HomeMy WebLinkAboutAda County Highway District W&S improvements, Ten Mile and Victory Roads City Project # 10975 Item#15. INTERAGENCY AGREEMENT FOR: ROADWAY CONSTRUCTION /WATER AND SEWER CONSTRUCTION TEN MILE RD AND VICTORY RD ACHD PROJECT NO. 319038 THIS INTERAGENCY AGREEMENT FOR ROADWAY CONSTRUCTION/WATER AND SEWER CONSTRUCTION ("Agreement") is made and entered into this 1 6 t h day of November , 2021, by and between the ADA COUNTY HIGHWAY DISTRICT, a highway district organized under the laws of the State of Idaho ("DISTRICT" or "ACHD"), and the CITY OF MERIDIAN, a municipal corporation organized under the laws of the State of Idaho ("MERIDIAN" or"City"), regarding ACHD Project no. 319038. RECITALS WHEREAS, ACHD is a single county-wide highway district, a public entity, organized and existing pursuant to Idaho Code Title 40, Chapter 14, as amended and supplemented, with the exclusive jurisdiction and authority to maintain, improve, regulate and operate public rights-of-way in Ada County; WHEREAS, City is a municipal corporation organized and operating pursuant to Idaho Code Title 50, as amended and supplemented with jurisdiction, authority and police power to regulate and control municipal activities within the City; WHEREAS, Idaho Code § 67-2332 provides that one or more public agencies may contract with any one or more other public agencies to perform any governmental service, activity or undertaking which each public agency entering into the contract is authorized by law to perform, provided that such contract is authorized by the governing body of each party and that such contract shall set forth fully the purposes, powers, rights, objectives and responsibilities of the contracting parties; and WHEREAS, DISTRICT and MERIDIAN desire to undertake a cooperative effort to incorporate into the DISTRICT'S road construction projects known as TEN MILE RD AND VICTORY RD ("Project" or "Project Boundaries"), certain modifications or improvements to City owned facilities, including constructing water and sewer services, adjusting water valve boxes and covers and sewer manholes to grade, and correcting potable/non-potable spacing issues (collectively, "City Water and Sewer Improvements") as detailed in Project no. 319038, to be constructed pursuant to a separately-executed agreement between DISTRICT and the selected Contractor ("CONTRACT"); and WHEREAS, DISTRICT is willing to accommodate MERIDIAN'S request by including the City Water and Sewer Improvements in the Project plans, subject to the terms, conditions and obligations set forth in this Agreement and so long as DISTRICT receives assurances by the City that it will fully reimburse DISTRICT for all actual costs including, without limitation, any indirect costs and expenses that DISTRICT incurs as a result of the additional work attributable to the modification or installation of the City Water and Sewer Improvements within the Project Boundaries; and Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 1 of 9 Page 23s Item#15. NOW, THEREFORE, in consideration of the foregoing premises, mutual covenants and agreements herein contained, the parties hereto agree as follows: 1. DISTRICT SHALL: a. Be the party responsible for soliciting, receiving and opening of bids and for executing and administering the construction CONTRACT for the roadway reconstruction and City Water and Sewer Improvements referenced herein, which CONTRACT shall include, inter alia, a provision that all work required for the City Water and Sewer Improvements shall be performed in conformance with the most current edition of the Idaho Standards for Public Works Construction (ISPWC) and the most current City of MERIDIAN Supplemental Specifications to the ISPWC. It is hereby specifically agreed that: i. Adjustment of water valve boxes and covers to grade shall include reconstruction in conformance with ISPWC Section 404, and ii. Adjustment of sewer manholes to grade shall include reconstruction in conformance with ISPWC Section 602. b. Provide MERIDIAN with a complete set of combined bid documents for the roadway reconstruction, and for the City Water and Sewer Improvements. c. Furnish MERIDIAN with an abstract of all bids received, and obtain MERIDIAN'S written concurrence with DISTRICT'S recommendation for award of the CONTRACT prior to making such award. MERIDIAN'S concurrence shall specifically acknowledge that the City Water and Sewer Improvements are and shall be subject to the terms and conditions of this Agreement. If MERIDIAN does not concur, DISTRICT shall remove the City Water and Sewer Improvements and if necessary, rebid the Project. MERIDIAN shall be responsible and shall reimburse DISTRICT for any and all costs suffered by DISTRICT attributable to the removal of the City Water and Sewer Improvements from the Project and if applicable, the rebidding of the Project. d, Include in the CONTRACT, a term providing that MERIDIAN will have the right and authority to work directly with the Contractor to resolve any claims relating in any way to the City Water and Sewer Improvements and that any such claims will be reviewed, approved or denied by MERIDIAN including enforcement of the two (2) year warranty period to be started at the date described in the final acceptance letter from MERIDIAN. e. Coordinate with MERIDIAN should any changes be made to DISTRICT's portion of the CONTRACT or work pursuant thereto that does or may impact the City Water and Sewer Improvements. Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 2 of 9 Page 239— Item#15. f. Make monthly progress payments and the final CONTRACT payment to the Contractor in conformance with the terms of the construction CONTRACT. g. Submit to MERIDIAN a copy of each design consultant billing attributable to the City Water and Sewer Improvements if applicable and Contractor progress payment estimate, and the final CONTRACT payment estimate, as such estimates are approved by DISTRICT after obtaining MERIDIAN'S concurrence regarding MERIDIAN'S portion of the CONTRACT, together with an invoice for MERIDIAN'S share of the construction CONTRACT costs earned by and to be paid to the Contractor. h. As applicable, provide for the reference and replacement of all pre-existing survey monuments within the Project. i. Provide the field survey and grade control necessary for construction of the roadway. Centerline or offsets and stationing shall be established prior to the City staking any sanitary sewer or potable water service lines, water valve boxes, manhole locations, and other City facilities. j. At the conclusion of the Project, submit to MERIDIAN written documentation of expenditures with an invoice for payment of all costs and expenses the DISTRICT incurs, in addition to those provided under paragraph 1.g. above, as a result of the additional work attributed to the City Water and Sewer Improvements within the Project Boundaries, including but not limited to, costs or changed conditions, plan errors and omissions, and delays attributable to design and/or installation of the City Water and Sewer Improvements. k. Indemnify, save harmless and defend regardless of outcome, MERIDIAN from expenses and against suites, actions, claims or losses of every kind, nature and description, including costs, expenses and attorney fees caused by or arising out of any negligent acts by DISTRICT or DISTRICT'S officers, employees, agents or contractors while acting within the course and scope of their employment, which arise from or which are in any way connected to the City Water and Sewer Improvements. Such indemnification hereunder by DISTRICT shall in no event cause the liability of DISTRICT for any negligent act to exceed the amount of loss, damages, or expenses of attorney fees attributable to such negligent act, and shall not apply to loss, damages, expenses or attorney fees attributable to the negligence of MERIDIAN. This duty to defend, indemnify and hold harmless is subject to the limitations of Idaho law, including Article VII Section 4, Idaho Constitution and Idaho Code Title 6 Chapter 9 (the Idaho Tort Claims Act), and to any other limitations set forth in the Agreement. 2. MERIDIAN SHALL: a. Provide the inspection, field survey and grade control required for the installation of all City Water and Sewer Improvements incorporated into the Project and installed and adjusted under the CONTRACT and provide copies of appropriate tests and Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 3 of 9 Page 240 Item#15. construction diaries to the District Project Representative as designated by DISTRICT. b. Provide DISTRICT with the special provisions if applicable, and stamped plans, bid quantities and an Engineers Estimate (or pursuant to Paragraph 1.g. pay the DISTRICT the actual cost if the DISTRICT'S design consultant prepares the same) for the City Water and Sewer Improvements to be incorporated into the Project and included in the bid documents for the CONTRACT (all work required for the City Water and Sewer Improvements to be performed in accordance with the most current edition of the Idaho Standards for Public Works Construction (ISPWC), the City's Supplemental Specifications to the ISPWC, and the City's Revisions to the Standard Specifications). c. Remit to DISTRICT, within thirty-five (35) calendar days after the date of any invoice referenced in paragraph 1.g., all funds for which MERIDIAN is responsible pursuant to the approved progress payment estimate and the final CONTRACT payment estimate. d. Remit to DISTRICT, within thirty-five (35) calendar days after the date of invoice referenced in paragraph 1.j., all funds for which MERIDIAN is responsible pursuant to this Agreement. e. Reimburse DISTRICT five percent (5%) of MERIDIAN'S construction costs attributable to the City Water and Sewer Improvements as payment toward the additional costs incurred by DISTRICT, including overhead and benefits, and project administration costs which include but are not limited to: public advertisement of the Project, supplying bid plans, supplying construction plans, preparing and holding the preconstruction meeting, generating monthly pay estimates and paying the Contractor, preparing change orders, general construction project oversight, and maintaining construction project files. f. Reimburse DISTRICT for mobilization, traffic control, flagging, detours and weekly meetings on a prorated basis. The prorated basis for the above items will be calculated using the percentage of MERIDIAN'S project costs as they relate to the total project construction costs. g. Provide (at City's sole costs) trench compaction testing for the City Water and Sewer Improvements from one-foot (1') above the pipe zone to sub-grade of the roadway section; trench compaction testing shall be provided at the minimum frequency rate of one (1) test per one thousand (1,000) lineal feet, minimum one (1) for every three (3) transverse trenches; provide all re-testing required in any area that does not meet CONTRACT requirements; and provide copies of tests for the area along the alignment of the pipeline to the designated DISTRICT representative. h. Be liable for the cost of repairing any trench failure attributable to the City Water and Sewer Improvements within the Project Boundaries, and be liable for and indemnify, Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 4 of 9 Page 241 Item#15. defend and hold DISTRICT harmless for any and all costs, claims, and damages resulting from any such trench failure. L Reimburse DISTRICT for any additional costs to DISTRICT over and above costs specifically enumerated herein, where such costs are attributable to the installations, adjustments, relocations and abandonments of the City Water and Sewer Improvements or to the removal of any or all items from the CONTRACT that are associated with the installation of the City Water and Sewer Improvements. j. Indemnify, save harmless and defend regardless of outcome, DISTRICT from expenses and against suites, actions, claims or losses of every kind, nature and description, including costs, expenses and attorney fees caused by or arising out of any negligent acts by MERIDIAN or MERIDIAN'S officers, employees, agents or contractors while acting within the course and scope of their employment, which arise from or which are in any way connected to the City Water and Sewer Improvements. Such indemnification hereunder by MERIDIAN shall in no event cause the liability of MERIDIAN for any negligent act to exceed the amount of loss, damages, or expenses of attorney fees attributable to such negligent act, and shall not apply to loss, damages, expenses or attorney fees attributable to the negligence of DISTRICT. This duty to defend, indemnify and hold harmless is subject to the limitations of Idaho law, including Article VII Section 4, Idaho Constitution and Idaho Code Title 6 Chapter 9 (the Idaho Tort Claims Act), and to any other limitations set forth in the Agreement. k. Work directly with the Contractor to resolve any claims relating in any way to the City Water and Sewer Improvements; any and all such claims will be reviewed, approved or denied by MERIDIAN and MERIDIAN shall indemnify, save harmless and defend regardless of outcome, DISTRICT from expenses and against suites, actions, claims or losses of every kind, nature and description, including costs, expenses and attorney fees caused by or arising out of any and all such claims regardless of the outcome of the City's efforts to resolve said claims with the Contractor. 3. THE PARTIES HERETO FURTHER AGREE THAT: a. In accordance with Idaho Code § 67-2332, the purposes, powers, rights and objectives of each of the parties are as set forth in the Recitals above. Each of the Recitals above is incorporated into the body of this Agreement. b. The amount to be reimbursed to DISTRICT by MERIDIAN for MERIDIAN'S portion of the Project shall be based on the actual quantities of work acceptably performed and/or installed, as determined from field measurements made by MERIDIAN, and paid for pursuant to the unit, and or lump sum prices, established in the CONTRACT. c. DISTRICT shall obtain MERIDIAN'S approval prior to commencement of any change order work involving the installations, adjustments, relocations and abandonments of City water or sewer facilities. d. Prior to commencement of work by the Contractor, the parties will, together with the Contractor, inspect within the entire Project Boundaries for the purpose of reviewing Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 5 of 9 Page 242 Item#15. the Project to locate any unstable areas and to resolve any items of concern or misunderstanding. e. This Agreement may not be enlarged, modified, amended or altered except in writing signed by both of the parties hereto. f. All signatories to this Agreement represent and warrant that they have the power to execute this Agreement and to bind the agency they represent to the terms of this Agreement. g. Should either party to this Agreement be required to commence legal action against the other to enforce the terms and conditions of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees and costs incurred in said action. h. Any action at law, suit in equity, arbitration or judicial proceeding for the enforcement of this Agreement shall be instituted only in the courts of the State of Idaho, County of Ada. L This Agreement shall be binding upon and inure to the benefit of the personal representatives, heirs and assigns of the respective parties hereto. j. Nothing in this Agreement shall be construed to be an indebtedness or liability in violation of Article VIII, Section 3 of the Idaho Constitution. k. The validity, meaning and effect of this Agreement shall be determined in accordance with the laws of the State of Idaho. I. This Agreement and the exhibits hereto constitute the full and entire understanding and agreement between the parties with regard to the transaction contemplated herein, and no party shall be liable or bound to the other in any manner by any representations, warranties, covenants or agreements except as specifically set forth herein. m. The promises, covenants, conditions and agreements herein contained shall be binding on each of the parties hereto and on all parties and all persons claiming under them or any of them; and the rights and obligations hereof shall inure to the benefit of each of the parties hereto and their respective successors and assigns. n. If any part of this Agreement is held to be illegal or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent reasonably possible. o. The failure of a party to insist on the strict performance of any provision of this Agreement or to exercise any right or remedy upon a breach hereof shall not constitute a waiver of any provision of this Agreement or limit such party's right to enforce any provision or exercise any right. No acknowledgments required hereunder, and no modification or waiver of any provision of this Agreement or Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 6 of 9 Page 243 Item#15. consent to departure therefrom, shall be effective unless in writing and signed by DISTRICT and MERIDIAN. p. The headings used in this Agreement are used for convenience only and are not to be considered in construing or interpreting this Agreement. q. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but both of which together shall constitute one and the same. r. The parties hereto agree that nothing herein contained shall be construed to create a joint venture, partnership or other similar relationship which might subject any party to liability for the debts and/or obligations of the others, except as otherwise expressly agreed in this Agreement. s. This Agreement is not intended to create, nor shall it in any way be interpreted or construed to create, any third-party beneficiary rights in any person not a party hereto. t. All parties have been represented by legal counsel, and no party shall be deemed to be the drafter of this Agreement for purposes of interpreting an ambiguity against the drafter. u. Time shall be of the essence for all events and obligations to be performed under this Agreement. Without limiting the foregoing, in the event that MERIDIAN does not timely comply with any of its obligations hereunder, DISTRICT shall have no obligation whatsoever to incorporate, facilitate, and/or complete the City Water and Sewer Improvements, regardless of whether prior approval has been given by DISTRICT to MERIDIAN. IN WITNESS HEREOF, the parties hereto have executed this Agreement on the day and year herein first written. Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 7 of 9 Page 244 Item#15. ATTEST: ADA COUNTY HIGHWAY DISTRICT B ' _. By: Bruce tlyung- __._ en oldthorpe y Director President, Board of Commissioners ATTEST: CITY OF MERIDIAN �4By: o.«. C ris Johns Robert E. Sitos -2021 City Clerk Mayor STATE OF IDAHO ) Ss. COUNTY OF ADA ) Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 8 of 9 EEDI Item#15. On this I day of , 2021, before me, the undersigned, personally appeared KENT GOLDTHORPE and BRUCE WONG, President of the Board of Commissioners and Director respectively of the ADA COUNTY HIGHWAY DISTRICT, a body politic and corporate, known to me to be the persons whose names are subscribed to the within instrument, and acknowledged to me that they executed the same for and on behalf of said body. IN WITNESS WHEREOF, I have hereunto set my-Kand and affixed my official seal the day and year first above written. Notary Publ or, Idaho Comm.62051 Residing at Idaho ° My commission expires: August 13, 2025 �j ��/,�°s000eeo�� ••� STATE OF IDAHO ) OF •••e' ) ss. COUNTY OF ADA ) On this 16th day of November , 2021, before me, the undersigned, personally appeared Robert E.simison and Chris Johnson , Mayor and City Clerk respectively of MERIDIAN, a municipal corporation, known to me to be the persons whose names are subscribed to the within instrument, and acknowledged to me that they executed the same for and on behalf of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. CHARLENE WAY COMMISSION#67390 NOTARY PUBLIC Notary Public for IdahIdaho &TATE OI:ItiAt�EC3Residin at Meridian MY COAi111iEI33lQtJ iEXPIRES 31290 g N My commission expires: 3-28-2022 Interagency Agreement for Roadway Construction and Water and Sewer Construction Rev. 10-2-20 Page 9 of 9 Page 246 Item#15. City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 60 - Enterprise Fund 3490 - Water Construction Projects From 10/1/2021 Through 9/30/2022 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 96140 WATERLINE EXTENSIONS 620,000.04 0.00 620,000.04 100.00% 0000 NON-DEPARTMENTAL 0.00 156.75 (156.75) 0.00% 10575.a ACHD Linder Road Franklin 0.00 (767.01) 767.01 0.00% Road to RR Tracks - Design & Const 10575.b ACHD Linder Rd to RR 0.00 (38,649.46) 38,649.46 0.00% Tracks Utility Improvements 10591.b ACHD - Meridian Rd. 0.00 (83,544.43) 83,544.43 0.00% Utility Improvements Cherry to Ustick 10624.a Water Main Extension, W 0.00 67,660.74 (67,660.74) 0.00% Amity Rd and S Linder Rd - Design 10631 Water Main Extension, W 0.00 (10,000.00) 10,000.00 0.00% Victory Rd and S Ten Mile Rd 10631.0 Water Main Ext. at Victory 0.00 (37,055.90) 37,055.90 0.00% & Ten Mile - Construction 10763.a ACHD, Linder Road - Cayuse 0.00 0.01 (0.01) 0.00% Creek to Chinden Utility Improvem 10914.a ACHD Ten Mile, McMillan to 0.00 (2,639.36) 2,639.36 0.00% Chinden Utility Improvements 10915 ACHD Eagle Rd Amity to 0.00 147,277.37 (147,277.37) 0.00% Victory Water and Sewer Improve 10975.a ACHD Ten Mile Rd. Utility 0.00 llr05O.25 (11,050.25) 0.00% Imp. (Overland - Victory) 10976.a ACHD - Locust Grove - 0.00 13,103.00 (13,103.00) 0.00% Overland to Victory 10987 ACHD - Ten Mile and Amity 0.00 lr076.00 (lr076.00) 0.00% Intersection 10987.c ACHD - Ten Mile and Amity 0.00 3,641.20 (3,641.20) 0.00% Intersection - Construction 10989.a ACHD - Lake Hazel & Eagle 0.00 13,531.20 (13,531.20) 0.00% Rd. Int Utility Imp. Design 11089 ITD SH16-Chinden to Ustick 0.00 200.00 (200.00) 0.00% Page 247 Date: 1/25/22 11:04:01 AM Pag Item#15. City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 60 - Enterprise Fund 3490 - Water Construction Projects From 10/1/2021 Through 9/30/2022 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining 11089.a ITD SH16-Chinden to Ustick 0.00 17,268.00 (17,268.00) 0.00% - Utility Improvements Carr... Carryforward 669,365.76 0.00 669,365.76 100.00% Total Capital Outlay 1,289,365.80 102,308.36 1,187,057.44 92.07% TOTAL EXPENDITURES 1,289,365.80 102,308.36 1,187,057.44 92.07% Page 248 Date: 1/25/22 11:04:01 AM Pag Item#15. City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 60 - Enterprise Fund 3590 - WW Construction Projects From 10/1/2021 Through 9/30/2022 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 93505 Sewer Line Extensions 275,000.04 0.00 275,000.04 100.00% 10575.a ACHD Linder Road Franklin 0.00 (593.69) 593.69 0.00% Road to RR Tracks - Design & Const 10575.b ACHD Linder Rd to RR 0.00 (31,381.55) 31,381.55 0.00% Tracks Utility Improvements 10591.b ACHD - Meridian Rd. 0.00 (55,804.09) 55,804.09 0.00% Utility Improvements Cherry to Ustick 10614 Black Cat Trunk Sewer - 0.00 4,013.32 (4,013.32) 0.00% Phase 5 10671.a E. Broadway Ave. Sewer 0.00 (3,684.00) 3,684.00 0.00% Main Ext. - Design 10782.a South Meridian Linder Rd 0.00 908.40 (908.40) 0.00% Sewer Truck - Design 10914.a ACHD Ten Mile, McMillan to 0.00 (1,737.01) 1,737.01 0.00% Chinden Utility Improvements 10915 ACHD Eagle Rd Amity to 0.00 66,205.82 (66,205.82) 0.00% Victory Water and Sewer Improve 10976.a ACHD - Locust Grove - 0.00 (112.75) 112.75 0.00% Overland to Victory 10988 ACHD - Fairview and Locust 0.00 18,115.00 (18,115.00) 0.00% Grove Intersection 10989.a ACHD - Lake Hazel & Eagle 0.00 3,382.80 (3,382.80) 0.00% Rd. Int Utility Imp. Design Carr... Carryforward 1,428,600.96 0.00 1,428,600.96 100.00% Total Capital Outlay 1,703,601.00 (687.75) lr704r288.75 100.04% TOTAL EXPENDITURES lr703,601.00 (687.75) lr704r288.75 100.04% Page 249 Date: 1/25/22 11:04:01 AM Pag Mayor Robert E. Simison Item#15. E IDIA N ��� City Council Members �-► Joe Borton Treg Bernt Public Works Luke Cavener Brad Hoaglun DepartMpnt Jessica Perreault Liz Strader TO: Mayor Robert E. Simison Members of the City Council FROM: Brent A. Blake Engineering Project Manager DATE: January 25, 2022 SUBJECT: IN ACCORDANCE WITH THE INTERAGENCY AGREEMENT AND COST SHARE AGREEMENT PREVIOUSLY APPROVED BY CITY COUNCIL,APPROVE THE NOT-TO-EXCEED AMOUNT OF $469,192.96 TO PAY ADA COUNTY HIGHWAY DISTRICT (ACHD) FOR CITY WATER AND SEWER IMPROVEMENTS CONSTRUCTED BY CENTRAL PAVING IN THE INTERSECTION OF TEN MILE AND VICTORY ROADS. ACHD PROJECT 319038 AND CITY OF MERIDIAN PROJECT 10975 I. RECOMMENDED ACTION A. Move to: In accordance with the Interagency Agreement and Cost Share Agreement, approve the not-to-exceed amount of$469,192.96 to pay ACHD for City water and sewer improvements constructed in the intersection of Ten Mile Road and Victory Road. ACHD Project 319038 and City of Meridian Project 10975. II. DEPARTMENT CONTACT PERSONS Brent Blake, Engineering Project Manager 208-489-0340 Kyle Radek, Assistant City Engineer 208-489-0343 Warren Stewart, City Engineer 208-489-0350 Laurelei McVey, Director of Public Works 208-985-1259 III. DESCRIPTION A. Backizround ACHD plans to construct a roundabout at the intersection of Ten Mile and Victory Roads. ACHD has agreed, per the attached Interagency Agreement, to include I Page I of 3 Page 231 Item#15. City water and sewer improvements as part of their project. They incorporated these improvements in their plans and bid documents. B. Proposed Project This project includes the construction of water and sewer improvements. The water improvements will include adjusting water mains,relocating water services and fire hydrants, adjusting water valve boxes, and installing new water main and services. The sewer improvements include extending pressure sewer stubs, installing new sewer main and services, and adjusting manholes to grade. IV. IMPACT A. Strategic Impact: This project is aligned with the Public Works objective of being opportunistic in planning for growth and infrastructure needs. The construction impacts on the residents will be minimized by partnering with ACHD. B. Fiscal Impact: The costs of the City of Meridian infrastructure improvements are $469,192.96 and will be funded from two different accounts as shown below. Project Costs: Fiscal Year 2022 Construction Cost $428,962.51 ACHD Overhead Costs $21,448.13 ACHD Traffic Control, $18,782.32 Mobilization, and Flagging Total $469,192.96 Available Project Funding_ Fiscal Year 2022 Account Code / Codes Water Main Extensions 60-3490-96140 $273,083.23 Sewer Main Extensions 60-3590-93505 $196,109.73 Total Funding $469,192.96 Page 2 Of 3 Page 232 Item#15. V. TIME CONSTRAINTS ACHD plans to start construction on this project in February 2022. City approval of this agreement is required for ACHD to install sewer and water improvements as part of their project. VI. LIST OF ATTACHMENTS A. Construction Cost Breakdown Approved for Council Agenda: Page 3 of 3 Page 233 m CITY OF MERIDIAN Ci Purchase 3 VE IDIAN • • Purchasing Department � DATE OF 1/25/2022 33 E BROADWAY AVE, STE 106 CITY OF MERIDIAN REQUEST MERIDIAN, ID 83642 Public Works PURCHASE ORDER NUMBER APPEAR• INVOICES, TEL: (208)489-0417 • •CORRESPONDENCE .TO THIS ORDER FAX: (208)887-4813 AVAILABLE BUDGET AMOUNT _ _......._..__._ _. __._._...I IS BUDGET AMENDMENT REQUIRED? SUGGESTED VENDOR Ada County Highway District No jCITY SUPPORT TICKET NO. I PROJECT MANAGER PAYMENT TERMS FREIGHT TERMS F.o.B. REQUESTOR Brent Blake NET 30 PREPAID DESTINATION Brent Blake PROJECT NAME: ACHD -Ten Mile Rd and Victory Rd Roundabout(Construction) Description of Purchase Quantity and Pricing ACCOUNTINGCODES PART NUMBER/ DEPT EXPENSE ORPROJECT/DESCRIPTION • • TOTAL • TASK ORDER/CONTRACT/PROJECT DESCRIPTION CODE GLACCOUNT# COMMITMENT ! I Interagency Agreement/Contract 1 LS $ 273,083.23 60 3490 96140 109751 $ 273,083.23 Interagency Agreement/Contract 1 LS $ 196,109.73 60 3590 93505 10975.d $ 196,109.73 $ - $ - NOTES: Council Approval Date: 2-1-2022 $469,192.96 TH 1 DEPART NT SIG E N CD (D N W A Item#15. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl) OD N N LO LO N 00000Lf) 00000000000000000 P (0 (00 O 0 A ONOOON U') O N QQ O000000c; COON [t 00 Cl) N N OO _ O V CO V1� 6) 0E Om " wNh- NV OOONrMr ,Tt., (pN11- dN00 (OLOCDLOI- 0 _t- ' VON NN 1 - E-- V N V V U) P0N V Or T (ON V (OM OO LONP rOI- T 0 G t P T EF}EA VIX(f)ffl(f),0 0 ER 0,01,EA Hf E9 64 COO 4%r to N r fA d} 0 (O Efl fo 69 491 EA 6!b 69. EA EA V V Ef3 (A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M M N N O O N O V M Cl O O O O O O O O O O O LO O O 00 O r W (p O p 0 N 0 C4 ai of (fl N 0 L i ui 0 0 0 0 0 0 0 00 C-i 0 C6 06 06 ri r t- h 'C U O ti (H LO Va-(f}V (t).r P V tl-�N V O U') V (fl,r 0(A LO V V O N N � Q„ ct �' �' ��'�'PMNN (OMN d9� rOhP -0 6s EA 6%613 EFT 6% fA N(fT PEH Ga 69 n Co 'E m m a >- >- >- u_ u_ u_ u_ Q a Q Q Q Q ¢ ¢ u_ u_ (0 u_ ¢ (n v) c/) (n JS00C/) U) JJJJwWwW W wW W .JJJJw JJJJ OM V �MNM � MMrNrNrNODOOPM PrrE OD + r P r LO t- (O (D N w I W w l l l uj j m rn I I > N I w i4 N mCD p N W 0 0 m O U N J O Z Z 0 Z p O 4.5 zZ ¢Zv 4- C. Q ¢ O E o w 2 wO v � HW> W j' wo D wz�U J z OJ 0) W '`� Q > ¢ p W W0 WJ f zQ c=n (0) C) ¢ ILL W ZQ c a m � dwR' OC w0crz � U) a W WQOQ Z � w (wl7 Jc aw2M ¢ � o � wQQ 000ap wJwww � Ofd w > Ut- o z c> m F- a °- wwrm > JOzF- 6 zzE" � ¢ 'Tz Q > 3: 0i � F00 000 < WQ > vWU) U �'- -�0 - - > � a — wi- aZWa - - zJ -jF- F-- p W 1- - >' Q0. _W no QUp000 � OV � _D = wuamwo- w > < ww W p ¢ w CD - 2LLzV <z - 0J U in 2Z W W Horn d (D Lu(D SR' -U' IXiv5nwwwmO z � i= U) PX S>> QWO z (n U U �C U Q O w (n v) Q U) w a w o z C9 � � � I<iI�� V `� aF- > � >GZ >C � wapwF- a z O � U » ~ Q i v~i ¢ > W w Of w � p = U) � X LL c a, W W F- (n (gapQ > wl- - pF- w = wow c o o w E- � aa ` >Z wwr ¢ a > as � � w ►- mU �, Od' W MV F- 1- UUZc QT (/) N (6 Q > d Q M d •a .- U •- J O > w w > d vd ¢ 0 0 0 w 0 o- c U p ¢ - - rn 'S ( Jaa Ow2UHI}- NmrmO - � of Ww5w ~ v00 � � o o c2 o � w LL W co CO P J V Q LO P2 I- u_ I- �- N � C6 _C] U N .!? Ci q, t6 .Q (3 It P r T rLLi z ¢ QQaUQ ¢ <LQQ <CQmmp o r r171- a- T r r r r r r P P r r T a- �- C) - LOMCO81- I- OPrs- TN (V NNMMMMLOWLO m 000 0 0 0 r O O O O O O O O O O O O O O P O Q N M M M M C M M V V V V V V L V V V V O LO LO LO P N af Page 235 Item#15. HDKent Goldthorpe,President Dave McKinney,Vice-President G . +- / Jim Hansen,Commissioner�ywrn�tit't P�O� � �GPi Alexis Pickering,Commissioner Mary May,Commissioner Capital Projects November 16, 2021 Programming Expenditures 2021-2025 IFYWP Construction $2,415,000 2022 TO: ACHD Commissioners, ACHD Construction $269,000 2023 Director, ACHD Deputy Construction Eng. $30,000 2022 Directors Material $52,000 2022 FROM: Amber Morales Utilities $20,000 2022 Project Manager SUBJECT: Interagency Agreement—City of Meridian Water& Sewer-Improvements Ten Mile Rd and Victory Rd ACHD Project# 319038 Consent Agenda: December 1, 2021 Executive Summary Staff has negotiated an Interagency Agreement with the City of Meridian for water and sewer improvement work as part of the Ten Mile Rd and Victory Road roundabout project. This Interagency Agreement will allow the City of Meridian to add water and sewer improvements to the ACHD contract. Staff recommends approval of the Interagency Agreement. Facts & Findings The project consists of replacing the intersection of Ten Mile Rd and Victory Rd with a multilane roundabout that includes multiuse pathway and intersection lighting. Construction of this project is scheduled for February 2022 through September 2022. This agreement will allow the bidding and construction of City water and sewer work as part of the ACHD construction contract. This agreement has been reviewed and approved by the ACHD Legal Department. Fiscal Implications Costs for the work will be reimbursed by the City of Meridian estimated at$321,120. Policy Implications This project was approved as part of the FY21 Budget and the 2021-2025 Integrated Five-Year Work Plan, adopted by the Commission on September 23, 2020. Pan Ada County Highway District•3775 Adams Street•Garden City,ID•83714•PH 208 387 6100• FX 345-7650•www.achdidah age 236 Item#15. Alternatives 1. Approve the Interagency Agreement with the City of Meridian and authorize the President of the Commission to execute the agreement on behalf of ACHD. 2. Do not approve the Interagency Agreement and provide staff with further direction. Recommendation Approve the Interagency Agreement with the City of Meridian and authorize the President of the Commission to execute the agreement on behalf of ACHD. Attachment: Interagency Agreement cc: Dyan Bevins,P.E. Ricardo Calderon Project File Page 237