Loading...
HomeMy WebLinkAboutStorm Drain Calcs V1STORM DRAINAGE REPORT AND CALCULATIONS FOR SKYBREAK SUBDIVISION NO. 1 /GENF�� 16970 ksT11-12-21 OF MERIDIAN, IDAHO PREPARED BY: CORINNE M GRAHAM, PE October 26, 2021 Csw C 1N/I L S ITE w 0 R K S PO BOX 6059 BOISE, ID 83707 (208)946-3874 cgraham@cswengineering.com INTRODUCTION The existing 30.76-acre site for the proposed Skybreak Subdivision No. 1 is currently agricultural row crop ground. The proposed development includes 54 single family residential lots, 18 landscape common lots, and associated public and private streets, landscaping, and utilities. HISTORIC DRAINAGE The existing project site sits southeast of the intersection of E. Lake Hazel Road and S. Eagle Road in Meridian. The eastern portion of the site that will be developed in Phase 1 lies along Meridian's southern rim. Surficial soils are comprised of sandy silts and silty sands. At depths of 3-6 feet, free draining poorly graded gravel with sand was encountered during geotechnical exploration. Groundwater was not encountered at depths up to 15.2 feet and is not anticipated to reach levels higher than 20 feet below existing ground. Because of the presence of free draining materials and the depth to groundwater, the site is suitable for the use of infiltration facilities. PROPOSED DRAINAGE The storm drainage calculations and design for the proposed improvements are intended to meet the requirements of ACHD's storm water policy. Storm water facilities are designed to store and treat runoff from a 100-year storm event and to pretreat the water quality volume defined as the 80t" percentile storm event. Stormwater runoff from the public entry street is conveyed via curb and gutter to drain inlets within the roadway then piped to an underground seepage bed where it is treated, stored, and finally infiltrated. A sand and grease trap will be installed to provide pre-treatment for the water quality event. Storm water runoff from the private streets and an area 40 feet behind the sidewalk within the residential lots, including driveways, will be conveyed to the public stormwater system to be owned and maintained by the subdivision HOA. Remaining lot drainage will be contained within individual lots. Storm water runoff is conveyed via curb and gutter to drain inlets within the private roadway then piped to six underground seepage beds where it is treated, stored, and finally infiltrated. Sand and grease traps will be installed to provide pre-treatment for the water quality event. APPENDICES • Drainage Basin Map • Storm Drainage Calculations • Project Geotechnical Report �--- - - BASIN #3P ACHD BASIN 1#1 � I 1 -- BASIN- T� I 1 I � BASIN #BP - - - -� BASIN #5P -TTTT BASIN #4P BASIN #7P SKYBREAK SUBDIVISION NO. 1 DRAINAGE BASIN MAP N T 100 0 100 200 SCALE: 1' - 200' CSW C I V I L S I T E Prepared By: Corinne Graham, PE October 26, 2021 Skybreak Subdivision No. 1 Storm Drainage Calculations Drainaee Basin Characteristics C Values Impervious = 0.90 Landscape = 0.20 ACH D Basin #1 Basin #2P Basin #3P Basin #4P Basin #5P Basin #6P Basin #7P Total Area (SF) 85187 72233 132706 128044 74725 72523 86099 Roadway Area (SF) 35396 30097 32430 37226 23903 21282 22052 Sidewalk Area (SF) 7982 4390 5197 5780 3989 1891 4781 House/Driveway Area (SF) 0 0 36737 34409 18406 18562 19101 Landscape Area (SF) 41809 37746 58342 50629 28427 30788 40165 C Value: 0.56 0.53 0.59 0.62 0.63 0.60 0.57 Catch Basin Calculations CB #1A CB #113 Total Area (SF) 42370 42817 Roadway Area (SF) 17670 17726 Sidewalk Area (SF) 3968 4014 House/Driveway Area (SF) 0 0 Landscape Area (SF) 20732 21077 C Value: 0.56 0.56 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #1 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 2.81 2.58 in hr 2.81 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,761 3,761 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Both 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 1,332 1,332 fY 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 376 ft' Primary Treatment/StorageBasin V 3,385 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,761 3,761 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 35,396 7,982 41,809 1.96 0.90 0.90 0.20 0.56 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.30-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #1 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.56 1.96 acres 0.00 cfs V 3,761 Link to: LQV QV TR55 3,761 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 12.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 56.2 ft3/ft 15 Calculate Design Length L 67 67 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 67 67.0 ft 17 Variable Infiltration Window W SWW 12.0 12.0 ft 18 Time to Drain 6.3 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 67 67 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:54 AM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #2P 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 2.29 2.58 in hr 2.29 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,061 3,061 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 1,084 1,084 fY 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 306 ft' Primary Treatment/StorageBasin V 2,755 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,061 3,061 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 30,097 4,390 37,746 1.66 0.90 0.90 0.20 0.53 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.30-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #2P 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.53 1.66 acres 0.00 cfs V 3,061 Link to: LQV QV TR55 3,061 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 46.8 46.8 ft'/ft 15 Calculate Design Length L 65 65 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 65 65.0 ft 17 Variable Infiltration Window W SWW 10.0 10.0 ft 18 Time to Drain 6.4 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 65 65 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:54 AM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #3P 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 4.66 2.58 in hr 4.66 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 6,236 6,236 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 2,208 2,208 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 624 ft' Primary Treatment/StorageBasin V 5,612 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 6,236 6,236 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 32,430 5,197 36,737 58,342 3.05 0.90 0.90 0.90 0.20 0.59 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.31 Railroad yard areas 0.20210 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #3P 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.59 3.05 acres 0.00 cfs V 6,236 Link to: LQV QV TR55 6,236 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 20.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 93.5 93.5 ft'/ft 15 Calculate Design Length L 67 67 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 67 67.0 ft 17 Variable Infiltration Window W SWW 20.0 20.0 ft 18 Time to Drain 6.3 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 67 67 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:54 AM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #4P 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 4.73 2.58 in hr 4.73 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 6,331 6,331 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 2,242 2,242 ft 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 633 ft' Primary Treatment/StorageBasin V 5,698 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 6,331 6,331 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 37,226 5,780 34,409 50,629 2.94 0.90 0.90 0.90 0.20 0.62 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.31 Railroad yard areas 0.20210 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #4P 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.62 2.94 acres 0.00 cfs V 6,331 Link to: LQV QV TR55 6,331 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 11.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 51.5 51.5 ft'/ft 15 Calculate Design Length L 123 123 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 123 123.0 ft 17 Variable Infiltration Window W SWW 11.0 11.0 ft 18 Time to Drain 6.3 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 123 123 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:55 AM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #SP 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 2.80 2.58 in hr 2.80 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,757 3,757 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 1,331 1,331 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 376 ft' Primary Treatment/StorageBasin V 3,381 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,757 3,757 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 23,903 3,989 18,406 28,427 1.72 0.90 0.90 0.90 0.20 0.63 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #5P 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.63 1.72 acres 0.00 cfs V 3,757 Link to: L0,v QV TR55 3,757 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 8.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 37.5 37.5 ft'/ft 15 Calculate Design Length L 100 100 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 100 100.0 ft 17 Variable Infiltration Window W SWW 8.0 8.0 ft 18 Time to Drain 6.3 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 100 100 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:54 AM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #6P 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 2.59 2.58 in hr 2.59 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,469 3,469 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 1,228 1,228 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 347 ft' Primary Treatment/StorageBasin V 3,122 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,469 3,469 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 21,282 1,891 18,562 30,788 1.66 0.90 0.90 0.90 0.20 0.60 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #6P 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.60 1.66 acres 0.00 cfs V 3,469 Link to: L0,v QV TR55 3,469 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 8.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 37.5 37.5 ft'/ft 15 Calculate Design Length L 92 92 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 92 92.0 ft 17 Variable Infiltration Window W SWW 8.0 8.0 ft 18 Time to Drain 6.4 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 92 92 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:54 AM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #7P 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 2.92 2.58 in hr 2.92 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,917 3,917 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 1,387 1,387 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 392 ft' Primary Treatment/StorageBasin V 3,526 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,917 3,917 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 22,052 4,781 19,101 40,165 1.98 0.90 0.90 0.90 0.20 0.57 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS_112018 Version 10.5, November 2018 10/26/2021, 10:54 AM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin #7P 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.57 1.98 acres 0.00 cfs V 3,917 Link to: L0,v QV TR55 3,917 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 6.5 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 30.5 30.5 ft'/ft 15 Calculate Design Length L 128 128 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 128 128.0 ft 17 Variable Infiltration Window W SWW 6.5 6.7 ft 18 Time to Drain 6.4 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 128 128 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\19044 Skybreak Subdivision\Reports\Storm Drain age\ACH D_SD_CALCS_1 12018 10/26/2021, 10:54 AM Version 10.0, May 2018