HomeMy WebLinkAboutCommentsAugust 14, 2006 CUP 06-023
MERIDIAN PLANNING & ZONING MEETING August 17, 2006
APPLICANT W.H. Moore Company ITEM NO.
REQUEST Public Hearing - Conditional Use Permit for the construction of a 14,315
square foot multi -tenant retail building with one drive thru window for Grandview
Marketplace, Retail Building # 1 - NWC of Overland Road & Eagle Road
AGENCY
CITY CLERK:
CITY ENGINEER:
CITY PLANNING DIRECTOR:
CITY ATTORNEY
CITY POLICE DEPT:
CITY FIRE DEPT:
CITY BUILDING DEPT:
CITY WATER DEPT:
CITY SEWER DEPT:
CITY PARKS DEPT:
MERIDIAN SCHOOL DISTRICT:
SANITARY SERVICES:
ADA COUNTY HIGHWAY DISTRICT
CENTRAL DISTRICT HEALTH:
NAMPA MERIDIAN IRRIGATION:
SETTLERS' IRRIGATION:
IDAHO POWER:
COMMENTS
See Attached Staff Report
- IN, Ir u-�
See Attached Comments
See Attached Comments
See Attached Comments
INTERMOUNTAIN GAS:
OTHER: See Attached Affidavit of Posting
2
Contacted: -LX Date: Phone:3A3,/g�
Emailed: /, See-/(V /PJ Staff Initials:
Materials presented at public meetings shall become property of the City of Meridian.
CITY OF��
IDAHO
TRANSMITTALS TO AGENCIES FOR COMMENTS ON
DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN
R 2/"''rREASU2EVN�11 NCE R To insure that your comments and recommendations will be considered by
i I I SIeoa
MAYOR
Tammy de Weerd
CITY COUNCIL MEMBERS
Keith Bird
Joseph W. Borton
Charles M. Rountree
Shaun Wardle
CITY DEPARTMENTS
City Attorney/HR
703 Main Street
898-5506 (City Attorney)
898-5503 (HR)
Fax 884-8723
Fire
540 E. Franklin Road
888-1234 / fax 895-0390
Parks & Recreation
11 W. Bower Street
888-3579/fax 898-5501
Planning
660 E. Watertower Lane
Suite 202
884-5533 / fax 888-6844
Police
1401 E. Watertower Lane
888-6678 / fax 846-7366
Public Works
660 E. Watertower Lane
Suite 200
898-5500/fax 895-9551
- Building
660 E. Watertower Lane
Suite 150
887-2211 / fax 887-1297
- Wastewater
3401 N. Ten Mile Road
888-2191 / fax 884-0744
- Water
2235 N.W. 8th Street
888-5242/fax 884-1159
the Meridian Planning and Zoning Commission please submit your
comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by: August 10, 2006
Transmittal Date: July 10, 2006 File No.: CUP 06-023
Hearing Date: August 17, 2006
Request: Public Hearing - Conditional Use Permit for the construction of
a 14,315 square foot multi -tenant retail building with one drive thru
window for Grandview Marketplace, Retail Building #1
By: w.H. Moore
Location of Property or Project: NWC of Overland Road & Eagle Road
David Zaremba (no FP)
David Moe (no FP)
Wendy Newton-Huckabay (No FP)
Michael Rohm (No FP)
Keith Borup (No FP)
Tammy de Weerd, Mayor
Charlie Rountree, C/C
Joe Borton, C/C
Keith Bird, C/C
Shaun Wardle, C/C
Water Department
'ZSewer Department
Sanitary Services(No VAR, VAC, FP)
Building Department / Rich Greene
Fire Department
Police Department
City Attorney
City Engineer
City Planner
Parks Department
Your Concise Remarks:
Meridian School District (No FP)
Meridian Post Office(FP/PP only)
Ada County Highway District
Ada County Development Services
Central District Health
Nampa Meridian Irrig. District
Settlers Irrig. District
Idaho Power Co. (FP,PP,CUP)
Qwest (FP/PP only)
Intermountain Gas (FP/PP only)
Bureau of Reclamation (FP/PPonly)
Idaho Transportation Dept. (No FP)
Ada County Ass. Land Records
Meridian Development Corp.
Historical Preservation Comm.
RERD
CEO tl"
JUL 18 2006
UI Meridian
No-C Jerk Of�ce
CITY HALL 33 EAST 1DAHO AVENUE MERIDIAN, 1DAHO 83642 (208) 888-4433
CITY CLERK- FAX 888-4218 FINANCE & UTILITY BILLING- FAX 887-4813 MAYOR'S OFFICE -FAX 884-8119
Printed on recycled paper
20 July 2006
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE:
Nampa
466-7861
Planning & Zoning Commission
SHOP:
Nampa
466-0663
City of Meridian
Kt��
660 E. Watertower Lane Suite 202
Meridian, ID 83642 AUG 0 4 2006
RE: CUP 06-023/Grandview Marketplace Retail Building No. 1
Dear Anna:
If all storm drainage is retained on -site there will be no impact on Nampa & Meridian
Irrigation District and no further review will be required.
However, if any surface drainage leaves the site, the Nampa & Meridian Irrigation District
requires that a Land Use Change Application is filed for review prior to final platting. Please
contact Donna Moore at 466-7861 for further information.
All laterals and waste ways must be protected. The developer must comply with Idaho Code
31-3805. It is recommended that irrigation water be made available to all developments
within the Nampa & Meridian Irrigation District.
Sincerely,
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: File - Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
25 July 2006
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE: Nampa 466-7861
Larson Architects SHOP: Nampa 466-0663
210 Murray Street
Boise, ID 83714
RE: Land Use Change Application — Grandview Market Place, Retail Building #1
Please note the District now requires three (3) sets of plans
To Whom It May Concern:
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above -referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order or
cash as payment of the fees in order to speed the process up. If you submit a company or
personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P.
Anderson, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or John P. Anderson, at the District's shop.
Sincerely,
Donna N. Moore, Asst.
NAMPA & MERIDIAN
DNM/smc
cc: File
enc.
Secretary/Treasurer
IRRIGATION DISTRICT
Water Superintendent
Meridian City Planning & Zoning Commission
W. H. Moore, 1940 S. Bonito Way, Suite 160, Meridian, ID 83642
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CENTRAL
•• DISTRICT
pll'HEALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTFr,-iL DISTRICT HEALTH DEF'i-vRTMENT
Environmental Health Division
Preliminary / Final / Short Plat
6- c-I.-d v:tw
� up 1J G - 0 .�_
❑ 1. We have No Objections to this Proposal.
Return to:
❑ Boise
❑ Eagle
❑ Garden City
,T1Vleridian
❑ Kuna
❑ACZ
❑ Star
JUL 2 5 2006
❑ 2. We recommend Denial of this Proposal. City Of Meridian
City Clerk Office
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ or bedrock from original grade ❑ other
❑ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
,�T& After written approval from appropriate entities are submitted, we can approve this proposal for:
central sewage ❑ community sewage system ❑ community water well
❑ interim sewage El -central water
❑ individual sewage ❑ individual water
9. The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of Environmental Quality:
central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines .central water
,U 10. Run-off is not to create a mosquito breeding problem.
❑ 11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
,Zff 13. We will require plans be submitted for a plan review for any:
,4 'food establishment swimming pools or spas
&beverage establishment &grocery store
❑ 14. Please see attached stormwater management recommendations
❑ 15.
4child care center
Date: 7 / / 7 / D 6
Reviewed By: L�
I %�
15726-001EHO904 Review Sheet
-ACHDJohn S. Franden, President
It IL Sherry R. Huber, 1st Vice President
David Bivens, 2nd Vice President
Carol A. McKee, Commissioner
Rebecca W. Arnold, Commissioner
July 18, 2006
TO: W.H. Moore
1940 S. Bonito Way Ste. 160
Boise, ID 83642
SUBJECT: MCUP-06-023
Grandview Marketplace
Overland & Eagle
RECEIVED
JUL 2 5 2006
City Of Meridian
City Clerk Office
On May 11, 2005, the Ada County Highway District Commission acted on MPP-05-020/MAZ-05-019 for
Dorado Subdivision. The conditions and requirements also apply to MCUP-06-023.
• Prior to final approval you will need to submit plans to the ACHD Development Review
Department.
• A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a
building permit. Contact ACHD Planning & Development Services at 387-6170 for
information regarding impact fees.
If you have any questions or concerns please feel free to contact this office at (208) 387-6177.
Sincerely,
';)ose W. Kunz
Planner Intern
Right -of -Way and Development Services
CC: Project File
Lead Agency: Meridian
Larson Architects
210 Murray
Boise, ID 83714
qua wwuy ngnway uismct • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
Rigna-of-Way & Development Services
Planning Review Division
Gosw,wvi�`uoC�� S�y,�icG
This application required Commission action due to the size of the development. This item was scheduled
on the consent agenda on May 11, 2005 at 6:30 pm. Tech Review for this item was held with the applicant
on Friday April 29, 2005. Please refer to the attachment for request for reconsideration guidelines. Staff
contact: Andrea N. Tuning, 208-387-6177-phone, 208-387-6393-fax, atuning(a)-achd.ada.id.us
File Numbers: Dorado Subdivision / MPP-05-020 / MAZ-05-019
Site address: Northwest corner of Overland Road and Eagle Road
Owner/Applicant: Kimball Properties
1940 South Bonito Way Suite 160
Meridian Idaho 83642
Representative: Stanley Consulting
1940 South Bonito Way Suite 140
Meridian Idaho 83642
Application Information:
The applicant has submitted an application to the City of Meridian requesting annexation, rezone and
preliminary plat approval to construct a 16-lot commercial subdivision on 10.9-acres. The site is currently
zoned RUT and is proposed to be rezoned to C-G. The site is located on the northwest corner of Overland
Road and Eagle Road.
Acreage: 10.9-acres
Current Zoning: RUT
Proposed Zoning: C-G
Buildable Lots: 16-Lots
Common Lots: None
Vicinity Map
0
Findings of Fact
2.
Trip Generation: This development is estimated to generate 4,208 additional vehicle trips per based
on the Institute of Transportation Engineers Trip Generation Manual.
Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building
permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time.
3. Traffic Impact Study: A traffic impact study was not required with this application due to the fact that
the adjacent roadways have recently been improved and all access is in accordance with District
policy.
4. Site Information: The site has one existing single-family residential dwelling.
5. Description of Adjacent Surrounding Area:
a. North:
1-84 - Interstate
b. South:
Eldorado Business Park
c. East:
1.409-acres zoned R-1
d. West:
Overland Way Subdivision
6. Impacted Roadways
Overland Road:
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
An acceptable Level of Service for
COMPASS Planning Thresholds
Eagle Road:
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
An acceptable Level of Service fo
COMPASS Planning Thresholds
900-feet
Minor Arterial
East of Eagle Road was 13,341
Better than C
35 MPH
this segment of roadway is a
on 2-27-02
Level of Service D based on
r
675-feet
Principal Arterial
North of Overland Road was 22,670 on 2-27-02
Better than C
40 MPH
this segment of roadway is a Level of Service D based on
7. Roadway Improvements Adjacent To and Near the Site
Overland Road (west of Eagle Road) is improved with 5-traffic lanes with vertical curb, gutter and
sidewalk. Overland Road widens as it approaches the Eagle Road intersection. Overland Road at
the Eagle Road intersection (west leg) has 7-traffic lanes with vertical curb, gutter and sidewalk.
Eagle Road is improved with 5-traffic lanes with vertical curb, gutter and sidewalk. Eagle Road
widens as it approaches Overland Road. Eagle Road at the intersection (north leg) has 7-traffic
lanes with vertical curb, gutter and sidewalk. There is a small segment of Eagle Road abutting this
site that is not improved with curb, gutter and sidewalk.
8. Existing Right -of -Way
Overland Road has a total of 120-feet of right-of-way (70-feet from centerline).
Eagle Road has a total of 150-feet of right-of-way (58-feet from centerline).
2
9. Existing Access to the Site
The site has a number of curb cut driveways and one curb return type driveway that intersects
Overland Road.
10. Site History
The District has not previously reviewed a development application on this parcel.
11. Capital Improvements Plan/Five Year Work Program
Overland Road and Eagle Road (abutting this site) were improved in 2003-2004 as a result of a
developer's cooperative agreement. At that time, Eagle Road and Overland Road were fully
improved (abutting this site).
12. Other Development in Area
On January 16, 2002, the District reviewed and approved a 32-lot commercial subdivision on 85.36-
acres (Eldorado Subdivision). As a part of Eldorado Subdivision, the District approved three -access
points to Overland Road (one public roadway, one full -access driveway and one right-in/right-out
driveway only).
B. Findings for Consideration
Overland Road
Right -of -Way and Improvements
District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way
allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks
and bike lanes.
District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector
roadways and arterial roadways (7204.7.2).
Overland Road was recently reconstructed to provide 5-traffic lanes with vertical curb, gutter
and sidewalk between Eagle Road and Locust Grove Road. Overland Road widens at the
Eagle Road intersection (west leg) to accommodate 7-traffic lanes with vertical curb, gutter
and sidewalk. Due to the fact that Overland Road is fully improved and is not anticipated to
be widened in the future, the applicant will not be required to dedicate additional right-of-way
or construct additional improvements on Overland Road.
Driveways
District policy 72-F4 (1) requires driveways located on arterial roadways near a signalized intersection
to be located a minimum of 440-feet from the signalized intersection for a full -access driveway and a
minimum of 220-feet from the signalized intersection for a right-in/right-out only driveway.
District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of
35 to align or offset a minimum of 150-feet from any existing or proposed driveway.
District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles
to a maximum width of 36-feet. Most commercial driveways will be constructed as curb -cut type
facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for
driveways accessing collector and arterial roadways.
Graveled driveways abutting public streets create maintenance problems due to gravel being tracked
onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to
pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the
roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge.
C
The applicant is proposing to utilize an existing 35-foot wide curb return type driveway that
intersects Overland Road approximately 365-feet east of Bonito Way. This driveway is in
alignment with the full -access driveway that was previously approved and constructed as a
part of Eldorado Business Park on the south side of Overland Road. This driveway width and
location meets District policy and should be approved with this application.
The applicant is proposing to construct a 35-foot wide curb return type driveway that functions
as a right-in/right-out driveway ONLY and intersects Overland Road approximately 235-feet
west of Eagle Road. This driveway is proposed to be located in alignment with the right-
in/right-out driveway ONLY that was previously approved as a part of the Eldorado Business
Campus. As a condition of approval, this driveway was required to be restricted with a 6-inch
raised median. The median has been constructed and will restrict the proposed driveways
movements to right -in and right -out ONLY. Although this driveways location meets District
policy, staff recommends that the driveway be narrowed to approximately 24-feet in width.
The 24-foot wide driveway will accommodate two 12-foot travel lanes and should adequately
and safely handle traffic entering and exiting this driveway.
2. Eagle Road
Right -of -Way and Improvements
District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way
allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks
and bike lanes.
District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector
roadways and arterial roadways (7204.7.2).
This segment of Eagle Road was recently reconstructed at the intersection of Overland Road
and was constructed with 7-traffic lanes with vertical curb, gutter and sidewalk abutting most
of the site. There is a small segment of Eagle Road abutting this site that is not improved with
curb, gutter and sidewalk. District policy requires the construction of a 5-foot wide detached
(or 7-foot attached) concrete sidewalk on all arterial roadways. The applicant should construct
a 5-foot wide detached concrete sidewalk on Eagle Road abutting the portion of the site that
was not improved as a part of the intersection project (approximately 320-feet). The sidewalk
should not be constructed any closer than 50-feet from the centerline of Eagle Road.
Driveways
• The applicant is proposing to construct a 20-foot wide right -in ONLY driveway that intersects
Eagle Road approximately 230-feet north of the curb line for Overland Road. The applicant is
proposing to construct a 15-foot wide (390-feet long) deceleration lane on Eagle Road to
accommodate the right -in driveway ONLY. District policy requires restricted driveways to be
located a minimum of 220-feet from a signalized intersection. This driveway meets District
policy and should be approved with this application. The applicant should coordinate with
District staff in regard to the details of the design and construction of the driveway and
deceleration lane on Eagle Road. The applicant should also construct a 6-inch raised median
in Eagle Road to restrict the driveway to provide a right -in movement ONLY.
3. Other Access
Overland Road and Eagle Road are classified as arterial roadways. Other than the access points
that have specifically been approved with this application, direct lot access to Overland Road and
Eagle Road is prohibited. The applicant will be required to place a note on the final plat that states
this access restriction.
4
C. Site Specific Conditions of Approval
Utilize an existing 35-foot wide curb return type driveway that functions as a full access driveway and
intersects Overland Road approximately 365-feet east of Bonito Way, as proposed.
2. Construct a 24-foot wide curb return type driveway that functions as a right-in/right-out driveway
ONLY and intersects Overland Road approximately 235-feet west of Eagle Road.
3. Construct a 5-foot wide detached concrete sidewalk on Eagle Road abutting the portion of the site
that was not improved as a part of the intersection project (approximately 320-feet). Construct the
sidewalk a minimum of 50-feet from the centerline of Eagle Road.
4. Construct a 20-foot wide right -in ONLY driveway that intersects Eagle Road approximately 230-feet
north of the curb line for Overland Road and construct a 15-foot wide (390-feet long) deceleration
lane on Eagle Road to accommodate the right -in driveway ONLY. Coordinate the details with District
staff in regard to the design and construction of the driveway and deceleration lane on Eagle Road.
Construct a 6-inch raised median in Eagle Road to restrict the driveway to provide a right -in
movement ONLY.
5. Other than the access points that have specifically been approved with this application, direct lot
access to Overland Road and Eagle Road is prohibited. Place a note on the final plat that states this
access restriction.
6. Comply with all Standard Conditions of Approval.
D. Standard Conditions of Approval
Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
5. All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State
of Idaho shall prepare and certify all improvement plans.
6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
7. Construction, use and property development shall be in conformance with all applicable requirements
of the Ada County Highway District prior to District approval for occupancy.
8. Payment of applicable road impact fees are required prior to building construction in accordance with
Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance.
5
9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in
the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
10. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized representative
of the Ada County Highway District. The burden shall be upon the applicant to obtain written
confirmation of any change from the Ada County Highway District.
11. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other
regulatory and legal restrictions in force at the time the applicant or its successors in interest advises
the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the
time the change in use is sought.
E. Conclusions of Law
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are
satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
Attachments
1. Vicinity Map
2. Site Plan
3. Request for Reconsideration Guidelines
A
_ -- - E I - -- ( r
---
s t000t ,—
.oNno r
I .....� ,--� t
34 4
w
� 1
9 r
i X
i
L = i
-- r ,A
i [AQX ROAD g , i
IS
'3 Y
� v.a ..•.,,rwrti w...r
f slit*It
;If(Q = -.
Wil
31 IE '
4� _ !ASj jot
� 3
y�E
DORADO SUBDIVISION =
J I I FrLq
curtoMnrtarw1x �
J AORcoumy.IpYq '
l99a Stanley/ Ca sWanu rc . a uw
t'aq :smn
7
Request for Reconsideration of Commission Action
Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff
or any other person objecting to any final action taken by the Commission may request
reconsideration of that action, provided the request is not for a reconsideration of an action previously
requested to be reconsidered, an action whose provisions have been partly and materially carried
out, or an action that has created a contractual relationship with third parties.
a. Only a Commission member who voted with the prevailing side can move for reconsideration,
but the motion may be seconded by any Commissioner and is voted on by all Commissioners
present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a
certain time.
b. The request must be in writing and delivered to the Secretary of the Highway District no later
than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following
the meeting at which the action to be reconsidered was taken. Upon receipt of the request,
the Secretary shall cause the same to be placed on the agenda for that next scheduled
regular Commission meeting.
c. The request for reconsideration must be supported by written documentation setting forth new
facts and information not presented at the earlier meeting, or a changed situation that has
developed since the taking of the earlier vote, or information establishing an error of fact or
law in the earlier action. The request may also be supported by oral testimony at the meeting.
d. If a motion to reconsider passes, the effect is the original matter is in the exact position it
occupied the moment before it was voted on originally. It will normally be returned to ACHD
staff for further review. The Commission may set the date of the meeting at which the matter
is to be returned. The Commission shall only take action on the original matter at a meeting
where the agenda notice so provides.
e. At the meeting where the original matter is again on the agenda for Commission action,
interested persons and ACHD staff may present such written and oral testimony as the
President of the Commission determines to be appropriate, and the Commission may take
any action the majority of the Commission deems advisable.
If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover
administrative costs, as established by the Commission.
E
Development Process Checklist
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do one of the following:
❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
❑Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of
a previous development application and that the site specific requirements from the previous development also appl,
to this development application.
❑Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the
proposal for its conformance to District Policy.
®Write a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
El For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Reviem
Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,
then architectural plans may be submitted for purposes of impact fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, includinc
but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
❑ Working in the ACHD Right -of -Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHD Construction — Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
❑ Sediment & Erosion Submittal
• At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage
Division.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled.
❑ Final Approval from Development Services
9 ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con.
LJ
`ems'
E
U
O
N
-m8
5 @mqggq���
��a3f
c E s
m �
CC��gcS
• �f
�B
w
73 n �b W
y
E W
r
d
..........................
EEP
2
vi € s
Figure 1