HomeMy WebLinkAboutDrainage Report V1Storm Drainage Report-Graycliff Subdivision Phase 3 701 W. Harris Street, Meridian, ID Prepared For: KB Home Prepared by: Kimley-Horn 950 W Bannock St. Suite 1100 Boise, ID 83702 Contact: Abbey Hahn, PE 208-917-4977 abbey.hahn@kimley-horn.com S�ONAL FH\ \ \CENSfO F: 18670 LP 03/04/20220 qTF OF \�P /GA IL NP% Kimley>Morn Kimley»>Horn GENERAL LOCATION AND DESCRIPTION This drainage study is being prepared to describe the existing and proposed drainage conditions for the proposed Graycliff Estates Phase 3 located in Meridian, Idaho. The site is located at 710 West Harris Street. The site area is approximately 5.25 acres and is located within the Section 25, Township 3 North, Range 1 West of the Meridian, City of Meridian, Ada County, Idaho. The property is bounded two sides by development. The site is currently an open field and is located southeast of Phase 1 of Graycliff Estates Subdivision. Undeveloped land is located to the east and south of the property. Future Phase 4 of the Graycliff subdivision will be located southeast of Phase 3 and runoff from a portion of this phase was accounted for in Phase 3 improvements, as noted in Basin 2 description below. Proposed development of the site will consist of 35 buildable single family residential lots and 3 common lots with associated public roads, landscaping and utilities. II. EXISTING CONDITIONS The property is undeveloped. The site currently drains to the northwest corner of the site. The property is pervious and has no drainage structures located on site. Runoff from the property infiltrates into the ground. The majority of the existing ground cover consists of native grasses with the rest containing no vegetation. The site consists of 1-2ft of silty clay loam with pit run material below. Proposed drainage facilities have been designed to infiltrate into the pit run material. In areas where hardpan is encountered, the material will be removed, broken and returned to the trench where it will permeate with a similar rate of the pit run material. The site is in zone "X", or areas determined to be outside the 0.2% annual chance flood hazard, according to FEMA Map Number 16001CO234J, dated 06/19/2020. It is unlikely that any offsite water runoff will enter the proposed site. Area west of the site is undeveloped native grasses and sage brush. III. DRAINAGE DESIGN CRITERIA The storm drainage conveyance and storage systems are designed to meet ACHD's Stormwater Policy. Seepage beds are designed to store and infiltrate the 100-year storm event. The Water Quality storm will be treated through sand and grease traps prior dispersion into the seepage beds. Inlet piping for Seepage Bed 1 and 2 include diversion manholes which allow flows greater than the Water Quality storm to bypass the sand and grease traps. The Rational Method was used in calculating the required detention volume for the site. The site was delineated into hardscape areas and landscape areas and appropriate runoff coefficients were applied. A weighted runoff coefficient was calculated for the site using 0.20 for landscaping and 0.95 for hardscape areas. Two seepage beds will be constructed on this site and all water will be retained on site as shown on the Grading and Drainage plans. Kimley»>Horn The site was delineated into multiple drainage basins as shown on the Drainage Area Map Exhibit. These basins were divided into subbasins and a minimum time of concentration of 10 minutes was used to determine peak flows to each catch basin. The proposed storm pipes were sized according to the accumulative peak flows of each interconnected pipe and sub basin. See Appendix A for storm drainage calculations. III. PROPOSED DRAINAGE Basin 1: Basin 1 includes drainage from the right of way, sidewalks and lots along South Graycliff Way. Drainage from these areas will be directed to catch basins, treated through a sand and grease trap. The stormwater will be stored/infiltrated through Seepage Bed 1. Basin 2: Basin 2 includes drainage from the right of way, sidewalks and lots along a portion of West Learmont Street. This basin includes 1.4 acres east of West Learmont Street from the future Phase 4 of Graycliff. Drainage from these areas will be directed to catch basins, treated through a sand and grease trap. The stormwater will be stored/infiltrated through Seepage Bed 2. Name Width Depth (ft) Length (ft) Runoff Volume (cf) Seepage Bed #1 15 10 157 8,833 Seepage Bed #2 15 10 89 4'986 Kimley >>Horn V. APPENDIX A- Storm Drainage Calculations \ 4 \� \ GRAYCLIFF SUBDIVSION PHASE 3 \ 2 \\\ 'OF \\ DRAINAGE BASIN MAP 3 BLOCK 3 \ T \ \ 1C O/ 1C / B'LOCK 2 2 3 29 / - F 11 28 27 26 25 / 24 1 I 2� 3 I \ 4 Ex NORTH Rg N pa o j N .s =m GRAPHIC SCALE IN FEET =x 0 75 150 300 oa° \ \\ \ z 3 \\\ 7 \ \ 22 8 \ b 7 \ g \ \\ \ \ 8 10 \ �p 23 11 \\ \ \ 22 '° BASIN 1 12 \\ \ \ 21 12 20 13 14 \ \ i 19 BLOCK 3 \ \ \ 18 14 \ \ BLOCK 2 15 \ \\ \ \ 17 15 \ FUTURE BA S 1 N 2 PHASE \ \ FT \ \ 1 a iu II 12 \ \ 2 34 I Mimi \ 3 35 4 36 5 37 r BLOCK 4 I I I I I II 27 I 26 25 24 23 22 21 20 19 18 17 16 15 14 7 Kimley>>>Horn 6 5 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Peak Discharge Rate or p Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin 1 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities (25 max) 2 r lir4 to chn nAnrn 5 Area of Drainage Subbasin (SF or Acres) SF Acre, 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user CalcWate • 1 min J 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc i 2.58 in/hr 9 Calculate the Post -Development peak discharge (QPeak) Qp-k 6.59 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 8,833 ft3 V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V,r, 5,521 ft3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 883 ft3 Primary Treatm e nt/Sto rage Basin V 7,950 ft3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 8,833 ft3 0.90 0.20 Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.31 0. Average: 2-6% 0.09 0.12 0.15 O. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE ACHD Calcs- Ph3.xlsm Version 10.5, November 2018 3/3/2022, 4:43 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) --- User input in yellow cells. 1 Project Name Basin 2 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre• 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Av@ �mrsaiartr.�r m9nmtaae•.i Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 2 3 4 5 6 7 8 9 10 56,840 58,470 2.65 0.90 0.20 0.55 7 User Calculate -1 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 min -J 8 Determine the average rainfall intensity (1) from IDF Curve based on Tc i 2.58 in/hr 9 Calculate the Post -Development peak discharge (QPeak) Qp-k 3.72 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 4,986 W V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 3,117 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 499 ft3 Primary Treatment/StorageBasin V 4,488 W Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 4,986 Estimated Runoff Coefficients for Various Surfact Type of Surface Runoff Coefficients "( Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-OAO Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil _. Soil Type n I a I r n ACHD Calcs- Ph3.xlsm Version 10.5, November 2018 3/3/2022, 9:49 PM ACHD Quick Calcs for Pipe and Ditch Capacity NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Basin 1 (WQ) 1 Enter Flow Q= 2.94 cfs 2 Manning's n n= 0.015 Table on QV Tabs 3 Slope S= 0.0100 ft/ft 4 Pipe Diameter D= 12 in 5 Uniform Flow Depth y„ = 9.3 in 6 Normal Velocity V= 4.49 ft/s 7 Critical Flow Depth y, = 8.82 in 8 Critical Velocity V= 4.75 ft/s 8 Full Flow Qmn = 3.09 cfs 9 Full Flow % 95% 1 Project Name Basin 1 (100 YEAR) 2 Pines 1 Enter Flow Q= 6.59 cfs FULL GRAVITY 2 Manning's n n= 0.015 Table on QV Tab 3 Slope S= 0.0377 ft/ft 4 Pipe Diameter D= 12 in 5 Uniform Flow Depth Y. = 12.0 in 6 Normal Velocity V= 8.39 ft/s 7 Critical Flow Depth y�= 11.62 in 8 Critical Velocity V= 8.47 ft/s 8 Full Flow Qmn = 6.00 cfs 9 Full Flow % —PIPE 71 —DEPTH OF FLOW 5 4 2 1 -7 -5 -4 -3 -2 -1� 1 2 3 4 5 7 _2 3 -5 12" DIAMETER -7 0.015 MANNINGS FLOW 2.94 CFS 0.01 FT/FT SLOPE ACHD Calcs- Ph3.xlsm 2/22/2022, 11:29 AM Version 10.0, May 2018 ACHD Quick Calcs for Pipe and Ditch Capacity NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Basin 2 (WQ) 1 Enter Flow 2 Manning's n 3 Slope 4 Pipe Diameter 5 Uniform Flow Depth 6 Normal Velocity 7 Critical Flow Depth 8 Critical Velocity 8 Full Flow 9 Full Flow % Q= 3.17 cfs n= 0.015 S= 0.0150 ft/ft D= 12 in y= 8.4in V= 5.40 ft/s y, = 9.15 in V= 4.93 ft/s Qmn = 3.78 cfs 84% 1 Project Name Basin 2 (100 YEAR) Table on QV Tab 2 Pipes 1 Enter Flow 3.72 cfs 2 Manning's n n= 0.015 Table on QV Tab 3 Slope S= 0.0377 ft/ft 4 Pipe Diameter D= 12 in 5 Uniform Flow Depth Y. = 6.8 in 6 Normal Velocity V= 8.06 ft/s 7 Critical Flow Depth y� = 9.86 in I 8 Critical Velocity V= 5.39 ft/s 8 Full Flow Qfun = 6.00 cfs I 9 Full Flow % 62% I —PIPE —DEPTH OF FLOW 5 4 3 1 -7 -5 -4 -3 -2 -1� 1 2 3 4 5 7 _2 3 -5 12" DIAMETER -7 0.015 MANNINGS FLOW 3.17 CFS 0.015 FT/FT SLOPE —PIPE 7 —DEPTH OF FLOW 5 4 3 2 -72ETER -7 0.015 MANNINGS FLOW 3.72 CFS 0.0377 FT/FT SLOPE ACHD Calcs- Ph3.xlsm 2/22/2022, 11:27 AM Version 10.0, May 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name SGT 1 2 Enter number of Sand/Grease Traps (25 max) 2 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 Number Peak Baffle Throat Velocity Is the Vault Size of S/G Flow Q- Spacing width Area (ftZ) 0.5 fps Velocity Traps cfs (inch) (inch) max. ok? 1000 G 1 2.94 48 20 6.67 0.44 ACHD Calcs- Ph3.xlsm 2/22/2022, 11:32 AM Version 10.0, May 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name SGT 2 2 Enter number of Sand/Grease Traps (25 max) 2 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 Number Peak Baffle Throat Velocity Is the Vault Size of S/G Flow Q- Spacing width Area (ftZ) 0.5 fps Velocity Traps cfs (inch) (inch) max. ok? 1000 G 1 3.17 48 20 6.67 0.48 ACHD Calcs- Ph3.xlsm 2/22/2022, 11:34 AM Version 10.0, May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Graycliff Phase 3 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No 2 Link to: Q,V2 Q,V TR55 J V 11,041 ft3 25%Sediment 8 Set Total Design Width of All Drain Rock W 9 Set Total Design Depth of All Drain Rock D Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 13 Size of Overflow Perf Pipe (Perfs 3600), REQD if Q100>3.3 cfs 14 Calculate Total Storage per Foot Spf 15 Calculate Design Length L Override Value Required for Chambers 16 Variable Infiltration Window L SWL 17 Variable Infiltration Window W SWW 18 Time to Drain 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) upuonai storage �namoers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 2 Volume to Store V 3 Installed Chamber Width Cw Installed Chamber Depth Cd Installed Chamber Height Ch 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 6 Chamber Storage Volume, With Rock, Per Manuf 7 Total Number of Units Required 8 Area of Infiltration Aperc 9 Volume Infiltration Vperc 10 Time to Drain 90%volume in 48-hours minimum 100 0.64 4.00 acres 0.00 cfs 15.0 ft 10.0 ft 0.4 8.00 in/hr 18 in in 70.2 ft3/ft 157 ft 157 ft 15.0 ft 6.3 hours 157 ft ACHD Calcs- Ph3.xlsm 3/3/2022, 9:51 PM Version 10.0, May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Graycliff Phase 3, Facility 2, Bed 2 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No 2 Link to: Q'V2 -J Q,V TR55 J V 6,233 ft3 25%Sediment 8 Set Total Design Width of All Drain Rock W 9 Set Total Design Depth of All Drain Rock D Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 12 Size of WQ Perf Pipe (Pert 1800) Dia pipe 13 Size of Overflow Perf Pipe (Perfs 3600), REQD if Q100>3.3 cfs 14 Calculate Total Storage per Foot Spf 15 Calculate Design Length L Override Value Required for Chambers 16 Variable Infiltration Window L SWL 17 Variable Infiltration Window W SWW 18 Time to Drain 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) upuonai storage �namoers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 2 Volume to Store V 3 Installed Chamber Width Cw Installed Chamber Depth Cd Installed Chamber Height Ch 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 6 Chamber Storage Volume, With Rock, Per Manuf 7 Total Number of Units Required 8 Area of Infiltration Aperc 9 Volume Infiltration Vperc 10 Time to Drain 90%volume in 48-hours minimum 100 0.55 2.65 acres 0.00 cfs 15.0 ft 10.0 ft 0.4 8.00 in/hr 18 in in 70.2 ft3/ft 89 ft 89 ft 15.0 ft 6.3 hours 89 ft ACHD Calcs- Ph3.xlsm 3/3/2022, 9:53 PM Version 10.0, May 2018 Kimley >>Horn V. APPENDIX B- Grading and Drainage Plan Sheets 3° PAVING CONSTRUCTION NOTES ' ❑1 CONSTRUCT 6"—TICALF CURB AND GUTTER PER e �2 CO UO TER PER ACHD SU U ❑3 CO TITDAL RUNS iER T I. OWG NS^ n CC _ .MAB R 2714.94 [ - _ ABLE ],S 3T - T-.L .. Tv- A. - SHDEET 27 5.3 CA 11 49 2J1E22 ' v\ T r ., « AFF .T M15.2C 71 y _ FITI AT- DIG D CURB E 2 P LE ON e fit L' _DR35 Pv_ PIPE LENGTH AND SLOPE t o o f 0 70' 20' 40" - < r Fl L-PE P12" PERFORATED PVC PIPE. LENGTH AND o - - — SCALE: 1" = 10' - , r SEEPAGE eE I w L :::N:, R. � � D PER DETAIL ON SHEET T �ISSyy T T T C AD.'U� J-V1 E -1.1 TO GRADE. �I - � �� ��— F / �� C NIA I TO D",, DRAIN MANHOLE ttPE A Tc.zn3.eeFT IS 7 B 2 'a'i. 0 4 11 12 14 / 15 /- /1 ]�� _ r A 1. ALL ERUNIJING AND OFFSETS ARE FROM THE STREET 1 v l 3 3e 1 CENTERLINE. II , a—T ,sg3oti / 2. ALL SIOEWAlHS SHALL COMPLY tWiH THE LAIESi ADA w,m raT.r. STwta.aaU 1 2 auT 2na,5 n, . n, . n,aTo 2T,soo f r FRjai58� '�atR33e sTwta.es.3n sTwts.,s.ss ,5tet.le nn,eaoT..3 / B<OCK STANDARDS. CRO55 SLOPE SHALL BE L£55 THAN 2B � F;a : r ` rr rr ,s �t� r F;s m:s „,� T r°f,,, oL. , rT7,,, s,i f." rrz,,;s TeIL x 2a.e3RTr^ ^ ^ ^ ^ ,aam ^ ^ S.GRATCLIFFWAT^ ^ ^ ,+ ^----------- NI I oUT 2J09oo a 33 -I - - - — - SS B - - - as as LFas 12 ea�,z'`sr zT»ai 7l. D.TTc.mam _aF ,ee.Peox�crin " e 'N Tc.s ITA Tc2T,a.2o a.esIIS'r M2n.T2 Tcn,ae3 R127— Tcznsa3 ,c zT,sea T 11-1 is 2T,e 31 "' "", xRT aFF. ten1-s / RII -AA 26 27 26 25 2 28 22 21 20 N nzJ30 L . e .9 BLOCK 2// RN 2720 a2.00R I 2718 smof n a 2712 a "a 242 d x 2J08 2'- SD INV: 2711.40 2JOB 2J01 2J06 �a El 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 C7.10 / I � FEE 1 E zTlss SEE SHEET C7.10 L-�L;'EARMONT I He w ST 1- U+oo t I - n o�oaox u3n N IT, ` . x2ns.s4 1 Tc n1 o J l T1717 x6m IT 2-36 m177ii 4 az w z e7 z s7 �.. P BLO••CK4 I I I 2M0 8 - 27. $. i am wQ -A p 2718 - - - +0.45X- -_-_ --ex. _ +045R _-__ m o m 2718 2712 12" INV:2714.fi4 5D mme------ 2112 27 0 2710 FZ I Y)iYIHl) YSYao/l� I 'I �Y)iMiCY Y)SMFZ! Y)6Fki Y)DdLD` Y)fY�Z) Y)f[iF) �Y)iMFSi `.. Y)iYRl•) F� FiTFA) � Y)iY�ri �e)uev) V)iYAA) CURB RAMP BLOWUP DETAIL NTS PAVING CONSTRUCTION NOTES ® CONSTRUCT S' DETACHED CONCRETE SIDEWALK PER C 'IPF. I..PWC STO ❑ COP..N�. - -n.BLE L ., Tv - A = SHEET Cd1O O C - - CURB F_ EDIG SPWC -L ,.�� - -524 WITH 20 BAFFLE SEPARATION. L- -.-P F. ,.1 SDR35 PVC PIPE. LENGTH AND SLOPE SLTPE PEF PL„RFORATED PVC PIPE. l£NGTH AND 103 II CDNS _i _LEPAGE BED Pr DE -Al- ON SHEET C7.10� ADJUST WATER VALVE BOX AND COVER TO GRADE. 15 ADJUST MANHOLE RIM TO GRADE. 17 INSTALL TYPE II TERMINUS BARRICADE PER ACHD 5 SD 1132A 1�8 INSTALL TYPE II TERMINUS BARRICADE PER ACHD � R SD 1132B O IB INSTALL 48 D A. STORM DRAIN MANHOLE TYPE A F PER I STD DWG SD 612 y s 1. ALL STATIONING AND OFFSETS ARE FROM 1HE STREET ^ - CLLNIERLINE 2 SIARDS, S SHALL COMPLY B THE LATEST ADA 2%. STANDARDS. CROSS SLOPE SHALL BE LESS THAN TR. LONG NUDINAL SHALL BE LESS THAN 5% UNLESS AT A RAMP. Y8 J BID w Q m a F aOx 7.10 CC °ga4 W 1Nn s �U0 Z mw�QN L9 q} LL rc lL M i KEY MAP � o NORTH 0 30' 60' 120' �a SCALE: 1" = 30' NEAL rl` VLib70 I 60' PUBLIC RIGHT-OF-WAY 5' SIDEWALK B' PLANTER 16.50' 16.50' 6' PLANTER 5' SIDEWALK 3" ROLLED CURB AND ��� s a 2RAT LANDING /1` _ - BEHIND SIDEWALK, TYP. IIJ _ �� III —ICI —III III o III JIL II III —III —III ICI III"' II`' C C FCf �� o C 1 Q dill 25 -A CR 51[FE L'ELRLE 11" OF COMPACT IN IF E6 PCOMPAC �L TRADE 3T TYPICAL LOCAL STREET SECTION WITH DETACHED SIDEWALK 0 $ 2 s o /^ 9 LOCAL ROAD TYPICAL SECTION SCALE: NTS 2 NOT USED SCALE: NTS a NA vzszvsszvsssBEDr. - s wusE wAa - ;3�iY+(3�iY _� s m UD i 0 FaQ - J _ cl) w o a N S Q lL > DO w DO b7— rzv w � y ti qJ -t"-r'r-rr-fG-txD, 1-0 11 `g ; `g i NL aK IIA.Ra1r• O N a 10' 'UT U 7 NO = No I—NR .1 o R. EZl AI Ia I, 0 x 4 w wry^ I)RM WATER RET=1.iION SUMMARY TABLE LENGTH TOP OF ROCK GGTTOU OF GROUNDWATER REO'D SEPARATIDN DESIGN INFILTRATION NAME (ft) ELEV. RGCl ELEV. ELEV. (3' MIN) RATE (IN/HR) 5670 h3 C8.10 SEEPAGE BED DETAIL SCALE: NTS 4 NOT USED SCALE: NTS Kimley >> Horn VI. APPENDIX C- Geotechnical Report and Addendum