HomeMy WebLinkAboutStorm Drainage Calcs V2�E IDIAN> APPROVED DATE 03/02/22 FILE NUMBER: Fa-2021-oo5e THE LAND GROUP Southridge South Subdivision —Phase 1 Meridian, Idaho Storm Drain Management & Engineering Drainage Report Developer Challenger Development Meridian, ID 83642 Engineer E� The Land Group, Inc. �$1pNAL G1ST� G'1 462 East Shore Drive, Suite 100 o�� Eagle, Idaho 83616 Contact: Jason Densmer, PE 09 1 Ph:208-939-4041 �T£ OF op ��N DETI� October 26, 2021 10/2��2021 TLG Project No. 121027 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com CUEIDR IAy APPROVED DATE: 03/02/22 FILE NUMBER: Fa-2o21-11 Purpose & Site Description Southridge South Subdivision — Phase 1 Meridian, ID Storm Water Management Report The purpose of this report is to evaluate and document the post -development storm drain characteristics of the Southridge South Subdivision — Phase 1 project. This report analyzes the storm drainage conditions and provides calculations confirming the adequacy of proposed storm drain facilities to meet the project needs. The proposed Southridge South Subdivision — Phase 1 project is located located south of Overland Road, between Linder Rd and Ten Mile, within the City of Meridian, Idaho. The proposed improvements consist of single family homes with associated site improvements including new access roads, landscaping and underground utilities. Geotechnical conditions at the site were evaluated by Site Consulting, LLC and their findings are attached as Appendix C. The site geotechnical evaluation provides guidance on design and project construction considerations. Relative to storm drainage systems, recommendations for groundwater and soil infiltration rates are provided. The geotechnical engineer's recommendations have been incorporated to the proposed design and systems. Proposed Systems Appendix A provides an overview of the proposed drainage basins. Storm Drainage Routing & Treatment Within each drainage basin, stormwater runoff is collected from roadways that are sloped to the gutters along the road edges, which then transport the collected drainage to catch basins. Once inside the system, stormwater flows through a drainage piping network to sand & grease traps which remove heavy sediment and light oils prior to discharge into underground seepage beds. The seepage bed provides final treatment with an 18-inch layer of ASTM C33 filter sand. Peak Rate of Discharge and Storage Volume The peak rate of discharge for the roadway drainage systems were calculated using the Ada County Highway District's published spreadsheets. Calculation worksheets for peak flow and required storage volume in each drainage basin are provided in Appendix B. 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com E IDI� Il APPROVED DA EI 03/02/22 endix A Site Drainage Areas Southridge South Subdivision — Phase 1 Meridian, ID Storm Water Management Report - - �h a 1oucmc corn (�j�E1s,IDIANg- — APPROVED - - - - ChM OMM2 - - - - - --------- , FUNUMBFA:manarce \ s \ \ \ s \ \ a \ y O- mco=, s, c Gzs=o sa cvs � �� tia cak VV � \ i oozes=i�z, cEs � 0 GEs � G 1 FACILITY 7b \ - 14513 SF y I hMPpVAYD-G-E \ \ \ wm-.cF m a \\ � c y FACILITY 7a \ �\ 2889 SF \ \ Q Q G,co=osocvs 1 I G25=GffGFS I Q I4 \ I ptr v va I \ � �pG��ry\/�, � ozs-, b SF vloo=soss� FACILITY 1 \ \ AREA 8477 SF \ o \ \ \ s \ Drainage Map gag IIManYISUK 1 =8tl P Y=vec°s FACILITY 8a 2897 . SF —PPINDCF RGE $WPLE vmo=aao cE FACILITY Bb 2912 SF %:'THE BLAND WGROUP um Fau 4& �oFumucnou OFainagu Map App A APPROVED DA EI 03/02/22 endix B Drainage Calculations Southridge South Subdivision — Phase 1 Meridian, ID Storm Water Management Report - - �h a 1oucmc corn L �1E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These 03/02/22 p4TE blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: Fe Ml, D59 Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities (25 max) 8 Click to Show More Subbasins ❑ 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user cal�nlate min o Min. i 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 0.45 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) MEr 605 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm 1 (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V" 378 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfS 13 Volume Summary Surface Storage: Basin Basin Forebay V 61 ft' Primary Treatment/Storage Basin V 545 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 605 ft' Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 8,477 0.19 0.90 0.90 Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 1 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xism Version 10.5, November 2018 10/11/2021,10:19 AM 1 E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 2 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Min- 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc i 9 Calculate the Post -Development peak discharge (QPeak) Qpeak 2.58 2.72 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,644 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 2,277 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 364 ft' Primary Treatment/StorageBasin V 3,280 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,644 ft' Clirk to Shnw MnrP Snhhacinc F-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 47,575 44,282 2.11 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 L �1E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 3 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Minim 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc i 9 Calculate the Post -Development peak discharge (QPeak) Qpeak 2.58 4.00 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 5,358 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 3,348 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 536 ft' Primary Treatment/StorageBasin V 4,822 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 5,358 ft' Clirk to Shnw MnrP Suhhacinc F-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 76,980 58,074 3.10 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 L �1E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 4 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Min- 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc i 9 Calculate the Post -Development peak discharge (QPeak) Qpeek 2.58 1.20 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 1,610 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 1,006 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 161 ft' Primary Treatment/StorageBasin V 1,449 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 1,610 ft' Clirk to Shnw MnrP Snhhacinc F-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 20,644 19,931 0.93 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 1 E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 5 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Minim 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i Qpeek 2.58 233 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 3,125 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 1,953 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 312 ft' Primary Treatment/StorageBasin V 2,812 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,125 ft' Clirk to Shnw MnrP Suhhacinc I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 42,144 36,621 1.81 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 L �1E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 6 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Minim 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i Qpeek 2.58 3.14 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 4,201 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 2,625 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 420 ft' Primary Treatment/StorageBasin V 3,781 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 4,201 ft' Clirk to Shnw MnrP Suhhacinc I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 57,020 48,874 2.43 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 1 E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 7 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Minim 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i Qpeak 2.58 0.52 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 690 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 431 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 69 ft' Primary Treatment/StorageBasin V 621 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 690 ft' Clirk to Shnw MnrP Suhhacinc I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 14,513 2,889 0.40 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 L �1E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These DATE 03/02/22 blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: ra-zozi-Doss ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 8 2 Is area drainage basin map provided? YES (map must be included with storm water calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient(C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min 10 Minim 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i Qpeak 2.58 0.17 in hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 230 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 144 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 23 ft' Primary Treatment/StorageBasin V 207 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 230 ft' Clirk to Shnw MnrP Suhhacinc I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 2,897 2,912 0.13 0.50 0.50 0.50 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "F Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE G:\2021\121027\CAD\Calcs and Reports\121027 ACHD _SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.5, November 2018 IDS IAy; �J ACHD Calculation Sheet for Sizing Basins I,ns s intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's APPROVED Y. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or �� 03/02/22 in order to be accepted. FILE NUMBER:Fc- 10 D5e t in yellow cells. 1 Project Name Southridge South Phase 1 2 Enter number of Basins (25 max) 3 3 Number of Cells (Forebay+primary=2, Primary Only=1) 1 4 Design Storm 100 Link to: Qv 5 Weighted Runoff Coefficient C 0.90 Q.V2 QV3 6 Area A (Acres) 0.19 acres Q.V4 7 Approved Discharge Rate (if applicable) 0.00 cfs Q,v5 QV6 8 1-Basin Forebay V 605 ft3 Q•V7 v8 Toggle between Forebay and Primary Basin, enter data and print far each st Shp z smeshr z 4 nw A Flw M D ssrsiWz <..- --> <----------- i:--------- > Sid, smp.z L sts4" r Forebay 9 Select Forebay Shape 3-Rectangle Ono 10 Width of Forebay Bottom W 33.0 ft 11 Length of Forebay Bottom L 40.0 ft 12 Side Slopes (H:1) H:1 4.00 13 Enter Bottom Elevation 2684.88 ft 14 Enter Top Bank Elevation 2686.38 ft 15 Enter Water Surface Elevation (WSE) 2685.88 ft 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 ft 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 ft 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note: infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom sloped% or 0 outflow 22 Infiltration Area for Forebay As nd 330 ftZ Enter 0 for no infiltration 23 Adjusted Storage Required Storm Duration i total Runoff Pre-Dev Total Max Vol Q Vol Perc Vol Discharge Discharge Reqd Min Hr in/hr cfs ft3 ft3 ft3 ft3 ft3 60 1.00 0.96 0.17 605 165 0 165 440 24 Depth -Storage Relationship: 1.00 ft depth for storage STORAGE OR 25 Does forebay have capacity? YES 26 Time to drain forebay 3.3 hours 90%volume in 48-hours minimum OK Saved Surf Saved Stage (ft) New Stage (ft) Side Slope (H:V) Basin Width at Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (ft) Surface Area A at Stage (ftZ) ace Area A at Stage (ft) OVERIDE Volume Below Stage (ft)2684.88 2684.88 4.000 33.0 40.0 1,320 0 2684.88 4.000 33.0 40.0 1,320 2685.88 4.000 41.0 48.0 1,968 1,644 G:\2021\121027\CAD\Gales and Reports\121027 ACHD_SD_CALCS_112018.x1sm 10/11/2021, 10:19 AM Version 10.0, May 2018 IDS IAy; �J ACHD Calculation Sheet for Sizing Basins is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's APPROVED Y. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or 03/02/22 ns in order to be accepted. DATL FILE NUMBER: rP-z 1z Dse t in yellow cells. 1 Project Name Southridge South Phase 1, Facility 7, Pond 2 z enter number or basins )v max) s 3 Number of Cells (Forebay+primary=2, Primary Only-1) 1 4 Design Storm 100 Link to: Qv - 5 Weighted Runoff Coefficient C 0.50 Q•V2 QV3 6 Area A (Acres) 0.40 acres Q.V4 7 Approved Discharge Rate (if applicable) 0.00 cfs Q.v5 QV6 8 1-Basin Forebay V 690 it Q•Vr v8 Toggle between Forebay and Primary Basin, enter data and print far each pie Shp z SM. 2 sm. slip. 4 M A Flw M D wj� siiesNez <..----> <----------- �--------- > see smpez ! L i Si`slip" r Forebay 9 Select Forebay Shape 3-Rectangle Ono 10 Width of Forebay Bottom W 33.0 ft 11 Length of Forebay Bottom L 40.0 ft 12 Side Slopes (H:1) H:1 4.00 13 Enter Bottom Elevation 2664.87 ft 14 Enter Top Bank Elevation 2666.37 ft 15 Enter Water Surface Elevation (WSE) 2665.87 ft 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 ft 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 ft 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note: infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom sloped% or 0 outflow 22 Infiltration Area for Forebay As nd 1,320 ftZ Enter 0 for no infiltration 23 Storm Duration i total Q Runoff Vol Perc Vol Pre-Dev Discharge Total Discharge Max Vol Reqd Min Hr in/hr cfs ft' ft' ft3 ft, ft3 60 1 1.00 0.96 0.19 690 660 0 660 30 t - toraee Ke ations io: Saved Stage (ft) New Stage (ft) Side Slope (H:V) Basin Width at Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (ft) Saved Surface Area A at Stage (ftz) Surface Area A at Stage (ft) OVERIDE Volume Below Stage (ft3) 2664.87 2664.87 4.000 33.0 40.0 1,320 0 2665.87 4.000 41.0 48.0 1,968 1,644 1.uu tt depth for storage 25 Does forebay have capacity? 26 Time to drain forebay 90%volume in 48-hours minimum YES 0.9 hours OK STORAGE OK G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_ SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.0, May 2018 IDS IAy; �J ACHD Calculation Sheet for Sizing Basins is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's APPROVED Y. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or 03/02/22 ns in order to be accepted. DATL FILE NUMBER: Fc-z 1z Dse t in yellow cells. 1 Project Name Southridge South Phase 1, Facility 8, Pond 3 2 Enter number of Basins (25 max) 3 3 Number of Cells (Forebay+primary=2, Primary Only-1) 1 4 Design Storm 100 Link to: Qv - 5 Weighted Runoff Coefficient C 0.50 Q.V2 QV3 6 Area A (Acres) 0.13 acres Q.V4 7 Approved Discharge Rate (if applicable) 0.00 cfs Q,v5 QV6 8 1-Basin Forebay V 230 it Q•V7 v8 Toggle between Forebay and Primary Basin, enter data and print far each sie Shp z SM. 2 sm. sy.. 4 M A Flw M D wj� S&siWz <..- --> <----------- i:--------- > Sid, smp.z L sts4" r Forebay 9 Select Forebay Shape 3-Rectangle Ono 10 Width of Forebay Bottom W 33.0 ft 11 Length of Forebay Bottom L 20.0 ft 12 Side Slopes (H:1) H:1 4.00 13 Enter Bottom Elevation 2667.35 ft 14 Enter Top Bank Elevation 2668.85 ft 15 Enter Water Surface Elevation (WSE) 2668.35 ft 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 ft 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 ft 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note: infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom sloped% or 0 outflow 22 Infiltration Area for Forebay As nd 660 ftz Enter 0 for no infiltration 23 Adjusted Storage Required R60! uration i total Runoff Pre-Dev Total Max Vol Q Vol Perc Vol Discharge Discharge Reqd Hr in/hr cfs ft3 ft3 ft3 ft3ft31.00 0.96 0.06 230 330 0 330 0 24 Depth -Storage Relationship: 1.00 ft depth for storage STORAGE OK 25 Does forebay have capacity? YES 26 Time to drain forebay 0.6 hours 90%volume in 48-hours minimum Saved Surf Saved Stage (ft) New Stage (ft) Side Slope (H:V) Basin Width at Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (ft) Surface Area A at Stage (ftz) ace Area A at Stage (ft) OVERIDE Volume Below Stage (ft)2667.35 2667.35 4.000 33.0 20.0 660 0 2668.35 4.000 41.0 28.0 1,148 904 G:\2021\121027\CAD\Gales and Reports\121027 ACHD_SD_CALCS_112018.x1sm 10/11/2021, 10:19 AM Version 10.0, May 2018 �E IDR IAN,-- �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 03/02/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must FIEF NUMBER: FP-��21-Dose s that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Southridge South Phase 1 Enter number of Sand/Grease Traps E" Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area (ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 1000 G 1 2.72 18 48 6.00 0.45 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.0, May 2018 �E IDR IAN,-- �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 03/02/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must FIEF NUMBER: FP-��21-Dose s that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Southridge South Phase 1, Tank 2 Enter number of Sand/Grease Traps E" Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area (ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 1500 G 1 4 20 60 8.33 0.48 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.0, May 2018 �E IDR IAN,-- �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 03/02/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must FIEF NUMBER: FP-��21-Dose s that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Southridge South Phase 1, Tank 3 Enter number of Sand/Grease Traps E" Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area (ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 1000 G 1 1.2 18 48 6.00 0.20 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.0, May 2018 �E IDR IAN,-- �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 03/02/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must FIEF NUMBER: FP-��21-Dose s that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Southridge South Phase 1, Tank 4 Enter number of Sand/Grease Traps E" Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area (ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 1000 G 1 1.25 18 48 6.00 0.21 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.0, May 2018 �E IDR IAN,-- �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 03/02/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must FIEF NUMBER: FP-��21-Dose s that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Southridge South Phase 1, Tank 5 Enter number of Sand/Grease Traps E" Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area (ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 1000 G 1 3.14 20 48 6.67 0.47 Reference for Throat widths (inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm 10/11/2021, 10:19 AM Version 10.0, May 2018 1 E IDS IAN�- HD Calculation Sheet for Sizing Seepage Bed With Optional Chambers APPROVED t is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the In methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in DATL 03/02/22 exceed these calculations in order to be accepted. t pulls information from the "Peak QV" tab FILE NUMBER: FP-z 1z 0se Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No lity 2 S 100 0.50 2.11 acres 0.00 cfs V 4,555 Link to: Qv Qvz:::::::::::::]F QV3 QV4 Qv5 ft, 25%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 11.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360% READ if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 45.5 ft,/ft 15 Calculate Design Length L 100 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 100 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 8.2 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 100 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxJ(2xgxH) Optional Storage Chambers This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.x1sm 10/11/2021, 10:22 AM Version 10.0, May 2018 1 E IDS IAN�- HD Calculation Sheet for Sizing Seepage Bed With Optional Chambers APPROVED t is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the In methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in DATL 03/02/22 exceed these calculations in order to be accepted. t pulls information from the "Peak QV" tab FILE NUMBER: FP-z 1z 0se Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No lity 3, Bed 2 5 100 0.50 3.10 acres 0.00 cfs V 6,697 Unkto: Qv Qv2� QV3 QV4 Qv5 ft, 25%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 11.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360% READ if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 43.8 ft,/ft 15 Calculate Design Length L 153 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 153 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 7.9 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 153 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxJ(2xgxH) Optional Storage Chambers This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.x1sm 10/11/2021, 10:22 AM Version 10.0, May 2018 1 E IDS IAN�- HD Calculation Sheet for Sizing Seepage Bed With Optional Chambers APPROVED t is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the In methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in DATL 03/02/22 exceed these calculations in order to be accepted. t pulls information from the "Peak QV" tab FILE NUMBER: FP-z 1z 0se Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No ility 4, Bed 3 S 100 0.50 0.93 acres 0.00 cfs V 2,012 Unkto: Qv Qvz� QV3 QV4 Qv5 ft, 25%Sediment 8 Set Total Design Width of All Drain Rock W 8.0 ft 9 Set Total Design Depth of All Drain Rock D 9.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360% READ if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 29.5 ft,/ft 15 Calculate Design Length L 68 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 68 ft 17 Variable Infiltration Window W SWW 8.0 ft 18 Time to Drain 6.6 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 68 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxJ(2xgxH) Optional Storage Chambers This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.x1sm 10/11/2021, 10:22 AM Version 10.0, May 2018 CUEIDR IAN,-- �� HD Calculation Sheet for Sizing Seepage Bed With Optional Chambers APPROVED t is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the In methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in 03/02/22 exceed these calculations in order to be accepted. DATE t pulls information from the "Peak QV" tab FILENUMBER:F 02voose ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No lity 5, Bed 4 5 100 0.50 1.81 acres 0.00 cfs V 3,906 Linkto: Q•V Qvz QV3 QV4 Qvs ft3 25%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 5.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 24.5 ft,/ft 15 Calculate Design Length L 159 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 159 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 477 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 159 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxJ(2xgxH) Optional Storage Chambers This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xism 10/11/2021, 10:22 AM Version 10.0, May 2018 1 E IDS IAN�- HD Calculation Sheet for Sizing Seepage Bed With Optional Chambers APPROVED t is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the In methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in DATL 03/02/22 exceed these calculations in order to be accepted. t pulls information from the "Peak QV" tab FILE NUMBER: FP-z 1z 0se Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Southridge South Phase 1, Facility 6, Bed 5 2 Enter number of Seepage Beds (25 max) 5 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.50 Unkto: Qv3 Qv4 5 Area A (Acres) 2.43 acres Qvs 6 Approved discharge rate (if applicable) 0.00 cfs QV6 Qv7 7 Is Seepage Bed in Common Lot? No V 5,251 ft, 25%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 11.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360% READ if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 45.5 ft,/ft 15 Calculate Design Length L 115 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 115 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 8.2 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 115 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxJ(2xgxH) Optional Storage Chambers This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.x1sm 10/11/2021, 10:22 AM Version 10.0, May 2018 E IDI� Il APPROVED DA EI 03/02/22 endix C Geotechnical Report Southridge South Subdivision — Phase 1 Meridian, ID Storm Water Management Report - - �h a 1oucmc corn C `(E IDI� I N APPROVED DATL 03/02/22 FILE NUMBER: Fa-2021-Do51 SITE LONSULTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmai1.com - 208-440-6276 Mr. Tim Eck September 10, 2021 Cottonwood Development, LLC Page 1 of 23 2228 West Piazza Street Report 21831-A Meridian, Idaho 83642 Re: Geotechnical Recommendation Report Proposed Southridge South Subdivision S. Ten Mile Road & W. Overland Road Meridian, Idaho Tim: In May 2021, SITE was contacted about generating a geotechnical recommendation report for your proposed Southridge South Subdivision. Our background with this property is as follows: • April 2010 — SITE Staff generated a ITD Gravel Source Approval Report for JLJ Enterprises for the subject property. • April 2013 — SITE Staff generated a report documenting the proper compaction of structural fill placed by Idaho Sand and Gravel on a section of the property located west of the Williams Petroleum Pipeline. • April 2014 — This engineer was retained by this client to generate a Reclamation Recommendation Report and then review reclamation activities by Idaho Sand & Gravel. Based upon our historical involvement with the property, field research & observations, and laboratory test results, the site is acceptable for development as a residential subdivision. Recommendations for construction are included herein. We appreciate this opportunity to be of service. When appropriate, we would like to discuss continuing our role as geotechnical consultant during construction. Please contact our office if additional information or services are required. Respectfully submitted, SITE Consulting, LLC Bob J. Arnold, PE /l �Z. f ao 9AF OF e4P Geotechnica/Services/Soil Testing & Inspection Services C `(E IDI� I N APPROVED DATE: 03/02/22 FILE NUMBER: FP-2021-0050 SITE DONS LTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Geotechnical Recommendation Report Proposed Southridge South Subdivision Overland Road, East of Ten Mile Road - Meridian, Idaho GENERAL_ This report presents our geotechnical research and resulting recommendations for a proposed subdivision to be constructed east of Ten Mile Road on the south side of Overland Road in Meridian, Idaho. Historical aerial photos, available on Google Earth, indicate that the property was irrigated farmland prior to becoming a gravel pit. These historical photos are included in the Appendix. Research indicates the property includes two parcels as follows: Number Parcel # Address Acres 1 S-1223234050 W Overland Road 26.5 2 S-1223131380 2347 W Overland Road 56.6 Total Acres 83+ in April 2010 this engineer generated a ITD Gravel Source Approval Report for the subject property. That report included a reclamation plan that established maximum depth of removal for the gravel pit operation. It also included the excavation of test pits on a 150 x 150-foot grid pattern. That pattern is provided in the Appendix. Over 100 test pits were excavated, eight were selected at random for inclusion in the Appendix of this report. Note that the depth of allowed gravel extraction is indicated on each test pit log. In April 2013 this engineer excavated test pits and then provided recommendation for the recompaction of non-structural fill placed on the property west of the petroleum pipeline. This effort was completed as designed. In April 2014 this engineer designed and then oversaw the reclamation of the gravel pit east of the pipeline. This effort structurally filled the site to the current elevation and was completed by Idaho Sand and Gravel. W Geotechnica/Services /Soil Testing & Inspection Services C `(E IDI� I N APPROVED DATE: 03/02/22 FILE NUMBER: FP-2021-Mll SITE ONSULTING, LLC a.Lrr� Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 The purpose of this evaluation is to document site history and provide recommendations for building a residential subdivision and single-family residential structures. Additional test pits may need to be excavated as development phases are submitted to ACHD for review and approval in order to comply with ACHD rules concerning test pit proximity to infiltration facilities. AUTHORIZATION E-mail authorization to proceed with this geotechnical investigation was received from the project civil engineer (Land Group) and confirmed with the client in May 2021. At that time the Preliminary Plat included in the Appendix was provided. Authorization to proceed and the use of the recommendations provided herein indicate the client's acceptance of the scope of work, warranty, limitations, and general conditions provided herein and within any submitted and / or approved proposal. WARRANTY AND LIMITATIONS The evaluation of subsurface conditions documented herein is considered sufficient to form a basis for the provided recommendations. The provided recommendations are based on the available soil information and preliminary design details either assumed or furnished by the client. It is warranted that these recommendations have been promulgated after being prepared in accordance with locally accepted professional engineering and geotechnical engineering practice. No other warranties are implied or expressed. W, Geotechnical Services /Soil Testing & Inspection Services PPRE IDIAN> "0'0 AOVED I SITE DATE: 03/02/22 -Al 1jJj ` N S U LT I ' 'Rv!` G , L LC EU�z E NUMBER FP .11 Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 DESIGN & CONSTRUCTION RECOMMENDATIONS General Earthwork All native soils, which are free of organic matter and expansive clays, are acceptable for use as fill on the building pads, in structural fill areas, and within planned ACHD right of ways. Removal of the majority of the organic materials will require only minor grubbing of 0-4 inches of surface soils. Removal of organics is required in all areas to receive structural fill. The depth of grubbing is to be adjusted and inspected during construction to ensure that organic materials are properly removed from beneath future pavements and structural fills. Structural fills less than three feet deep are to be compacted to 95% of the maximum dry density by ASTM D698, Standard Proctor. Deeper fills are to be compacted to 100%. If structural fill is to be placed on residential lots, the fill is to extend laterally outside foundations a distance equal to the depth of structural fill. Structural fill should be placed in uniform, thin horizontal lifts, moisture conditioned as necessary, and compacted to the above requirements. Compaction testing to confirm proper compaction is strongly recommended. Excavations Shallow excavations and trenches that do not exceed four feet in depth may be constructed with side slopes approaching vertical. Below this depth it is recommended that slopes not exceed a vertical to horizontal ratio of one to one. The ability of soils on site to maintain a vertical or near vertical excavation over any extended period can be quite variable. This information is provided for planning purposes. It is our opinion that maintaining safe working conditions is the responsibility of the contractor. Jobsite conditions such as soil moisture content, weather condition, earth movements and equipment type, and operation can all affect slope stability. All excavations should be sloped or braced as required by applicable local, state, and federal requirements. 0-1 Geotechnica/Services /Soil Testing & Inspection Services C `(E IDI� I N APPROVED DATE: 03/02/22 FILE NUMBER: F 2021-00s0 Pavement Section Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 The entire property surface is structural fill consisting of pitrun type materials harvested from the prior onsite gravel pit. R-Value test performed as a part of the ITD gravel pit approval process resulted in R-Value results of much greater than R=20, the maximum value SITE uses for street design. Based upon an R-Value of R=20 and a Traffic Index of TI=6 the following pavement section is recommended for interior subdivision streets. Material Layer TI=6 HMA Pavement 2.5" Base Coarse (3/" minus) 4.0" Subbase (Pitrun) 10.01, It is noted that it is common for the local jurisdiction to require a standard design or to match the existing pavement section when working on collectors or arterials such as Overland Road. If improvements are required for Overland Road, ACHD should be consulted concerning pavement design requirements. Materials meeting the requirements of ISPWC & / or ACHD are required for any work within this project. Foundation System The proposed single-family residential structures may be supported on conventional, continuous, and isolated pad foundations founded upon the native soils or upon structural fill extending to these soils. Based upon proper placement and compaction of structural fill, bearing pressures of up to 1500 psf are allowed for foundations founded on the native soils or upon properly placed and compacted structural fill. Either crawlspaces or slab on grade floors are acceptable. Basements are not allowed without a lot specific geotechnical /groundwater evaluation and recommendation report. Slab on Grade Concrete Care must be taken so that all excavations below both interior and exterior slab on grade concrete are properly backfilled. Trenches and wall backfill areas are to be filled in lifts and benched each lift so that fill is not placed against a vertical soil face greater than three feet tall. Any fill used to increase the elevation of slab on grade concrete should meet the requirement for structural fill. Slab on grade floors, sidewalks and pavements should be placed atop a mat of at least Y2 foot of granular structural fill materials. Mat material should all pass a 3/4-inch sieve and should contain less than seven percent passing the # 200 sieve. ISPWC 3/" base or equivalent is recommended. The mat shall be compacted to the requirement for structural fill. Wd Geotechnica/Services/Soil Testing& Inspection Services L ( E IDIAN> APPROVED DATE: 03/02/22 f I! E NUMBEN' FP-2o21-11 ONSULTING.. Lim. Storm Water Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Two well logs, one south and one northeast of the subject property, were located on the IDWR website and are included in the Appendix. The well logs indicate the static groundwater is greater than 50 feet deep to the south and less than 10 feet deep to the northeast. Preliminary plans indicate that stormwater will be directed to surface detention ponds with subsurface infiltration or seepage pits. Based upon observed subsurface conditions, SITE recommended a design perc rate of P=6 in./hr. with a drain time not to exceed 24 hours. Monitoring wells and perc tests at injection locations are recommended prior to design of each phase of this development. It is recommended that storm runoff be directed away from all open excavations and not be allowed to puddle on subgrade soils. Inspection & Testing A qualified engineer or his representative should monitor fill placement to ensure the work is performed in accordance with these recommendations. Testing should be performed in accordance with ASTM Test Methods D3017-88 and D2922-91 (nuclear densometer). For mass filling, field nuclear moisture - density testing shall be performed on each lift of compacted fill for each lot. Trench backfill and right of ways are to be tested to ACHD / ISPWC requirements. It is noted that structural fill can pass compaction tests and still be unacceptable if pumping, rutting, or deflecting under vehicle or foot traffic. General Comments Testing and inspection services are recommended herein. Proper quality control during construction is required to confirm materials and methods and thereby obtain a desirable finished product. Monitoring and testing should also be performed to verify suitability of materials used for structural fills and to confirm proper demolition, subgrade grubbing, subgrade stability, and proper placement and compaction of fills. Any deviations from the herein described subsurface conditions must be brought to the attention of this consultant. This report has been prepared for the exclusive use of the client and their retained design consultants. Findings and recommendations within this report are for specific application to the proposed construction described herein and apply only to the property identified. Client may duplicate this report as needed or additional copies will be provided upon proper client authorization. Appendix Follows Geotechnica/Services /Soil Testing& Inspection Services APPROVED DA EI 03/02/22 S1T C Post Office Box 190537 - Boise, Idaho 83719 �ii ftt G AAl1 site.consulting.idaho@gmail.com - 208-440-6276 LTI APPENDIX Vicinity Map Historical Aerial Photos (2) Preliminary Plat Geologic Map Test Pit Locations Test Pit Logs (8) Soil Log Legend / Abbreviations & Acronyms IDWR Well Logs (2) 0 Geotechnical Services /Soil Testing & Inspection Services JE APPROVED � S /IT/E DATE: 03/02/22 �% O N S U LT I N G' L L C FILE NUMBER: FP-2-- Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Vicinity Map C P8 H PH xaPwl i it I I)'Ptg N Et E >1C ar: Yahoo Maps 2008 rm Geotechnical Services /Soil Testing & Inspection Services �ER y Post Office Box 190537 - Boise, Idaho 83719 APPROVED ���� oa/ov22 site.consulting.idaho@gmail.com - 208-440-6276 DATE: hULTI FILE NUMBER: FaD21-D1e N!, SLC Historical Aerial Photos July 2010 Gravel Pit Visible and former test pits visible -- IF N bD Geotechnica/Services /Soil Testing & Inspection Services 1 E IDIA\ - APPROVED DATE: 03/02/22 FILE NUMBER: Fa- D -o9s9 /SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Preliminary Plat 008J y,..,.v're # tI 4N111111 JuldAaeUIU!P1d ,kl ja 3H1uois j AiPgeS 4lnag aGpsiy}UoS i iEs itittt9I9El } {IF it tF6t ttTSt iL IF l� i iF i p [ IE{{31 11 Elf ELid�lllx{%{{ �kg�s s w Sgg94 „vR sll €il 8B 69 cieittltlEi€Riii}iEeiii `:!g} n, w+lr�Ls iEd N � jS�� vrrrw � �- � vrtrw g LINO t- CIE iJi# 1 s I N r e 71 t,} Y i I ' °.�a` ..' `3'�•. j1 I "``-4,a,•,. fit ti In t t F [# ill :61 iFtr { t i S C R �••,,,�4 e�`.V�i f s : k , IJ iSiSiS � i � s > s y : �1� `� • I � C I L � i If F s t a � R L ,r /�:\ \'_, ,-1•il I I} !I fit p` g111 �E i } / F ! xre•'/ /H if ! h- xe w•' s to _} Sbl. 4 / Z E S3S li ii i�{.I di t9e t t • �` ! f tg 01111 . ,ii Ls ; Supplied by the Land Group (5/10/2021) Geotechnical Services JSoll Testing & Inspection Services 1 E IDIA\ - APPROVED SiTYE DATE: 03/02/22 -4 V N J U L! I N L LC FILE NUMBER: Fa- D -DDs9 Post Office Box 190537 - Boise, Idaho 83719 site. consulting.idaho@gmail.com - 208-440-6276 -' A -----1 r111--A.— r-- — --- 0%-- -1— C--&L. \A/w L,e+:4-� G & B FVdy isk Pit Thuesen Pit Busy Bee-Blackcat Subject Property Qag = Gravel of Amity Terrace Geologic Map of Boise Valley Idaho Geologic Survey Website I Geotechnica/ Services /Soil Testing & Inspection Services CUEIDR IAy APPROVEDECONSULTING., DATE: 03/02/22 L LC FILE NUMBER FP-1-0059 Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 TEST PIT LOCATIONS'IITSIi Co\ ---a CL 4 IR PC From Prior SITE report Geotechnica/Services /Soil Testing & Inspection Services APPROVED DATE: 03/02/22 FILE NUMBER: FP-2o21-- SITE [.CONSULTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 RANDOM TEST PIT LOGS Test Pit: TP-212 Existing Grade: 2684.5 Logged by: Bob J. Arnold, PE Finished Grade: 2684.7 Date Excavated: 02/22/10 Available / Excavated: NEEDS FILL Test Pit Log PREVIOUSLY STRIPPED 0 1 Sandy Silt with Gravel 2 3 4 HARDPAN 5 Cemented Silt with Sand and Gravel 6 10 - Sand, Gravel and Cobble To 8" 15 BOHINGE Abbreviations 130I'1 Bottom of Hole NGE No Groundwater Encountered Comments Geotechnical Services /Soil Testing & Inspection Services CUEIDR IAN APPROVED DATE 03/02/22 FILE NUMBER: Fa- D -Doss SITE CONSULTING, LL Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Test Pit: TP-217 Existing Grade: 2672.0 Logged by: Bob J. Arnold, PE Finished Grade: 2668.4 Date Excavated: 02/22/10 Available / Excavated: 3.6 / 15.0 Test Pit Loa PREVIOUSLY STRIPPED 0 1and 1 Sandy Silt with Gravel Cobble 2 Cemented at top of Gravel Stratum 3 4 5 6 8 10 Sand, Gravel and Cobble To 8" 13 15 BOHINGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered Comments q. d ih n 41 c�a n- Geotechnica/ Services /Soil Testing & Inspection Services APPROVED DATE 03/02/22 FILE NUMBER: Fa- D -Doss dw LONJULTINGJ LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Test Pit: TP-240 Existing Grade: 2665.5 Logged by: Bob J. Arnold, PE Finished Grade: 2656.5 Date Excavated: 02/23/10 Available / Excavated: 9.0 / 15.0 9 est r-it Lo Previously Stripped Sandy, Gravel & Cobble To 8" Maximum 6 7 8 Sand Layer from 8-10' 9 - 10 11 �12 13 14 15 BOH/NGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered Comments Previously Grubbed 11 Geotechnica/Services/ Soil Testing & Inspection Services 1 E IDS IAN,_- APPROVED DATE 03/02/22 FILE NUMBER: Fa-2D21-11 SITE ONSi. LTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 Test Pit: TP-249 Existing Grade: 2690.1 Logged by: Bob J. Arnold, PE Finished Grade: 2676.8 Date Excavated: 02/25/10 Available / Excavated: 14.3 / 16.0 Test Pit Log 0 Silt & Clay topsoil 1 with organics 2 Sandy, Gravel & Cobble To 8" Maximum 16 BOH/NGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered Comments Geotechnica/Services /Soil Testing &inspection Services `(E IDI� IAN,— APPROVED DATE: 03/02/22 FILE NUMBER: FP-2o21-11 /'SITE ONSULTING, LLc Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Test Pit: TP-268 Existing Grade: 2678.8 Logged by: Bob J. Arnold, PE Finished Grade: 2664.2 Date Excavated: 02/25/10 Available / Excavated: 14.6 / 16.0 d Test Pit Lo 0 15 FILL IN BANK 3 i Original topsoil 6 7 Cements Silt and Sand Sand, Gravel & Cobble To 8" Maximum 16 BOH/NGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered Comments Excavated against an Existing 5' fill a Geotechnical Services/Soil Testing A Inspection Services 1 E IDS IAN,_— APPROVED DATE: 03/02/22 FILE NUMBER: Fa-2o21 oD59 /S1 l E ONSULTINGj LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Test Pit: TP-289 Existing Grade: 2692.3 Logged by: Bob J. Arnold, PE Finished Grade: 2670.3 Date Excavated: 04/17/10 Available / Excavated: 22.0 / 22.0 Test Pit Lo 0 1 Silt & Clay w/ Organics 2 3 4 Cemented Gravel 5 Sand, Gravel & Cobble To 10" Maximum -9 21 22 BOH/NGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered Comments IC bL Geotechnica/Services/Soil Testing & Inspection Services 1 E IDS IAN,_— APPROVED DATE: 03/02/22 fILE NUMBER: FP-2o21-11 SITE ONSULTING. LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Test Pit: TP-294 Existing Grade: 2672.5 Logged by: Bob J. Arnold, PE Finished Grade: 2661.0 Date Excavated: 02/25/10 Available / Excavated: 11.5 / 14.0 '-�'!� h•'9 .''f tea,. `r r� - r , Test Pit Loa 0 Silt & Clay w/ Organics 1 2 Cemented Silt 3 4 HARDPAN 5 Sand, Gravel & Cobble To 8" Maximum 14 BOH/NGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered �� Comments ;W �i j fG x+Lc AiMiA Geotechnical Services /Soil Testing & Inspection Services 1 E IDS IAN,_— APPROVED DATE: 03/02/22 FILE NUMBER: Fa-zDi-Doss SITE ONSULTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Test Pit: TP-307 Existing Grade: 2670.1 Logged by: Bob J. Arnold, PE Finished Grade: 2660.3 Date Excavated: 04/17/10 Available / Excavated: 9.8 / 10.0 Test Pit Loa 0 Silt & Clay w/ Organics 1 2 HARDPAN 3 4 5 Gravel in Cemented Silt 6 ----- ----------- Sand, Gravel & Cobble 10 BOH /NGE Abbreviations BOH Bottom of Hole NGE No Groundwater Encountered Comments �I Geotechnical Services/Sol/ Testing & Inspection Services C`(E IDI� I N- APPROVED DATE: 03/02/22 FILE NUMBER: F 2021-00s0 SITE ONSULTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 SOIL LOG LEGEND UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM STANDARD TEST METHOD D 2487 FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES) MAJOR DIVISIONS ITYPICAL DESCRIPTIONS GW ell- raded gravel, ravel -sand mixture, little or no fines. GRAVEL & < 5% - #200 GP Poorly graded gravel, gravel sand mixture, little or no fines GRAVELLY COARSE <SOILS #4 5-12%-#200 GM Silty gravel, gravel -sand -silt mixtures > 12% - #200 GC Clayey gravel, gravel -sand -clay mixtures GRAINED SOILS < 50% - #200 SAND & < 5% - #200 SW ell -graded sand, gravelly sand, little or no fines. SP Poorly graded sand, gravelly sand, little or no fines SANDY SOILS SM Silty sand, sand -silt mixtures > 50% - # 4 — >12% - #200 SC Clayey sand, sand -clay mixtures ML Inorganic silt and very fine sand, rock flour, silty or clayey fine SILTS AND INORGANIC sand or clayey silt with slight plasticit CL Lean clay -low to medium plasticity, gravelly clay, sandy clay, CLAYS FINE LL < 50% Isilty clay GRAINED ORGANIC OL Organic silt and organic silty clay of low plasticity SOILS MH Elastic silt, micaceous or diatomaceous fine sand or silty soil. > 50% - #200 — SILTS AND INORGANIC CLAYS LLa50% CH Fat clay - high plasticity ORGANIC OH Organic clay-med. or high plasticity: organic silt HIGHLY ORGANIC SOILS I PT jPeat, humus, swamp soil with high organic content ABBREVIATIONS AND ACRONYMS AASHTO American Association of State Highway & Transportation Officials ACP Asphaltic Concrete Pavement ASTM American Society for Testing and Materials BH Bore Hole IBC International Building Code ISPWC Idaho Standard for Public Works Construction ITD Idaho Transportation Department NP Non -Plastic PCC Portland Cement Concrete P('_F Pounds per Cuhir Foot PSF Pounds per Square Foot TP Test Pit USCS Unified Soil Classification System U0 o_ Geotechntca/Services/Soil Testing& Inspection Services E IDI� IAy,> APPROVED SITE DATE: 03/02/22 ULT I_ L LC FILE NUMBER: Fa- D -Goss Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 IDWR WELL LOG South of Site IOAHO DEPARTMENT OF WATER RESCitIR(;e$ - _or - WELL DRIL LER'S REPORT t.' Salt point Pere -A.. r a t 4ci A. 1. ofiil,uNG pmrr rip, !�3.1 3—J--01143 r Mer Ittvrw Na 2. OWNEW r~ 3. LOCATION OF WELL by "of description. '.lvltzi mu, 00 mk'}+t Ea%jrA mprtmt with vontten IacaGar;. to • i T. North)( or SenAh _ r }t. east 0 or ww ' K see. _ 114 14 Nk,14 Addffte ot Wet E;r Lot NO 010atix —S.W. N..e fwL Vt5 4, PROPOSED USE. �.E ; }rtGr'sir"'�T} [fall :1tT>'�7SiX1 r1 Trwmad t lrgocwn Ocivw _ S.' ` OF WORK t4sLw WVB *o0'ty tx Fkstatir i RepFerernoM _, Abar,darrrtent 6. ORtLL METHOD OD 7. %EALING PROC DUKES &EaL,f+LT[R Phh4 _ aa�;k�` r_ �1ETt+tYG B. CASINGIUNER; tLpyo�ene tRM` n fiwff raw ft".'� w 4 T-00~ +ice. _ K17 C" 0 C 0 0 >� FrAl to ,n of et--t,.�-.-�-- t� pry � r�aaa�t� .�. � �+►..,�.� . 9. PE FC1RAATtONSiSCREENS �. F'arfoT7S�7ns h4erttxxf 7A SG beS # TWO zamatsw . EnHt lc fil+:.Ayy#i9■ N.mab I!*wm +r�.. CY1H cr 10, WELL TESTS* _. Pump Ba1w = A+r t3 R w—v A t —n Tamest mA.pe ad .fir.__, Was a water arty dor*? Yes t+ IEFMm Hole TemWa-rrOw.e.. �__.�_.. �...-..._.._.._ .- 11WTIGWATERLEVEL. R.. slaw �.;trtrrc+; C}ep}t� ttrt�tern r}aw }Good J`✓ Artesian pro0ure — th- Qo§Cflhe acte5S port-,_— ^;. Dv.dcn»e co€rtraHrV Oevves:.._^. 12. LiTHOLOGIC L4G; raper m Or Y F 1 i� v i ■ t 13. DRILLER`S dATW.ATION vwe ce" that eN mw war cortBmAFbw sdandimif wwo o m bw wmt: ;.I me rarer the Aq +bus mfttov� Firm Fktrns f tt� /� I ertt No „- arr'-'qt 7 / St4tt3}vtw or f COWARt V,+11T'E COPY TO WAT q RESOURCES Geotechnica/Services /Soil Testing & Inspection Services CUEIDR IAy APPROVEDrCONSULTING, SITE DATE: 22 FILE NUMBER: FaozDose L LC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 IDWR WELL LOG Northeast of Site 1) ` '` / 4DAH0 DEPARTMENT OF WATEH HESOURCES ° ) r2 ... WELL DRILLER'S REPORT 4. Waj TACT Ns?, a -... �' ZC �+�" -- � if4.�.,,, iWP g —A14 DRUJINQPEfAMNo, �• l_� s It WELL. TESTS;otw sat Ec�B ktst'€ 41, _ r-pvmo =SvIer i_Afr i- Rowrnq ArWsIV 2. OWNER, i NAM 11111a Ic t Aake4s _-,.- V.rr. t___�_��,`�{i�t��t1•Ar„r{ 3. LOCATION Of WELL by "of desetipt(ttn: ti-v cf magi €aomucA re }s•t agrta *Rh witty to emn. rs 7ect. horci a soom C ixi�`t �a• ._.-.. ate m r,..."'�,�.. tat forg. Addy.. & lut Sirs :arl;-a...: gays a •. *z.r s'.a�;«ti.; 4, USE- )<Domtste C € imk—fai F7;Mority (`rorration Thntmet injertlon.. ! Dr'her— _ 5 PE OF WORK cnnct ac tat apoty dtia[,kceman€ yet l Maw ftl C MOVy 0 6• DRILL METHOD �tJ4ilFt' v Gabii t-. M4 ttstary .— 0tw ....,., 7. SEALING PRQfLLI` ))IVIES ftaW nmv Y +W ,, ram" ,'.� � rtnplhtdi iIGL. s: san'WOe a sea` tasredad; �` u Htwr' _• _ ._._ S CASINGILINER: _. _ : ilwr Cxx,.y lap afNdwd tkaclp ZI L"r4l S oP dtsa G•P•___<..._..___m. tangth of Ta*ipo - _ __ _ 9. PERFORATIONStSCREENS p_tnna €�tathtux� _ t f 10, STATIC WATER LEVEL ON ARTESIAN PRESSURE; _,_.tom;,_ It befos 410u10 Artewan pressure Dept tte* enyxlrwrWed _ tt, Qrrsczitm access Pon W cont€# davio .,,,_a,,,,,,,,.,,— FORWARD W"QE; uory p:r 'fi!} aAl rsn a xCffF �6w€• L tlFM r-P! 41iA* Temp. 3II€An €r.N""mp. E;Oo 1r..Y7hw E,nn;t "V 12. UT14OLOGIC 100, (Detente atpairs or nbandomment) w._ I`=,, Irrcn I T. I IFea ft L7ahafM, Wahtt Wsaty a I Y I * ill Gfi-�V la€ed Depttx�[r -.744view =aata; S€ar€td __ �.rt•-�-�r'� c,.:mo�t€�rff�-S" ' I3• DRILLER'S CERTIFICATION tww mbily tea€ of wimp un arm ca"Nkm1w suways� warn } kd wjfr at Isr' frrr the rig .Paa =4 fial.x},etx`y ttam��-�.t%A� �411kt,�� �. € x�iTfi'•e �4.j�7+�Y l �r'tEk€rui / 34- ttataLT=,i_.. ark r I�R wa }� w oAfe.-tdMapeS WATER RESOLIKES Nothing follows. Geotechnica/Services /Soil Testing & Inspection Services