HomeMy WebLinkAboutMER22-0015, NR Roaring Springs East Expansion, A-2022-0026 V1CUEIDR IAy ACHD
APPROVED I IL
DATE 03/09/22
FILE NUMBER: ^-2D22 D026
February 17, 2022
To: Arch, PLLC
Damond Beard
537 E. Forest Ridge Drive
Meridian, Idaho 83642
Subject: MER22-0015/ A-2022-0026
1420 S. Black Marlin Lane
Roaring Springs Water Park, East Expansion Design Review
Mary May, President
Alexis Pickering, Vice -President
Jim D. Hansen, 2nd Vice President
Kent Goldthorpe, Commissioner
Dave McKinney, Commissioner
The Ada County Highway District (ACHD) has reviewed the submitted application for the application
referenced above and has determined that there are no improvements required to the adjacent
street(s).
The applicant shall be required to:
1. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act
(ADA) requirements. The applicant's engineer should provide documentation of ADA compliance
to District Development Review staff for review.
2. Pay a traffic impact fee. If applicable, a traffic impact fee may be assessed by ACHD and
will be due prior to the issuance of a building permit by the lead agency. This is a separate
review process, and it is the applicant's responsibility to submit plans directly to ACHD. For
any questions regarding the traffic impact fee please contact ACHD's Impact Fee
Administrator, Austin Miller, at amiller(a)achdidaho.org or (208)387-6335.
3. Comply with all ACHD Policies and ACHD Standard Conditions of Approval for any
improvements or work in the right-of-way.
4. Obtain a permit for any work in the right-of-way prior to the construction, repair, or installation
of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways,
culverts, etc.).
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 9 PH 2O8-387-6100 • FX 345-7650 • www.achdidaho.org
MIAN,
DAHO
APPROVED
EMh: 03/09/22
RE NUMBEB:^-20210020
Traffic Information
This development is estimated to generate 484 vehicle trips per day; and 57 vehicle trips per hour
in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual,
11th edition.
Condition of Area Roadways:
Traffic Count is based on Vehicles per hour (VPH)
Roadway
Frontage
Functional
PM Peak Hour
PM Peak Hour
Classification
Traffic Count
Level of Service
Overland Road
0-feet
Principal Arterial
1,255
Better Than "E"
Black Marlin Lane
155-feet
Local
N/A
N/A
* Acceptable level of service for a five -lane principal arterial is "E" (1,780 VPH).
** ACHD does not set level of service thresholds for local roadways.
Average Daily Traffic Count (VDT):
Average daily traffic counts are based on ACHD's most current traffic counts
The average daily traffic count for Overland Road west of Meridian Road was
23,530 on October 5, 2021.
There are no average daily traffic counts for Black Marlin Lane.
If you have any questions, please feel free to contact me at (208) 387-6171.
Sincerely,
4"). pl,
1r�m
Renata Ball -Hamilton
Planner
Development Services
cc: City of Meridian (Bill Parsons), Via Email.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achdidaho.org
CUEIDR tAN,_- Standard Conditions of Approval
proposed irrigation facilities shall be located outside of the ACHD right-of-way (including
APPROVED easements). Any existing irrigation facilities shall be relocated outside of the ACHD right -
DATE 03/09/22 ay (including all easements).
FILE NUMBER: A-zozz-oozs ate Utilities including sewer or water systems are prohibited from being located within the
HD right-of-way.
3. In accordance with District policy, 7203.6, the applicant may be required to update any existing
non -compliant pedestrian improvements abutting the site to meet current Americans with
Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation
of ADA compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at 387-
6280 (with file number) for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be
borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The
applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days
prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic
Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised
during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers)
for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPVVC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of
Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing
and signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation
of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site
plan and may require additional improvements to the transportation system at that time. Any
change in the planned use of the property, which is the subject of this application, shall require
the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at
that time unless a waiver/variance of the requirements or other legal relief is granted by the
ACHD Commission.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achdidaho.org