Loading...
HomeMy WebLinkAbout2022-03-09 Settlers Irrigation Adrienne Weatherly From:Alan Tiefenbach Sent:Wednesday, March 9, 2022 2:20 PM To:Adrienne Weatherly; Charlene Way; Chris Johnson Subject:FW: Jamestownranch development Alan Tiefenbach | Current Associate Planner City of Meridian | Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208-489-0573 | Fax: 208-489-0571 Built for Business, Designed for Living From: Mack Myers <mack@settlersirrigation.org> Sent: Wednesday, March 9, 2022 1:14 PM To: Bill Parsons <bparsons@meridiancity.org> Cc: Alan Tiefenbach <atiefenbach@meridiancity.org> Subject: Jamestownranch development External Sender - Please use caution with links or attachments. Good afternoon, I just wanted to provide you a quick update per an onsite meeting held this past Monday morning at the Jamestown Ranch development. Several representatives from ACHD, KM Engineering, the Walsh Group, Granite Excavation, and Settlers Irrigation District were all in attendance. The topic of discussion was that ACHD has not received/reviewed or approved plans for construction inside of their ROW. This would include both the access off McMillan, the access off Blackcat, the Meadows Lateral diversion box, and any piping in the ROW which all have already been installed. Furthermore, it was determined that both accesses installed do not meet ACHD requirements per the attached code below. ACHD is requiring removal of the structures and a complete redesigned before a public road can be constructed over the top of the Lemp canal. 1 The License Agreement between SID and the Walsh Group states all construction impacting the SID facilities must be th completed by March 15. This means, the issues with the two accesses to the project are not able to be addressed until the next non-irrigation season. Also, being the latest design details the Lemp canal remaining open, please note the District will not permit any sidewalk/pathway or landscaping within the easement. Please take this into consideration as I believe the intent is to request a waiver. As to the request from Josh Jantz at KM to Alan to leave the Lemp open based on the Volterra sub. to the east, please see that that the Lemp canal was in fact piped at the Ten Mile intersection by the developer, as well as the east side of the intersection and additional intersections to the east along McMillan in much larger pipe. Is this not a standard requirement for future widening of all intersections? Please note that the intersections I referenced are traditional intersections which take up less space and the two lane round about designed for Blackcat and McMillan would be much larger than a traditional intersection. Based on the fact that plans for this project have not been approved by any other entity, and what was approved by SID will be removed, the developer will need to submit new plans for review to SID for consideration of the proposed construction within the Districts facilities next season. If you have any questions, please feel free to contact me anytime. Thank you, Mack Myers District Manager Settlers Irrigation District P.O. Box 7571 Boise, ID 83707 Office 208-343 5271 Fax 208 343-1642 2