HomeMy WebLinkAboutEngineer Statement V1Kimley >>Horn
March 4, 2022
City of Meridian
33 E Broadway Avenue
Meridian, Idaho 83642
RE: Graycliff Subdivision- Phase 3 Construction Drawings
To Whom it May Concern —
Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period
from 2006-2019. Based on the results of these groundwater readings, the roadway centerline
elevations within the Graycliff Subdivision Phase 3 are designed to be greater than 3' above highest
established groundwater elevation.
Respectfully,
SS\ONAL FNc
\,\CENSf�
� F
8670
tlJ,03/OA/20220
qTF OF SOP
�e�GA IL HP��
Abbey Hahn, PE
Kimley-Horn