Loading...
HomeMy WebLinkAboutBridgetower Subdivision No. 1 FP-00-025BEFORE THE MERIDIAN CITY COUNCIL C/C 01/16/01 IN THE MATTER OF THE ) APPLICATION OF PRIMELAND ) DEVELOPMENT CO., LLP, FOR ) APPROVAL oF FINAL PLAT FOR ) BRIDGETOWER SUBDIVISION ) NO. 1, LOCATED NORTH OF ) USTICK ROAD AND EAST OF ) TEN MILE ROAD, MERIDIAN, ) IDAHO ) ) ) CASE NO. FP-00-025 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code § 12-3-7 on January 2, 2001, and tabled to January 16, 2001, and the Council finding that the Administrative Review is complete which has included certain comments and conditions as stated in a letter to the Mayor and Council from Bruce Frecldeton, Engineering Technician III, and Shari Stiles, Planning and Zoning Administrator, listing ! 1 General Comments and 24 Site Specific Comments, which are herein found fair and reasonable, and at the January 16, 2001 meeting, Shari Stiles, Planning and Zoning Administrator, commented at the hearing, and Becl~ Bowcutt, Becky Bowcutt Planning Services, testified on behalf of the Applicant, and Frank Varrialle, appeared and testified, and the Council having considered the requirements of the preliminary plat the Council takes the following action: ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR BRIDGETOWER SUBDIVISION NO. 1 (FP-00-025) - 1 IT IS HEREBY ORDERED THAT: 1. The Plat of "BRIDGETOWER SUBDIVISION NO. 1" as evidenced in Plat bearing "PLAT OF BRIDGETOWER SUBDIVISION NO. 1, A PORTION OF THE SOUTH 1/2 OF SECTION 35, T. RN., R. 1W., B.M., ADA COUNTY, IDAHO 2000, SHEET 1 OF 2,/0601 \0601-PLT.DWG BKB 11/01/00, STAMPED NOV 01 2000, By: BRIGGS ENGINEERING, INC., and PRIMELAND DEVELOPMENT CO., LLP, Developer", is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Bruce Frecldeton, Engineering Technician III, and Shaft Stiles, Planning and Zoning Administrator, dated December 28, 2.000, listing 11 General Comments and 24 Site Specific Comments, and Applicant's response letter by and through Becky Bowcutt Planning Services, dated December 29, 2000, true and correct copies of which are attached hereto marked Exhibit "A", and consisting of eight pages, and by this reference incorporated herein, with the additional requirements that: 1.1 Additionally, at the City Council meeting on January ! 6, 2001, action taken by the Council consisted of the following pertaining to the tiling of the ditch: The City of Meridian will waive the requirement for tiling of the Creason Lateral Ditch for a portion of the property. The portion waived is on the North side of the applicant's parcel that is also contiguous to property owned by Leonard Huskey. In lieu of tiling this section of ditch, the applicant will construct a six foot perimeter fence on that boundary. Additionally, the applicant will have to obtain the Nampa & Meridian Irrigation District's approval for the fence. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR BRIDGETOWER SUBDIVISION NO. 1 (FP-00-025) - 2 On the western boundary, the applicant has to post a bond or a letter of credit for a three (3) year time period, and which may be renewed for additional three (3) year periods for an amount of estimated costs of construction or tiling of one-half (%) of the Creason Lateral along the western boundary of the property. 1.2 The Central District Health Department requires after written approval from the appropriate entities are submitted, they can approve this proposal for central sewage and central water; that plans must be submitted to and approved by the Idaho Department of Health and Welfare, Division of Environmental Quality for central sewage and central water; that run-off is not to create a mosquito breeding problem; and it is suggested that stormwater be pretreated through a grassy swale prior to discharge to the subsurface to prevent impact to groundwater and surface water quality; that engineers and architects should obtain current best management practices for stormwater disposal and design a stormwater management system that is preventing groundwater and surface water degradation. Manuals for guidance: 1.2.1 State of Idaho Catalog Of Stormwater Best Management Practices For Idaho Cities And Counties. Prepared by the Idaho Division Of Environmental Quality, July 1997. 1.2.2 Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works Department, January 1997. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: a. The Plat dimensions are approved by the City Engineer; and b. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR BRIDGETOWER SUBDIVISION NO. 1 (FP-00-025) -3 issued guaranteeing the completion of off-site and required on-site day of improvements. By action of the City Council at its regular meeting held on the Copy served upon Applicant, the Planning and Zoning Department and the Public Works Department. ~t~lerk ' '- ff ~ msWZ:XWork~di~efidi~ 15360~fidge%wer g017 C~043 PP017~P~de~25 "~]T "~tltii ,... ~i~~ ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR BRIDGETOWER SUBDIVISION NO. 1 (FP-00-025) -4