Loading...
Engineer Statement V1 (2)Kimley >>Horn January 14, 2022 City of Meridian 33 E Broadway Avenue Meridian, Idaho 83642 RE: Graycliff Subdivision- Phase 2 Construction Drawings To Whom it May Concern — Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period from 2006-2019. Based on the results of these groundwater readings, the roadway centerline elevations within the Graycliff Subdivision Phase 2 are designed to be greater than 3' above highest established groundwater elevation. Respectfully, S\ONAL FN\ O�� V\CENSF� �y " '08670 L O1/14/2022 O ,9eF OF \'CA IL N Abbey Hahn, PE Kimley-Horn