HomeMy WebLinkAbout2022-01-24 ACHD "60 CHD
Mary May, President
Alexis Pickering,Vice-President
CIO
�o Jim D. Hansen,2n Vice President
{j � Kent Goldthorpe,,Commissioner
Dave McKinney,Commissioner
January 2011, 2022
To: AMERCO Real Estate Company
2727 N Central Avenue, Suite 500
Phoenix, AZ 85004
Subject: MER22-0001/ H-2021-0085
1250 E Overland Road
U-Haul Moving and Storage Store
This site is proposed to be located within the Pack It Up Subdivision, which was approved by
ACHD in 2002. As part of the preliminary plat, a 30-foot wide driveway onto Overland Road located
224-feet east of the site's west property line was approved. The final plat shows this driveway as
a common/cross access easement to provide access to subdivision. Because the easement is
limited to 30-feet wide on the final plat, the applicant's proposal to construct a 40-foot wide
driveway is not approved. The driveway should be reconstructed as a curb return type driveway
and be restricted to a maximum width of 30-feet consistent with the final plat.
In addition, the applicant should be required to replace any broken or deteriorated segments of
curb, gutter, and sidewalk on Overland Road abutting the site, consistent with ACHD's Minor
Improvement Policy, below.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing
streets adjacent to a proposed development may be required. These improvements are to correct
deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement;
curb and gutter construction or replacement; replacement of unused driveways with curb, gutter
and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic
control devices; and other similar items.
If you have any questions, please feel free to contact me at (208) 387-6132.
Sincerely,
1
Kelly Bruner
Planner
Development Services
cc: City of Meridian (Alan Tiefenbach, via email)
Adler AB Owner I LLC
Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 2O8-387-6100• FX 345-7650•www.achd.ada.id.us
Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way(including
all easements). Any existing irrigation facilities shall be relocated outside of the ACHD
right-of-way(including all easements).Private Utilities including sewer or water systems are
prohibited from being located within the ACHD right-of-way.
2. In accordance with District policy, 7203.6, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current
Americans with Disabilities Act (ADA) requirements. The applicant's engineer should
provide documentation of ADA compliance to District Development Review staff for review.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
4. A license agreement and compliance with the District's Tree Planter policy is required for
all landscaping proposed within ACHD right-of-way or easement areas.
5. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
6. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business
days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD
Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are
compromised during any phase of construction.
7. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file
numbers)for details.
8. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all
applicable ACHD Standards unless specifically waived herein. An engineer registered in
the State of Idaho shall prepare and certify all improvement plans.
9. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
10. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant's authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
11. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that time.
Any change in the planned use of the property which is the subject of this application, shall
require the applicant to comply with ACHD Policy and Standard Conditions of Approval in
place at that time unless a waiver/variance of the requirements or other legal relief is
granted by the ACHD Commission.