Verizon SEC of McMillan and Red Horse CZC A-2022-0041 V1E ID, IAN;a—
APPROVED
ea• aoeaumi•I oomPe,•o. wnn
.PPnwm. epilm•p ootl.a. coa
tlaecienci•a lopntla+iaapecllane
wlll to eewrracletl
regardl of le•information on
e approwtl plans. iee
apProvetl Dl,na, Inclutlin9 any
eP•«...
;,,�i�tl � � o• le. �p•,Ir•erip•
�.em.al•ap.eep•a.
D.
Permit NtllPear: wwz@a•a+
Planning Division
E IDIAN Community Development Department
D A H O 33 E. Broadway Avenue, Suite 102
Meridian, Idaho 83642
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0041
Project Name
Verizon SEC of McMillian and Red Horse CZC
Project Address
4801 N. Red Horse Way
Project Description
Verizon Wireless proposes to collocate on an
existing ACHD traffic signal and install (3)
panel antennas, (3) junction boxes, and (1)
power disconnect stand in the R-4 zoning
district.
Applicant
Elizabeth Mickelson, Powder River
Development Services LLC
Assigned Planner
Stacy Hersh
Expiration Date
March 14, 2023
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed below.
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
3. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
4. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
5. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
6. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
1 1 P a g e
E ID, IAN;a-
APPROVED
ea• aoeaumi•I oomhe,m. wnn
.hhnwm. epilm•p aotl.a. coa
tlaecienci•a loontla+iaapecllane
wlll pi. dl to eewrraclatl
reharp
M1e information on
apDrowtl plans. iee
apProvetl Dl,na, Inclutlin9 any
w Whom, are
requirM ro e• on tea conaVuclion
al Me eme of inapactlona.
Daermle:tN
Pit Numear: wwz@a•a+
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-313-6 and to install and maintain all landscaping
as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
2. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
3. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
4. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
5. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
6. The applicant and/or assigns shall have the continuing obligation to meet the specific
use standards for the proposed use as set forth in UDC 11-4-3-43, wireless
communication facility.
II. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before March 29,
2022, within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.
2 1 P a g e