Loading...
HomeMy WebLinkAboutPZ - Memo from Staff to Commission 3-3 hearing Mayor Robert E. Simison E IDIAN.� City Council Members: =�� Treg Bernt Brad Hoagiun Joe Borton Jessica Perreault Luke Caverier Liz Strader February 18, 2022 MEMORANDUM TO: Planning and Zoning Commission CC: Wendy Shrief, JUB Engineers; Dave Yorgason, Primeland Investment Group FROM: Joseph Dodson, Current Associate Planner RE: Verona Live/Work—CUP (H-2021-0080) Dear Commissioners, Verona Live/Work CUP (H-2021-0080)was continued per the request of the Applicant from the December 16, 2021 hearing to the January 20, 2022 hearing in order to meet with Staff and work through some of the concerns brought up within the staff report. Prior to the January 20,h hearing, the Applicant requested a continuance in order to provide Staff enough time to receive and analyze any revised plans. At the February 3rd meeting, the Commission continued the application to the March 3, 2022 Commission hearing to give the Applicant a chance to respond to concerns brought up at the meeting. Since the hearing, Staff has received revised floor plans and has analyzed them against code and previous versions of the plans. The revisions made to floor plans include removing any interior access between the commercial and the residential and for the larger units (noted as the B-units), the commercial space has become one larger suite by the removal of a dividing wall. Staff finds the revised floor plans to be in compliance with code, more in line with the intent of Vertically Integrated Residential Projects specific use standards and definition, and consistent with changes discussed by the Commission. The revised floor plans do not constitute any changes to the conditions of approval. Staff has attached the revised floor plans to this memo-for-your convenience and has kept the previously recommended changes to the conditions of approval for transparency. Previously recommended revisions to the conditions of approval: • Modify_A.1 -The Applicant shall substantially comply with the revised and approved site plan, landscape plan, and conceptual building elevations min this report as depicted in Section IX and revised per Section X.A. or unity Development Department . 33 E. Broadway Avenue, Suite 102, Meridian, ID 83642 / Phone 208-884-5533 . Fax 208-888-6854 . www.meridiancity.org • Modify A.5 —The site plan(s) shall be revised as follows prior to submitting for Certificate of Zoning Compliance approval the Planning and Zoning Commissien hear-in : • Modify A.5b—For the facades facing W. Milano Drive and N. Cortona Way, depict additional 5-foot wide sidewalks connecting from these building entrances to the existing sidewalks along the public streets, similar to what is shown in the submitted color site plan image. • Strike A.5c—Remove the ovva units fr-a ing the eemerof W. Milano Drive and N. Geftana a-ad add a shared plaza spaee with outdoor-seating and shade stfueWres. • Strike A.5d—Remove the two units not along the adjacent stFeets in lieu of additional par-king and some usable eommon open spaee for-the development. • Strike A.6d—Depi t the shared plat as noted above with to lands s. • Strike A.7 altogether. • Strike A.8 altogether. • Add Condition to A.5 —Move the northern four(4) units approximately three (3) feet to the north to accommodate an extension of 5-foot wide sidewalk and 5 feet of landscaping aloniz the south side of this buildiniz from Cortona Way_ to the plaza area in the interior of the site. Exhibits: A. Revised Floor Plans (February 2022) 2 A. Revised Floor Plans (February 2022) 4. rR PRELIMINARY h eseacasace LOT BLOCK Ll k v I 1 Li — — i H 1 e A � A- 1 F 2 � .4. ce a. a,was �. FLOOR PLAN-MAIN LEVEL FA2.0x 3 4 wewoa e p PRELIMINARY LOT BLOCK B emu" Ll ,xao" su .B rpza+ i' r(_y�e Y.. I LA Q LL— W � w p. AIN LEVEL z 3 a „<•,0 0 0 0 A2.0 4