Request for Minor Modification to Existing Wireless Facility - Section 6409
Site Address: 508 Bower Street, Meridian, ID 83642
CZC (land Use) application
Crown Site Number: 825767
Crown Site Name: McRae Meridian
Customer: Verizon Wireless
Customer Site Number: 683734
Application Number: 579086
On behalf of Cellco Partnership ("Verizon Wireless" or "Applicant"), Crown Castle USA Inc. ("Crown Castle") is pleased to
submit this request to modify the existing wireless facility noted above through the collocation, replacement and/or removal
of the Applicant's equipment as an eligible facilities request for a minor modification under Section 64091 and the rules of
the Federal Communications Commission ("FCC").2
Section 6409 mandates that state and local governments must approve any eligible facilities request for the modification of
an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base
station. Under Section 6409, to toll the review period, if the reviewing authority determines that the application is
incomplete, it must provide written notice to the applicant within 3o days, which clearly and specifically delineates all
missing documents or information reasonably related to whether the request meets the federal requirements.3 Additionally,
1 Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112-96, § 6409 (2012) (codified at 47 U.S.C. § 1455).
2 Acceleration of Broadband Deployment by Improving Wireless Facility Siting Policies, 29 FCC Rcd. 12865 (2014) (codified at 47
CFR § 1.6100); and Implementation of State & Local Governments' Obligation to Approve Certain Wireless Facility Modification
Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket No. 19-250 (June 10, 2020).
3 See 47 CFR § 1.6100 (c)(3). 4 See 2020 Upgrade Order at paragraph 16.
The Foundation for a Wireless World
CrownCastle.com
(E IDIAN -
APPROVED
DATE 02/28/22
FILE NUMBER: az0zz Oa
CROWN
CASTLE
1505 Westlake Ave N, N
Seattle, WA 98109
Phone:
www.crowncasfle.com
government, fails to issue any approvals required for this request within 6o days, these approvals are
deemed granted. The FCC has clarified that the 30-day and 6o-day deadlines begins when an applicant: (i) takes the first
step required under state or local law; and (2) submits information sufficient to inform the jurisdiction that this modification
qualifies under the federal law. Please note that with the submission of this letter and enclosed items, the thirty and sixty-
day review periods have started. Based on this filing, the deadline for written notice of incomplete application is March 18,
2022, and the deadline for issuance of approval is April 17, 2022.
The proposed scope of work for this project includes:
Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an
existing wireless communication facility.
At the end of this letter is a checklist of the applicable substantial change criteria under Section 6409. Additionally, plea se
find enclosed the following information in support of this request:
(1) City of Meridian, Idaho addressing approval: LDAV-2022-0102;
(2) NARRATIVE - see this document, EFR Applicant cover letter with Attachment "A," 6409 Substantial Change
Checklist, and Attachment "B," Scope of work;
(3) WARRANTY DEED
(4) AFFIDAVIT OF LEGAL INTEREST
(5) VICINITY MAP
(6) TRASH ENCLOSURE APPROVAL
(7) PHOTOMETRIC PLAN
(8) RECORDED PLAT
(9) SITE PLAN
(io)LANDSCAPE PLAN
(11) ELEVATION
(12)CZC CHECKLIST
(13)CONSTRUCTION DRAWINGS - separated into individual PDF's
(14)PROPERTY DETAIL REPORT
(15) PRIOR APRPOVALS FOR THIS SITE
(16)CROWN CASTLE AGENT AUTHORIZATION TO SUBMIT FOR PERMTS
As these documents indicate, (i) the modification involves the collocation, removal or replacement of transmission
equipment; and (ii) such modification will not substantially change the physical dimensions of such tower or base station.
As such, it is an "eligible facilities request" as defined in the FCC's rules to which the 6o-day deadline for approval applies.
Accordingly, Applicant requests all authorization necessary for this proposed minor modification under Section 6409.
Our goal is to work with you to obtain approvals earlier than the deadline. We will respond promptly to any request for
related information you may have in connection with this request. Please let us know how we can work with you to expedite
the approval process. We look forward to working with you on this important project, which will improve wireless
The Foundation for a Wireless World
CrownCastle.com
�E IDIAN>
APPROVED
DATE 02/28/22
FILE NUMBER:-0-000
CROWN
CASTLE
1505 Westlake Ave N, N
Seattle, WA 98109
Phone:
www.crowneasfle.com
services in your community using collocation on existing infrastructure. If you have any questions,
please do not hesitate to contact me.
Regards,
qa W WhaEfuurvs
Gary Abrahams, GMA Network Services, LLC
For Crown Castle
The Foundation for a Wireless World
CrownCastle.com
(E IDIAN —
APPROVED
DATE: 02/28/22
FILE NUMBEkA-zozz Oo
CROWN
CASTLE
1505 Westlake Ave N, N
Seattle, WA 98109
Attachment "A"
Section 6409 Substantial Change Checklist
Towers Outside of the Public Right of Way
Phone:
www.crowncasfle.com
The Federal Communications Commission has determined that a modification substantially changes the physical dimension of a wireless tower or base
station under 47 U.S.C. § 1455(a) if it meets one of six enumerated criteria under 47 C.F.R. § 1.6100.
Criteria for Towers Outside the Public Rip_hts of Way
YES/NO
Does the modification increase the height of the tower by more than the greater of-.
NO
(a) 10%
(b) or, the height of an additional antenna array plus separation of up to 20 feet from the top of
the nearest existing antenna?
YES/NO
Does the modification add an appurtenance to the body of the tower that would protrude from the
NO
edge of the tower more than 20 feet or more than the width of the tower structure at the level of the
appurtenance, whichever is greater?
YES/NO
Does the modification involve the installation of more than the standard number of new equipment
NO
cabinets for the technology involved or add more than four new equipment cabinets?
YES/NO
Does the modification entail any excavation or deployment outside the current site by more than 30
NO
feet in any direction, not including any access or utility easements?
YES/NO
Does the modification defeat the concealment elements of the eligible support structure?
NO
YES/NO
Does the modification violate conditions associated with the siting approval with the prior approval the
NO
tower or base station other than as specified in 47 C.F.R. § 1.6 1 00(c)(7)(i) — (iv)?
If all questions in the above section are answered "NO," then the modification does not constitute a substantial change to the existing
tower under 47 C.F.R. § 1.6ioo.
The Foundation for a Wireless World
CrownCastle.com
CUEIDR IAy
APPROVED
DATE: 02/28/22
FILE NUMBER:—02100a
CROWN
CASTLE
1505 Westlake Ave N, N
Seattle, WA 98109
Attachment `B"
Scope of Work
Phone:
www.crowncastle.com
PROJECT DESCRIPTION
THE PURPOSE OF THIS PROJECT IS TO ENHANCE BROADBAND
CONNECTIT\'ITY AND CAPACITY TO THE EXISTING ELIGIBLE
NX`IRELESS FACILITY.
TOWER SCOPE OF R ORh:
• INSTALL (3) ANTENNA SECTOR FRAMES
• D,;STALL (12) A—IENNAS
• INSTALL (9) RRHs
• INSTALL (3) 0`\1' BOX
• D;STALL (3) MBRID CABLE (2")
GROLT-ND SCOPE OF WORK:
• INSTALL (1) EQUIP'ENT PAD
• D,'STALL (1) RF CABINET
• INSTALL (1) BATTERY CABINET
• INSTALL (1) EQL"IP�M-1T UTILITY RACK
• D,�ST_ALL (1) EQUIR ENT CANOPY
• DI STALL (1) GENERATOR
• INSTALL (3) O'\'P BOX
• D�STALL (1) ICE BRIDGE
The Foundation for a Wireless World