Loading...
HomeMy WebLinkAbout2022-04-01 BPBCDAVID REYNOLDS CHAIRMAN OF THE BOARD DONALD BARKSDALE VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 BOISE PROJECT BOARD OF CONTROL (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE,IDAHO 83705-3155 29 March 2021 RE: Skybreak No. 1 C4 Land LLC, Peter Eisenmann East of South Eagle Rd, Meridian New York Irrigation District Farr Lateral 72+00 Sec. 4, T2N, R1E, BM. Alan Tiefenbach: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX:(208)344-1437 DECEIVED APR 01 2022 VI I r urti�$Dt��- CI"fY CLERKS OFFICE FP-2021-0058 (Updated) NY-249-001-00, 249-001-01 Boise Project does not approve of this final plat for Skybrealc No. 1 as we do not accept overflow from a pump station back into our facilities, per our board policy, as shown on sheet C7.1. Please see the highlighted section. The United States' Farr Lateral lies within the boundary of the above -mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert this federal easement of 20 feet north and 30 feet south of the lateral's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve landscaping (other than grass or gravel) within its easements, as this will certainly increase our cost of maintenance. All easements must remain a flat drivable surface. Fencing and pathways (as may be required) must be constructed just off the easement, to ensure public safety and prevent encroachments. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Project Board of Control prior to construction. Project facilities and/or easements that parallel, and are within and/or intended to be within road right -of --ways due to any development of this property must be relocated outside of road right-of- ways. The easements of Boise Project facilities will remain the same unless agreed upon and/or approved with written permission from Boise Project Board of Control. The construction of any roadway crossings must be conducted only during the non -irrigation season when the canal is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross any project facility must get the proper crossing agreements from the Bureau of Reclamation. In any case, no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. A time schedule for the construction to be done during the non -irrigation season must be approved by Boise Project prior to any activity within Project easements. No construction will be allowed within the easement boundaries of the Boise Project Board of Control facilities after March 15t' of each year. However, on a case by case basis, overhead utilities and utilities boring underneath a Project facility may be allowed after March 15"' if reviewed and approved by the Boise Project. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irri ation system is permitted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Should there be any small (neighborhood) irrigation ditches on this site, the developers and/or landowners will be obligated to protect them and allow water to pass to downstream neighbors. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a full_ size hard cony of the irrigation and drainage plans. Whereas this property lies within the New York Irrigation District it is important that representatives of this development contact the NYID office as soon as possible to discuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the New York Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Wording on the preliminary and final recorded plat needs to state that any proposed and/or firture usage of the Boise Project Board of Control facilities are subject to Idaho Stahies, Title 42-1209. Future preliminary and final plats must call out the Project easements and the plats must also note, which lots have surface irrigation water rights and which lots do not. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors, even during the construction phase of the project. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Thomas Ritthaler Assistant Project Manager for/tr cc: Clint McCormick Terri Hasson File Watermaster, Div; 2 BPBC Secretary -Treasurer, NYID |||| k � g*ao m� p« !! _ ! E ` ®. &]� s_a� mmwm ` � �� _� � , _ /°- � \ � `°�" !n S !� No waswwe»s �� U �` � ^�� � o �} � _ �,_ §!(| ` � §| ; � � ƒ ) 2 = .! . ] , � \ � t z$ §, r ,§ r | \ � . / � � �� � - --�-- . � � ju --- — -- — -- — -- — -- � | §| �����. . � � �� � � �� � � f ■ �� '� | ( „ , • � j� - � —, .��\ §_� � % � z ,� r | / � � °� b§ | � � ) / � ` § � . j f � ■ � �� ! � ! .. � , /� / �g. 4 � \ ' � -- — -_ � � � \ \ / ��j d( ! % § } ¥�, / �� �§{ � � � � ��/ � � � j �® � � �' �- . |/| . ��� ���-_ ) - � �����}��� � \ } �/`�� /�� � | '��` � � z .H # � ��I�� ,� . � � � �� '�: � � ..,. �- � � �