HomeMy WebLinkAbout2022-04-04 BPBCAVID REYNOLDS
CHAIRMAN OF THE BOARD
DONALD BARKSDALE
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
BOISE PROJECT BOARD OF CONTROL
City Clerk's Office
33 E Broadway Avenue
Meridian ID, 83642
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155
30 March 2022
RE: Pura Vida Ridge Ranch Sub
3727 E. Lake Hazel, Meridian
New York Irrigation District
Hess Lateral 04+1 OB
Sec. 4, T2N, R1E, BM.
Sonya Allen:
MFP-2022-0001
NY-315-001-01, 315-001-03
OPERATING AGENCY FOR 1671000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL:(206)344-1141
FAX: (208) 344-1437
RECEIVED
APR 0 4 2022
CITY Ot= Gtd. ID��
GITY CLERKS OFFICE
There are no Boise Project facilities located on the above -mentioned property, however it
does in fact possess a valid water right.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
Per Idaho Statutes, Title Al local irrigation drainage ditches that cross this property, in
order to serve neighboring properties, must remain unobstructed and protected by an
appropriate easement by the landowner, developer and contractors.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting afull-size copy of the irrigation and clrainage plans.
Whereas this property lies within New York Irrigation District it is important that
representatives of this development contact the NYID office as soon as possible to
discuss a pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the New York
Irrigation District as to who will own and operate the pressure irrigation system prior to
review and approval of an irrigation plan by Boise Project Board of Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 424209.
Future preliminary and final plats must call out the Project easements and the plats must
also note, which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors even during the construction phase.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Chb�ffias Ritthaler
Assistant Project Manager, BPBC
for/tr
cc: Clint McCormick Watermaster, Div; 2 BPBC
Terri Hasson Secretary -Treasurer NYID
File