Loading...
HomeMy WebLinkAboutL3.2_Drip Irrigation Details V1A APPROVED DATE: 03/02/22 0lE ll'ABik: 2 3 4 5 6 7 8 9 10 12 I J K FLUSH VALVE AIR RELIEF VALVE REFER TO START PLUMBED TO PLUMBED TO CONNECTION DRIPLINE INLINE DRIPLINE DETAIL. EMITTER FLUSH VALVE PER PLANS 'RAINBIRD' 3/4" DRIPLINE PLUMBED TO DRIP LINE OF HEADER AS NEEDE FV BLANK DRIPLINE EXHAUST HEADER DRIPLINE PER PLANS STAPLED ON TOP OF AR FINISH GRADE. INSTALL DRIP LINE UNDER WEED AI'l BARRIER FABRIC WITH J MULCH PLACED ON TOP. 1 NO KINKS IN LINE. INSERT TEE Pees Pees � 2 ROOT BALL TREETRUNK 1 -�— 6-INCH SOIL STAPLE (TYP) DRIPLINE SPACING SEE DRIP NOTES AREA PERIMETER SHAPE DRIPLINE TO MEET PER PLANS FOR ROW SPACING SPECIFIED SPACING OR USE (1) 1 GPH EMITTER 'RAINBIRD' 3/4" QF HEADER INTO DISTRIBUTION ( PERIMETER LATERALS AS NEEDED. O TUBING AT BASE BLANK DRIPLINE MAX DISTANCE 1/2 OF TREE ABOVE SUPPLY HEADER ROW SPACING CONTROL ZONE KIT -REMOTE CONTROL VALVE, MULCH SO VISIBLE NOTE: FILTER AND PRESSURE REGULATOR PER PLANS. (INDICATOR ONLY) INSERT CROSS (TYP) 1. CENTER FEED LITE LAYOUTS ALLOW 2X MAX TUBING LENGTH OF MIN PVC POLY TUBING TO INSTALL DRIPLINE STANDARD LAYOUTS. CONNECTION; SIZE AS WITH EMITTERS ADAPTER AS NEEDED 2. PLACE SOIL STAPLE EVERY 3'-5' PLUS TWO ON EACH TEE, ELBOW OR INDICATED ON PLANS. INLINE TO BE CROSS. 3. SEE MAX LINE DISTANCE FOR CENTER FEED LAYOUT @ 40 PSI INLET; .4 @ 12" o.c. = 800 .6 @ 18" o.c. = 900' LOCATED EVENLY ON TOP OF ROOT BALL DRIP LINE LATERAL PER PLANS, REFER TO FULL CHART FOR ALTERNATE PRESSURES: .4 @ 18" o.c. = 1,200' SIZE PER FLOW (DO NOT .6 @ 12" o.c. = EXCEED 5 F.P.S.) DRIPLINE LAYOUT NOTES: 1 SCH. 40 PVC THREADED TEE NOT TO SCALE 1. FOR EVERGREEN TREES, LOCATE INDICATOR EMMITTER ON OR START CONNECTION AS OUTSIDE OF OUTER DRIP RING.) DETAILED 2. ALL FITTINGS TO INLINE DRIP TUBING TO BE COMPRESSION FITTINGS. IF MALE INSERTS ARE NEEDED, INSTALL WITH OETICKER 1/4" SINGLE OUTLET BARBED EMITTER CLAMPS. PER PLANS: LOCATE 12" MAX. FROM PLANT TRUNK. BOTTOM OF EMITTER TO BE FLUSH WITH TOP OF MULCH D RIP LINE TREE RING LAYOUT 1/4" VINYL SPAGHETTI TUBING 1/4" TUBING STAKE TOP OF MULCH 1/4" SELF -PIERCING BARBED CONNECTOR PE PIPE: INLINE DRIP TUBING OR DISTRIBUTION TUBING (UNDER WEED FABRIC) 1 \ \� FINISH GRADE NOTES: 1. CONNECT EMITTER DIRECTLY INTO IN -LINE OR BLANK DRIP TUBING. 2. OPTIONALLY USE DISTRIBUTION MANIFOLDS CONNECTED DIRECTLY TO LATERAL LINE AS NEEDED. 3. LOCATE EMITTER ON BUILDING OR FENCE SIDE OF PLANT. 4. ON SLOPES, LOCATE EMITTER ON THE UPHILL SIDE OF PLANT OR TREE. 5. USE TEES ON DISTRIBUTION TUBING TO PROVIDE EACH PLANT WITH REQUIRED NUMBER OF EMITTERS PER PLANS. EMITTER ON 1/4" TUBING COI SP FLI 1 ECO INDICATOR FINISH GRAE 6" ROUND V/ BOX AUTOMATIC FLUSHING Vi BRICK SUPP, (THREE) PEA GRAVEL FLUSHING VALVE NOT TO SCALE MULCH FINISH GRADE IN -LINE EMITTER DRIP TUBING ECO INDICATOR HUNTER MODEL: OPERIND MARLEX STREET ELBOW NOT TO SCALE DRIP TUBING CTION PER ACTURERS MENDATIONS. NOT TO SCALE NOT TO SCALE 6" ROUND VALVE BOX FINISH GRADE AIR / VACUUM RELIEF VALVE IF III-1I111 = = _ Z(— — II1=1I1=1II � 111-111- 3/4"M x 1/2"F REDUCTION —I—� BUSHING IF I I I 1=1 11- IN -LINE DRIP TUBI —I 3/4" CRUSHED GRAVEL J 11 111 11 1� SUMP -1 I II = — - I I —I II — I_ BRICK SUPPORTS (THREE) 1= I=1 11=1 11=1 I I 1=1 —I — — — — — -- �- � 180 2-WAY ADAPTER TEE AIR / VACUUM RELIEF VALVE NOT TO SCALE FINISH GRADE �a wZ w a �❑ a OWEED BARRIER FABRIC WHERE APPLICABLE LATERAL SPACING PE PLANS SUB GRADE MULCH PER PLANS DRIPLINE SUBGRADE J INSTALLATION FINISH GRADE 3/4" COME DRIPLINE 3/4" MIN. TRIPLE SWING, LENGTH AS RE( NOTE: EACH CONNECTIOI o DRIPLINE START CONNECTION NOT TO SCALE NOT TO SCALE 1 2 3 4 5 6 7 8 9 10 12 STAMP: 0000 600000 pp PTF, �O 000 S� G. MIp,� �ODoo 00000 S,ti^ i n LA - 276 ioIC�� 11/4/21 Z`o 00000 �00C�00 pppp DATE: 11/04/2021 arcoi W yYp�p�J 0 a, > o -m o o a \ m u u a 00 N tl�0 blip .i 6 0 0 N O] N _ V Q u c 3 au 3a �� tj C Ovi� O Lu : a t �o NGOm vO ca u N 00 c r� a t h H O Copyright © 2021 Al resew. Reppa�u� o, :e i. r a ie h L.W WA-revc n DWor REVISIONS: No. Date Description W a M oA0 1�1 Wo� Axe Z Oo O a 0 A � 1� DRAWN BY: JRB CHECKED BY: JGM PROJECT NUMBER 21-048 SHEET: L3.2 A B C D E F G H I J K L M N O P