HomeMy WebLinkAboutNMID Comments
. . --. - .
'Z:~,_.- ~1..,' Î. 'i ;"
MAR 1 3 2006
~,i:J ëft~~i¡~::~,:~~~[:~.
~ & ~ '7~"Z;é4tfûa
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651 "4395
FAX # 208-463-0092
9 March 2006
phones: Area Code 208
OFFICE: Nampa 466"7861
SHOP: Nampa 466-0663
Will Berg, City Clerk
City of Meridian
33 East Idaho
M.;:-ridian, ID 8-3642
RE:
FP 06-011/Umbria (aka Silver Oaks) Subdivision
Dear Will:
Nampa & Meridian lITigation District reserves all comments on the above referenced
application for Final Plat for Umbria (aka Silver Oaks) Subdivision until our review is completed.
ALL WORK WITHIN NAMP A & MERIDIAN IRRIGATION DISTRICT FACILITIES
MUST BE COMPLETED BY MARCH 15, 2006.
Sincerely,
,¡gMl'/~~
Bill Herf'so;
Asst. Water Superintendent
Nampa & Meridian lITigation District
BH/dbg
c:
File - Office/Shop
() . '-I '\ ""oc,
,L . ¡.....
;,) dL
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
17 May 2006
Matt Price
Riveridge Engineering
405 W. Myrtle St.
Boise, ID 83702
RE: Umbria Subdivision (aka Silver Oaks)
Dear Matt:
Please be advised that the following items need to be corrected:
1. Install First Street Welding Screen
2. Must have a pump house on the pump station — none is shown.
3. Pump house must have the following:
a. Exhaust fan
b. 110V outlet
c. Four foot (4') fluorescent light
d. Ventilation
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
2ECEIVET
MAY 2 5 2006
City of Meridian
(City Clerk Office
Nampa & Meridian Irrigation District will be responsible for the Pump House ONLY! The
District will not be responsible for MAIN LINE or SERVICES!
Sincerely,
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: Laura Bum, attorney
City of Meridian; Brad Hawkins -Clark, Principal Planner
Water Superintendent
Ted C., PUIS Supervisor
File - Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
19 May 2006
Nathan Cleavers
Leavitt & Assoc. Inc.
1324 1st St. South
Nampa, ID 83651
RE: Courtyards at Ten Mile
Dear Nathan:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
UCEIVED
MAY 2 5 2006
City of Meridian
City Clerk Office
Please be advised that the pressure irrigation main line that was to be installed parallel to Ten
Mile Road south of West Pine Street has never been completed. Per approved plans and
Urban Contract this main line needs completed as soon as possible. I would appreciate your
prompt attention to this matter.
If you have any questions, please feel free to give me a call.
Sincerely,
egg=.'I
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: Laura Burri, attorney
City of Meridian; Brad Hawkins -Clark, Principal Planner
Water Superintendent
Ted Clinton, PUIS Supervisor
File - Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
i��A W_,Poi
20 April 2006
Matt Price
Riveridge Engineering
405 W. Myrtle St.
Boise, ID 83702
RE: Umbria (aka Silver Oaks) Subdivison
Dear Matt:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
RECEIVE hones:
Area Code 208
FFICE:
Nampa 466-7861
APR Z 5 2006 SHOP:
Nampa 466-0663
OITY OF MERIDIAN
CITY CLERK OFFICE
The following are concerns that Nampa & Meridian Irrigation District still has concerning the
above -mentioned proposed project. All storm water, I am assuming, is being retained onsite since
there is nothing on the plans showing storm water.
The pressure irrigation exterior main lines should be six inch (6") all other interior lines must be a
minimum of four inch (4"). There needs to be a bypass for your MEI Clear water screen. The
drain valves attachment to the main lines do not meet Nampa & Meridian Irrigation District's
specifications. The size and type of valves method which attach the main line also do not meet
our specifications. The number of services do not meet the District's specification either.
Nampa & Meridian Irrigation District would prefer a regular partial weir rather than the V-
notched weir shown in the plans.
All encroachments within the Kennedy easement must be with approved plans and a signed
License Agreement.
'Zkmt Io. rp 0(o-010
Page I of 2
cq pe, 6� L 0� 3/a i t ��
\' APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
Ben Thomas
Riverridge Eng.
Umbria aka Silver Oaks
20 April 2006
Page 2 of 2
An Urban Contract must be signed before any construction is started. Please contact the District's
attorney, Ms. Laura Burri at 342-4591 and ask that she prepare this document. Once this
agreement has been signed and returned it will be presented to the District's Board of Directors for
their consideration at the next available board meeting.
Pump curves must be verified to ensure adequate pressure and water allotment. A First Street
Welding Screen mounted on the headwall in the Kennedy Lateral with a C-10 headgate behind it
would be more acceptable as then all the trash would remain in the Kennedy Lateral.
All excess water from the sump must be diverted and piped to the Ten Mile Drain back to the
northeast. This would ensure an adequate and constant flow instead of returning back into the
Kennedy Lateral which is unacceptable to Nampa & Meridian Irrigation District.
Once the above concerns have been addressed this proposed project should meet and be
acceptable to Nampa & Meridian Irrigation District.
If you have any further questions, please feel free to give me a call.
Sincerely,
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: City of Meridian; Brad Hawkins -Clark, Principal Planner
Laura Bum
Bryce Farris
Water Superintendent
Ted Clinton
Rider 5
File - Office/Shop
RECEIVED
MAR 2 7 2006
City of Meridian
City Clerk Office
~&~'7~'Z)~
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 ,
FAX # 208-463-0092
22 March 2006
phones: Areo Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
Mayor Tammy deWeerd
City of Meridian
33 E. Idaho Ave.
Meridian, ill 83642
RE:
Kennedy Lateral/Umbria Subdivision
Dear Kristy:
Nampa & Meridian Irrigation District would prefer that all laterals were piped as development
occurs. There are many safety reasons for this (i.e. operation, maintenance etc.). However at
this time the District does not have any requirements concerning this. If laterals aren't piped
then we ask that fences and encroachments need to be placed far enough back to allow for
machinery to perfonn all necessary operation and maintenance.
If you have any further questions, please feel free to give me a call.
Sincerely,
¿:=:-
Water Superintendent
Nampa & Meridian Irrigation District
JPAldbg
C: Dave McKinnon, Congor Mgmt.
Board of Directors
Secretaryrrreasurer
Asst. Water Superintendent
File
1'- ¡
I I r;\
C rr )1J<) tvV "
r'.' .~
[O¿,¿t
þd{;J
A¡]lJI/IJ
"'Î I , \
Jø1 fl¿t cU
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS. 40,000