Roaring Springs East Restroom Building A-2022-0029 V1C+E IDIAN�- Planning Division
�� Community Development Department
D A H O 33 E. Broadway Avenue, Suite 102
APPROVED Meridian, Idaho 83642
DATL 02/23/22
FILE NUMBEF•A-zozz- M
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0029
Project Name
Roaring Springs East Mechanical Building 4
Project Address
1420 S. Black Marlin Lane
Project Description
Applicant proposes to construct a new 907
square foot restroom building as part of a larger
expansion to an existing water park. Proposed
building will be located off an existing service
drive on the north side of the park on 1.601
acres of land in the C-G zoning district.
Applicant
Damon Beard, Arch PLLC
Assigned Planner
Stacy Hersh
Expiration Date
The Administrative Design Review shall be
exercised with the approval period of the
underlying permit or the approval shall expire.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete thatprocess before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Design Review is approved with the conditions listed below. The
director determined that the proposed structural and/or site designs conform to the standards
and meet or exceed the intent of the "City of Meridian Architectural Standards Manual".
NOTE: The proposed restroom building is located off an existing service drive on the north side
of the property and not seen from a public street.
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
3. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
4. The approved site plan, landscape plan and/or elevations may not be altered without prior
written approval of the City of Meridian Planning Division.
5. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
1 I Page
(E IDS IAN,4-
APPROVED
DATE: 02/23/22
FILE NUMBEF•A-zoz 029
If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14.
2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth
in UDC 11-3A-14.
3. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (Development Agreement #2017-011444; CUP-98-100;
CZC-06-147; CZC-12-056; CZC-15-010; CZC, DES A-2018-0046, CZC. DES A-2019-
0276).
4. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
6. The applicant shall have an ongoing obligation to maintain all pathways.
7. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
8. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
9. The applicant and/or assigns shall have the continuing obligation to meet the specific use
standards for the proposed use as set forth in UDC 11-4-3-2 (Arts, entertainment or recreation
facility, indoors and outdoors).
II. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before March 5,
2022, within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.
2 1 P a g e