Engineer Statement V1 (2)Kimley >>Horn
January 14, 2022
City of Meridian
33 E Broadway Avenue
Meridian, Idaho 83642
RE: Graycliff Subdivision- Phase 2 Construction Drawings
To Whom it May Concern —
Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period
from 2006-2019. Based on the results of these groundwater readings, the roadway centerline
elevations within the Graycliff Subdivision Phase 2 are designed to be greater than 3' above highest
established groundwater elevation.
Respectfully,
S\ONAL FN\
O�� V\CENSF� �y
" '08670
L O1/14/2022 O
,9eF OF
\'CA IL N
Abbey Hahn, PE
Kimley-Horn