HomeMy WebLinkAboutConstruction Drawings - C2.20 V1GIRR GIRR GIRR
GIRR
GIRR
GIRR
M
W
EP
EP
EP
EP
EP
W(12")
W(12") W(12")
SD
W
1-18
S
S
S
S
S
S
S
S
S
S
W. HARRIS STREET
S. GRAYCLIFF WAY
S. COLDITZ WAY
S. COLDITZ WAY
EP
M
M
M
M M M M
M M
M M
M M M M
M M
M M
M
M
M
M
M
M
M
M
M
SSCO
W
W
SSCO
S
S
S
W
W(8")
W(8")
W(8")
W(8") W(8")
S(8")
S(8")
S(8")
S(8")
S(8")
M
M
M
M M
M M
M M M M
M M
M M M M
M
M
W. BRIARIDGE DR.
GIRR GIRR GIRR
GIRR
GIRR
GIRR
GIRR GIRR GIRR
GIRR
GIRR
GIRR
W. HARRIS ST
1
BLOCK 1
EXISTING PHASE 1
EXISTING PHASE 1
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse
of and improper reliance of this document without written authorization by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
Path:
Date: User:
K:\BOI_CIVIL\093888000 KB HOME_GRAYCLIFF- MERIDIAN ID\CADD\PLAN SHEETS\EC.DWG
1/14/2022 11:10 AM HAHN, ABBEY (STOVER)
GRAYCLIFF ESTATES
GRAYCLIFF SUBDIVSION - PHASE 2
701 W HARRIS ST MERIDIAN, IDAHO 83642
1/14/2022
SHEET
DRAWN BY:
DESIGNED BY:
CHECKED BY:
ARH
PROJECT No.: SCALE:
093888000 AS SHOWN
# DATE DESCRIPTION
SEAL
950 W Bannock Street, Suite 1100, Boise, ID 83702 | Tel. No. (208) 297-2885
ARH
BM
1/14/2022
1/14/2022
FOR REVIEW ONLY - NOT APPROVED FOR CONSTRUCTION
NORTH
GENERAL NOTES
SEQUENCE OF CONSTRUCTION
MAINTENANCE
EROSION CONTROL PLAN
C2.20
MATCH LINE: SEE SHEET C2.10
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Call beofre you dgi.
Know whast' below .
R
LEGEND
01/14/2022