HomeMy WebLinkAboutENGINEER CERT RELIEF V1Alan Tiefenbach Feb 1, 2022, 4:40 PM (9 days ago)
to Joe, me, Bill -
Kent, isn't this short plat also including the remainder of the landscape strip to the northwest? That would be a common lot.
You would be combining this into the existing lot where you are building the warehouse. so that would be one building lot.
I'm pretty sure Joe doesn't care about this since he will review the CZC and already revised the annexation request, but I've copied him so he can respond and if nothing else is required you can include his email as the later.
Landscape plan should include as -built buffer to the northwest (remaining buffer). The remaining landscaping will be part of the CZC. ON THE PHONE LATER STATED NO LANDSCAPE
Not necessary to submit engineer drawings or CAD drawings PLAN WOULD BE REQUIRED
Please submit that all this is not applicable so no one holds this up.
NO NEW STREETS SO NO ENGINEERING CERT
Alan Tiefenbach I Current Associate Planner
City of Meridian I Community Development Dept.
33 E. Broadway Ave., Ste. 102. Meridian, Idaho 83642
Phone: 208-489-0573 1 Fax: 208-489-0571
C DIAN.-
Joe Bongiorno
lr�l to Alan, me, B,li -
Yes - I will comment at the CZC
Joe Bongiorno CFI, CFEI
Deputy Chief - Fire Marshal
Meridian Fire
33 E. Broadway Ave., Ste. 210, Meridian. ID 83642
(Direct) 208-489-0458 (Cell) 208-936-9554
Oyl E IFZ DIAN} V
�(E ID$QIA
Dedication-L oyal ry-Tradition
tD Feb 1, 2022,.4:45 PM (9 days ago)