Loading...
HomeMy WebLinkAboutNMID Comments . . --. - . 'Z:~,_.- ~1..,' Î. 'i ;" MAR 1 3 2006 ~,i:J ëft~~i¡~::~,:~~~[:~. ~ & ~ '7~"Z;é4tfûa 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651 "4395 FAX # 208-463-0092 9 March 2006 phones: Area Code 208 OFFICE: Nampa 466"7861 SHOP: Nampa 466-0663 Will Berg, City Clerk City of Meridian 33 East Idaho M.;:-ridian, ID 8-3642 RE: FP 06-011/Umbria (aka Silver Oaks) Subdivision Dear Will: Nampa & Meridian lITigation District reserves all comments on the above referenced application for Final Plat for Umbria (aka Silver Oaks) Subdivision until our review is completed. ALL WORK WITHIN NAMP A & MERIDIAN IRRIGATION DISTRICT FACILITIES MUST BE COMPLETED BY MARCH 15, 2006. Sincerely, ,¡gMl'/~~ Bill Herf'so; Asst. Water Superintendent Nampa & Meridian lITigation District BH/dbg c: File - Office/Shop () . '-I '\ ""oc, ,L . ¡..... ;,) dL APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 17 May 2006 Matt Price Riveridge Engineering 405 W. Myrtle St. Boise, ID 83702 RE: Umbria Subdivision (aka Silver Oaks) Dear Matt: Please be advised that the following items need to be corrected: 1. Install First Street Welding Screen 2. Must have a pump house on the pump station — none is shown. 3. Pump house must have the following: a. Exhaust fan b. 110V outlet c. Four foot (4') fluorescent light d. Ventilation Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 2ECEIVET MAY 2 5 2006 City of Meridian (City Clerk Office Nampa & Meridian Irrigation District will be responsible for the Pump House ONLY! The District will not be responsible for MAIN LINE or SERVICES! Sincerely, Bill Henson Asst. Water Superintendent Nampa & Meridian Irrigation District BH/dbg C: Laura Bum, attorney City of Meridian; Brad Hawkins -Clark, Principal Planner Water Superintendent Ted C., PUIS Supervisor File - Office/Shop APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 19 May 2006 Nathan Cleavers Leavitt & Assoc. Inc. 1324 1st St. South Nampa, ID 83651 RE: Courtyards at Ten Mile Dear Nathan: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 UCEIVED MAY 2 5 2006 City of Meridian City Clerk Office Please be advised that the pressure irrigation main line that was to be installed parallel to Ten Mile Road south of West Pine Street has never been completed. Per approved plans and Urban Contract this main line needs completed as soon as possible. I would appreciate your prompt attention to this matter. If you have any questions, please feel free to give me a call. Sincerely, egg=.'I Asst. Water Superintendent Nampa & Meridian Irrigation District BH/dbg C: Laura Burri, attorney City of Meridian; Brad Hawkins -Clark, Principal Planner Water Superintendent Ted Clinton, PUIS Supervisor File - Office/Shop APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 i��A W_,Poi 20 April 2006 Matt Price Riveridge Engineering 405 W. Myrtle St. Boise, ID 83702 RE: Umbria (aka Silver Oaks) Subdivison Dear Matt: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 RECEIVE hones: Area Code 208 FFICE: Nampa 466-7861 APR Z 5 2006 SHOP: Nampa 466-0663 OITY OF MERIDIAN CITY CLERK OFFICE The following are concerns that Nampa & Meridian Irrigation District still has concerning the above -mentioned proposed project. All storm water, I am assuming, is being retained onsite since there is nothing on the plans showing storm water. The pressure irrigation exterior main lines should be six inch (6") all other interior lines must be a minimum of four inch (4"). There needs to be a bypass for your MEI Clear water screen. The drain valves attachment to the main lines do not meet Nampa & Meridian Irrigation District's specifications. The size and type of valves method which attach the main line also do not meet our specifications. The number of services do not meet the District's specification either. Nampa & Meridian Irrigation District would prefer a regular partial weir rather than the V- notched weir shown in the plans. All encroachments within the Kennedy easement must be with approved plans and a signed License Agreement. 'Zkmt Io. rp 0(o-010 Page I of 2 cq pe, 6� L 0� 3/a i t �� \' APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 Ben Thomas Riverridge Eng. Umbria aka Silver Oaks 20 April 2006 Page 2 of 2 An Urban Contract must be signed before any construction is started. Please contact the District's attorney, Ms. Laura Burri at 342-4591 and ask that she prepare this document. Once this agreement has been signed and returned it will be presented to the District's Board of Directors for their consideration at the next available board meeting. Pump curves must be verified to ensure adequate pressure and water allotment. A First Street Welding Screen mounted on the headwall in the Kennedy Lateral with a C-10 headgate behind it would be more acceptable as then all the trash would remain in the Kennedy Lateral. All excess water from the sump must be diverted and piped to the Ten Mile Drain back to the northeast. This would ensure an adequate and constant flow instead of returning back into the Kennedy Lateral which is unacceptable to Nampa & Meridian Irrigation District. Once the above concerns have been addressed this proposed project should meet and be acceptable to Nampa & Meridian Irrigation District. If you have any further questions, please feel free to give me a call. Sincerely, Bill Henson Asst. Water Superintendent Nampa & Meridian Irrigation District BH/dbg C: City of Meridian; Brad Hawkins -Clark, Principal Planner Laura Bum Bryce Farris Water Superintendent Ted Clinton Rider 5 File - Office/Shop RECEIVED MAR 2 7 2006 City of Meridian City Clerk Office ~&~'7~'Z)~ 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 , FAX # 208-463-0092 22 March 2006 phones: Areo Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 Mayor Tammy deWeerd City of Meridian 33 E. Idaho Ave. Meridian, ill 83642 RE: Kennedy Lateral/Umbria Subdivision Dear Kristy: Nampa & Meridian Irrigation District would prefer that all laterals were piped as development occurs. There are many safety reasons for this (i.e. operation, maintenance etc.). However at this time the District does not have any requirements concerning this. If laterals aren't piped then we ask that fences and encroachments need to be placed far enough back to allow for machinery to perfonn all necessary operation and maintenance. If you have any further questions, please feel free to give me a call. Sincerely, ¿:=:- Water Superintendent Nampa & Meridian Irrigation District JPAldbg C: Dave McKinnon, Congor Mgmt. Board of Directors Secretaryrrreasurer Asst. Water Superintendent File 1'- ¡ I I r;\ C rr )1J<) tvV " r'.' .~ [O¿,¿t þd{;J A¡]lJI/IJ "'Î I , \ Jø1 fl¿t cU APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS. 40,000