HomeMy WebLinkAboutCrown Castle For Verizon @ 508 Bower Street A-2022-0034 V1C+E IDIAN�- Planning Division
�� Community Development Department
D A H O 33 E. Broadway Avenue, Suite 102
APPROVED Meridian, Idaho 83642
DATL 02/28/22
FILE NUMBEtA-zozz Oo
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0034
Project Name
Crown Castle For Verizon @ 508 Bower Street
Project Address
508 E. Bower Street
Project Description
EFR to modify an existing wireless facility on
1.20 acres of land in the I-L zoning district:
Tower Scope of work:
Install (3) antenna sector frames
Install (12) antennas
Install (9) RRH's
Install (3) OVP's
Install (3) hybrid cables
Ground scope of work:
Install (1) equipment pad
Install (1) RF cabinet
Install (1) battery cabinet
Install (1) equipment utility rack
Install (1) equipment canopy
Install (1) generator
Install (3) OVP
Install 1 ice bridge
Applicant
Gary Abrahams, GMA Network Services
Assigned Planner
Stacy Hersh
Expiration Date
February 28, 2023
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed below.
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
11 Page
(E IDS IAN,<-
APPROVED
DATE: 02/28/22
FILE NUMBER:n-zozz OM
31
The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
General Conditions of Approval
The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-3B-14.
2. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
3. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
4. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
5. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
6. The applicant and/or assigns shall have the continuing obligation to meet the specific
use standards for the proposed use as set forth in UDC 11-4-3-43, wireless
communication facility.
II. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before March 15,
2022, within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.
2 1 P a g e
C+E IDIAN�- Planning Division
�� Community Development Department
D A H O 33 E. Broadway Avenue, Suite 102
APPROVED Meridian, Idaho 83642
DATL 02/28/22
FILE NUMBEtA-zozz Oo
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0034
Project Name
Crown Castle For Verizon @ 508 Bower Street
Project Address
508 E. Bower Street
Project Description
EFR to modify an existing wireless facility on
1.20 acres of land in the I-L zoning district:
Tower Scope of work:
Install (3) antenna sector frames
Install (12) antennas
Install (9) RRH's
Install (3) OVP's
Install (3) hybrid cables
Ground scope of work:
Install (1) equipment pad
Install (1) RF cabinet
Install (1) battery cabinet
Install (1) equipment utility rack
Install (1) equipment canopy
Install (1) generator
Install (3) OVP
Install 1 ice bridge
Applicant
Gary Abrahams, GMA Network Services
Assigned Planner
Stacy Hersh
Expiration Date
February 28, 2023
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed below.
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
11 Page