Loading...
HomeMy WebLinkAbout2022-04-04 BPBCAVID REYNOLDS CHAIRMAN OF THE BOARD DONALD BARKSDALE VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER BOISE PROJECT BOARD OF CONTROL City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 30 March 2022 RE: Pura Vida Ridge Ranch Sub 3727 E. Lake Hazel, Meridian New York Irrigation District Hess Lateral 04+1 OB Sec. 4, T2N, R1E, BM. Sonya Allen: MFP-2022-0001 NY-315-001-01, 315-001-03 OPERATING AGENCY FOR 1671000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL:(206)344-1141 FAX: (208) 344-1437 RECEIVED APR 0 4 2022 CITY Ot= Gtd. ID�� GITY CLERKS OFFICE There are no Boise Project facilities located on the above -mentioned property, however it does in fact possess a valid water right. Boise Project Board of Control must approve any requests and/or relocation of delivery points prior to construction. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irrigation system is permitted. Per Idaho Statutes, Title Al local irrigation drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting afull-size copy of the irrigation and clrainage plans. Whereas this property lies within New York Irrigation District it is important that representatives of this development contact the NYID office as soon as possible to discuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the New York Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 424209. Future preliminary and final plats must call out the Project easements and the plats must also note, which lots have surface irrigation water rights and which lots do not. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors even during the construction phase. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Chb�ffias Ritthaler Assistant Project Manager, BPBC for/tr cc: Clint McCormick Watermaster, Div; 2 BPBC Terri Hasson Secretary -Treasurer NYID File