Loading...
HomeMy WebLinkAboutRevised Landscape Plan V16213 N. Cloverdale Rd. Suite 125 Boise, Idaho 83704 t.208.846.8955 f.208.846.8956 c.208.867.3954 ross@ericksoncivil.com erickson civil NO. REVISION DATE PREPARED BY: PROJECT MANAGER: JOB NUMBER: PH: (208) 846-8955 FAX:(208) 846-8956 DRAWN BY: ERICKSON CIVIL, INC. - RKE SHEET NUMBER: SHEET TITLE: DATE: IDB2100 OWNER: PROJECT TITLE: JOCELYN PARK SUBDIVISION PHASE 2 MERIDIAN, ID HAYDEN HOMES IDAHO, LLC P R O F E S S I O N A L E O H A D I F O E T A T S E R I C K S O TR CREEK WAY S. CABIN CREEK WAY S. GARIBALDI PL. W. WINNIPEG ST. WILKINS DRAI FARR LATERAL 567.82 LF OF 4" 66.66 LF OF 4" N: 695394.5747 E: 2453330.8464 90° BEND N: 695395.0799 E: 2453264.1879 N: 695962.3763 E: 2453335.1496 6213 N. Cloverdale Rd. Suite 125 Boise, Idaho 83704 t.208.846.8955 f.208.846.8956 c.208.867.3954 ross@ericksoncivil.com erickson civil NO. REVISION DATE PREPARED BY: PROJECT MANAGER: JOB NUMBER: PH: (208) 846-8955 FAX:(208) 846-8956 DRAWN BY: ERICKSON CIVIL, INC. - RKE SHEET NUMBER: SHEET TITLE: DATE: IDB2100 OWNER: PROJECT TITLE: JOCELYN PARK SUBDIVISION PHASE 2 MERIDIAN, ID HAYDEN HOMES IDAHO, LLC P R O F E S S I O N A L E O H A TR 0' 30' 60' 90' 02/17/22 FPS-2022-0003 PART 2 - PRODUCTS 2.1 TOPSOIL A. If deemed usable, native topsoil shall be stockpiled for re-use in landscape work. Topsoil shall be fertile, friable, natural loam, surface soil, reasonable free of subsoil, clay lumps, brush, weeds, roots, stumps, stones larger than 1 inch in any dimension, and other extraneous or toxic matter harmful to plant growth. 1. Contractor shall send a minimum of three (3) representative topsoil samples for testing. See testing requirements below. Contractor is responsible for whatever soil additives are recommended by the tests. Submit to Architect for approval. Compost will be added to other additives and added regardless of test results. B. If quantity of stockpiled topsoil is insufficient, contractor to provide imported topsoil that is fertile, friable, natural loam, surface soil, reasonably free of subsoil, clay lumps, brush, weeds and other litter, and free of roots, stumps, stones larger than 1 inches in any dimension, and other extraneous or toxic matter harmful to plant growth. 1. Obtain topsoil from local sources or areas with similar soil characteristics to that of project site. Obtain topsoil only from naturally well-drained sites where topsoil occurs in a depth of not less than 4 inches. Do not obtain from bogs or marshes. 2. Composition: Topsoil shall contain from 1 to 20% organic matter as determined by the Organic Carbon, 6A, Chemical Analysis Method described in USDA Soil Survey Investigation Report No. 1. Maximum particle size, 3/4-inch, with maximum 3% retained on 1/4-inch screen. Other components shall conform to the following limits: pH 6.5 to 7.5 Soluble Salts 600 ppm maximum Silt 25-50% Clay 10-30% Sand 20-50% 3. Contractor shall submit representative soil report on imported topsoil proposed for use for approval. Report shall meet standards below. Contractor is responsible for whatever soil additives are recommended by the test. Compost will be in addition to other additives and added regardless of test results. C. Soil Testing 1. Soil tests are required for this project (see above for requirements). Test shall be provided as follows: a. Provide certified analysis at time of sample submitted (three samples imported topsoil). Amend soils per chemist's recommendations and as herein specified unless otherwise approved by Architect. 2. Test shall include, but not limited to recommendations on chemical distributions, organic contents, pH factors, and sieve analysis as necessary. Test #1T by Western Laboratories (1-800-658-3858) is required. 3. Contractor is responsible for whatever soil additives are recommended by the soil testing laboratory. 4. Contractor shall coordinate, obtain and pay for all soil tests. 5. If regenerative noxious weeds are present in the soil, remove all resultant growth including roots throughout one-year period after acceptance of work, at no cost to Owner. 2.2 pH ADJUSTERS A. When pH does not comply with this specification, commercial grade aluminum sulfate shall be used to adjust soil pH. 2.3 SOIL AMENDMENTS A. Compost: Compost: “Cascade Compost” from Cloverdale Nursery (208) 375-5262 and NuSoil Compost (208) 629-6912 or approved equal in equal amounts by volume. B. Commercial Fertilizer: Fertilizer shall be complete, standard commercial brand fertilizer. It shall be free-flowing and packaged in new waterproof, non-overlaid bags clearly labeled as to weight, manufacturer, and content. Protect materials from deterioration during delivery and while stored at site. 1. Commercial fertilizer "A" for trees and shrubs during planting; slow release Agriform Planting 5-gram tablets 20-10-5 type or equal. 2. Commercial fertilizer "B" for lawn areas, applied to bed prior to sodding, to be 16-16-17 applied at the rate of ten pounds per acre. 3. Commercial fertilizer "C" for lawn areas three to four weeks after planting sod. Organic Fertilizer Milorganite (6-0-2) type or equal.