Loading...
HomeMy WebLinkAbout2022-02-28 Meridian Pathways Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Joseph Dodson Project Name: Burnside Ridge Estates File No: H-2021-0070 AZ,PP Date: 2/28/2022 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public access easement for a multi-use pathway along the length of the Calkins lateral where it traverses the site. The applicant shall also dedicate easement for and construct a detached 10’ multi-use pathway along the N/S collector road (S Farmyard Ave, proposed) to provide a pedestrian connection between W Victory Road and the proposed E Holstein Dr. Submit all easement documents to the Planning Division for Council approval and subsequent recordation. Easements shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Use standard City template for public access easement. Submit all easement documents online through Citizen’s Access Portal. 3. Construct multi-use pathways per paving section based on existing site conditions as recommended by project civil engineer in accord with UDC 11-3A-8 and 11-3B-12. Prior to city engineer signature on the final plat, the applicant’s engineer shall provide written documentation that the pathway segments were constructed per the recommended specifications 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. 5. 6’ high open vision fencing shall be installed between pathways and (live) water irrigation canals and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other fence details per UDC 11-3A-7. Not applicable for laterals to be piped. 6. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. 7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall Rev. 02.11.22 not (nor are they intended to) override those of the irrigation district having jurisdiction over the project area. Rev. 02.11.22