HomeMy WebLinkAboutAcceptance Letter�VIERIDIAN
February 11, 2009
Jayo Construction
1323 S Five Mile
Boise ID 83709
RE: HACIENDA
Sewer & Water Construction — Final Acceptance
Dear Sirs:
Mayor Tammy de WeeCd
City Council Members:
Keith Bird
Joe Borton
Charles Rountree
David Zaremba
Installation of this project's sanitary sewer and/or domestic water systems has
satisfactorily completed in accordance with the a been
hese systems have
the required tests, in accordance with City of Meridian Stanlda d Specifications and Dr apassedwings,
and are hereby accepted by the City for ownership and maintenance.
Record drawings submitted to us for this project are also accepted and are beingforwarded
the Idaho Department of Environmental Quality. The engineer of record is responsible
certification of the record drawings as to horizontal and vertical location of rwardea to
sewer facilities installed. p nsible for
all public water and
In accordance with City of Meridian Standard Specifications and Drawings, the installation
materials of the sewer and domestic water systems are to be warranted against defeand
contractor for a period of one year from the date of this letter ct by the
Sincerely,
C),;J OCITV�
Clint Dolsby
Interim City Engineer SCANNED
cc. City Clerk, Water Division, Wastewater Division, File
Bailey Engineering
DEQ
Public Works Department
Phone 208-898_ 33 E Broadway Ave, Suite 200, Meridian, !D 83642
5500 . Fax 208-898-9551