rv:~RJDJA/\1 -Rn, O~,~fr'!--: Owner: 1777 Victory Road OAAS Laney, LLC 519 West Front Street Boise, 1083702 Site address: Applicant/Representative: Insight Architects 2238 Broadway Avenue Boise, 10 83706 Application Information: The applicant has submitted an application to the City of Meridian requesting annexation, rezone and conditional use approval to construct a 32-unit townhouse subdivision. The 6.9-acre site is currently zoned RUT and is proposed to be rezoned to R-15. The site is located on the southeast corner of Victory Road and Locust Grove Road. Acreage: Current Zoning: Proposed Zoning: 6.9-acres RUT R-15 II /" Y1l JhIj 3-~-()& -S~ )JLJ. Î Vicinity Map .'ISIT~' "',.,'., ",!" " 'ÌJ ' , 7,62-BCr.' '0: ; " Iii § 6,35-BCr.. 'm/,' "",'", ... 1 A. 1. 2. 3. 4. Findings of Fact Trip Generation: This development is estimated to generate 188 vehicle trips per day based on the Institute of Transportation Engineers Trip Generation Manual. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. Traffic Impact Study: A traffic impact study was not required with this application. Site Information: The site has one existing single-family residential dwelling. 5. Description of Adjacent Surrounding Area: a. North: Sage land Subdivision b. South: 6.35-acres zoned RUT c. East: 7.62-acres zoned RUT d. West: 1.0-acres and 6.69-acres zoned RUT 6. Impacted Roadways Locust Grove Road: Frontage: Functional Street Classification: Traffic count: 532-feet Collector South of Victory Road was 1,490 on 12-10-03 North of Victory Road was 1,938 on 12-10-03 Level of Service: LOS C Speed limit: 50 MPH An acceptable Level of Service for this segment of roadway is a Level of Service 0 based on COMPASS Planning Thresholds (up to 9,500 VTPD) Victorv Road: Frontage: Functional Street Classification: Traffic count: 619-feet Collector West of Eagle Road was 4,615 on 1-20-05 East of SH 69 was 3,745 on 1-20-05 Level of Service: LOS C Speed limit: 50 MPH An acceptable Level of Service for this segment of roadway is a Level of Service 0 based on COMPASS Planning Thresholds (up to 9,500 VTPD) 7. Roadway Improvements Adjacent To and Near the Site Locust Grove Road Victory Road Existing Right-of-Way Locust Grove Road Victory Road 8. 9. Existing Access to the Site The existing single-family dwelling has a 20-foot wide driveway that intersect Victory Road in alignment with the emergency drive for Sageland Subdivision. 10. Site History The District has not previously reviewed a development application on this site. 2 B. 1. 11. Capital Improvements Plan/Five Year Work Program There are currently no roadways, bridges or intersections in the general vicinity of the project that are currently in the Five Year Work Program or in the Capital Improvements Plan. Findings for Consideration Victory Road Right-at-Way District policy requires 70-feet of right-of-way on collector roadways (Figure 72-F1 B). This right-of- way width allows for the construction of a 3-lane roadway with curb, gutter, 5-foot wide detached sidewalks and bike lanes. . The applicant should dedicate a total of 35-feet of right-of-way from the centerline of Victory Road. Street Section District policy 72-F1 B requires collector roadways to be constructed as a 46-foot street section with vertical curb, gutter and 5-foot detached (or 7-foot attached) concrete sidewalk within 70-feet of right- of-way with parking prohibited on both sides. . The applicant should construct Victory Road as one half of a 46-foot street section with vertical curb, gutter and a 5-foot detached (or 7-foot attached) concrete sidewalk. 2. Locust Grove Road Right-ot-Way District policy requires 70-feet of right-of-way on collector roadways (Figure 72-F1 B). This right-of- way width allows for the construction of a 3-lane roadway with curb, gutter, 5-foot wide detached sidewalks and bike lanes. . The applicant should dedicate a total of 35-feet of right-of-way from the centerline of Locust Grove Road. Street Section District policy 72-F1 B requires collector roadways to be constructed as a 46-foot street section with vertical curb, gutter and 5-foot detached (or 7-foot attached) concrete sidewalk within 70-feet of right- of-way with parking prohibited on both sides. . The applicant should construct Locust Grove Road as one half of a 46-foot street section with vertical curb, gutter and a 5-foot detached (or 7-foot attached) concrete sidewalk. 3. Roadway Offsets Roadways Intersecting Victory Road District policy 7205.6, other jurisdictions in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an arterial roadway (measured centerline to centerline). If the City of Meridian approves the private road, the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Victory Road and Locust Grove Road and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private 3 road grade meets the public road. District Policy requires a design approach speed of 20 MPH and a maximum intersection approach grade of 2% for at least 40.feet. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. . The applicant is proposing to construct a 26-foot wide private road that intersects Victory Road approximately 92-feet west of the east property line. This private road is proposed to be located approximately 240-feet west of Siduri Street. The location of the private road does not meet District policy. Staff is recommending a modification of policy to allow the private road to be located in this location due to the fact that the private road will be located approximately 470.feet east of the Locust Grove RoadNictory Road intersection and will be in alignment with the emergency access that was approved with Sageland Subdivision. If staff were to require the private road to meet District policy the applicant would be required to shift the road approximately 60.fee to the west. By shifting the roadway 60-feet to the west, the roadway would be located closer to an intersection that is likely to be signalized in the future and would place headlights directly on the single-family residence located on the north side of Victory Road. The private road location requires a modification of policy that is approximately 20%. This is within staff's ability to modify the dimensional standard of 300-feet. The applicant should pave the private roadway a minimum of 20 to 24.feet wide and at least 30-feet into the site beyond the edge of pavement of Victory Road and install 15-foot curb radii abutting the existing roadway edge. Roadways Intersecting Locust Grove Road District policy 7205.6, other jurisdictions in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an arterial roadway (measured centerline to centerline). If the City of Meridian approves the private road, the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Locust Grove Road and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPH and a maximum intersection approach grade of 2% for at least 40-feet. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. . The applicant is proposing to construct a 26-foot wide private road that intersects Locust Grove Road approximately 90-feet north of the south property line. This private road location meets District policy and should be approved with this application. The applicant should pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond 4 4. C. the edge of pavement of Locust Grove Road and install 15-foot curb radii abutting the existing roadway edge. Gates District policy 7207.9.2 requires gated driveways and roadways to provide a minimum 50-foot storage distance. The storage area will be measured from the edge of pavement of the street. . The applicant is proposing to gate both of the private roads. If the City allows the applicant to gate the private roads, the applicant will be required to provide a minimum of 50-feet of storage from the edge of pavement of Victory Road and Locust Grove to the proposed gate. Special Notice to the City of Meridian . The applicant is proposing to construct the transportation network within the subdivision as private streets. By constructing these roadways as private streets, the District and the City of Meridian lose any chance of obtaining connectivity in this area. Essentially, this corner would be an enclave that is completely separated from all of the surrounding neighborhoods. District staff strongly recommends that the internal streets be required to be public roadways that can provide stub streets to the east and to the south to provide interconnectivity. The connectivity to the surrounding parcels would provide additional access for emergency services, eliminate multiple access points to major roadways (collector and arterial roadways), reduce vehicle miles traveled, connect neighborhoods and have the ability to increase the sense of community in the area. . The "L-shaped" roadway that the applicant is proposing is similar to what was proposed with Sageland Subdivision. When Sageland Subdivision proposed a similar roadway network, the City of Meridian was very concerned with potential cut through traffic and required the installation of landscape islands. This proposal may promote cut through traffic on a private roadway network. D. Site Specific Conditions of Approval 1. Dedicate 35-feet of right-of-way from the centerline of Victory Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Victory Road is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties. 2. Dedicate 35-feet of right-of-way from the centerline of Locust Grove Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will not be compensated for this additional right-of-way because Locust Grove Road is classified as a collector roadway and is to be brought to adopted standards by the developers of abutting properties. Construct Victory Road as one half of a 46-foot street section with vertical curb, gutter and a 5-foot detached (or 7-foot attached) concrete sidewalk. 3. 4. Construct Locust Grove Road as one half of a 46-foot street section with vertical curb, gutter and a 5- foot detached (or 7-foot attached) concrete sidewalk. 5. Construct a 26-foot wide private road that intersects Victory Road approximately 92-feet west of the east property line, as proposed. Pave the private roadway a minimum of 20 to 24-feet wide and at 5 6. 7. 8. least 30-feet into the site beyond the edge of pavement of Victory Road and install 15-foot curb radii abutting the existing roadway edge. Construct a 26-foot wide private road that intersects Locust Grove Road approximately 90-feet north of the south property line, as proposed. Pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Locust Grove Road and install 15- foot curb radii abutting the existing roadway edge. Provide a minimum of 50-feet of storage from the edge of pavement of Victory Road and Locust Grove to the proposed gate. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right- of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Impact Fee Ordinance. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 11. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative 6 of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines 7 _L ---^_J "".."....,,--~,-~--"""'" ...._,.._--~..__.." i'~'-'~I I I ~~1rljJJ) ! \j-~ 8 ! \ \-""""'---'\ \' \-.'-_"_.-\-""'_'_'-""'/,:'::~=':::~:-:::::j I (.. J.__....,L~-~::.,:=--=::~---' I \ \ \ \ \ , '-T----"-"'>~~--<-""'-=::_"---"""-'--:~"--~'" I (~- ! \\ r.".'-'" ,,- \ \ \"..."-"-,,.."'\.....- ¡ ¡ I "-'T~-"'-T"'""'--r---- \ II I! \-"-"',,./-\ \ \ ,/ . r"""'¡";1..-"..)_-........... / I \,......."j-----......\ \ ~~ \ \ '\ \ "" / í ! r-"""""'r'-'-~"'-r"" i \ ' i \ \ .><~:='::::::=:~:".._...,....".._-- j I I / -"~-"ì--~'~" ,,_J \ ~"- 1\\'/ ¡""'r"""""""',,,""""""-..l ¡ 'í r"!---..,.., ~~-~~~ i i i I Il,\-,......"_m_._~-J '-""'r"--"::~,\ (-----1 \ \ Im"'......'......_mm/ c+J - I-~~~!~" ~1~ =1\ \ \ /~ I \L=~~- ~ ~~"" =i~ '..'~~..,~_..-""_m "-T..,....",..",..m,'m"~_"""__m' I I \ \ \, , , \.. ~ i, , , \, \ '\ \ '\ \ \ \ \ \ \ \ , , , \ \ " , \ \ \ \ 7.62-acres .' , , ) \\-------r- I / I """"¡--"'----. I / ;! t-"-....L /""',j i ! ¡--....."!'- '-""'" ([:~~ """-"'" / "'..~ í / t-..:::::::~-..¡ ~I / ",. I I ' i "'.. I' ,. ~---,.._m'-i I I ¡ . ( l----- -r"'-l-'l........_....j//" :::\"'/ _........~' \ t'.._------~;,-,-----\ ,\----' II .....---"""-' \ \ \ ,--......,...-\ \ \ .~ " \. \ \ ......,----,..,-\ , \ Y 6.35-acres ii 'i"",,- I! """"'" .. il I I L!-__....'~__m " ( , i i ¡ "\ 1. Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 9 II II Development Process Checkl ist 0Submit a development application to a City or to the County 0The City or the County will transmit the development application to ACHD 0The ACHD Planning Review Division will receive the development application to review [gIThe Planning Review Division will do one of the following: DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time. DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. 0Write a Staff level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. DWrite a Commission level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. 0The Planning Review Division will hold a Technical Review meeting for all Staff and Commission level reports. DFor All development applications, including those receiving a "No Review" or "Comply With" letter: . The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) . The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. 010 YOU REMEMBER: Construction (Zone) 0 Driveway or Property Approach(s) . Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. 0 Working in the ACHD Right-of-Way . Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) 0 Sediment & Erosion Submittal . At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. 0 Idaho Power Company . Vic Steelman at Idaho Power must have his IPca approved set of subdivision utility plans prior to Pre-Con being scheduled. 0 Final Approval from Development Services . ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 10 THE PROCESS ,- - ----- ------- -- ------- ----- -- ... -- ----- ---- j "... -..--. . ~~ ~- --.- .----- ------ ----. The ðp¡>iGaot w+ _UW,,¡ 8 ffi:¡ve'Dp,ne,-,¡ "DPIiGat"'" 10 '" C"yOttD tho C""oiy -----------,---, -,~.-~.--..~-~...-- - 1- ---- --,-.--_._._-_.~--~.--... ---_..~. .-- -- ----.1 ----- '--------~'~~- The Crt)' Of !he: County w.lllflln....." !h<¡ ct,,'Æ>l<Jproen ap¡>liœúOn to ACHD- . ,~ -- -~..._- ;'CHD, P"",oir\g Re~ Divi$bo ""I P""" th" app&a!i"" v<\ [t-,e ""Ai ,"",ek'.:'a.\l.",:~d"~~.œff "",gW 1 __1_- ------~-----'" Staff ",i "",e..IM de\'elCpm"olsppliœi<on aM COO'\¡>ik> ar> o..ess""",¡ o!!.he d~""lopmMr" pcKofl;;al 'mpads on Oh~ 1:far\SþoMl<on 5ysl$t'- and ~w>,.m!!> th" de""_I>~ú' pmpçs;Il ier ':5 OOI1¡ormaoœ 10 Dis!ri!::t pt>IÌC)i. (4 to 5wùrl>i"IJ ~;'SJ (\'wdsfthrough Frida'») ---_._-----,.~_.~. -~.-,._'" -1 ------- .------------ - -,--'- , -----------------------.---.....--.-.---"--- ._....ì ~-~----. ¡The ap¡¡fiCant will rooN witil staff 1m a ieclmi""i ffi'~ Th's ¡¡mooss is Open to ~"'Q p;;bl;; aM a~ a¡¡aodes ! I ........ I . - - - -- I , lithe ",,~""t ~s policy-and the ! ~ !t the ~ppj'conl feq\lO)st; a modification i ðppl,C:OOI dœ$ ooi ~W""! '" ""1'Jes! a mOdof.-::a1;oo 01 i 0' ...aNe' 01 policy 0' .."pea.. ; 1 thl> District's "'qU¡'èm"r\!.. a staff le",,1 spptO';81 " 0 staff leval ap¡>roVsI, me: eppW:a!kJn ",K be : ' lot\e:rw'll bl> Sf!:"t 001. ¡TuesdaYì I i heard by !he: ACrID Commoss'oo- : L..-.- u----., .--~ --' .---- .-,--_. -_._-,- -.--- .~---~ --" ----"----'--~T'-.- -- ---------- -- ...----..------------L----...--..---.--------.,',-.- -~--~~._~_J--- -------,----_. ----------,-----~ rr-'<! "p",,!ant mU$! .u",1\( a letter appe:a!irlg a SUlff I' 111(, appíIC8ftÍ mtJSl sub<r.¡¡ a ielte r 10 ,fa ff requesting a i Ieve! apþfO\l1i1!)(¡Jor>;!he _al """"" ha;; B'P'ffid- i j modiOCabon orwa"'B' 01 poKey- i (Tho 3ppc!an! has 1 G wo.mg <jays from \he date I j The - W'SI must 00 rede ved ...ithm 2 workin¡¡ days- i of the staff tem! dwsl,:" '<<!is ,!fl8d¡,l~, ~ ! l~.u~llythiS ~~~'JGS<iay fuOOf,'inQ T Bd'I Rf!:,,;ew !_~..J ---- -.----,,-..'-'.' - r. - --. --- Staff Level Review and Approval -",-_.....",""'- M ~ n ",,' -"""'"' " """. 1-- - ._------------,--------_....._-----_:J---_.--~-_.------ ------... Commission level RevIeW and Approval ""~""-....."",._"""""",-,,,...~..,, ,,=---~""""W""."'---"""" i'~' I I :.......--.......~, . .J...... ...... ...... ...... - f""" ""'1 Staff ~;¡~::::~~;:~::I;dð~¡~I~e;::::on ð~nde- l........i bformatiof1 ìo <!af,.,ored;o ¡he Comm;"slon, , (7 days prior 10 ¡he Com""ss;",,, meeiJr>¡¡) ," . :=:"'::"'-=._=-...:=].-:== The CommissIon ,,;1 ht>ð' !he: "'c~ as they are , ¡¡resented b-" st&!I 8f¡( lhe a ppI<cafft . i The Comm!ssion 'M OhM tBl<e acl1oo on \t1I! opplícatkm : , (\VeOOesday) , '----...---- .............m .... ................... '" ". ............, u'" ,....,............... ................. """" .,........."........ ..........¡ ,--- .......L.~...----~----.-~- ~_.-..._-~- .--...-- ¡-------,------- -------- -.--,,~_.- i thl>aþp~¿¡inta~1S tM District's fequi~"-\s I HI UmapPiain( does nolacœpt U,e CC<i1m15Sion's i I a Commission ~¡ awn:,.,a! wØ bà...m OUt I i ad","" ~~e applkaol can request ~5ide"-'~'m. I , (ThuWaY) I' m'ti wri~n retjUl!Sl "'US! 00 ,""","'° by!he O!slf-d by !he: Ioim...ng lU.1!~d~y~! 3' C<} pm! -- - ; 1ft" ~h~J:;~~~':~d:¡ ! swd"ted 00 l.;.,;, MAl i ¡"",,¡able agcooa, ' ~----,-"......,~--- " ',,-- --- .,,---- ~. -- -------- .-----..--------,- i ,~""--' r:::::=:=-' Subm[ a~ rua&...ay i ,.- i:me r.<¡'Je$! i5 der;e"., Iffiprowmenl pians , , ,.. COO""",.,.".. ,""port", 1oR~~~:~;;P~ ¡".. 1" sem 00\ iThe:~~~is~';;'~ard"1 ! - ..- ¡A¿;;:;-,~;~¡'~;! ..... no... U", ....... u U , u..................... .; - ' Imp?" '"':".nIDUl.! 'T _. (Jq ::: -! G :/ --- CUP 05-060 MERIDIAN PLANNING & ZONING MEETING APPLICANT Insight Architects February 16, 2006 ITEM NO. 23 REQUEST Conditional Use Permit for a 32 unit multi-family development in a proposed R-15 zone for Coso Meridiana - 1777 Victory Road ---"--- -- COMMENTS AGENCY-- -'---- --'- P/H ID 3 ) ;,). ) (Xo OZ/ £JrY) 5--0 ---- ---- c~o ^' f7 n fAR- CITY CLERK: CITY ENGINEER: -------, --- ---------=---- CITY PLANNING DIRECTOR: CITY ATTORNEY ---- .. ----,-- - - CITY POLICE DEPT: CITY FIRE DEPT: ---- '- --- CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: See Comments in Al Packet SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: See Comments in Al Packet See Comments in Al Packet CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS' IRRIGATION: IDAHO POWER: INTERMOUNTAIN GAS: OTHER: Phone: Contacted: Emailed: Date: Staff Initials: Materials presented at public meetings shall become property of the City of Meridian. e~reb. ¡,. 2006: 9:37AM0833890S7 ----- -- INSIGHTARCHITECTS No. 3628 ¡P. 1 e2 RE C E IVEJ) FEB t 4 2006 CITY OF MERIDIAN CITY CLERK OFFICF Re: Casa Meridiana - Public Hearing Continuance ',-;" , February 14,2006 Mr. Joe Guenther, Planner MeridIan Planning & Zoning e60 E. Watertower Lane, Ste. 202 Meridian. ID 83642 Dear Joe, Per our recent phone conven;ations it appears this project has been moved to the next public hearing data of March 2, 2006. We understand the Planning Department workload volume Is significant. Considering we submitted our application in early December, 2005 we request that our application be heard at the March tld meeting and not be further deferred. In the event you have any fur1her questions, please contact me immediately. p;' Ø/IJIl- Russ Phillips, AlA INSIGHT architects. pa .".-.--~.. 2238 Broadway Avenue Boise, Idaho 208.338.9080 208.338.9067 fax FEE 15 '06 10:02 PAGE. 01