HomeMy WebLinkAboutConstruction Drawings C3.10 V1w
w
x
0 a
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING IMPROVEMENTS SHOWN ON THE PLAN.
2. CONTRACTOR TO PROTECT IN PLACE, DURING DEMOLITION AND CONSTRUCTION, ALL
EXISTING IMPROVEMENTS THAT ARE TO REMAIN AS NOTED ON THE PLAN.
3. ANY EXISTING STRUCTURE, IMPROVEMENT OR APPURTENANCE TO REMAIN THAT IS
DAMAGED DURING DEMOLITION OR CONSTRUCTION SHALL BE IMMEDIATELY REPAIRED OR
CONNECT TO EXISTING REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
PRESSURE IRRIGATION.
4. COVER OVER WATER MAIN SHALL BE 4 FEET.
LEGEND
PROPERTY LINE
EXISTING PHASE 1 �. REMOVE EXISTING BLOW OFF — — — —
AND MAKE COMPATIBLE RIGHT-OF-WAY LINE 0
CONNECTION TO EXISTING 8" ADJACENT PROPERTY LINE
WATER MAIN.
�. 8" SS PROPOSED MAIN SEWER LINE o
8" W PROPOSED MAIN WATER LINE
' PiRR PROPOSED PRESSURE IRRIGATION LINE
2 w
F
REMOVE EXISTING SEWER GIRR EXISTING GRAVITY IRRIGATION LINE Q
CLEANOUT AND MAKE
COMPATIBLE CONNECTION ON / PROPOSED A.C. PAVEMENT
TO EXISTING SEWER MAIN.
SSMH 02 3
PROPOSED CONCRETE PAVEMENT a
oS 4
31
/ a 5
/ s / NORTH N
30 / O
z
/ 6
0 40' 80' 160'
29 / ^
SEEPAGE BED #1 \ 7 0
/ SCALE: 1 " = 40'
28 /g/
/ 9
27 / y
SSMH 03 /
0
/ 10 ■�
/ 26
25
3
/24/ 8S 12
c
M 23 N / �O�/�� 13 / J Q CD
i EXISTING PHASE 1 , / 22 \8 w Lu O
14 Q
21ILL
LL
15 H
J � �
20 ss° U U) U)
Of
E / BLOCK 3 Q U =
19 SSMH 04
Lu — -- % �<o
BLOCK 2 C7
CONNECT TO EXISTING 16 17
PRESSURE IRRIGATION.
18 I
REMOVE EXISTING BLOW OFF N N N z
AND MAKE COMPATIBLE
CONNECTION TO EXISTING 8" o 0 0
3 r— _ _ WATER MAIN. — — O
INSTALL BLOW OFF w Q
U
I`I —W. LEARMONT ST. W U'
EXISTING PHASE 1
SSMH 06 SS "q SS „8
SSMH 05 =CD
SQ ¢ m o
INSTALL SEWER CLEANOUT m m 0 co
o z m
w Lu
z z U
- U U Lu CD
SEEPAGE BED #2 <ll� w Lu = O
E
2 3 4 5 I 6 I 7 SEAL
BLOCK 4 I �FFSS `\C NSfONC�y�
CONNECT TO EXISTING 8670
_ PRESSURE IRRIGATION. y- 0=�s/�wzo2zo
iRlld r9lf OF
9ejGA IL HP��
3
E SHEET
C3.10