HomeMy WebLinkAboutDR Checklist V1Planning Division
DESIGN REVIEW ■ Checklist
Community Development Planning Division 33 E. Broadway Avenue, Ste. 102 Meridian, Idaho 83642
Phone: 208-884-5533 www.meridiancity.org
(Rev: 08/01/2021)
Submittal Standards
♦ All Applications must be submitted electronically through CITIZEN ACCESS PORTAL
♦ All Drawings/Documents will be submitted electronically through PROJECT DOX
♦ Upload all documents and drawings in the appropriate folders
♦ Upload all documents and drawings per required checklist, as Individual PDF’s.
♦ Each checklist item must be named according to the naming convention listed below.
♦ All plans must have a space reserved in the upper left corner for City Approval stamps.
♦ Resubmittals must use the EXACT same file name as the original to allow versioning.
Description
Document
Naming Convention
Recorded warranty deed for the subject property Warranty Deed
Affidavit of Legal Interest signed and notarized by the property owner (If owner is a
corporation, submit a copy of the Articles of Incorporation. If you are not the owner listed on the
Recorded Warranty Deed, Affidavit of Legal Interest is required.)
Affidavit of Legal Interest
Completed Architectural Standards Compliance Checklist
(Indicate compliance with all applicable standards to include Commercial, Traditional
Neighborhood or Multi-family Districts, under Non-residential or Residential categories.)
ASM Checklist (not required for
exterior modifications)
Provide in a narrative letter, how the proposal addresses standards contained in the City of
Meridian Architectural Standards Manual and the Unified Development Code (UDC):
1. Architectural Character:
a. Cohesive Design
b. Building Scale
c. Building Form
d. Architectural Elements
e. Materials
f. Signs and/or Lighting
2. Parking Lots
3. Pedestrian walkways and facilities
Narrative
A complete set of scaled plans including building elevations, with building materials,
colors and textures, and mechanical equipment
Elevations
Site Plan - site plans showing landscaping on the site Site Plan
*The highlighted item(s) above may not be required depending on the project. Please contact a planner to verify if these item(s)
are required and received instructions on how to proceed with your submittal.
A-2022-0028
02/25/22