Loading...
DR Narrative V1ARCH, pllc Architecture + Planning 537 E. Forest Ridge Drive Meridian, ID 83642 tel. 208.921.0754 February 5, 2022 City of Meridian Planning Department 33 E. Broadway Ave., Suite 102 Meridian, Idaho 83642 RE: Roaring Springs Expansion – Mechanical 4 Building Dear Planner, On behalf of Roaring Springs we are pleased to submit the attached application and supporting materials for a new Mechanical Building for Design Review. This project will consist of a new single story building located at the North side of the proposed Roaring Springs water park and is part of a larger expansion to the park that includes new pools and attractions. This particular building is integral to the proposed Action River and houses pumps for the new water features throughout the expansion. The applicant is proposing to construct a new 800 SF single story building. Site access is proposed off an existing service drive on the North side of the park. This drive, when completed, will form a loop around the water park and Wahooz and connect back to Overland Road. This Mechanical 4 Building is intended to serve as an electrical room and pump room for new water attractions in the proposed expansion. It also house the wave generator for the proposed Action River. The proposed building is located on the North side of the property. It will front an existing service drive on the North side of the property. This building is not intended to by occupied full time but needs access for equipment installation and future maintenance. Building elevations take cues from the existing structures in the water park. Materials include split-face and smooth concrete block and standing seam metal roofing. CMU block color will match existing color: Charcoal. Changes in the texture of the block break up the massing of the elevations. Metal roofing is to be a blue color to match with a yellow fascia band at the overhang. At the east end of the building a caisson is to be constructed that will tie directly into the Action River and will provide the wave generation. The wave generator is housed inside the building as part of the equipment package. A-2022-0028 02/25/22 This application has been prepared in coordination with the Meridian Design Manual. We expect that you will find it complete and generally as discussed. Should you have any questions don't hesitate to contact us. Sincerely, R. Damon Beard, AIA ARCH, pllc 537 E. Forest Ridge Dr. Meridian, ID 83642 208.921.0754 A-2022-0028 02/25/22