Loading...
HomeMy WebLinkAbout8 - Landscape Plan V1(V O Egress to existing Bridge to City of Meridian pathway 1 " = 20'-0" 2"x4" Top and Bottom 1 "x6" Rough Sawn 4"x4" PT. Spruce Post io 4"x4" PT Post Rough Sawn Spruce Stained w/ "Sandstone" Solid Wood Stain By Cloverdale Paints. Fence Boards To Be Close Nailed. Space Dia. Of one Nail 1 "x6" Sas Spruce. 1' Dia Conc. Base Note: 1. All wood to be stained with "Sandstone" solid wood stain both sides prior to installation. 2. All hardware to be galvanized. 3. All stain to be applied to manufacturer's specifications. 5. Nail to be 3 1/2" coated for stringers to posts and 2" ardox for boards. 7. All planed materials #2 and better. Fence Detail 1 /4" = 1'-0" Street Lighting 1. All street light construction shall be don in accordance with the current version of the ISPWC, the Meridian Supplemental Specifications to the ISPWC, and the National Electric Code. 2. A street lighting electrical permit shall be openend prior to starting work. Use the online Citizen portal at HTTP://citizenportal.meridiancity.org/CitizenAccess/ to open a permit and request inspections. 3. Installation will require inspections for the concrete bases and below ground wiring. 4. Street lift bases shall be located 10' minum from tree, 5minimum from fire hydrants and 2' minimums from water meters. 5. Keep accurate asbuilts of all conduit, Junction boxes, and submit an electronic copy of the red line as -build with the approved permit to the city of Meridian at compleation of project. 6. Coordinat with the City transportation and Utility Coordinator @ (208) 898-5500 for questions regarding Utility conflicts, or access locked meter pedestals. LIGHTING NOTE 1 " = 1'-0" SOIL LINE — ROOT PROBE WHEN PRESENT: LOCATE THE BUD POINT 1 1/2" ABOVE SOIL LINE N ROOT LOCATE FLARE/ COLLAR 2 @ SOIL LINE. THIS CAN BE iv LOCATED BY SWELLING LINE, WERE THE BARK OF THE TREE TRANSITIONS TO ROOT BARK) HIGHEST ROOT SHALL BE 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ ROOT PROBE AROUND TRUNK (APPROX 1-2" AWAY FROM TRUNK) TO LOCATE HIGHEST ROOT. RUBBER CINCH TIE 2"X2" WOOD STAKE AT OR BELOW GRADE PLACE STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP AFTER INSTILATION. 3" THICK MULCH 3" FROM TREE TRUNK. CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2/3" OF ROOTBALL, REMOVE ALL NONBIODEGRADABLE TRASH FROM HOLE. ROOTBALL TO BE PLACED ON NATIVE SOIL. COMMERCIAL SLOW RELEASE FERTILIZER TABLETS BACKFILL W/ APPROVED TOPSOIL. BACK FILL IN 6" LIFTS, WATERING EACH LAYERAND TAMP AS REQUIERD TO SUPPORT TREE. — WIDTH OF BALL I WIDTH OF BALL WIDTH OF BALL 5' MIN DIA. TREE RING Keynote Legend OTage Keynote Text 6'-0" Ceeder fencing, see detail 5/1_1 1 6'-0" Ceeder fencing, see detail 5/1_1 2 Street Lamp are to be type 2 per meridian standard drawing T1 & T2. Install street lights are to be installed per current city of Meridian supplemental specifications. NOTES: TREE PLANTING (>2"CAL 1. ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH THE AMERICAN STANDARDS FOR NURSERY STOCK (ANSI Z60.1-2004). PLANT ACCORDING TO ANSI A300 PART 6. 2. DIG THE PLANTING HOLE A MINIMUM OF 2x WIDTH OF ROOTBALL FOR AT LEAST THE FIRST 12 INCHES OF DEPTH. BELOW 12 INCHES, DIG HOLE WIDE ENOUGH TO PERMIT ADJUSTING. DO NOT DIG THE HOLE DEEPER THAN ROOT BALL DEPTH. 3. SCARIFY THE SUBGRADE AND SIDES OF THE PLANTING HOLE WHEN PLANTING IN CLAY SOILS (MORE THAN 15% CLAY). 4. LIFT AND SET THE TREE BY ROOT BALL ONLY. DO NOT LIFT USING THE TREE TRUNK AND DO NOT USE TREE TRUNK AS A LEVER. 5. SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL SURFACE OR SLIGHTLY HIGHER IF THE SOIL IS PRONE TO SETTLING. 6. AFTER THE TREE IS SET IN PLACE, REMOVE BURLAP, WIRE AND STRAPS FROM AT LEAST THE UPPER 1/3 OF THE ROOTBALL. 7. BACKFILL WITH EXISTING SOIL THAT HAS BEEN WELL - TILLED OR BROKEN UP. DO NOT ADD AMENDMENTS TO THE BACKFILL SOIL. AMEND THE SURFACE WITH MULCH. 8. USE THREE 2" X 2" WOOD STAKES DRIVEN INTO UNDISTURBED SOIL A MINIMUM OF 16INCHES. SPACE STAKES EQUALLY AROUND THE TREE. 9. ATTACH 3/4" NYLON WEBBING TO CONNECT THE TREE TO 2" settled layer STAKES. ATTACH WEBBING AT 1/3 THE TREE HEIGHT. of mulch 10. APPLY A 2-3" (SETTLED) DEPTH OF PINE STRAW OR BARK MULCH TO THE PLANTING SURFACE. LEAVE A 2" SPACE Tilled Or Broken up AROUND THE TRUNK FOR AIR CIRCULATION. Soil min 12" Deep 11. PRUNING SHALL BE LIMITED TO DEAD, DISEASED, OR BROKEN LIMBS ONLY AND SHALL BE IN ACCORDANCE WITH ANSI A300 SPECIFICATIONS. 12. REMOVE ANY TRUNK WRAP REMAINING AT TIME OF PLANTING. NO WRAPS SHALL BE PLACED ON TRUNK. FINISH GRADE WIDTH OF BALL I WIDTH OF BALL n 2" and larger conifer tree detail J 3/16" = 1'-0" 1710 E. Summerridge Meridian Idaho 83646 0:208-895-0437 Plabsl7@gmail.com Hesscomm Corp. 2338 w. Boulder Bar Drive Meridian, Idaho 83646 ph. 208-7894064 Date Hesscomm Corp. Pinedale Subdivision Landscape Plan 3679 W Newland St. Project number BH-21-02 Date 8-3-21 Drawn by Author Checked by Checker L1 Scale As indicated