Loading...
HomeMy WebLinkAbout2022-02-25 Boise Project Board of Control DAVID REYNOLDS OPERATING AGENCY FOR 167,000 CHAIRMAN OF THE BOARD OISE PROJECT BOARD OF CONTROL ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS DONALD BARKSDALE VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S.RECLAMATION PROJECT) ROBERT D.CARTER 2465 OVERLAND ROAD PROJECT MANAGER BOISE.IDAHO 83705-3155 NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT THOMAS RITTHALER WILDER DISTRICT ASSISTANT PROJECT MANAGER NEW YORK DISTRICT '.. BIG BEND DISTRICT APRYLGARDNER SECRETARY-TREASURER MARY SUE CHASE ASSISTANT SECRETARY- TEL:(208)344-1141 TREASURER FAX:(208)344-1437 22 February 2022 City of Meridian City Clerk's Office 33 E. Broadway Avenue, Meridian, Idaho 83642 RE: Graycliff Etates FP-2022-0005 S Meridian Rd and W. Harris St. Boise- Kuna Irrigation District BK- 90 B2 Tumbler Lateral 21+10, Carlson 2.4 31+70 Sec. 25, T3N, Rl W, B.M. Sonya Allen: The United States' Sundell Lateral lies within the boundary of the above-mentioned location. The easement for these laterals is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain these laterals. We assert this federal easement of 20 feet in both directions from the laterals' centerline and 20 feet in all directions from any concrete irrigation Structures. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. Boise Project reserves the right to have changes made that effect our easements even during the construction phase of this project. The Boise Project does not approve landscaping including trees and/or shrubs (other than grass or gravel) within its easements, as this will certainly increase our cost of maintenance. All easements must remain a flat drivable surface. Any fencing/pathways, as may be required, must be constructed off of any Boise Project Easements. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be located outside of these easements. I i Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall talce place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or Sheet Runoff must be retained on site. Per Idaho State Statutes, title 42, all local irrigation/drainage ditches that cross this property, in order;to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. I Boise Project is also under the understanding that the Home Owners Association will own and operate any pump station that is associated with this project. This development is subject to Idaho Code 31-3805, in accordance,this office is requesting a full- size hard copy of the irrigation and drainage plans. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 3 1. Si Y omasitthaler Assistant Project Manager, BPBC for/tr cc: Clint McCormick Watermaster, Div; 2 BPBC Alicia Flavel Secretaiy-Treasurer, BKID File