Loading...
HomeMy WebLinkAboutEngineer Statement V1Kimley >>Horn March 4, 2022 City of Meridian 33 E Broadway Avenue Meridian, Idaho 83642 RE: Graycliff Subdivision- Phase 3 Construction Drawings To Whom it May Concern — Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period from 2006-2019. Based on the results of these groundwater readings, the roadway centerline elevations within the Graycliff Subdivision Phase 3 are designed to be greater than 3' above highest established groundwater elevation. Respectfully, SS\ONAL FNc \,\CENSf� � F 8670 tlJ,03/OA/20220 qTF OF SOP �e�GA IL HP�� Abbey Hahn, PE Kimley-Horn