HomeMy WebLinkAboutDrainage Report V1Kimley >>Horn
Oakwind Estates
Subdivision
Meridian, ID
Prepared By:
Kimley-Horn Associates
950 W Bannock St
Suite 1100
Boise, ID 83702
Contact: Brandon McDougald, P.E.
(801) 915-7842
Job No. 093893000
February 04, 2022
Kimley»)Horn
GENERAL LOCATION AND DESCRIPTION
This drainage study is being prepared for both Phase 1 and Phase 2 of the Oakwind Estates
Subdivision in Meridian, Idaho. The site is located to the northeast of the intersection of
McDermott Road and McMillan Road. It is bound to the north by a commercial development,
east by Phases 1 and 2 of the Oaks North Subdivision, west by McDermott Road, and south by
McMillan Road. This project consists of approximately 24.36 acres and 185 lots. The site is
located within section 28, Township 4 North, Range 1 West Meridian, Ada County, Idaho.
The proposed development will consist of approximately 212 residential and common lots with
the associated roadways and utilities.
The site currently slopes mostly to the west at a grade of ±0.25-1%. The site is currently a
portion of an undeveloped field used historically for agricultural purposes. The site is in zone
"X", an area determined to be outside the 0.2% annual chance floodplain, according to the
Flood Insurance Rate Map, Map Number 16001C0140J, which bears an effective date of June
19, 2020.
II. HISTORIC DRAINAGE
Currently, the site is undeveloped, and is bounded by McDermott Rd to the west and McMillan,
to the south. This site generally slopes from the east to the west at a rate of approximately
0.25-1'%. In the existing condition it appears that storm water runoff will mostly infiltrate into
the undeveloped ground. Any runoff appears to drain to ditches along McMillan or McDermott
where it is eventually conveyed by a culvert under McDermott to the west. No
detention/retention was found to be existing on the current site.
III. DRAINAGE DESIGN CRITERIA
Ada County Highway District (ACHD) requires that new developments provide primary
conveyance for the 100-yr storm event and retention for the 100-yr storm event. The site has
been designed to these standards with detention volumes being determined for the 1-hr 100-yr
event per the ACHD Calculation Sheet for Finding Peak Discharge/Volume Spreadsheet. This
volume was used to design the infiltration beds. The infiltration rate and high groundwater
elevation for this design were taken from the geotechnical reports B180977g (July 20, 2018) and
B210822g. (April 16, 2021) prepared by Materials Testing and Inspection, Inc.
The Rational Method was used in calculating the required retention volume for the site. The
site was delineated into drainage areas based upon the proposed grading and drainage design.
The C-factor was taken to be 0.5 which is the higher end for single family residential listed in
the ACHD "Estimated Runoff Coefficients for Various Surfaces" table. Along the McDermott
Kimley»)Horn
frontage where the residential C-factor did not apply, a composite C-factor was determined
using 0.9 for the roadway and 0.35 for the planted areas.
The required volume and the provided volume of retention for each drainage area has been
calculated and is shown in the appendixes along with all design assumptions.
III. PROPOSED DRAINAGE
The proposed drainage infrastructure will consist of an on -site storm drain system discharging
into an underground infiltration bed for each of the drainage areas.
Prior to releasing water into the on -site underground infiltration beds, the water will be treated
by a sand/oil separator unit per ISPWC SD-606. This treatment unit will be capable of treating
the 25-year event. Since the seepage beds are located in common lots, no silt factor was used
in sizing the infiltration beds per the requirements of the ACHD design requirements.
The design infiltration rates were taken to be between 1-8in/hr per the geotechnical report No.
13180822g prepared by Materials Testing & Inspection, Inc prepared April 16th 2021. Each bed
was assigned an infiltration rate in this 1-8in/hr range based upon its location on site in relation
to the closest infiltration test. Given this infiltration rate each infiltration bed will drain in under
the required 48 hrs.
Kimley>»Horn
1y�_l:J:jAill 11:1
Seepage Bed - 1.1
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.50
1.17 acres
0.00 cfs
V 2,022
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
19.0 ft
3.0 ft
0.4
8.00 in/hr
18 in
Spf 35.6
in
1
Link to: Qv
QV TR55
2,022 ft3 0%Sediment
35.6 ft'/ft
L 57
57 ft
SWL 57
57.0 ft
SWW 19.0
19.0 ft
2.5 hours
57
57 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
,3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP01.1.xlsm 2/3/2022, 4:18 PM
Version 10.0, May 2018
Seepage Bed - 1.2
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.50
1.75 acres
0.00 cfs
V 3,024
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
13.0 ft
3.0 ft
0.4
8.00 in/hr
18 in
Spf 24.4
in
1
Link to: LQV
QV TR55
3,024 ft' 0%Sediment
24.4 ft'/ft
L 124
124 ft
SWL 124
124.0 ft
SWW 13.0
13.0 ft
2.5 hours
124
124 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP01.2.xlsm 2/3/2022, 4:19 PM
Version 10.0, May 2018
Seepage Bed - 02
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1uu
0.50
5.99 acres
0.00 cfs
V 10,351
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
60.0 ft
3.0 ft
0.4
5.50 in/hr
18 in
Spf 99.7
in
1
Link to: Qv
QV TR55
10,351 ft' 0%Sediment
99.7 ft3/ft
L 104
104 ft
SWL 104
104.0 ft
SWW 60.0
60.0 ft
3.3 hours
104
208 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP02.xlsm 2/3/2022, 4:22 PM
Version 10.0, May 2018
Seepage Bed - 03
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
luu
0.50
1.93 acres
0.00 cfs
V 3,335
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
17.0 ft
3.0 ft
0.4
1.00 in/hr
18 in
Spf 22.0
in
1
Link to: LQV
QV TR55
3,335 ft' 0%Sediment
22.0 ft3/ft
L 152
152 ft
SWL 152
152.0 ft
SWW 17.0
17A ft
13.9 hours
152
100 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP03.xlsm 2/3/2022, 4:24 PM
Version 10.0, May 2018
Seepage Bed - 04
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
tnter number of Seepage beds (1S max)
3 Design Storm
100
4 Weighted Runoff Coefficient C
0.50
5 Area A (Acres)
2.19 acres
6 Approved discharge rate (if applicable)
0.00 cfs
7 Is Seepage Bed in Common Lot? Yes V
3,784
8 Set Total Design Width of All Drain Rock
W
25.0 ft
9 Set Total Design Depth of All Drain Rock
D
3.0 ft
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
6.50 in/hr
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
18 in
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
in
14 Calculate Total Storage per Foot
Link to: LQV
QV TR55
3,784 ft3 0%Sediment
Spf 43.7 43.7 ft3/ft
15 Calculate Design Length
L
87
87 ft
Override Value Required for Chambers
16 Variable Infiltration Window L
SWL
87
87.0 ft
17 Variable Infiltration Window W
SWW
25.0
25.0 ft
18 Time to Drain
2.9 hours
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
87
87 ft
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
Optional Storage Chambers
Note: This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers
SC740
2 Volume to Store
V
0
ft3
3 Installed Chamber Width
Cw
4.25
ft
Installed Chamber Depth
Cd
2.50
ft
Installed Chamber Height
Ch
7.12
ft
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
45.90
ft3/Unit
6 Chamber Storage Volume, With Rock, Per Manuf
74.90
ft3/Unit
7 Total Number of Units Required
0
ea
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ftZ
Vperc 0 ft3/hr
hours
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP04.xlsm 2/3/2022, 4:27 PM
Version 10.0, May 2018
Seepage Bed - 05
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.50
0.93 acres
0.00 cfs
V 1,607
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
10.0 ft
3.0 ft
0.4
6.50 in/hr
18 in
Spf 17.6
in
1
Link to: Qv
QV TR55
1,607 ft' 0%Sediment
17.6 ft3/ft
L 91
92 ft
SWL 92
92.0 ft
SWW 10.0
10.0 ft
2.9 hours
92
92 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BO1_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SPOS.xlsm 2/3/2022, 4:29 PM
Version 10.0, May 2018
Seepage Bed - 06
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.50
1.51 acres
0.00 cfs
V 2,609
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
20.0 ft
3.0 ft
0.4
7.50 in/hr
18 in
Spf 36.7
in
3
Link to: Qv
QV TR55
2,609 ft3 0%Sediment
36.7 ft3/ft
L 71
72 ft
SWL 72
72.0 ft
SWW 20.0
20.0 ft
2.6 hours
72
72 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP06.xlsm 2/3/2022, 4:30 PM
Version 10.0, May 2018
Seepage Bed - 07
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.65
0.63 acres
0.00 cfs
V 1,415
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
10.0 ft
3.0 ft
0.4
1.00 in/hr
18 in
Spf 13.0
in
1
Link to: Qv
QV TR55
1,415 ft3 0%Sediment
13.0 ft3/ft
L 109
109 ft
SWL 109
109.0 ft
SWW 10.0
10.0 ft
14.0 hours
109
109 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP07.xlsm 2/3/2022, 4:32 PM
Version 10.0, May 2018
Seepage Bed - 08
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.65
0.26 acres
0.00 cfs
V 584
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
10.0 ft
3.0 ft
0.4
8.00 in/hr
18 in
Spf 18.8
in
1
Link to: Qv
QV TR55
584 ft' 0%Sediment
18.8 ft3/ft
L 31
32 ft
SWL 32
32.0 ft
SWW 10.0
10.0 ft
2.5 hours
32
32 ft
uptionai storage t nam
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP08.xlsm 2/3/2022, 4:33 PM
Version 10.0, May 2018
Seepage Bed - 09
Phase 1
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.65
0.84 acres
0.00 cfs
V 1,887
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
10.0 ft
3.0 ft
0.4
3.00 in/hr
18 in
Spf 14.7
in
1
Link to: Qv
QV TR55
1,887 ft3 0%Sediment
14.7 ft3/ft
L 128
129 ft
SWL 129
101.0 ft
SWW 10.0
10.0 ft
6.7 hours
129
101 ft
Optional Storage Charm
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP09.xlsm 2/3/2022, 4:35 PM
Version 10.0, May 2018
Seepage Bed - 1
Phase 2
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
tnter number of Seepage beds (1S max)
3 Design Storm
100
4 Weighted Runoff Coefficient C
0.50
5 Area A (Acres)
2.02 acres
6 Approved discharge rate (if applicable)
0.00 cfs
7 Is Seepage Bed in Common Lot? Yes V
3,491
8 Set Total Design Width of All Drain Rock
W
39.0 ft
9 Set Total Design Depth of All Drain Rock
D
3.0 ft
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
3.00 in/hr
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
18 in
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
in
14 Calculate Total Storage per Foot
Link to: LQV
QV TR55
3,491 ft3 0%Sediment
Spf 56.7 56.7 ft3/ft
15 Calculate Design Length
L
62
62 ft
Override Value Required for Chambers
16 Variable Infiltration Window L
SWL
62
62.0 ft
17 Variable Infiltration Window W
SWW
39.0
39.0 ft
18 Time to Drain
5.2 hours
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
62
62 ft
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
Optional Storage Chambers
-
Note: This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers
SC740
2 Volume to Store
V
0
ft3
3 Installed Chamber Width
Cw
4.25
ft
Installed Chamber Depth
Cd
2.50
ft
Installed Chamber Height
Ch
7.12
ft
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
45.90
ft3/Unit
6 Chamber Storage Volume, With Rock, Per Manuf
74.90
ft3/Unit
7 Total Number of Units Required
0
ea
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ftZ
Vperc 0 ft3/hr
hours
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_PH2_SP1.xlsm 2/3/2022, 4:37 PM
Version 10.0, May 2018
Seepage Bed - 2
Phase 2
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
2 Enter number of Seepage Beds (25 max)
3 Design Storm
4 Weighted Runoff Coefficient C
5 Area A (Acres)
6 Approved discharge rate (if applicable)
7 Is Seepage Bed in Common Lot? Yes
1Uu
0.50
1.75 acres
0.00 cfs
V 3,024
8 Set Total Design Width of All Drain Rock
W
9 Set Total Design Depth of All Drain Rock
D
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
14 Calculate Total Storage per Foot
15 Calculate Design Length
Override Value Required for Chambers
16 Variable Infiltration Window L
17 Variable Infiltration Window W
18 Time to Drain
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
17.0 ft
3.0 ft
0.4
3.30 in/hr
18 in
Spf 25.3
in
1
Link to: Qv
QV TR55
3,024 ft3 0%Sediment
25.3 ft3/ft
L 120
120 ft
SWL 120
120.0 ft
SWW 17.0
17.0 ft
4.9 hours
120
120 ft
Optional Storage Charm
Note: This assumes chambers are organized in a rectangular layout.
1 Type of Chambers
2 Volume to Store V
3 Installed Chamber Width Cw
Installed Chamber Depth Cd
Installed Chamber Height Ch
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
6 Chamber Storage Volume, With Rock, Per Manuf
7 Total Number of Units Required
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ft 2
Vperc 0 ft3/hr
hours
ft3
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_PH2_SP2.xlsm 2/3/2022, 4:39 PM
Version 10.0, May 2018
Seepage Bed - 3
Phase 2
ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers
NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the
Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in
facilities that meet or exceed these calculations in order to be accepted.
Note this spreadsheet pulls information from the "Peak QV" tab
Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab)
User input in yellow cells.
1 Project Name Oakwind Estates
z tnter number of Seepage beds (1S max)
3 Design Storm
100
4 Weighted Runoff Coefficient C
0.50
5 Area A (Acres)
2.69 acres
6 Approved discharge rate (if applicable)
0.00 cfs
7 Is Seepage Bed in Common Lot? Yes V
4,648
8 Set Total Design Width of All Drain Rock
W
22.0 ft
9 Set Total Design Depth of All Drain Rock
D
3.0 ft
Rock Only, Do Not Include Filter Sand Depth or Cover
10 Void Ratio of Drain Rock
Voids
0.4
0.4 for 1.5"-2" drain rock and 3/4" Chips
11 Design Infiltration Rate (8 in/hr max)
Perc
3.40 in/hr
12 Size of WQ Perf Pipe (Pert 1800)
Dia pipe
18 in
13 Size of Overflow Perf Pipe (Perfs 3600), READ if Q100>3.3 cfs
in
14 Calculate Total Storage per Foot
Link to: LQV
QV TR55
4,648 ft3 0%Sediment
Spf 32.8 32.8 ft3/ft
15 Calculate Design Length
L
142
142 ft
Override Value Required for Chambers
16 Variable Infiltration Window L
SWL
142
142.0 ft
17 Variable Infiltration Window W
SWW
22.0
22.0 ft
18 Time to Drain
4.7 hours
90%volume in 48-hours minimum
19 Length of WQ & Overflow Perf Pipes
142
142 ft
20 Perf Pipe Checks. Qperf >= Qpeak;
where Qperf=CdxAxJ(2xgxH)
Optional Storage Chambers
Note: This assumes chambers are organized in a rectangular layout.
1-StormTech,
1 Type of Chambers
SC740
2 Volume to Store
V
0
ft3
3 Installed Chamber Width
Cw
4.25
ft
Installed Chamber Depth
Cd
2.50
ft
Installed Chamber Height
Ch
7.12
ft
4 Chamber Void Factor
5 Chamber Storage Volume, Without Rock, Per Manuf
45.90
ft3/Unit
6 Chamber Storage Volume, With Rock, Per Manuf
74.90
ft3/Unit
7 Total Number of Units Required
0
ea
8 Area of Infiltration
9 Volume Infiltration
10 Time to Drain
90%volume in 48-hours minimum
Aperc ftZ
Vperc 0 ft3/hr
hours
K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_PH2_SP3.xlsm 2/3/2022, 4:40 PM
Version 10.0, May 2018
APN:
SO429440000
APN:
SO428325610 APN"—
J SO428325460
r----------------------------------- ---------------------------------------------r--- ----
PHASE 2 1 — — — — — —
SP-3a
BLOCK 8 1 1 I 3 I 2 1 1 i I
51 I I I 1 11 11 5 I 4 I I 1 r---- I
I 15 I 14 1 13 12 1 11 I 10 I 9 I 8 0.5 � I I
16 9 BLOCK 8
PHASE 2 — — 2.69
SP 1 _1
IIII r— I
_ _W AVILLA ST _
e� — -- —
1 PHASE 2II� Q=
0.65 CB3 & 4 EXISTING OAKS NORTH
12 W 19 14 15 16 17 PHASE 2 1
18 20 21 — 2 SUBDIVISION NO. 2
0. —
84 O PHASE 2 SP 3b „',
CB1 & 2_ BLOCK 7 I I I I 1, 1 — — (NOT A PART)
00 2
20 III III 1111... 1 1� Uu
I
Q 3 >
0.5 11 10 9 8 6 0.5 4 3 �� ��,, z — — �O — —
s
1 21 III 2.02 PHASE 2 L 1.75 BLOCK 7 � Q
sP—os _ _ _ _ c67 & s _ _ — — 4
I�
W SOPRANO ST � � �
22 — —
W \
23 I III � III
J' 15 16 17 18 19 20 21 22 23 1 6 /
PHASE 2
D III III I I sP-2 BLOCK 6
• 24
II BLOCK 6 i 1 'i1 /
7 III 13 1 11 10 g 0.5 6 5 4 3 2 1
5
26.2
2.42 )Ili
IIII
/ II
26 I — — W MILANO ST
— PHASE 2
00 27
r � I CBS & 6 — —
O
SP 02
5
7 9 1
10
1 Co 28 III I II II Q BLOCK 4 Q — —
4
29 5 2
I III I /
Q I II II 3 I II � III — 4J
= I 9 I II z I 7 BLOCK 4 � 12
0.65 30 I /
Z 0.26 BLOC 5 BLOCK 4 Z °r° 1 I I
2
0.5 O
I SP-08 Ili it 10 III 6 6.1 13 n
1 I 3.57 4 I / \
I
0.5 BL 5 _
W DAPHNE ST
14
1.17 I�
111IJ
— SP-1.2 CB03 & 04 — — — — — —
SP-1.1 W DAPHNE ST
—49
_ —
1 3.2 BLOCK 3 — F — —
I IIII . r481 1 7156 o.5 I
II
I
1 I —
1 117 14 13 12 11 10 9 5 4 I I
3 2��
— —1 0.5
47 I I CB01 & 02 — SP-06I — —
5
0.93
—03
03 III 1 46 It0 /4
45
_ CB11 cn II 1 +J Q I I I I I I I I I I I BLOCK 2 1 I I r 5 �� EXISTING OAKS NORTH _
16 15 14 13 1 11 10 9 8 7 6 1 4 2 1 I SUBDIVISION NO. 1
44 I I I I I I I I I I I I I I 3 1I (NOT A PART)
1 J Z SP-05
10 z \, �
10 43 17
0.63 — �—
I r 42— CB09 & 10
SP-04
1 I
I I I I I I I I I I I 1 1 I I
1118 1 19 1 20 1 21 1 22 1 231 1 124 1 5 1 26 1 27 1 28 1 2911 1 1131 i 32 33 i 34 i 3
41 1 1 I -- 1—
_ I ' \
511 40— J9
� TL_L_ )_ �LLe I J 10
— — 1
SP-07 W RIVA CAPRI ST \
1 38 015 CB05 & 06 0 5 W Z /
38 11 / 1.93 e — — _ — 2.19 — Ip
SP-03 C607 & 08 I I _ � I
1 — 37 I I BLOCK 1
1 — J 11 34 33 32 i 31 i 3d 1 29 28 1 27 i 26 25 i 241 i 123 1 22 1 21 1 20 1 19 1 181 1 117 116 15 114 113 1 12
_. ---1 1 I I I 1 I I
I 52—
I' I — —
�52
-------_ __ _ — — —
--- —
� —=F
_.. - - - _.- --- L f.,_ - __.... _ .._._ C -- - -,��rrrrrr��w� - - - -- — - — —
W RIVA CAPRI ST
EXISTING OAKS WEST SUBDIVISION NO. 1 (NOT A PART) — — —
LEGEND
C FACTOR o.5
DRAINAGE AREA DESIGNATION 7
DRAINAGE AREA (AC) ###
DRAINAGE AREA BOUNDARY
PHASE BOUNDARY
GRAPHIC SCALE IN FEET
0 30 60 120 NORTH
OAKWIND ESTATES
PROPOSED DRAINAGE AREA M
MERIDIAN, ID
Call before yo„ dig.
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Kimley)))Horn
02022 KIMLEY—HORN AND ASSOCIATES, INC.
950 Bannock Street, Suite 1100
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
Kimley)Morn
SCALE (H): 1••=60• 6
SCALE (V): N/A w
1
1
National Flood Hazard Layer FIRMette .. FEMA
116o28'38"W 43o39'13"N
-- 1.17,VVV
0 250 500 1,000 1,500 2,000
Basemap: USGS National Map: Orthoimagery. Data refreshed October, 2020
Legend
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
Without Base Flood Elevation (BFE)
Zone A, V, A99
SPECIAL FLOOD
With BFE or Depth Zone AE, Ao, AH. VE. AR
HAZARD AREAS
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mile Zonex
Future " Conditions 1% Annual Chance Flood Hazard Zone
Area with Reduced Flood Risk due to
OTHER AREAS OF Levee. See Notes. Zone
FLOOD HAZARD Area with Flood Risk due to Levee zone D
NO SCREEN Area of Minimal Flood Hazard Zone
Q Effective LOMRs
OTHER AREAS Area of Undetermined Flood Hazard Zone D
GENERAL - — - - Channel, Culvert, or Storm Sewer
STRUCTURES I I I I I I I Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17•5 Water Surface Elevation
a - - - Coastal Transact
—5f5— Base Flood Elevation Line (BFE)
Limit of Study
Jurisdiction Boundary
— --- Coastal Transact Baseline
OTHER _ Profile Baseline
FEATURES Hydrographic Feature
Digital Data Available N
No Digital Data Available
MAP PANELS Unmapped
QThe pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 1/11/2022 at 10:34 AM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.