HomeMy WebLinkAboutBienville Square Sub PP
P P 05-059
MERIDIAN PLANNING & ZONING MEETING
APPLICANT Red Cliff Development, LLC
February 16, 2006
ITEM NO.
9
REQUEST Continued Public Hearing from February 2,2006 - Request for Preliminary Plat
approval of 54 single family residential lots, 22 multi family residential lots, 14 common lots
and 7 commercial lots for Bienville Square Subdivision - 2935 North Eagle Road
AGENCY
COMMENTS
CITY CLERK:
CITY ENGINEER:
See Previous Item Packet / Minutes in Al Packet
CITY PLANNING DIRECTOR:
CITY ATTORNEY
See Memo in Al Packet
CITY POLICE DEPT:
CITY FIRE DEPT:
~ (lj) rn ~ /tp p ro V~
% e/c-
CITY BUILDING DEPT:
CITY WATER DEPT:
CITY SEWER DEPT:
CITY PARKS DEPT:
MERIDIAN SCHOOL DISTRICT:
SANITARY SERVICES:
ADA COUNTY HIGHWAY DISTRICT:
See comments in Al Packet
CENTRAL DISTRICT HEALTH:
NAMPA MERIDIAN IRRIGATION:
SETTLERS'IRRIGATION:
IDAHO POWER:
INTERMOUNTAIN GAS:
OTHER: Se Revised Master Plan and Landscape Plan
Contacted: Date: Z- It! 1)(,1)-
Emailed: Staff Initials:
Phone: '-' ú- g gsõ
(~.
Materials presented at public meetings shall become property of the City of Meridian.
15 Febnmry 2006
Melidian Planning and Zoning Commission
Meridian City Hall
33 East Idaho Avenue
Meridian, Idaho 83642
l{F:,; (~.~; 1~ I"lE~l,,)
RE: Finch Lateral relocation/tiling - Carol Subdivision
F,t:J~:: j f }OOE
c~rr'{ OF ÎvìEF~IOAI<
'-.rr',/ CI-EP;( r-..,,":"--:",r-"r
Dear Chairman and commission members:
As per your request that the Leslie residents living along the Finch Lateral meet
withMr. Unger and Mr. Haggett concerning the relocation and tiling of said
Lateral. We have complied with that request. Out first meeting was with Mr. Bill
Henson of Nampa/Meridian lnigation and the two representatives from Red Cliff,
Wednesday, February 8th along the Lateral access. At that time, after much
discussion and hearing what will be required by the irrigation district and what
could not be done, the neighbors voted to leave the Lateral open and not tiled.
N ampa/Meridian requiring 18 feet of access fi..om the edge of the lateral to the
north will be the irrigation district's required maintenance access road. Deciding
on that we then discussed what Red Cliff proposed for their project which would
abut the maintenance road. Included in this discussion was, a see through wrought
iron fence with landscaping long that fence, possibly a small berm, then the foot
path, and then more buffer area with landscaping. We also met SatlU-day the 11 th
with Red Cliff and discussed all concelllS and obtained some commitments for
whatever they are worth. I hope that we, the seven residents along the lateral,
have met and can-ied out what you ask of us. Ido believe that there are still many
questions from the Carol residents along the west boundary of Red Cliffs project.
I am sony to say that for the most patt we feel that Red Cliff is not all together
straight fOlward and will say what they think needs to be heard. I sincerely hope
that is an incon-ect thought.
Sincerely,
2832 Leslie Dr.
Meridian, Idaho
February 14, 2006
'-I"-)l-ï~' ~'y;-¡., ".
- \ ..::1 ~j "~~j.J -
;1,:
Meridian City Hall
Meridian City Planning & Zoning Commission
33 E. Idaho Street
Meridian, ID 83642
;.::;.r(-{ OF,' MERIDIf'\f\!
,; t....E-RV c:r~'!Cc:
To Whom It May Concern:
I am writing to the Meridian City Planning & Zoning Commission to state that my wife.
Alana Eigen & myself would like to voice our vote of approval for the currently proposed
plan discussed with the Red Cliff Development regarding the fencing along the Finch
Lateral.
We met with the Red Cliff Development personnel on February II, 2006. Based upon
their proposal, all in attendance agreed with the proposed plan. Mr. Billy Knorpp has a
sketch that will outline the agreed upon plan.
We look forward to working with the Red Cliff Development to see that we can have a
mutually beneficial development project at the comer of Us tick Road & Eagle Road.
~. erely, ~. .
- .>
I, "J'
'-', , ç ",
I ,) ,. i;, ;2
, "j(G(/l1~. (JJ}-1
John & Alana Elge~ ð
2908 Leslie Drive
Meridian, ID 83642
STAFF MEMO
TO:
FROM:
SUBJECT:
'-t') "Hi f-.; Fir-V"- v'E'1"-l
,,\,- -.l, ..,,' .. ,-.J. ,. .:.J .P
.-
r !" ~'1I /¡lrlf;
, -0", J,.,
::;iTy OF MERIDIAN
-.',-j-' , C'[ l-=pï,( cr~--r-'!(~C
SUMMARY:
Planning & Zoning Commission
Hearing Date: February 16,2006
,') .--,.' ,i' . ¡
(""""'~'l-{">f"',' ./-i "-,/
\,.,-,-,,/ J- '-,:- j j ,i/ Iii: ./ ¡
P&Z Commission
Joseph Guenther, Associate Planner
:_, ",
Bienville Square Subdivision
AZ~05-057 - Annexation and Zoning of 18.43 acres from RUT and Rl to R-8
(Medium Density Residential), R-15 (Medium High Density Residential) and C-
G (General Commercial) for Bienville Square Subdivision by Red Cliff
Development, INC
RZ-05~019 - Rezone of 10.05 acres ofC-G (General Commercial) to R-8
(Medium Density Residential) and R-15 (Medium High Density Residential) for
Bienville Square Subdivision by Red Cliff Development, INC
PP-05-059 - Preliminary plat for 54 single family residential lots, 22 multi-
family residential lots, 14 common lots, and 7 commercial lots on 27.30 acres for
Bienville Square Subdivision by Red Cliff Development, INC
CUP-05-049 - Conditional Use Pennit for mixed use development within 300-
feet of a residence for Bienville Square Subdivision by Red Cliff Development,
INC
PS-05-002 - Private Street for providing frontage to multi-family site.
V AR-05-023 -Variance to UDC 11-3H-4.2 for allowance of an access point to
Eagle Road/SH55,
On February 2,2006 the Planning Commission voted to continue the application to allow the applicant
time to meet with the neighbors to discuss the fencing on the southern property boundary and allow staff
time to draft adequate conditioning,
On February 9,2006 the applicant, Bob Unger, indicated that he had in fact met with NMID and the
neighbors to discuss the southern property boundary, He indicated that it was their intention to not cover
the Lateral as previously shown on the landscape plan and in the request. Mr. Unger further indicated
five of the seven property owners had indicated their preference for the ditch to remain open. The entire
ditch would be required to comply with the standards as listed in the UDc.
I have asked Mr. Unger to provide a revised copy of the Landscape plan and to detail the changes he is
requesting in a letter to the Commission. Instead of amending conditions as previously indicated, the
date of the landscape plan would be the only change to the staff report dated February 2,2006. Staff
will have further comment available at the hearing on February 16,2006 after given a chance to review
the landscape plan, which is anticipated to be submitted on Monday Peb 14,2006 and immediately
mailed to P+Z members,
If there are any questions please feel free to email me at guentheî@l11eridiancity.org or call the office at
884~5533.
-----"-------,.,~""---,,-
--' -;:~~
If -i;;~"Wf¡t,i~~
~~~.
(k~ut~ ~u:-
-_.",---
John S. Franden, President
Carol A, McKee, 1st Vice President
Dave Bivens, 2nd Vice President
Sherry R. Huber, Commissioner
Rebecca W. Arnold, Commissioner
February 3, 2006
To:
Red Cliff Developments, Inc.
2060 S. Eagle Road
Meridian, 10 83642
Representative:
WRG Design, Inc: Ashley Ford
453 S. Fitness Place
Eagle, 1083616
Owner:
John Ewing
1500 Eldorado Street
Suite 4
Boise, 1083704
Subject:
Bienville Square/MPP-05-059/MRZ-05-019/MAZ-05-057
Mixed Use
2935 N. Eagle Road
On February 1, 2006 the Ada County Highway District acted on your application for the above referenced
project. The attached report lists site-specific requirements, conditions ot approval and street
improvements, which are required.
It you have any questions, please teel tree to contact me at 208-387-6178.
Sincerely, ~~ t<.or: c: R
Christy Richardson
Planning Review Supervisor
Right-ot-way & Development Services, Planning Division
CC:
Project file, Construction Services, Utilities, City ot Meridian
Ada County Highway District. 3775 Adams Street. Garden City, ID . 83714 . PH 2083876100. FX 345-7650. www.achd.ada.id.us
_._-"-----~-----
~ - Right-at-Way & Development Services
f f .¿ ~', 1-,. ~ .- Planning Review Division
.J/ ~ '" -. -:-. -
tk --vrr- uL ~ ~c-e-
This application is approved at the staff level on February 1, 2006. Tech Review tor this item was held with
the applicant on December 2, 2005. Please reter to the attachment for request for reconsideration
guidelines. Staff contact: Christy Richardson, 20B-3B7-617B-phone, 20B-387-6393-fax,
crichardsonCâJ.achd. ada. id. us
File Numbers:
Bienville Square/MPP~O5~O59/MRZ~O5~O19/MCUP-O5~O52
2935 N. Eagle Road (SH-55)
Site address:
Applicant:
Red Cliff Development
2060 S. Eagle Road
Boise, 10 83702
Representative:
Ashley Ford
WRG Design, Inc.
453 S. Fitness Place
Eagle, 10 83616
Application Information:
The applicant has submitted a preliminary plat, rezone and conditional use application to the City of Meridian
for a mixed use subdivision with 54 single family lots, 22 multi-family lots and 7 commercial lots. The 17.25-
acre site is located on the west side of SH-55, south of Ustick Road.
Vicinity Map
JJìJL ~ ffi:j trLJIII
I! ,-~rll 1~lr
t\~{ ~I - -'- ' I :1 'Ii F- --I t
/ ,<~(" SITE : Eil I
Î <r:;~\ ~ i_'rl_-.l~---- r=
I'-\~/ /---... :--"""--------11
7{/<)'"¡:~?'~"~~~Õõ~".,---.1=g~~~: ' 1"-" lEi
~~'----./;j¡I~-! J --T--T \ I )'%- ¡"-~}-- i i --
c+=tr1t=j - ì:I=f.-d f--.-J "'-\, r------___Jl_--,"_,
-+--~i------1 [~'!! rrB ¡------, 1------\\ 'I
9 (1}-----11 ! ffir - P-": 1----' -\~i
~C[I:UI::I)jl¡-----1l1 -fl-- I " ""--.--
, ,,:;-;"",""',---""'-"-0' U : I ,
1
MCUP-O5~O48
2
A.
Findings of Fact
1.
Trip Generation: This development is estimated to generate over 2,402 vehicle trips per day
based on the submitted traffic impact study.
2.
Impact Fees: There will be an impact fee that is assessed and due prior to issÙance of a building
permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time.
3.
Traffic Impact Study: A traffic impact study was submitted with this application and a summary is
noted below.
4.
Site Information: The site is currently undeveloped and vacant.
5.
Description of Adjacent Surrounding Area:
Direction Land Use Zoning
North Commercial/Sadie Creek Promenade C-G
South Single family residential R-2
West Single family residential R-2
East Undeveloped C-G
6.
Impacted Roadways
Roadway Frontage Functional Traffic Count Speed
Classification Limit
Ustick Road None Minor Arterial 10,833 on 8-5-3 w/o 40 MPH
Eagle Road
Eagle Road Principal 41,939 on 1-6-05 n/o
995' Arterial/State 50 MPH
(SH-55) HiQhwav Fairview Avenue
B.
Findings for Consideration
1.
Traffic Impact Study Summary
A traffic impact study was prepared by Gary Funkhouser of Stanley Consultants.
. 15% of the site traffic is projected to have origins/destinations west of the site and travel on
Ustick Road west of SH-55
. 20% of the site traffic is projected to have origins/destinations east of the site and travel on
Ustick Road east of SH-55
. 35% of the site traffic is projected to have origins/destinations south of the site and travel on
SH-55 south of Ustick Road
. 30% of the site traffic is projected to have origins/destinations north of the site and travel on
SH-55 north of Ustick Road.
. At build-out, Bienville Square is projected to add less than 2% of the total traffic on SH-55
during PM peak hour.
MCUP-O5-048
. At build-out, Bienville Square is projected to add less than 3% of the total traffic on Ustick
Road during the PM peak hour. -
. The proposed right-inlright-out access on SH-55 does not meet ITD spacing requirements.
. The Eagle Road/Ustick Road intersection is projected to operate at LOS D in2008.
. The Eagle Road/Fairview Avenue intersection is projected to operate at LOS E in 2008.
. The Eagle Road/Pine Avenue intersection is projected to operate at LOS Fin 2008.
. The Ustick Road/Cloverdale Road intersection is projected to operate at LOS E in 2008.
. The Ustick Road/Locust Grove Road intersection is projected to operate at LOS B in 2008.
. If access is allowed on Eagle Road, auxiliary lanes are warranted. (These should be
coordinated with lTD.)
2.
Ustick Road
Ustick Road, from Leslie Drive to Ally Street, including the Eagle Road intersection, has just been
widened and improved to 5-lanes. Sidewalks were not constructed with the roadway improvement
project, but are required to be constructed as development occurs on the undeveloped properties.
The intersection was widened to include dual left turning lanes. This project was a public/private
partnership that involved other land owners and developers in the area.
On November 9, 2005. the ACHD Commission reviewed and approved MCUPO5-048, a conditional
use application for the Kohl's Department Store located at the northwest corner of Ustick and Eagle
Roads. With that application, the Commission approved the installation of a signal at the west
property line. The signal was approved under the following conditions that also apply to this
application:
b. That no signals be allowed on Eagle Road to this site. The applicant's original
proposal included a signal at the % mile on Eagle Road. ITD's Eagle Road Study
allows for signals at the Y2 mile. On this segment of Eagle Road, Wainwright Drive
will eventually be signalized at the Y2 mile. The City of Meridian's newly adopted
Unified Development Code also prohibits access to the state highways except at the
Y2 mile. ACHD staff is recommending approval of this signal to "spare" Eagle Road
of the addition of another signal not located at the ~ mile. The addition of signal on
Eagle Road, not located at the Y2 mile, will further complicate signal timing and
congestion on the state highway.
c. That a north-south public roadway be constructed at the signal access to eventually
tie into Wainwright Drive north of Ustick, and to provide access to the parcels south
of Ustick. The additional traffic on the new roadway will help support the need for
the Ustick Road signal.
d. That all costs associated with the signal be borne by the applicant, except for
materials that will be donated by ACHD. Staff recommends donation of the
hardware because the signal will provide benefit to surrounding property owners.
(This applicant should work with the Kohl's developer regarding timing and
installation of the signal.)
3.
Internal Roadways
With the preliminary plat for Sadie Creek Promenade Subdivision, ACHD required that applicant to
construct a north-south public roadway as a 40-foot street section with vertical curb, gutter and 5-foot
wide concrete sidewalk on both sides of the roadway from Ustick Road to the north property line of
this site.
3
MCUP-O5-048
4.
5.
C.
D.
1.
2.
4
The applicant is proposing to extend Sadie Creek Avenue into the site at the north property line, with
a network of local streets throughout the subdivision, including a public street intersecting SH-55.
ACHD will not allow a new public street intersection at SH-55, because of the signal that was allowed
on Ustick Road that will serve all of the uses in this area. A public street in this- area could create cut-
through traffic through the subdivision from Ustick Road to SH-55, which is not a desired scenario
because of the front-on housing and residential uses.
The applicant may, if allowed by the City of Meridian and ITD, construct a private street or driveway
off of SH-55 to serve the commercial uses, and provide parking on the west side of the commercial
uses where a public street would terminate. This would allow the residents in the area to access the'
commercial uses without accessing SH-55, and would eliminate an unnecessary public street access
to SH-55.
Roadway Sections
. Extend Sadie Creek Avenue into the site as a 40-foot street section, transitioning to a 36-foot
street section, within 50-feet of right-of-way with curb, gutter and 5-foot wide concrete
sidewalk.
. All streets within the subdivision may be constructed as 36-foot street sections.
. The applicant is proposing to construct a private street/alley. The alley could be constructed
as a public alley, if it is paved 16-feet wide, within 20-feet of right-of-way. If the alley is private,
it should be signed accordingly, so that ACHD does not maintain a private alley/street.
Roadway Access
Because ACHD is not approving a public street off of SH-55, access to the residential portion of this
site will only come from Ustick Road. Sadie Creek Avenue north of this site to Ustick Road will need
to be constructed and dedicated prior to final plat approval for this site.
Access to Surrounding Subdivisions
The site is surrounded by single family residences in Carol's Subdivision served by Leslie Drive, both
west and south of the site. While it would be useful for the existing dwellings to have access to the
signal at Sadie Creek Avenue, and to the commercial uses, all of the lots in Carol's Subdivision have
dwellings on them, and there is no public right-of-way through that area to access this site.
Eagle Road Right-at-Way, Improvements and Access
The City of Meridian, applicant and ITD should work together to determine if additional right-of-way or
improvements are necessary on Eagle Road (SH-55). Access points should be approved in
accordance with the Eagle Road Corridor Study.
Note to the City of Meridian
ACHD requests that the City require parking on the west side of the commercial uses for the
residents of this subdivision and nearby subdivisions, to have access to the commercial uses off of
Ustick Road and local roadways, rather than SH-55. ACHD is not allowing access to SH-55 via a
public street.
Site Specific Conditions of Approval
Extend Sadie Creek Avenue into the site from the north property line. Transition the roadway from a
40-foot commercial street section to a 36-foot wide street within 50-feet of right-of-way, with curb,
gutter and 5-foot wide concrete sidewalk.
Sadie Creek Avenue north of this site to Ustick Road wíll need to be constructed and dedicated prior
to, or in conjunction with final plat approval for this site.
MCUP-O5-048
4.
3.
All local streets in the subdivision should be constructed as 36-foot street sections within 50-feet of
r¡ght-of-way with curb, gutter and 5-foot wide concrete sidewalk.
The proposed alley may be constructed as a public alley if it is paved 16-feet wide within 20-feet of
right-of-way. OR The proposed alley may be constructed as a private drive/street, if it is signed
accordingly.
5.
6.
Bourbon Street shall terminate in a culdesac and shall not extend to SH-55.
Public road access to SH-55 is prohibited.
7.
Provide a letter from ITD stating required improvements and access decisions.
8.
Comply with all Standard Conditions of Approval.
D.
Standard Conditions of Approval
1.
Any existing irrigation facilities shall be relocated outside of the right-of-way.
2.
Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way.
3.
All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
4.
Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5.
Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
6.
All design and construction shall be in accordance with the Ada County Highway District Policy
Manual. ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State
of Idaho shall prepare and certify all improvement plans.
7.
The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
8.
Construction, use and property development shall be in conformance with all applicable requirements
of the Ada County Highway District prior to District approval for occupancy.
9.
Payment of applicable road impact fees will be required prior to building construction in accordance
with Ordinance #200, also known as Ada County Highway District Impact Fee Ordinance.
10.
It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in
the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
5
MCUP-O5-048
11.
12.
No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized representative
of the Ada County Highway District. The burden shall be upon the applicant to obtain written
confirmation of any change from the Ada County Highway District. - .
Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans. or other
regulatory and legal restrictions in force at the time the applicant or its successors in interest advises
the Highway District of its intent to change the planned use of the subject property unless a ,
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the
time the change in use is sought.
E.
Conclusions of Law
1.
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are
satisfied.
2.
ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
6
MCUP-O5-048
-~ ¡
KOO~ &ore ~
SJb
SITE
7
MCUP~O5-048
8
Request for Appeal of Staff Decisic:m
1.
"Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the
final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not
properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error
of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or
enforcement of the ACHD Policy Manual. -
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary ,
of Highway Systems, which must be filed within ten (10) working days from the date of the
decision that is the subject of the appeal. The notice of appeal shall refer to the decision
being appealed, identify the appellant by name, address and telephone number and state
the grounds for the appeal. The grounds shall include a written summary of the provisions
of the policy relevant to the appeal and/or the facts and law relied upon and shall include a
written argument in support of the appeal. The Commission shall not consider a notice of
appeal that does not comply with the provisions of this subsection.
c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date -of
the filing of the notice of appeal to reply to the notice of the appeal, and may during such
time meet with the appellant to discuss the matter, and may also consider and/or modify
the decision that is being appealed. A copy of the reply, and any modifications to the
decision being appealed will be provided to the appellant prior to the Commission hearing
on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the ROWDS Manager's
reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal
and the reply shall be delivered to the Commission at least one (1) week prior to the
hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
MCUP-O5-048
II
II
Development Process Checklist
!8JSubmit a development application to a City or to the County
!8JThe City or the County will transmit the development application to ACHD
!8JThe ACHD Planning Review Division will receive the development application to review
IZJThe Planning Review Division will do one of the following:
DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of
a previous development application and that the site specific requirements from the previous development also appl:
to this development application.
IZJWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating thE
proposal for its conformance to District Policy.
DWrite a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
IZJThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
IZJFor ALL development applications, including those receiving a "No Review" or "Comply With" letter:
. The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Revie",
Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,
then architectural plans may be submitted for purposes of impact fee calculation.)
. The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, includin~
but not limited to, driveway approaches, street improvements and utility cuts.
DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
D Driveway or Property Approach(s)
. Submit a "Driveway Approach Requesr form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
0 Working in the ACHD Right-of-Way
. Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHD Construction ~ Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
0 Sediment & Erosion Submittal
. At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage
Division.
0 Idaho Power Company
. Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled.
D Final Approval from Development Services
. ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con.
9
MCUP-OS-O48
Meridian Planning & Zoning
February 2, 2006
Page 28 of 112
Zàremba: Okay.
MOTION CARRIED: THREE AYES. ONE NAY. ONE ABSENT.
Rohm: And so this will be continued to the regularly scheduled meeting of March 2nd,
2006, and for the sole purpose of discussion of the school site and the associated stub
streets and pathway.
Borup: And, Mr. Chairman, yeah, I think it would help if we -- and a preliminary plat
showing the stub street and how that would affect the school site and such would be
helpful.
Rohm: Yes, it would. Thank you. Due to the length of that application discussion, we
typically wait until 9:00 o'clock to take a break, but we are going to take a short break
right now for about ten minutes. So, we are adjourned until 20 minutes until 9:00.
(Recess. )
Item 6:
Item 7:
Item 8:
Item 9:
Continued Public Hearing from January 5, 2006: AZ 05-057 Request
for Annexation and Zoning of 17.25 acres from RUT and R1 to R-8, R-15
and C-G zones for Bienville Square Subdivision by Red Cliff
Development, LLC - 2935 North Eagle Road:
Continued Public Hearing from January 5, 2006: RZ 05-019 Request
for a Rezone of 10.05 acres from C-G to R-8, R-15 and C-G zones for
Bienville Square Subdivision by Red Cliff Development, LLC - 2935
North Eagle Road
Continued Public Hearing from January 5, 2006: PP 05-059 Request
for Preliminary Plat approval of 54 single family residential lots, 22 multi-
family residential lots, 14 common lots and 7 commercial lots for Bienville
Square Subdivision by Red Cliff Development, LLC - 2935 North Eagle
Road:
Continued Public Hearing from January 5, 2006: CUP 05-052 Request
for Conditional Use Permit for Mixed Use Regional project within 300 feet
of a residence for Bienville Square Subdivision by Red Cliff
Development, LLC - 2935 North Eagle Road:
Rohm: Okay. I'd like to reopen the regularly scheduled meeting of the Planning and ~
Zoning Commission for February 2nd, 2006, and begin with opening the continued
Public Hearing for AZ 05-057, RZ 05-019, PP 05-059, and CUP 05-052. All of these
relating to Bienville Square Subdivision and begin with the staff report.
Guenther: Thank you, Mr. Chairman and Members of the Commission. Bienville
Square Subdivision is an annexation. This portion up here. The annexation is for this
Meridian Planning & Zoning
February 2, 2006
Page 29 of 112
portion listed in purple on the screen. The annexation is for 18.43 acres and I will go
into the zoning here in a second. The second portion is a rezone of this portion that's
listed in red here. These two parcels are the Bienville Square Subdivision annexation
and rezone. With that, the annexation will require a development agreement and this
portion listed in red -- or shown in red has an existing development agreement tied to it
at this time that I'll try and go into a little bit further here in a second. With this, the site
is located on the southeast corner of Ustick and Eagle. It is approximately 600 feet
south of that intersection and mostly in a southwesterly direction. There is one major
feature, which is the Finch Lateral, which runs around the perimeter of this site. The
Finch Lateral has a 40 foot irrigation easement on it for Nampa-Meridian Irrigation
District. The Finch Lateral will be tiled on this site, as well as there is a user's lateral
that comes in approximately where I'm slowing off of Eagle Road and would continue
through this site, which also will be piped and Public Works will certify that the ins and
outs of that tile pipe will be maintained. With this we have a plat. The plat for 54 single
family residential lots, 24 -- 22 multi-family residential lots, 14 common lots, seven
commercial lots for the entire site of 27.3 acres and the Conditional Use Permit is a
conditional use permit that is issued due to the fact that this is a mixed use regional
district, which is within 300 feet of a residential district. Tried to have Barb include a
slide. This is a slide that I created tonight. It's very rough, but it shows a little better
definition of what the three zoning designations would be for the site. Closest to Eagle
Road the applicant is proposing a general commercial district. The general commercial
district is approximately -- I believe it's 68 acres. The transitional district between the
commercial and single family residential is an R-15 district and, then, the R-8 district
would be to the furthest to the west. This is, actually, tilted a little bit odd ball. This is
facing to the east. North would be to the left of this slide. This has three distinct
portions -- three distinct portions, but there is, actually, four portions of it that I would like
to define. Closest to Eagle there is five building pad sites that are listed for office or
retail use, as well as two larger retail buildings approximately in the 12,000 square foot
range. This is in general commercial. These would be general commercial uses that
would be proposed at this site. The applicant has brought in an amended portion -- an
amended design for this general commercial area. Obviously, within the general
commercial area certain things can shift around slightly. The amended design, staff
would actually support better than this design, due to the fact that the applicant has an
ACHD condition that this portion must terminate and no access shall be directed to
Eagle Road. I should have pointed this out already. This is Sadie Creek Avenue, which
is a -- will be a public road. The public road will loop around the residential district. This
is a commercial cross-access point and there is private streets that have been applied
for in order to provide frontage and access to the multi-family. Now, with that there is a
commercial access point to Eagle being proposed with this site. The applicant has
taken this commercial access point and shifted it approximately to between the ~
southerly two most buildings. So, the access point to Eagle would be in this location
and that commercial access would continue down to what is referred as Cajun
Boulevard, which would be the private street. This access point here would facilitate
that commercial traffic between the Sadie Creek Promenade application, which was
recently approved to the north of this site, and it would facilitate a better commercial
cross-access to the private street system and, then, out to Eagle Road, as well as to
Meridian Planning & Zoning
February 2, 2006
Page 30 of 112
satisfy ACHDs' conditions that the public street shall terminate and not provide a direct
access to Eagle Road. Staff would support that design. I will show you that here in a
second. The applicant does not have a hard copy of that I can show you at this time.
It's on his presentation. With this application staff has reviewed it in compli-ance with the
existing development agreement. This is the conceptual site plan that was brought
before the City Council for the annexation of the ten acres that lied originally within
2003. This site that was to the south of us did pull out of the annexation request, which
was the 18 acres. This site does indicate multi-family residential, as well as commercial
and office, with a transitional use to the residential uses west of this site. The
transitional use in this area is appropriately planned for. The applicant is providing the
multi-use pathway, as well as to landscape the Finch Lateral, according to the Unified
Development Code. The multi-family residential portion, obviously, is within the R-15,
which would be a condominium project, as well as the commercial operation. So, the
plan that is before you is consistent with what the development conceptual plan was
presented to the City Council in 2000 -- in 2003 and signed in 2004. With this we have
several elevations. These would be the alley loaded products and the condominium
projects. I'll let the applicant better define that area. One last thing. There are three
products residential. The condominium projects would be in the R-15 district. In the R-
8 district there is two areas of distinction. These are the front loaded single family
residential products. These lots do approximate in the eight to ten thousand square foot
range. There is some of them are actually larger, which provides a good transition to
the R-2 district to the south of this site. These products in the middle are an alley-
loaded product. They are, obviously, smaller lots and I don't have the lot size, but I
believe those were around 4,500 square foot lots. The amenities to the site are
provided to -- there is a basketball court and tennis court, as well as significant open
space design. There is a minimum of 50 feet between these condominium units in the
center. There is a clubhouse with an on-site post office, so each one of these -- this
entire condominium unit would receive their mail at one central location. The applicant
is also proposing to provide the multi-use pathway that would -- that would connect
Eagle Road at this location and continue through to Ustick Road along the perimeter of
the site, which would be off that Finch Lateral. Probably forgetting a couple of things,
but I will stand for questions at this time. Staff is recommending approval of this
application. The dates of the design may change due to the applicant making up the
amendments to their site plan. Staff would support an approval of that, if the applicant -
- or if the applicant's design is satisfactory to this Commission tonight. And at that,
before I guess I'll stop, I'd like to show you the applicant's amended design. This would
be the revised design, which would show one large box retail unit. I believe the
applicant has indicated this would be something of an athletic club, as well as this would
shift that to the -- to the south. Staff would support this better, because this is
approximately the quarter mile location, which does better facilitate limited access to-
Eagle than it would at the other alternate location. And I guess at that I will stand for
questions.
Rohm: Thank you. Any questions of staff?
Moe: Mr. Chairman?
Meridian Planning & Zoning
February 2, 2006
Page 31 of 112
Rohm: Commissioner Moe.
Moe: Joe, I just had one. I was going through the -- as far as the requ-irements and
noting in the R-17 -- or, excuse me, R-15, under the lot size, you had it noted as
required as a 8,424 and proposed a 2,400. Is that a type there, I assume? That would
be page six.
Guenther: Yep. That, actually, should be -- 8,424 is the propose lots, 2,400 is the
required lot.
Moe: Okay.
Guenther: Yeah.
Moe: I wanted to make sure. Thank you.
Borup: Oh. Just reversed.
Moe: Yeah.
Borup: Just -- Commissioner Moe, that was it? Just one clarification. Did you say the
pathway was going through to Ustick? I couldn't remember. The project would also be
doing a pathway there?
Guenther: Yes. They have 35-foot landscaping in here that would continue that
pathway to the Ustick corridor.
Borup: Okay.
Moe: You said there were -- you do have a copy of the -- the new plat?
Guenther: This is the only -- the only revised layout that the applicant has delivered.
This would be the one that we would amend the staff report in order to approve tonight,
if you so chose.
Moe: Okay. Thank you.
Rohm: Thank you. Any other questions of staff? At this time I'd like to have the
applicant come forward, please.
Unger: Good evening, Mr. Chair and Commission Members. My name is Bob Unger,
I'm with Red Cliff Development. Our address is 787 East State Street, Suite 125, Eagle,
Idaho. 83616. And appreciate the excellent job staff has done in reviewing the project,
particularly with this revised plan, and we can just go ahead and start with this plan, so I
don't have to explain to you that we are changing it. And we also appreciate staff's
Meridian Planning & Zoning
February 2, 2006
Page 32 of 112
ret;ommendation for approvaL If you remember, about a month ago we were on the
agenda to be heard. You did open up a hearing and we did ask for a postponement. At
that time we thought that we might be getting a commitment from a big box, which that
did not happen, so staff has recommended that we proceed with our application as
originally submitted. So, that's where we are now and I did want to explain to you what
has transpired in this past month. As staff has explained, Ada County Highway District
in their requirements specifically stated that they did not want us to have a public road
that connected from Ustick out to Eagle Road and as such that's part of what
necessitated this -- turning this into a cul-de-sac. So, the public road stops here and we
come back out to Ustick over here. This particular revision and relocating our access
over here is something that we did show to the neighbors. We had a neighborhood
meeting this past Saturday and they seemed to appreciate this revision over our original
access here and, if I remember correctly, I believe the Commission even said
something about that a month ago, that it would rather see something over here. So,
we have tried to do something here that works for everyone and for us. And as staff
has kind of discussed, we do have this public street access here over to Ustick. We
also have our private street here, which will come out and access to Ustick at a location
right in through here. There was a provision for the Sadie Creek Promenade folks to
provide us a cross-access for that and we were to coordinate with them to make that
location happen, which we are working with them to accomplish that. The access on
Eagle Road, we have actually moved that down to the quarter mile mark, which turns
out to have been a location that was identified during the original annexation of the
Rewe property, which is this portion of our property, which staff had shown you earlier.
That was one of the two locations. This location and another location right here for
access to Ustick Road -- or Eagle Road. So, we are trying to follow along with that also.
We have in our -- our ITD application for this access is pending at this time. Our traffic
engineer has been in contact with them and they are kind of holding off on ours and
also the Sadie Creek Promenade accesses. The indication we are getting is that they
are waiting to see what the City Council decides. So, we are hoping to get an answer
one of these days from them. As far as utilities, utilities are available to the site or close
enough that we can extend them into the site, sewer, water, through the city. All other
services are available and, of course, will be installed when we construct the project. If
we could go to the next one, Joe? I'm going to kind of run through these as best as
possible. This is our -- basically our retail area. And I know you have seen these two
pictures before, because these are the same pictures that the Sadie Creek Promenade
folks showed you and the only reason I really wanted to use these -- and forget the
palm trees, because that's not going to happen here. But what we want to convey here
is that we are going to work with the Sadie Creek Promenade folks to -- in our design, in
our architectural design, et cetera, so that we have two projects that work together well,
instead of conflicting architectural structures throughout the project. So, we want to-
show that -- we are going to work with them and try to, you know, kind of work our
architecture so that we work as a unified design, instead of two separate designs. Joe,
could we go to the next one, please? All right. And this is in the middle portion of the
project, condominium portion of the project. These are the structures that we are
proposing. And, actually, we are -- we are modifying these structures slightly, so that all
three of these will be two car garages, instead of one. It makes it much more desirable
Meridian Planning & Zoning
February 2, 2006
Page 33 of 112
wnen everybody has a two car garage and it also helps out with the parking situation.
And if you will notice, we have drive alleyways -- or not really alleyway -- well, accesses
-- common accesses to access the garage areas. We have asked that fire review.
These we have met with fire and our accesses and, then, our drives are in compliance
with the fire requirements.
Moe: Could you note the south elevation? I'm interested in the --
Unger: Over here?
Moe: Yes. That's correct.
Unger: Okay. Well, you will see either this end or this end.
Mae: Okay. Thank you.
Unger: And also these structures are very unique. There is a full front porch, covered
front porch on these. You can kind of see it there from side angles. And they really do
take on a single family residential look in the design, although they are, you know, 4,000
square feet total. In fact, each of the units -- we have three bedroom, two bath units
and two bedroom, two bath units in there, and square footage ranges from 1,200 to
1,500 square feet. So, they are fairly nice condominiums. In the next portion of the
project we have alley-loaded or rear-loaded lots. We have a common drive that runs
down through here and, actually, it is going to be designated as a private road. And this
is an example of the type of structures that we are looking at putting in there. We will
work further -- with further detail in getting the full designs on these, but I wanted to give
you some sort of an idea of the appearance of the structures. We also have open
space area with a pathway running through this portion here. And we feel that these
are going to be pretty desirable and our lot ranges in there are just under 5,000 square
feet and we have some that range on up to 6,500 square feet, depending upon which
bend of the road you're in. Joe. And, then, on the -- our western border, which wraps
right around here, these are all front loaded. Once, again, we are just trying to give you
some sort of an idea, an example of the type of buildings we want to put in there. I
didn't have any really good single stories to show you, but it would be a mix of some
single stories and two stories. These lots will range anywheres from I think 6,000
square feet up to -- over in this area we are looking into the 10,000 square foot. On the
rear loads and the front loads the square footage of the buildings that we are looking at
are somewhere in the area of at least 1,600 square feet up to 2,400 square feet. Okay.
We can go onto the next one, Joe. Thank you. Okay. As discussed by staff, we have
the Finch Lateral that runs along here. We are proposing to tile that. I have discussed -
that with Nampa-Meridian, John Anderson, very preliminarily, and they would support us
doing that and we may also be able to get them to participate. Along with that we are
proposing to put in a pathway that would be located over top of the piped ditch and,
then, of course, our pathway runs across here. We will also tie into this short section
that the Sadie Creek Promenade not would do. Once, again, we have some pathways
running up through here. So, we are trying to get everything connected nicely. Along
Meridian Planning & Zoning
February 2, 2006
Page 34 of 112
with -- in discussing the Finch Lateral, we also have this lateral that runs down through
here. Actually, this one that runs right down -- I'm sorry, it's right here. Runs along this
parcel line. Of course, that would be piped and continued onto terminus over here
where it feeds other properties to the west. That would be reviewed by city -- the city
engineer and also we have a gentleman who kind of represents the users, we were
fortunate enough to meet him Saturday and discuss some of the issues on that lateral
and we feel that -- real confident that we can work with them and make sure that we
satisfy everybody's needs and continue the water flow through there. As far as open
space on this project, we have three plus acres of dedicated open space. I'm going to
start off over on this side where we are showing over here -- we have a volleyball court,
a basketball court, or a hard surface court. That's a horseshoe pit there. Over here we
are going to do a clubhouse and a pool. We have a tot lot in this area. And this is all
open space area here for recreational purposes. All of the area in between these
condos -- and we have over 60 feet between the buildings in here, so it's a fairly large
area of open space, sufficient enough for, you know, kids to go out there and throw a
football and things like that. Intermixed throughout all of this we have some picnic
tables, barbecue pits, and things like that. We are very aware that a development such
as this -- and particularly in the higher density areas, that we need recreational areas,
particularly for kids, so that the kids aren't running over into the neighbors' yards over
here or down here or out into the streets. So, we have got a substantial amount of open
space and recreational areas for -- for the kids and for the adults. As far as the
buffering -- of course we have a 35 foot buffer along here and a meandering sidewalk
and with all of our buffering, not just along here, but the buffering that we will be doing
pretty much around the entire boundary of the project, with the exclusion of where we
connect into here, we are looking at putting in substantial buffering with trees and
shrubs and things like that to really, you know, provide a really nice buffer all the way
through this and, then, along here maybe not quit as heavy as what we would do where
we border the existing residential area. But certainly it's -- and they are hard to see.
There, actually, are trees in here. It's hard to see on this plan. Along this -- particularly
along here we are also looking at doing some sort of a berm along with our landscaping
along there. And we have discussed with the neighbors -- I guess Sadie Creek
Promenade has committed to constructing a -- I believe a -- some sort of a decorative
block wall. The neighbors have asked us -- along here have asked us to continue that
forward and up to this point we have said that we would certainly consider that.
Something we would like to do is spend more time with the neighbors and look at some
alternative fencing ideas, bring in a landscape architect and a few things to see if there
is something we can do that would be acceptable with them, but a little more
economical, because I can see if we do it here, then, I'm going to have to do it here and
by the time I get done I'm going to be putting in 13 -- close to at least 3,000 feet of
concrete wall, which is very very expensive, somewhere in the area of about, you know, -
five, six dollars a foot. That's just -- and that's probably on the cheap side. So, it is
something that we would like to meet and spend more time with the neighbors on to
discuss maybe some alternate fencing and some dense -- very dense landscaping
along there. Somebody threw this at me today and I thought it was great. We'd much
rather see green-scape than gray-scape. So, we are going to work on that with those
folks, but we will fence the boundary. And I hear the beeper and it's perfect timing,
Meridian Planning & Zoning
February 2, 2006
Page 35 of 112
b~cause I'm done and I thank you all very much for your time and the time of your staff
and as staff has stated in their report, our proposal substantially does comply with the
city's codes and regulations and we feel that this project will be a very nice addition to
the city and I will stand for any questions you might have. -
Rohm: Thank you very much. Any questions of the applicant?
Moe: Mr. Chairman?
Rohm: Commissioner Moe.
Moe: Well, I have a couple, yes. I noted on the landscape drawings that you are
showing a cedar fence on the west side. Is that what you have proposed? And you're
rethinking that issue as the block as the property to the north has done?
Unger: That is correct. Our -- in our submittal we showed a cedar block combination
type fence and in the last couple of neighborhood meetings that we have had, the
neighbors have -- along the -- I'm sorry, along the western boundary has said, well,
would you consider doing something like -- like they have done I guess behind -- is it
Home Depot or -- who is that over there? Lowe's. And we have looked at that and we
have said that we would -- you know, we would seriously consider that. But at that time
we weren't looking at the possibilities of doing that, so -- so, it's something we want to
revisit with the neighbors.
Moe: Next you made reference -- showed some elevations for the properties on the
west property line, which were all two story, and you said you were going to have some
single story in there. Do you know what kind of a balance you're going to have as far as
how many -- are there going to be more two stories than single or do you know that yet?
Unger: Actually, we have -- we really have not considered any kind of a balance there
as to what that would be and Rob Haggett is here and maybe he can come up and
address that when I'm done.
Moe: You had shown the elevations of the front side.
Unger: Yeah.
Moe: I would be very interested to see what the rear is going to look like that are
overlooking the properties to the west. That's what I was concerned about. That's it for
me.
Rohm: Thank you.
Zaremba: Mr. Chairman?
Rohm: Commissioner Zaremba.
Meridian Planning & Zoning
February 2, 2006
Page 36 of 112
Zaremba: Three general questions. The sports facilities here -- are you intending to
light those or will they just be daytime use?
Unger: Mr. Chair. They would be daytime use only.
Zaremba: Okay. I ask that question before the people to the south ask it.
Unger: Right.
Zaremba: The second question. With a mix of commercial properties and residential
properties -- where I'm going is the maintenance of the open areas and common areas.
Are there going to be separate homeowners association for the three different zones? I
mean two homeowners and one commercial owners association or is it going to be all
one association or what happens?
Unger: Mr. Chair, in the past on other projects we have had a property owners
association for an entire project, because of the maintenance of the open area and
things like that. I think in this particular situation we may be able to have a -- where we
have a homeowners association for the residential portion of the property and an
owners association for the commercial portion and -- but who would also jointly work
together. I'm not sure how we would work that out legally. So, I guess at this point we
are proposing one property owner's association that would -- that would control all the
architectural and all the maintenance, et cetera and et cetera. Because we have -- not
only do we have public streets in here, but we also have some private streets and also
these little private streets here are also going to be used by these folks also. So, some
of that maintenance should come out of that owners association, so --
Zaremba: Okay. Thank you.
Unger: It's something we have to look at a little bit closer.
Zaremba: Okay. What I hope is my final question at this point.
Unger: Okay.
Zaremba: I do like the suggestion of moving your access to Eagle much farther south. I
believe in Meridian code and perhaps ACHD there is -- they don't encourage connecting
public street and public street with a private street.
Unger: Correct.
Zaremba: So, I'm not quite sure how that's going to fly, but that wasn't really my
question. My question was going to be at the access to Eagle are you looking for a full
access intersection or is that going to be right-in, right-out?
Meridian Planning & Zoning
February 2, 2006
Page 37 of 112
- -
Unger: Mr. Chair. Although our original application -- our variance, we were requesting
a right-in, right-out, because we knew that that's all we could get here, this particular
location, actually, since it's at the quarter mile mark, actually puts us in a position where
we do want to request a full access there. And that's what I have shown as a full
access, as opposed to the right-in, right-out.
Zaremba: I would certainly encourage that. I probably was the one that suggested the
moving of it, but --
Unger: Yes.
Zaremba: -- also in anticipation of -- we some time ago -- is this working? Well, the two
portions of your property, the one that would be the northern portion -- thank you. We
had a -- we had an application on -- I think it was that piece that only had a right-in,
right-out and as one of the people at public testimony pointed out, that means that
anybody that needs to reverse direction is going to drive through Leslie Lane to do it.
So, I have to say I'm very much not in favor of the right-in and right-out, but I would even
like to see Sadie Creek's right-in, right-out disappear, so that more of the traffic was
coming out here and helped you meet the warrants for a signal there. But if you're
going for a full access, I'm much happier about that. Appreciate that.
Unger: And we appreciate that, too, and if you could pass that onto the City Council
when our variance comes up, we would appreciate it.
Zaremba: Happy to express my opinion.
Rohm: Thank you.
Zaremba: That's it for me.
Borup: Mr. Chairman? Mr. Unger, I think the only question I had clarification on the
boundary fence. You said your original proposal was a block and cedar? Did I hear
that right or --
Unger: Correct.
Borup: So, block pillars with cedar in between, is that --
Unger: Yes, sir.
Borup: And the fence at Lowe's, was that some type of -- was that a concrete panel or -
Unger: It's a -- it's a decorative block wall.
Borup: So, is this a CMU type of block?
Meridian Planning & Zoning
February 2, 2006
Page 38 of 112
Unger: Yeah.
Borup: Okay. That's what I thought.
panel.
Unger: Okay. Yeah.
Okay. That's what I meant when I said a concrete
Borup: But you have not looked into that at all?
Unger: We haven't looked -- we haven't gotten into that part of it that deep yet. You
know, the cost -- I -- you know, just from experience, the cost of that, you know, far
exceeds your cedar fence or a vinyl fence. In fact, one of the things that we -- you
know, that we wanted to discuss with the neighbors was the possibility of a -- some sort
of a wrought iron fence with extensive landscaping and things like that to go along with
it. Just -- and we really haven't had a chance to talk with the neighbors about that. It's
something that we just came up with this week.
Borup: And the property to the north, has been solidified on the type of fence or wall
that they are doing or is that still in negotiation?
Unger: Along this area?
Borup: No. To the north.
Unger: Oh, I'm sorry.
Borup: I thought you had mentioned they were doing a block wall.
Unger: Right here.
Borup: Yes.
Unger: Right here. Right. We understand that that's what they had committed to.
Borup: Okay.
Unger: So, if they have committed to that, you know, it kind of puts us in a spot where
we almost had to follow along with what they are doing, you know, unless -- you know,
unless the neighbors are, you know, open to something else that we don't know, so --
Borup: Or maybe we can get some more testimony on that. Right now I think where
you left it it was kind of open-ended.
Unger: Right. Right. Anyway you look at it, you know, we are definitely going to fence
it and it seems logical to do the same with what Sadie Creek has done, but then, again,
Meridian Planning & Zoning
February 2, 2006
Page 39 of 112
- "
they haven't gone to City Council yet either, so you never know. If I could, one other
point. I'm -- since you brought up the lighting issue. These units here are -- they are
not going to have like huge outside lighting or anything that like, they are going to have
standard residential lights, you know, just like any single family house out -here is going
to have a light, you know, on the front porch and things like that. It will be the same
situation here, unless the city specifically requires any additional lighting, that would be
the only lighting that we would be proposing in this particular area. And, of course, the
commercial will -- this area is definitely going to have the standard lighting that's
required for commercial development. With just this one small one over here, it should
be fairly minimal lighting throughout this area here. So, we are hoping with that -- all of
that we can really reduce any kind of glare that might even try to creep over to the
neighbors. That's everything.
Rohm: Good. Thank you.
Unger: Thank you very much.
Rohm: Okay. At this time I'd like to ask Candy Seeley if she would like to come
forward.
Seeley: Hi, my name is Candy Seeley. I live at 1567 North Leslie Way. I, actually, live
across the street from the houses that will be backing up to the property. I do have a
strong opinion on the fencing. I think it needs to be exactly the same as what's already
been offered and told going to be put up, because it would look pretty stupid, you know,
having a block wall behind two of the houses and, then, go along and having some
other funky design after he just got through saying he's going to try and match the
buildings in design with the people next door. Now, all of a sudden he doesn't want to
match the fencing. I have a problem with that. I also, I guess, am still quite upset by
the fact that I don't understand why the four-plexes still need to be in the middle of the
property. We have already -- from my opinion understood that the requirement for the
housing is already taken care of by the back -- the lots that are backing up and, then,
the alley-driven houses, why the middle area needs to be four-plexes, why can't it be
office space? I guess that's basically my problem with what's going on here. Thank
you.
Rohm: Thank you. Janice Helms? She has indicated she doesn't need to speak.
Linda Morris.
Morris: I'm Linda Morris. I live at 1374 Leslie Way. And my home is on that west end.
I was at the Saturday meeting the developer called and the homeowners specifically -
asked several times what kind of fencing would be put along the west end and unless I
misunderstood, what we went away with was that whatever the property owners of
those new homes put behind their yard for fencing is what there would be. This is the
first time we have heard about a path between our property and the undeveloped
property. That really has more concern for us, because -- and that more foot traffic is
going to go right along our boundary and for us, not only on the east side of our
Meridian Planning & Zoning
February 2. 2006
Page 40 of 112
- .
boundary, but on the south side of our boundary, because we are right on the corner
down here and where they tile right up to our property line, unless something else
happens that we haven't heard of, we have that open ditch there, which we much enjoy,
because all the wildlife like to be in there. It seems to me you're going to focus the kids
down that path and, then, you're going to go right behind our place right into the ditch
area there, too, which could be a safety concern. Besides more traffic along our area.
So, I guess my real concern is that we have heard several stories on what's going to be
the barrier between us and the development and it changes all the time. Like I said, this
is the first time we have heard about a path. And I would like to see something concrete
before you guys -- excuse me -- before the Commission or the Council here gives an
okay to this development, because we keep hearing so many different things and, well,
we are looking into this, but they don't commit to anything. So, we have no idea what's
going to happen for landscaping and fencing. We keep hearing different stories and
different stories from what you're hearing, so that's my concern.
Zaremba: Mr. Chairman. Would you care to offer a suggestion as to what you would
like to go there? I can understand if there is going to be, actually, a regional pathway
there, that you would want to separate your property from it. Do you have a preference
for what you would like to ask go there?
Morris: The block fencing that they are suggesting to go along the north end of the
houses, to go along -- between us and the pathway. But, then, I'm also concerned what
happens, again, right here.
Rohm: You need to speak into the microphone.
Borup: And there is one right there for you.
Zaremba: Right here.
Morris: If this path comes right to here and, then, turns here, I can guarantee you,
unless there is some kind of barrier here, the kids are not going to stop here and hang a
left -- or hand a right. They are going that way. They are going to come right down
here, here is open water here, and here is our place right here and you know how kids
are, the place you're not supposed to go, that's right where they are going to head.
Borup: So, you would like a fence there?
Morris: Something, yes, across here where they are not having access, yes. Thank
you.
Zaremba: Thank you.
Borup: Mr. Chairman, maybe while the next one is coming up, just might mention, the
exhibit that we got dated January 5th shows landscaping and a fence and pathway and
Meridian Planning & Zoning
February 2, 2006
Page41of112
- -
everything along the west, so I'm not sure why that wasn't presented at the meeting, but
that was what was presented to us.
Rohm: Betty Rosso.
Rosso: My name is Betty Rosso and I live at 2832 Leslie Drive. I am a little concerned
about the tiling of the canal. Not that I oppose it totally, but I talked with John Anderson
and he told me that it had been over two years before anybody had contacted him about
that Finch Lateral and that if it were tiled, the access road would still be in effect and
that property would still belong to Nampa-Meridian Irrigation and it would not be used
for a path or anything else. There is no trespassing on their property. And, secondly, I
wondered if, in fact, as she just mentioned, at the end where the tiling would come
down, then, there would be open canal again. The canal -- I can tell you I keep my
canal clean and I'm down in there working and that can be a very swift running canal.
And I am concerned about the safety of that. Plus, I'm also concerned about the
elevation of the condos, four-plexes, whatever you want to call them, on that lateral
boundary facing our homes along there. I'm also wondering about this access to Eagle
Road and how much traffíc is going to be coming through there and back through the
Sadie Creek Promenade out to Ustick. It seems to me there is an awful lot of housing
and a lot of traffic and a lot of commercial stuff and they are all on just one -- one in and
out on Eagle and two on Ustick. It seems to me there is an awful lot of car travel there
for such small streets and small openings and possibly right-hand turn only coming out
of -- onto Ustick. I don't know if that's true or not. Anyway, those are my concerns at
this point and thank you very much.
Rohm: Thank you. Mark Snodgrass. Okay. From the audience he said no comment
at this time. Billy Knorpp.
Zaremba: Mr. Chairman, while he's coming forward, I would comment that I believe the
one roadway at what would be the west end that intersects with Ustick is intended to be
full access and I believe signalized. And, then, the other side of it will go behind the
Kohl's department store on the north property, so that one at least has full access.
Knorpp: My name is Billy Knorpp. I live at 2972 Leslie Drive. My home is about right
there. I have -- just want to echo some of the concerns that they have. It appears that
they have no plan for a buffer along the back of the entire property line along the south
side. What he just told us, which we didn't hear -- I wasn't at the meeting. I got some
feedback from people. But what he just told us is they are going to make a pathway
that basically goes right along the back of our lots. That's unacceptable. Completely
unacceptable. There is going to be no -- and he's planning on putting up a cheap fence -
that will -- and he's not even talking about a fence along our boundary, only along this
one, because he thinks he might be forced to by Red Cliff. So, actually, I want to
change my vote on -- I put I'm neutral. I'm completely against what he's planning right
now. I thought it was going to be acceptable from the earlier plans, but no longer do I
believe that. So, he's planning to tile the ditch, put a path right along the back of my
fence. No barrier whatsoever, except maybe a cheap fence he's going to put up that's
Meridian Planning & Zoning
February 2, 2006
Page 42 of 112
gòing to fall down in another ten years. It needs to be one of the permanent type
fences. Who is going to maintain this fence? Ten years from now the thing's going to
fall down if he puts it up and nobody's maintaining it. It can't be a fence that is going to
fall down. It has to be a block fence with a berm and 30 or 40 feet of a buffer between
us and them. Right here where my house is and right along here where the others are,
very close the way they have got it planned. I can't tell exactly from the plans they
have, but it looks like that is -- on the order of 20 or 30 feet from my back fence. There
is no barrier whatsoever. That is completely unacceptable. The other thing is they are
going to be two story buildings looking right down on my backyard. Those need to be --
if they are going to put two story -- I agree with the previous testimony. They should not
be two story buildings there. If they are going to be two stories, there should be no
lights on our side and no windows on the south. And it was always noted that the right
of way along the ditch -- what we would prefer is that the right of way to the ditch remain
the way it is now with the ditch that they can't put anything on it that is going to encroach
upon our backyards. So, I believe that's alii wanted to say. Do you have any questions
of me?
Rohm: Thank you. Before we move to the next person that signed up here, I have a
question of staff. The proposed pathway along that south line parallel to the Finch
Lateral, is that something that the city is encouraging to move pedestrian traffic through
the properties?
Guenther: Mr. Chairman, the 2002 Comprehensive Plan does call for a multi-use
pathway -- a regional multi-use pathway on the Finch Lateral. The pathway location
does -- is shown to come from the north property -- or the west property -- east property
boundary through the west property boundary, come through the Leslie Creek -- or the
Leslie -- or the Carol Subdivision and, then, continue to the west from there. The
location has changed slightly with the developments that have occurred off of Ustick
Road and it -- this location would better connect that multi-use pathway to the sidewalks
on Ustick and, then, to the north -- again to the North Slough.
Rohm: Thank you. The reason why I asked those questions is because the -- and I'm
not speaking for the developer, but in compliance with ordinances and Comprehensive
Plan, these regional pathways are something that are encouraged within our own
Comprehensive Plan system and I'm not trying to speak for them, but in compliance
with what we are proposing -- what we have told them is a requirement, this is the
response that they have made. So, it's -- I want you to know that it's not something that
they just came up with on their own, it's something that's been encouraged by the cities
themselves. So, with that being said -- and we will continue with that discussion as to -
the applicant response to your concerns in their rebuttal. So, with that being said, I will
go to the next person that signed up and that's Steve Grant.
Grant: Mr. Chair, Commissioners, my name is Steve Grant. I live at 1534 Leslie Way,
which is kind of at the northwest corner. My home is the third one in. Third lot in. I
don't see a -- maybe this is it. It would be right about there. And I don't know if my --
yeah. I think the residents have always had kind of too big issues. One transition and
Meridian Planning & Zoning
February 2, 2006
Page 43 of 112
- .
the other traffic. And as has been indicated before, the Sadie Creek folks have made a
couple of commitments for this property here. One being a masonry fence, as you have
heard. Second being a 3D-foot easement. I think, if I read right in the staff report, that
this area would only be 25 feet and I think we are anxious to have continuity along the --
you know, all of this area here, so that it's consistent and I think you can understand
why we would want that. I think the landscaping plan -- I don't know that it's been
submitted, but is a concern. We would much prefer evergreen trees that would be --
provide that barrier year around, rather than, you know, trees that shed their leaves at
the end of the summer and, you know, for six months you would have -- you would be
staring at each other. I think there is -- you know, I'm not quite sure why, you know, a
public road is not allowed, but a private one is. That doesn't make a lot sense to me,
because access is access and I'm concerned that even moving that down here is going
to cause, you know, some congestion and safety issues here. While I would be in favor
of a full access for reasons that I think Commissioner Zaremba has indicated, if that's
not approved -- and it may well not be, then, they may approve right-in, right-out and,
then, we have a huge issue with this. And that right-in, right-out might be a
compromise. I don't know how that would work and I guess that's to be determined. I
think it's also one of the things we would like to have them consider is that, you know,
homes -- those homes along that area there, if they are second story homes, that there
would be no windows facing west and I think that provides privacy for not only us, but
also for the residents there, if that can be accommodated in their designs. I think that
that's -- those are the -- again, the issues that we are concerned about. Transition of
traffic -- and you have heard them a number of times from us over the last two and a
half years and we appreciate your consideration for the things that we have outlines as
our concerns. That's alii had.
Rohm: Thank you. Any questions?
Borup: Just one, Mr. Chairman.
Rohm: Yeah.
Borup: And, then, on the -- just on the wall, I think so far everyone has testified on
preferring a block wall. I haven't heard any discussion on the concrete panels like
behind Lowe's.
Knorpp: I think they are interchangeable to us.
Borup: Okay. That's what I was wondering.
Knorpp: Yeah.
Borup: But either one is -- accomplish the same thing.
Knorpp: We are interested in continuity and I think they have -- I don't know -- she's
shown us some elevations that a block that -- they are not necessarily -- they have got,
Meridian Planning & Zoning
February 2, 2006
Page 44 of 112
, .
yòu know, the face of the block wall is broken up a little bit, which would mitigate some
sound issue and other things. So, I think we could work those out. But a good barrier I
think is what everybody is interested in as a part of that transition. And, again, the 30
foot -- by the way, the -- it's important to note that the -- the decision has been made in
the negotiation with those folks on Sadie Creek that the fence would be on our property
line, rather than, you know, the property line of these homes.
Guenther: Correct.
Knorpp: Otherwise, you're going to build -- you're going to probably build two fences
anyway, but we'd wind up building our own fence if it was on that property line, so --
Borup: And that is where their landscaping plan shows it.
Knorpp: It is?
Borup: Yes.
Knorpp: Okay. And to my knowledge there is no pathway here -- dedicated pathway,
it's just -- and if I heard correctly from staff, that the path is -- the only path is -- on the
plan is on that southern boundary. Do I understand it correctly? Because I have never
heard that there would be a path. It would be open, but I have never heard of a foot
path there.
Borup: I think the concern is if you have a path that doesn't go anywhere, you have got
to turn around and go back.
Knorpp: Good point. So--
Borup: And now that would be to Ustick.
Zaremba: Well, what I understood staff's explanation was that the regional pathway
showed on the Comprehensive Plan continues into your subdivision.
Borup: Right.
Knorpp: That's the first time I --
Zaremba: And this is avoiding that.
Knorpp: Well, this would be here no matter what. And I don't know -- again, I don't
know -- I have never heard anybody discuss -- like a paved path. It would certainly be
open, so that somebody could walk there if they wanted to, but I assume it would be
grass or some kind of a maintained, you know, surface. But, again, a lot of questions, a
lot of concerns, and as you have heard from other residents, there are a lot of questions
Meridian Planning & Zoning
February 2, 2006
Page 45 of 112
- -
and we are -- we feel like it's appropriate to get those resolved before we move on.
Anything else?
Rohm: Thank you.
Knorpp: Thank you.
Rohm: I'd like to return to Linda Morris for just a moment. I believe she had some --
didn't you have a -- something you wanted to bring up? One more thing on --
Morris: We had heard nothing about this path along the western side at all. I mean
maybe you had heard about it.
Rohm: I think you need to restate your name, too.
Morris: Linda Morris.
Rohm: Okay. And that was your additional concern? Because I saw you down there --
Morris: Yes. That -- and as I said, Saturday -- this Saturday we met with them and we
were trying to get more information on what's going to happen on the western -- on the
western side here and nothing. We didn't get any answers.
Rohm: Okay. Thank you. That's what I needed. Thank you. That's the end of the list
of people that have signed up for this, but it's open, so anyone else is welcome to come
forward.
Thurston: Mr. Chairman and Members of the Planning and Zoning Commission, I think
I did sign up. My name is David Thurston and I live at --
Rohm: Oh, I'm sorry, I messed up.
Thurston: Okay. David Thurston. I live at 1470 Leslie Way, Meridian, Idaho. My home
is right there. And the question I have is concerning the -- Mr. Unger's comments about
tiling this ditch. He's indicated that he had met with the gentleman who represents the
water users of that ditch. I'd just like to have clarification of who that gentleman is,
because I am a water user on that ditch and I don't know of anybody who has been
given that authority to speak for all of us. So, I'd like to know the name of the gentleman
who represented the water users for that ditch and represented the things that Mr.
Unger stated.
Rohm: What is your concern specifically to that?
Thurston: Well, he indicated that they had met with somebody who represented the
water users and that this gentleman had agreed to whatever they -- the specifications
Meridian Planning & Zoning
February 2, 2006
Page 46 of 112
f6r the tiling of that ditch and I'd like to know who that individual is and exactly what are
the specifications.
Rohm: Well, I -- not knowing what those specifications are at all, but it is their obligation
to make sure that the water that you currently are receiving will continue --
Thurston: Yes.
Rohm: -- to be received and I think that that's the primary point of any of this, is that you
continue to receive water in the fashion that you had in past.
Borup: And the city also requires it to be tiled.
Thurston: Yes. I realize that. But as a -- the ditch is owned by the water user, not by
Nampa Irrigation District, and so as a water user I want to know who is making
decisions on behalf of my -- on behalf of me. So, I just wanted him to clarify that.
Rohm: And I think we will get that, so thank you.
Thurston: Thank you.
Rohm: And I'm sorry I missed your name on the first shot through. Is there anybody
else that would like to testify on this issue? Okay. At this time -- oh. Quick one.
Please come forward.
Knorpp: Billy Knorpp. 2972 Leslie Drive. The question that you raised about the path, I
don't think there is any problem with that path, I just don't want it right along my back
fence, unless there is some -- unless we do put the brick wall in there and there is a
barrier between me and whatever is going along that path.
Rohm: Thank you. Okay. At this time I'd like the applicant to come back forward,
please. Oh. And this will be a --
Rosso: Just short. Betty Rosso. 2832 Leslie Drive. Mr. Davis from Champion -- what
is it called, that new division there? Davis's -- where the Davis's dairy was.
Borup: Champion Park.
Rosso: Champion Park. Okay. He was the one here Saturday that was concerned
about the irrigation and I don't know that he was speaking for the irrigators, he was -
more concerned that his water was going to continue to come. And, again, I wanted to-
- the pathway has -- was startling to me, I guess, and especially when Mr. Unger said
that it would follow on top of the canal, which Mr. Anderson just told me that that
property, plus the road, would not be usable. They only maintain it themselves and it is
not to be used or be trespassed upon.
Meridian Planning & Zoning
February 2, 2006
Page47of112
Rbhm: Okay. Thank you.
Rosso: Thank you.
Rohm: Okay. Okay. With that, would the applicant like to come forward and offer
some clarifications to some of the issues brought up by the testimony?
Unger: Once again, for the record, Bob Unger, Red Cliff development. First of all, I
have to say I misquoted the price on the wall. It's running about 50, 60 foot -- or bucks
a foot, not -- I don't know where I got five. You can't do cedar for five.
Borup: No, you can't.
Unger: And -- yeah. Be a cheap wall, wouldn't it? And it's -- you know, we are going to
settle this right now. You know, we have made somewhat of a commitment to the folks
on the wall, we will make that commitment now. Okay?
Borup: Excuse me. When you say commit, you're saying either -- either block or
concrete wall?
Unger: Yeah. To match up -- to match up with whatever Sadie Creek Promenade is
doing.
Zaremba: Are you including the south property line as well?
Unger: If we end up tiling it, that's probably what we are going to have to do. If we don't
end up tiling it, we will have to fence it all on our side. And that's where I was going with
the whole tiling of the ditch and in -- you know, I have spoken with John Anderson. I
talk to John Anderson all the time in Nampa-Meridian. In fact, I have two other projects
this Finch Lateral runs through that we are building right now and we are piping both of
those projects and we are putting landscaping on top of those projects with a license
agreement through Nampa-Meridian Irrigation District. It is a standard operating
procedure. We also provide a path/drive on their easement, so that they can still
access and maintain if they ever have to get there and repair any pipes or anything like
that. Okay. And that is standard stuff that is done through a license agreement with
Nampa-Meridian Irrigation District, so that's what we are proposing here.
Moe: Mr. Unger, you did make one statement and I'm a little -- you said if we tile. Will
you explain that one to me?
Unger: We have committed to tiling this thing, but the neighbors are saying -- I'm
hearing from the neighbors they don't want us to and -- but our proposal is to go forward
with that and unless you folks change it, that's our proposal.
Rohm: Well, just as a point of clarification, then, the tiling, coupled with the fence, I
think is the solution that everyone wants to drive home here and so if you tile it and a
Meridian Planning & Zoning
February 2, 2006
Page 48 of 112
regional pathway is along that tiling, then, the fence would be in order. I think that's the
conclusion that we are trying to get to.
Unger: And that's -- and that's what we are trying to say here.
Zaremba: Mr. Chairman, Mr. Unger, while we are on the subject of the fencing and so -
- somebody mentioned whether there would be double fencing along the rear property
line, so -- of what you're proposing and I think the city would say that if there is a block
wall on one side, that abutting a pathway would have to be probably no more than four
feet clear vision or something like that along the new property lines. That's pretty
standard. Staff, am I doing that accurately?
Guenther: These standards are -- there is a standard condition in this report that says
that all fencing shall comply with the fencing standards listed in section three of the
UDC.
Unger: Yeah. Did you want a response on that or--
Zaremba: Well, I just want you to be aware of the issue. You probably are, but I just
wanted to raise it.
Unger: Exactly.
Moe: Mr. Chairman, just one other comment on that same subject. Basically, you're
expressing to put the block or a concrete wall up at the property line all the way around?
And, then, the path is -- would be on their side anyway, so, then, they have a shorter
one, if they so --
Unger: If I could, I think -- I think what we -- you know, along the ditch here -- and I
guess maybe that's part of why the fencing issue along this ditch is a tough one for
everybody, is I build a fence on somebody else's property. All of these folks -- and well
-- and we are going to have to figure this out. All these folks along here, their property
lines run to the center of the ditch. And the ditch lies within an easement and I'm not -- I
believe the one along here is -- I think it's a 40 foot easement. It could be a little larger.
I can't build a fence on their property. I can build a fence on my property. So, if we all
work together we might be able to build a fence to accomplish one goal, but at this
point, you know, we are going to have to build our fence and it's going to have to be
along -- along this easement on our side.
Rohm: And the pathway would lie to the south.
Unger: The pathway would be on that side -- yeah, on the south side of our fencing.
Borup: Can you do -- if you had an agreement with them to build a fence on their
property, is there any problem with that?
Meridian Planning & Zoning
February 2, 2006
Page 49 of 112
Unger: I think we would entertain that.
Borup: But I realize every property owner would have to agree to that.
Unger: Exactly.
Borup: And maybe while you're on that, 40 feet you said is what the easement is, to
your understanding?
Unger: I believe it's 40 feet. I'd have to check that to be sure, but I believe so.
Borup: That is what your document says, too.
Unger: Yes.
Rohm: Okay.
Unger: Okay. Let me finish up a couple things and I think that will wrap it up. As a
matter of fact, you're correct, this -- Sadie Creek there is a full access and signal going
in right there on Ustick. Where was this? Oh. Separation -- I think -- this -- this is a 30
foot landscape buffer with a path there. That's what staff told us. Two years ago I was
doing a 30 foot path or -- you know, a buffer there, so we have 30 foot there minimum.
This is -- you know -- you know, we have at least 40 foot of separation there. Over to
the condos we are looking close to a hundred feet, over to these structures here. So, at
least a hundred foot separation there.
Rohm: And that's to the property line, not to the --
Unger: Yeah. To the center of the ditch.
Rohm: Yeah. Thank you.
Unger: Yeah. So, we have some good separation there and the one gentleman about
piping the lateral that runs down through here -- and I appreciate the lady coming up
and identifying the gentleman. He gave me his name and number and for the life of me
I couldn't find it in my files. But he indicated that -- you know, that there really wasn't
anybody -- a good contact and I said, well, when we get ready to design this, who do we
contact? He says what -- give me a call and, then, you know, I'll help you through that.
So, he really didn't represent himself as, you know, the -- representing everybody of the
users association, but he was the first person that came up and identified himself as -
one of the users and I thought good connection to have, since finding out who these
users are sometimes are tough. So, I know I have got it written down, I just didn't have
it on a piece of paper I had in my hand. So, I think we have a good project here and I
think -- I think we are responding to a lot of the concerns of the neighbors. I think the
whole wall fencing issue can be totally resolved throughout this process and we are
Meridian Planning & Zoning
February 2, 2006
Page 50 of 112
more than willing to work with everybody on it. So, we certainly feel we have a good
project and we would ask for your recommendation of approval.
Rohm: Okay. And thank you, I appreciate your -- I believe we have come a long way --
Unger: Oh, I think so.
Rohm: -- tonight as far as the fencing and I appreciate both the public testimony and
your response to that. There were a number of people that also spoke to the two story
condominiums along that south line and I'd just like your comments on that.
Unger: That's a very hard -- very hard thing for us to look at and restrict I mean I'm
sure -- catch up with me, Joe. You know, I assume some of these are going to be
single story, but to specifically say half of them are going to be single story or not going
to be single story is -- it really restricts the use of those lots, the value of those lots to
some extent, but also you have to -- also have to understand that the houses to the
west of the project, those are all on their own one acre lots and the houses themselves
are approximately -- and approximately 40, 50 feet from the property line and maybe
even further. So, there is a huge separation of their backyard and, then, we have got
another 30 foot of -- we have the wall, we have the berming and the landscaping, and,
then, these structures that we have in here have an additional 15 foot setback, that's the
rear setback requirement, so you start adding it up, you have got 40 to 50 feet, plus
another 30 feet, so you are looking at at least 70 feet -- 85 feet separation between
buildings. That's a pretty good size separation.
Rohm: And thank you. I -- that's the response I was looking for.
Unger: Okay.
Rohm: Thank you.
Zaremba: Mr. Chairman?
Rohm: Commissioner Zaremba.
Zaremba: One of the other suggestions -- and I think it referred to the condos and not
other areas -- was that on their south surfaces they don't have windows and I would
only comment that the police department consistently asks to have windows, particularly
where there is a pathway involved, so that there is public visibility on anything that might
be happening on the pathway. So, I'm not sure that's an issue we can help the -
gentleman with. You probably need to have windows there.
Unger: Right.
Borup: These two are the south, so there is very limited windows.
Meridian Planning & Zoning
February 2, 2006
Page 51 of 112
Mae: Mr. Chairman, I think he was, actually, talking more about the homes on the west
side.
Rohm: Thank you. Any other questions of the applicant?
Unger: Thank you very much.
Rohm: Thank you. Before we move forward I'd like to just give each of the
Commissioners an opportunity to kind of summarize their thoughts on this project and
see if we have some concerns and we will go forward. Commissioner Zaremba, have
some comments?
Zaremba: I do. And I think my overall comment is that this whole concept pretty well
matches the intent of the mixed use area. It has a mix of uses and combined with the
other uses on the other Corners of Ustick and Eagle, brings the proper element of what
is being asked for in the Comprehensive Plan identifying that area as mixed use. I will
say that if on the original plan the roadway continued straight out to Eagle on the
original drawing and had to be right-in, right-out, even though I like the project, would
have been voting against it. The new configuration is important to me. If that can end
up being a full access intersection and it's very logical at that point that the development
on the other side of Eagle would line their road up with it as well and further make it
reasonable that it be signalized and full access, that not only helps this development,
but one of the advantages of a signalized intersection is that people that are trying to
get in and out of Leslie, a signal does what's called platooning. It slows down the
jackrabbits and let's the turtles catch up with them and it gives you several hundred feet
south a break in traffic that would not otherwise be there. So, there is a lot of reasons
why, in my opinion, the project is fine. I think it's extremely important to have the access
where the new design shows it and with it there I can support it.
Rohm: Thank you, Commissioner Zaremba. Commissioner Borup, do you have some
final thoughts on this?
Borup: Well, I think it's -- you know, as we hear time and time again, we are -- we are in
the city limits of Meridian and there is going to be growth and we need to try to
accommodate the best we can, realizing that an acre lot is not going to be abutting
against acre lots. So, my concern is best to see what could be done on buffering and
privacy and appears to me that the developer has agreed to -- I mean clarify this, a 38 --
a 30 foot easement to the west and it will either be a block or a concrete panel wall of
some type and I assume to be worked out between the neighborhood and the
developer. The property to the south, I don't know that that's been settled and I -- I don't -
have a high comfort to going into things where they are up in the air, unless there --
unless there is some stipulations that can be placed somehow. It sounds to me like a
good solution was if a ditch is tiled, a wall on the south -- to the south side of the
easement, but that would necessitate the wall to be on the property owner's side of the
ditch and on -- against their property -- against their usable property, which would
separate it from the ditch. So, I don't know, I mean it would have to be an agreement
Meridian Planning & Zoning
February 2, 2006
Page 52 of 112
with everyone along there. The other concern I had is maybe -~ I don't know if we got a
lot of detail on landscaping. I don't think we have the one tree per 35 feet, which is a
minimum along the south. It has that landscape plan. Josh, has that been analyzed at
all? '.
Guenther: Commissioner Borup, the landscape plan is not approved with this
application. It would need -- and there is conditions in there that this applicant's
landscape architect needs to certify two things, that the appropriate number of trees
have been provided for, as well as one tree per 8,000 square foot of turf be provided for
and we don't have those calculations at this time. We, typically, receive those through
the phasing plans of the final plat, but they are conditions of approval.
Borup: Could maybe something be added as far as maybe increasing that density at
this time?
Guenther: If the Commission so chooses, what we -- what this Commission has done in
the past is say add -- take the total required number of trees in that 20 percent or
something along that line in order to further buffer it. But that's something that we have
utilized in the past.
Borup: Okay.
Zaremba: There may be an issue along that south property --
Guenther: For the easement.
Zaremba: -- if it's a tiled ditch you can't plant a tree there.
Borup: Yes. I think they will only allow shrubs and bushes and -- without the root
invasion and stuff.
Zaremba: I think the ordinance requires that if there is a place where you can't plant the
trees, you still have to put that number of trees just somewhere else; isn't that correct?
Guenther: Yes. It's tree mitigation.
Borup: So, along the west line would be a good place for that.
Guenther: Yes. Or out of the easement.
Borup: Pardon?
Guenther: Or out of the easement.
Borup: Oh, out of the easement. Right.
Meridian Planning & Zoning
February 2, 2006
Page 53 of 112
Guenther: On the landscape plan it does show that there is several trees planted along
the southern portion of that boundary. However, the roughly 40 feet of landscaping,
which would be required in this area, most of it is in the easement. However, it could be
designed in order to accommodate trees immediately at that easement line, which is
what the landscape architect has preliminarily shown.
Borup: Okay. Thank you. That's alii had.
Rohm: Okay. Commissioner Moe.
Moe: Before I make comment, Joe, one question I have for you. Well, I guess more of
a statement than anything. I guess if, in fact -- my biggest concern -- as far as what's
gone on tonight, I'm in favor of the project. I think some compromises have been taken
care of and whatnot. The one concern I still have is the block wall, as far on the south
property line, and as to whether or not it ends up being on the north side of the ditch
and, then, we still need to put a fence on the south side of that walking path at that
point, would that not be correct?
Guenther: That would be correct.
Moe: So, that we'd have visual for that.
Guenther: Well, there is standard fencing required for multi-use pathways, which is a
section of our code.
Moe: Well, my point is is I'm just concerned that although the applicant has stated he
will want to work with the neighborhood to try and install block fence on their property,
whether or not all the neighbors agree to that, we don't know that tonight and so,
therefore, we are in a situation where we are requiring them to put a block wall in. If
that is the case, then, that other fence would have to definitely go in on the south side of
that walking path. And, therefore, that would be a condition that we would want to
clarify as well, based on the report.
Borup: Mr. Chairman, my plat shows there is only seven lots on the south. I'm just
curious how many of those seven homeowners are here tonight. South line. Three out
of the seven.
Zaremba: Well, I certainly think they could influence their neighbors to -- if it got them a
nice block wall, I think they could influence their neighbors to join them.
Rohm: Okay. And I guess -- and echoing both the public concern and the Commission
comments on that, has staff seen where they have been able to work with adjacent
property owners and place a fence on the adjacent property outside of their project to
be in compliance with fencing along that regional pathway?
Meridian Planning & Zoning
February 2, 2006
Page 54 of 112
Guenther: Chairman Rohmj in a situation like this -- and Mr. Cole has already kind of
talked about it a little bit here. Is that they can relocate that pipe anywhere within that
easement and be able to put the fencing in there on their property line in order to
accommodate the required separation from fence to the piped ditch. And -
Nampa-Meridian -- obviously, they have dealt with this situation before and have come
up to resolution. I guess while I have got you, it seems that this might be something
that if we continued the application for two weeks to allow staff time in order to draft a
condition with the applicant in order to adequately address that and bring this back to
the Commission in two weeks, because the second thing is that we still -- I haven't been
able to review a full scale plan for this southern boundary and it seems to be more of a
problem than originally I had anticipated. So, in order to give staff more time, I guess
we would change our recommendation to continue it for two weeks in order to allow us
time to keep the hearing open in order to work through this condition that we need -- or
that we seem to be going towards, as well as to get a better large scale copy and adjust
some of the staff report.
Zaremba: Mr. Chairman?
Rohm: Thank you.
Zaremba: If we went that direction, I would add one more thing to be discussed among
staff and the applicant and probably ACHD and that would be the newly aligned access
to Eagle, seeing if we can make that be a public street. I know ACHD has said no
public connection, but they don't actually control Highway 55. Just a comment for
discussion.
Guenther: Chairman Zaremba, just for point of clarification, staff is recommending
denial of that -- of that access point to Eagle Road, as it is inconsistent with Unified
Development Code.
Zaremba: Okay.
Guenther: Which will be presented to the City Council with the bulk of this application.
Rohm: Okay. I think that it's the consensus of the group as a whole that the fencing
issue along the south line is a major concern to those people who spoke tonight and I
believe that the applicant has offered up some alternatives that would make it
acceptable to the testimonies received, but it's easier said than done for us to be able to
respond to that in the form of a motion tonight, so I think that a two week continuance,
so that applicant and staff can work together to get that verbiage down, so that it would -
be included in the staff report in a fashion that is acceptable to the public and to the
applicant is probably in order. And with that being said --
Borup: Mr. Chairman, I would request maybe one other item be included on that.
Rohm: Okay.
Meridian Planning & Zoning
February 2, 2006
Page 55 of 112
Borup: And that's if those seven property owners could be contacted -- maybe that
would be up to the applicant to contact them and perhaps just to -- I don't know, maybe
a non-binding agreement as far as where they like the fence and see -- basically, in my
mind to see if all seven of them are in agreement on the location of the fence. If they
are not in agreement, then, there is going to be another direction that needs to go. If
they are in -agreement, then, something could be worked out.
Rohm: And I think that that's the direction we need to go as well and so I'm pretty sure
the applicant understands where we are going with this. So, I think at this point in time I
would entertain a motion.
Moe: Mr. Chairman?
Rohm: Commissioner Moe.
Moe: I move to continue file numbers AZ 05-57, RZ 05-019, PP 05-059, and CUP 05-
052 to the regularly scheduled meeting of February the 16th, 2006, give staff time to
review documents and resubmit. Does anybody want to second that?
Borup: Second.
Rohm: It's been moved and seconded that we continue items AZ 05-057, RZ 05-019,
PP 05-059, and CUP 05-0-52 to the regularly scheduled meeting of February 16th,
2006. All those in favor say aye. Opposed same sign? Motion carries.
MOTION CARRIED: FOUR AYES. ONE ABSENT.
Rohm: And thank you, folks, all for coming in and very much appreciate your testimony
and we will see you in two weeks.
Item 1 0:
Continued Public Hearing from January 19. 2006: AZ. 05-062 Request
for Annexation and Zoning of 5.11 acres from RUT to R-8 for Sharp
Estates Subdivision by The Gables, LLC - 2445 North Wingate Lane:
Item 11:
Continued Public Hearing from January 19, 2006: PP 05-062 Request
for Preliminary Plat approval of 25 single-family residential lots and 2
common lots on 5.11 acres in the proposed R-8 zone for Sharp Estates
Subdivision by The Gables, LLC - 2445 North Wingate Lane:
Rohm: All right. At this time I'd like to open up the public hearings of AZ 05-062 and PP
05-062, both pertaining to Sharp Estates Subdivision and begin with the staff report.
Hood: Thank you, Mr. Chair, Members of the Commission. I realized here late in the
game that the clerk did not run you a copy, because I did not send them any copy of the
staff report. Actually, it was the same copy that you had back on the 19th of January
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02116/06
STAFF REPORT
TO:
FROM:
SUBJECT:
Dl~-~«'j~~I'V<--.,E<J"~)'"
t \l-:'- j
"1""I.I":")(I£11.:
,'- t:._':: I,) -",', I)
GIT'{ OF tJ1E.RIOIAN
-'"T'"i (.'1 CR1/, r""F:-Cj(,F::
- '" .-,' '.--.'..-.." '.' ',-'" , ,-'...
Planning & Zoning Comniission
Hearing Date: January 5, 2006
Continued to: February 2, 2006
Continued to: February 16, 2006
-, -,~ ;': I/I'~
- "j ,y'" ,¡'
ctG'~';(;¡I(;t~/l"-'<."1,':'
1:".\1-1'"
I'
P &Z Commission
Joseph Guenther, Associate City Plamler
Bienville Square Subdivision, All applications are for Bienville Square
Subdivision by Red Cliff Development, me.
AZ~05-057 - Atmexation and Zoning of 18.43 acres from RUT and Rl to R-8
(Medium Density Residential), R -15 (Medium High Density Residential) and C-
G (General Commercial).
RZ~05-0l9 - Rezone of 10,05 acres ofC-G (General Commercial) to R-8
(M edium Density Residential) and R -15 (M edi unl High Density Residential).
PP-05-059 - Preliminary plat for 54 single family residential lots, 22 multi-
family residential lots, 14 common lots, and 7 commercial lots on 27.30 acres,
CUP-05-052 - Conditional Use Peront for mixed use development within 300-
feet of a residence.
PS-05-002 - Private Street for providing frontage to multi-family site.
V AR,05-023 -Variance to UDC ll-3H-4.2 for allowance of an access point to
Eagle Road/SH55,
1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Red Cliff Development, INC, is requesting approval ofa Preliminary Plat with a
Conditional Use Pel1l1:it (CUP) to construct retail/restaurant/and office uses as well as a mixture of
attached, detached and alley-accessed residences on approximately 27,36 acres within the Bienville
Square Subdivision development located approximately ~ mile south of the southwest comer of Us tick
Road and Eagle RoadlSH-55.
A portion of the subject property was in the Kissler, Cobb, Eagy annexation project AZ-03-0l8 and a
corresponding Development Agreement (DA) , (Similarly, a portion of the Sadie Creek Promenade
Subdivision project il111l1ediately north of this site was also in that annexation application,) The DA
(Instrument No. 104107406) requires that any future use be approved either through a site specific CUP
application or a Plamled Development. A concept plan for the overall site was submitted with the
application for information purposes (not for formal approval).
The Commission should note that the applicant has also submitted a Variance application that will be
before the City Council concurrent with the subject applications, The Variance request proposes one new
approach to N. Eagle Road/State Highway 55, for one right-in/right-out access driveway. The Idaho
Transportation Department (ITD) has not approved any approach pennits on this site. The Variance
application pertains only to the right-inlright-out access lying approximately 1,000 feet south of Us tick
Road.
The overall design of the site is paramount on City Council and ITD approval of the Eagle Road
approach. However, if the applicant is unsuccessful in obtaining an approach, Staff feels the proposed
conditions and an amended Development Agreement for the 27.36 acres could sufficiently address
interconnectivity issues associated with development of the site. Currently the Sadie Creek Promenade
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-0 I 9/PS-05-002 Page I
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR TI-IE HEARING DATE OF 02/16/06
Subdivision property to the north provides one public street access to Us tick Road, and staff is proposing
cross access to the two other approved Ustick Road approaches,
2. SUMMARY RECOMMENDATION
On December 8, 2005, the Commission continued the Sadie Creek Promenade project to the January 5,
2006 hearing in order to discuss both the subject propeliy and the Sadie Creek Promenade property at one
time. The original intent was to have a full hearing of both proj ects at that time and to address issues
common to both development proposals. On January 5, 2005 the Commission voted to table the item at
the applicant's request until the February 2,2006 hearing, The applicant was considering redesigning the
site, but has instead decided to proceed with the original configuration as advertised for the public
hearing; therefore no changes to the site layout were proposed prior to Februmy 2,2006, On Feblllary 13,
2006 the applicant submitted a revised master plan reflecting the Planning Conunission discussion of
February 2, 2006. Staff supports the revised design as submitted which includes open vision fencing
along the Finch Lateral as the applicant is no longer proposing to tile the ditch,
Staff is recommending approval of the subject applications (AZ-OS-OS7/PP-OS-059/RZ-05-0 19/PS-05-002
and CuP-OS-OS2) with the conditions noted in this repOli.
PROPOSED MOTIONS (to be considered after the public hearing)
Recommend Approval
I move to reCOlllinend approval of File Numbers AZ-OS~OS7/PP-OS-OS9/CuP-OS-OS2/RZ-OS-
019/PS-OS-002 as presented in staff report for the hearing date of February 16, 2006 with the
undated preliminary plat drafted by Staruey Consultants with the following modifications to the
conditions of approval: (add any proposed modifications)
Recommend Denial
I move to reconunend denial of File Numbers AZ-OS-OS7/PP-05-0S9/CuP-OS-OS2/RZ-OS-
019/PS-OS-002 for the following reasons: (you should state specific reasons for deniaL You
should address how the applicant might re-do the application to gain your recommendation for
approval.)
Recommend Continuance
I move to continue File Numbers AZ-OS-OS7/PP-05-059/CuP-OS-OS2/RZ-OS-019/PS-OS-002 for
the hearing date of February 16, 2006, to _,2006, and in addition to staff's conm1ents, direct
the applicant to make the following changes: (insert comments here)
3. APPLICATION AND PROPERTY FACTS
a, Site Address/Location:
SW comer of Us tick Road and Eagle Road/SH5S
Township 3N, Range IE, Section S
b. Owners
Red Cliff Development, INC
2060 South Eagle Road
Meridian Id 83624
John Ewing
1S00 £1 Dorado Street, Suite 4
Boise Id 83704
c. Applicant:
Bienville Square Subdivision
AZ-OS-OS7 /PP-OS-OS9/CUP-OS~OS2/RZ-OS-0 19/PS-OS-002 Page 2
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT POR THE HEARING DATE OF 02116/06
Red Cliff Development, mc
2060 South Eagle Road
Meridian Id 83624
d, Representative:
e. Present Zoning:
Ashley Ford, WRG Design, INC
General Retail and Commercial (C-G), Meridian, RUT-Rl-Ada County
f. Present Comprehensive Plan Designation:
Mixed Use-Regional- 2002 Comprehensive Future Land Use Map
g. Description of Applicant's Request:
1, See Exhibit Al (prepared by Stanley Consultants) for a copy of the proposed plat,
Exhibit A2 shows the proposed landscape plan, and Exhibit A3 shows a detailed site plan
which depicts the lot layout, building, parking and access locations with adjoining
subdivisions.
h. Applicant's Statement/Justification: The application notes that the mixed use regional
designation provides for the overall site to be developed with a mixture of Retail/Restaurant/
OfficelDrive through and other Commercial uses oriented around automobile traffic, the rear
portions of the site are designed around transitional uses of a mix of single-family detached
units and multi-family residential units. The applicant notes that the site is an ideal location
for a retail/residential complex and will provide the additional landscaping along drive aisles,
the design review for structures along the gateway corridor, and develop the new pubJic street
to improve traffic movement in the area,
4. PROCESS FACTS
f.
5. LAND USE
a.
The subject application will in fact constitute an annexation and zoning as determined by
City Ordinance. By reason of the provisions of the Unified Development Code Title 11
Chapter 5 Article B Section 3, a public hearing is required before the City Council on tlns
matter.
The subject applications will in fact constitute preliminary plats as detem1Ìned by City
Ordinance. By reason of the provisions of the Unified Development Code Title 11
Chapter 6, a public hearing is required before the City Council on this matter.
The subject application will in fact constitute a conditional use / planned development as
determined by City Ordinance. By reason of the provisions of the Unified Development
Code Title 11 Chapter 5 Article B Section 6, a public hearing is required before the City
Council on tlns matter.
b.
c,
d.
Newspaper notifications published on: December 19 and January 2,2005
Radius notices mailed to properties within 300 feet on: December 19, 2005
Applicant posted notice on site by: December 26, 2005
e,
a. Existing Land Use(s): Bare land, two single family residences.
b. Description of Character of SuITounding Area: Large lot residential, highway-oriented
services, rapidly urbanizing
c, Adjacent Land Use and Zoning
1. North: Future pad sites within Sadie Creek Promenade proposal zoned C-G and
Ada County Rl.
Bienville Square Subdivision
AZ-05-057 /PP-05-059/CUP-05-052/RZ-05-0I 9/PS-05-002 Page 3
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
2. West: Residential Subdivision zoned Meridian City R-2 and Ada County RI
3. South: Residential Subdivision zoned Meridian City R-2 and Ada County RI
4, East:
Road,
d, History of Previous Actions: In April 2004, the owners and City entered into a Development
Agreement for various High Density Commercial, Multi-family Residential, transitional, and
office uses under File AZ-03-0 18. Some propeliy was armexed and zoned to General Retail
and Commercial (C~G) with a Development Agreement while other pOliions of the propeliy
were not included in the annexation leaving out parcels which were addressed with the
original conceptual plan. The 18.43 acre out parcel immediately south of the C-G site is
included with this project.
Future pad sites within the Kissler Almexation project zoned C-G, Eagle
e, Existing Constraints and Opportunities
I. Public Works
Location of sewer:
Location of water:
Extension of mains in Ustick Road/Sadie Creek Promenade
Extension of mains in Ustick Road/Sadie Creek Promenade
Issues or concerns:
None
2. Vegetation:
Agri cuI turallIniga ted
3, Flood plain: N/ A
4. CanalslDitches lITigation: The Finch Lateral courses the southem part of property
and the Milk Lateral courses the northern part of the property
5. Hazards: None identified
6. Size of Property: 27.3 acres
7. Description of Use: Retail, Office, Commercial, and Restaurant uses and associated
parking and landscape improvements along Eagle Road. Attached townhouse and single
family residential, front accessed and alley accessed products.
£. Subdivision Plat InfOlmation
The submitted plat includes an R-8 proposed zone with 54 single-family residential lots
of which 20 units with street side garages along the western property line are located in
Block 2 (lots 20-40) which are in the 6,000 to 8,000 square foot range. The 34 alley
accessed homes are located in Block 3 and are approximately 4,500 square foot in area.
These lots are designed to meet the minimum standards of the R-8 district.
The submitted plat also includes 22 lots in an R~15 proposed zone. These R-15 products
are designed around a modified townhouse design and each building would be contained
on a lot with potential for a future condominium plat on the individual units, The
applicant has included a clubhouse and additional parking contained in common lots.
The submitted plat also contains seven lots in a C-G proposed zone with commercial
uses. Commercial uses are shown to be a mix of restaurant/retail and office spaces with
two approximate 12,000 square-foot buildings and five approximate 6,000 square-foot
buildings.
g. Landscaping
1. Width of street buffer(s): per the Future Land Use Map, both Ustick Road and Eagle
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-O5-0 J 9/PS-05-002 Page 4
CITY OF MERIDJAN PLANNING DEPARTMENT STAFP REPORT FOR THE HEARING DATE OF 02/16/06
Road are designated as "Entryway Corridors," As such, the ODC (Table 11-2B-3)
requires a 35-foot wide street buffer adjacent to both roadways, The landscape plan
(Sheet Ll.l) proposes a 35-foot wide buffer along Eagle Road. If the applicant
proposes to construct the "Entryway Corridor" buffers in easements they must meet
the landscaping standards required in the ODe.
2. Width ofbuffer(s) between land uses: Table 11-2B-3 requires a 25-foot wide buffer
between commercial uses on C-G-zoned land and residential uses. The properties to
the west are zoned R-2 (City of Melidian) and RI (Ada County), and are cun-ently
residential. Lots adjacent to the site on the west and south as shown on the
landscape/site plan shall include a 25-foot pennanent easement or the 25 feet shall be
included in a common lot as defined by the landscaping standards of the ODe.
3, Percentage of site as open space: The ODC does not require open space or site
amenities for commercial uses. The open space contained in the residential uses is
shown to be 3.3 acres or 16.4 percent and applied as an additional amenity. TIllS
calculation should be reduced to not include any landscape buffers. The applicant
shall clarify these calculations to be consistent with the amenity standards found in
ODC Chapter 3, Article G,
4, Other landscaping standards: The landscape buffer along Eagle Road should be
constructed in accordance with ODC Chapter 3, Article B.
h, Planned Development Characteristics - N/ A
i. Conditional Use fufoffi1ation:
1. Non-residential square footage: To be determined, 44,000 square feet shown
2, Proposed building height: 65 feet, or C-G standards
3. Percentage of site devoted to building coverage: Not defined
4. Percentage of site devoted to landscaping: 3.53 acres, 12.9%
5. Percentage of site devoted to paving: Not defined
6. Percentage of site devoted to other uses:
7. Number of Residential units: N/A
j, Amenities - The applicant is providing a clubhouse in Lot 12 Block I, recreational facilities in
Lot 20 Block 2 and additional open space for the residential amenities, The applicant is also
proposing a water feature in the turnabout in Block 6.
k. Off-Street Parking (residential uses) - provided within the R-15, to meet the multi-family
standards set forth in ODC 11-4-3.27
N/A
1. Proposed and Required Residential Standards - R-8 and R-15 bulk standards apply as found in
ODC 11.2A.
R-8 (Standards)
Setbacks (*a11 streets local)
Front Living Area
Side Accessed Garage
Front Accessed Garage
Proposed
15
Required
15
15
20
Street side
15
15
20
15
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-0 19IPS-05-002 Page 5
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Side 4 4
Rear 12 12
Frontage-alley loaded 45 40
Frontage-garage fronted 60 50
Lot Size-alley loaded 4,630 4,000
Lot Size-garage fronted 6,023 5,000
Lot Size- Corner 5,188 5,000
R-15 (Standards)
Setbacks (*all streets local) Proposed Required
Front Living Area 10 10
Front Accessed Garage 20 20
Street side 20 20
Side 4 4
Rear 12 12
Frontage 20 0
Lot Size 2,400 8,424
Maximum building height 40 40
m. Proposed and Required Non-Residential Parking - One off-street parking space required for
every 500 square feet of gross floor area. Also, one Type A and one Type B parking space
required for the loading area (per UDC ll-3C-8). The proposed total building floor area is
40,000 s.f., which requires 80 parking spaces. The total number of parking spaces has not been
calculated. This may be addressed during detailed CUP review and building design review
but the design appears to meet the minimum standards of the UDC parking requirements.
n. SummaI)' of Proposed Streets andlor Access (private, public, common drive, etc.):
The applicant is proposing one new access point to Eagle Road/SH55 to serve the Bienville
Square project at approximately 1,000 feet south of the Ustick/Eagle hltersection.
As noted previously, ITD must issue a right-inlright-out pennit for this access, and the access
is further contingent on the Meridian City Council granting a variance to UDC 11-3H, In
addition, the recorded DA between the applicant and the City requires either a public or
private street be constructed parallel to Eagle RoadlSH55 that may connect to the nOlih
boundary and may also connect to Eagle Road, if allowed by ITD at a point to be detennined
by ACHD. TIlls project will connect with Sadie Creek Avenue, a proposed public street
connecting to Us tick Road through the Sadie Creek property, to meet the frontage road
requirement and possibly connect to Eagle Road.
In addition, the applicant will be required to connect to and provide cross access to the three
new access points to Us tick Road at the following locations in the proposed Sadie Creek
Promenade Subdivision applications:
.
Driveway #1 - 400 feet west of Eagle (light-inlright-out with center median)
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-0 19/PS-05-002 Page 6
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
. Driveway #2 - 600 feet west of Eagle (full access)
. Driveway #3 - I, 1 00 feet west of Eagle (full access public street (Sadie Creek Avenue)
with proposed traffic signal)
Ustick Road, from Leslie Drive to Ally Street (on the east side of Eagle Road), including the
Eagle Road intersection, has just been widened and improved to 5 lanes, The intersection was
widened to include dual left turn lanes.
The applicant's CUP site plan shows a connection with the new public, commercial street
extending south of Us tick Road, beginning approximately ~ mile west of Eagle Road/SH55.
The preliminary plat (Sheet 1) shows this roadway (Sadie Creek Avenue) as a 50-foot street
section, continuing as a public street in a loop design around the R-8 development with
private streets providing frontage for the townhouse development. The area (Kissler
Annexation site) concept plan shows the road connecting to the propeliy south of the site with
a looped design and possible connection to Eagle Road through this site. The area plan shows
private, internal driveways connecting to tlllS public street; such driveways run mostly
north/south connecting Sadie Creek Avenue to Ustick Road.
For a detailed report on both ITD's and ACHD's actions and comments, please see the
letters/reports submitted with the application materials,
6. AGENCY COMMENTS MEETING On October 28th 2005, staff held an agency conunents
meeting. The agencies and departments present included: Meridian Fire Department, Meridian
Meridian Public Works Department, and the Sanitary Services Company. Staff has included all
cOl1Unents and recommended actions as Conditions of Approval in Exhibit C,
7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed
Use-Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, this
designation is defined in part as an area that is situated in highly visible or transitioning parts of
the City where innovative and flexible design opportunities are encouraged. The MU-R has no
upper limit on the square footage of non-residential uses and is intended to allow a broad range of
uses.
Staff finds the following Comprehensive Plan policies to be applicable to this property and apply
to the proposed development (staff analysis in italics below policy):
.
Require that development projects have planned for the provision of all public services,
(Chapter VII, Goal III, Objective A, Action 1)
When the City established its Area of City Impact, it planned to provide City selïJices to the
subject property. The City of Meridian plans to provide municipal services to the lands
proposed to be annexed in the following manner:
. The suQject lands currently lie within the jurisdiction of the Meridian Rural Fire
District. Once annexed the lands will be under the jurisdiction of the Meridian -
City Fire Department, who currently shares resource and personnel with the
Meridian Rural Fire Department,
The subject lands currently lie within the jurisdiction of the Ada County Sheriff's
Office, Once annexed the lands will be serviced by the Meridian Police
Department (MPD),
The roadways adjacent to the subject lands are currently owned and maintained
by the Ada County Highway District (ACHD). This service will not change.
.
.
Bienvillc Square Subdivision
AZ-05-057/PP-O5-059/CUP-O5-052/RZ-05-0 19/PS-05-002 Page 7
CTTY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
"
The subject lands arecurrent~y serviced by the 1I1eridian School District #2, This
service¡,vill not change,
The subject lands are currently se/1JÎced by the Meridian LibraT)! District, This
service will not change and the Meridian LibraT)! District sliould suffer 110
revenue loss as a result of the subject annexation,
.
.
Municipal, fee-supported, services will be provided by the Meridian Building Department,
the Meridian Public Works Department, the Meridian Water Department, the Meridian
Wastewater Department, the Meridian Planning Department, 1I1eridian Utility Billing
Services, and Sanitary Services Company,
Chapter VII, Goal I, Objective B: Plan for a variety of commercial and retail opportunities
within the Impact Area.
Stafffinds that the site is designatedfor MU-R on the Comprehensive Plan Future Land Use
Map, Although strictly commercial uses have not been spectfically plannedfor this property
on the Comprehensive Plan Future Land Use Map and through the Development Agreement
from the annexation, the overall site plan when combined with the proposed Sadie Creek
Promenade Subdivision meets the general classifications for mixed use regional.
.
Chapter VII, Goal I, Objective B, Action 5: Locate new community conunercial areas on
arterials or collectors near residential areas in such a way as to complement with adjoining
residential areas.
Ustick Road is classified as an arterial roadway. The applicant is proposing access from the
adjoining commercial areas from micropaths, sidewalks and shared streets which will
provide future connection to residential areas west of the site along Ustick Road, Staff
believes that the commercial areas proposed compliment the existing and planned residential
areas in the vicinity.
.
Chapter VII, Goal N, Objective D: Encourage appropriate land uses along transportation
conidors,
Staff believes that the proposed land uses are appropriate along the adjoining transportation
corridors (Ustick Road and Eagle Road).
.
Chapter VII, Goal IV, Objective D, Action 2: Restrict curb cuts and access points on
collectors and arterial streets.
The ACHD evaluates access points in their analysis; no direct lot access is allowed to any of
the arterial/collector roadways. The proposed access points to the arterial streets generally
comply with ACHD 's standards, Please see the ACHD staff report and Exhibit B for the
conditions from ACHD. This site does notfront on an ACHD controlled arterial road
although Sadie Creek Avenue provides a collector system for the internal circulation of
residents.
.
The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal
Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas.
ITD allows approaches (other than intersections) in special cases and on a temporary basis,
The Eagle Road access shall he eliminatedfrom this project if the Meridian City Council
does not grant a variance and/or if ¡TD does not approve an approach for this site.
Protect existing residential properties from incompatible land use development on adjacent
parcels (Chapter VII, Goal IV, Objective C, Action 1)
Biel1viIle Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-0 19/PS-05-002 Page 8
CITY OF MERIDIAN PLANNING DEPARTMENT STAFf REPORT FOR THE HEARING DATE OF 02/16/06
The properties adjacent to the subject site are designatalfor a 11iide variety (if uses, North of
the site is planned for commercial uses, east (if the site are proposed commercial
developments also tied in with this project by development agreement, and west and south of
the site are vefY low density uses and expected to continue these uses as per the
Comprehensive Plan Future Land Use Alap, The project provides a transition from the
intense commercial uses along Eagle and Ustick Roads into a mix of residential densities
from the C-G District to the R-8 and R-15 Districts, The applicants have included residential
to residential use bz!ffers along the south and west boundaries as well as additional open
spaces along the commercial corridors by providing amenities and open spaces-
.
Chapter VII, Goal N, Objective D, Action 5: Require appropriate landscape and buffers
along transportation conidor (setback, vegetation, low walls, berms, etc.).
The applicant is proposing to construct appropriate buffers along all of the adjacent arterial
streets. By ordinance, a minimum 251oot wide landscape bu;ffer is required adjacent to
residential uses and 35-foot wide landscape buffer to Gateway Corridors. The landscape
plan shows the appropriate landscape buffers,
Staff also finds the following 2002 Comprehensive Plan text policies to be applicable to this
application:
.
"Require all new parking lots to provide landscaping in internal islands." (Chapter V, Goal
III, Obj. D, #3, page 43)
"Eagle Road is the major north-south arterial in Ada County. The capacity of this alierial
should be protected by minimizing the number and location of private driveway access
connections to this impOliant roadway. The City should recognize, adopt, and help implement
the Eagle Road Access Control Study, prepared by ACHD in 1997." (Chapter VI, page 71)
"The capacity of arterial. . .roadways Call be greatly diminished by excessive driveway
cOlIDections to the roadways. The City should cooperate with ACHD to minimize access
points on arterial. . ,roadways as development applications are reviewed," (Chapter VI, page
72)
"Develop methods, such as cross~access agreements, :ftontage roads, to reduce the number of
existing access points on to arte11al streets." (Chapter VI, Goal II, Obj. A, #12, page 79).
"Identify transitional zones to buffer commercial and residential uses, to allow uses such as
offices and other low intensity uses." (Chapter VII, Goal I, Obj, B, #7, page 102)
"Restrict curb cuts and access points on. . . arterial streets." (Chapter VII, Goal IV, Obj. D,
#5, page 107)
.
.
.
.
.
8. UNIFIED DEVELOPMENT CODE
a. Allowed Uses in the Commercial Districts: UDC Table 11-2B-2 lists retail store/restaurant/
drive thru/ office/ financial institute uses as permitted uses in the C-G zarling district.
b. Purpose Statement of Zone: The purpose of the Commercial Districts is to provide for the
retail and service needs of the community in accord with the Meridian Comprehensive Plan.
Four Districts are designated which differ in the size and scale of commercial structures
accommodated in the district, the scale and mix of allowed commercial uses, and the location
of the district in proximity to streets and highways, C-G General Retail and Service
Commercial District: The purpose of the C-G district is to provide for commercial uses which
are customarily operated entirely or almost entirely within a building; to provide for a review
of the impact of proposed commercial uses which are auto and service oriented and are located
in close proximity to major highway or arterial streets; to fulfill the need of travel-related
ßienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-0 19/PS-05-002 Page 9
CITY Of MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR TI-IE HEARING DATE OF 021I6/06
services as well as retail sales for the transient and permanent motoring public, All such
districts shall be connected to the municipal water and sewer systems of the city, and shall not
constitute strip commercial development and encourage c1usteling of commercial
development.
c. General Off-Street Parking Standards (from UDC ll-3C-5):
The following standards shall apply for off-street vehicle parking for nonresidential uses: In all
Commercial Districts the requirement shall be one (I) space for every five hundred (500) square
feet of grOSS floor area.
d. Structures Subject to Design Standards (1l-3A-19.B.5): All structures on property adjacent to an
entryway couidor (Ustick/Eagle Roads) are subject to the design standards listed in this section.
e, Outdoor storage/refuse areas (11-3A-12): Outdoor utility meters, HV AC equipment, trash
dumpsters, trash compaction and other service f-i.mctions shall be incorporated into the overall
design of buildings and landscaping so that the visual and acoustic impacts ofthese functions are
flllly contained and out of view from adjacent properties and public streets.
9. ANALYSIS
9a. Analysis of Facts Leading to Staff Recommendation
The PP/AZ/RZ/CUP/PS application appears to substantially comply with the Unified
Development Code. However, there are several areas of c1alification and some modifications
required to both the site plan, cross access, public road design, and building elevations. Below
are several special considerations for the P&Z Commission to review at the public hearing:
Analysis of Facts Leading to Staff Recommendation
1. AZ Application (AZ-05-057): Based on the policies and goals contained in the
Comprehensive Plan and the general compliance of the proposed development with
the Zoning Ordinance, Staff believes that this is a good location for the proposed
development. Please see Exhibit D for detailed analysis of the required facts and
findings for a Zoning Amendment.
The annexation legal description submitted with the application (stamped on
10/24/2005 by Michael Marks, PLS) shows the property as contiguous to the existing
corporate boundary of the City of Meridian.
The applicant will be responsible for all costs associated with the sewer and water
service extension, Any existing domestic wells and/or septic systems within this
project will have to be removed from their domestic service when services are
available from the City of Meridian. Wells may be used for non-domestic purposes
such as landscape iuigation.
All future development of the subj ect property shall be constructed in accordance with
City of Meridian ordinances in effect at the time of development. All future uses shall
not involve uses, activities, processes, materials, equipment and conditions of
operation that will be detrimental to any persons, property or the general welfare by
reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
UDC llA5B-3D provides the P&Z Commission and City Council the authority to
require a property owner to enter into a Development Agreement with the City of
Bienvje Square Subdivision
AZ-O5-057/PP-O5-059/CUP-O5-052/RZ-O5-0 19/PS-O5-002 Page 10
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/]6/06
Meridian that may require some written commitment for all future uses, Due to the
close roximit of existin. and future residential uses staff believes that a
Develo Jment A reement is necessm to ensure that tlus 1'0 Jert is develo ed in a
fashion that is consistent with the comprehensive Dlan designatioli and does not
negatively impact nearby properties,
Staff believes that the Development Agreement should include the following
provIsIOns:
Phasing Plan: Generally, the applicant anticipates the phasing plan to begin with the
commercial lots near the Eagle Road intersection and then continue development to
the south and east. Construction is anticipated to reflect market demand and
construction needs. Staff is supportive of this request but believes that some of the
amenities proposed with the development should be constructed prior to the
development build out. Therefore, that prior to issuance of any certificate of zoning
compliance all landscaping shall be constructed along the southern and eastern
property boundary and along Eagle Road to the point of connection with adjoining
projects. The commercial/office lots should include either a peITllanent easement or
be redesigned to include landscaping in common lots.
Non-Residential Buildings: The applicant has requested a maximum of 54,000 square
feet of retail/restaurant/office spaces. Staff proposes to limit the applicant to their
request with an allowance of up to 20% additional conul1ercial square footage
(65,000) for more marketable conditions. The maximum square footage of one single
building shall not exceed Y2 of the maximum request.
Residential Buildings: The applicant has shown several elevations for both alley
accessed residential, townhouses, and detached single family residential products.
Staff supports these elevations but would also support better clarification of the
specific height, bulk, types of materials, and locations proposed for each type to
address the concerns of adjoining property owners and to include witlun the DA.
Pathways: The applicant shall coordinate with the Meridian Parks Department and
Nampa Meridian Irrigation District to define the location of the multiuse pathway,
bridge maintenance, and landscaping along the Finch Lateral. The applicant shall
comply with all design and maintenance standards as defined by UDC 11-3A-8 unless
specifically waived by the Meridian City Council.
That the applicant will be responsible for all costs associated with the sewer and water
service extension. Any existing domestic wells and/or septic systems within this
project will have to be removed from their domestic service, per City Ordinance
Section 5-7-517, when services are available from the City of Melidian. Wells may be
used for non-domestic purposes such as landscape inigation,
That all future development of the subject property shall be constructed in accordance -
with City of Meridian ordinances in effect at the time of development. All future uses
shall not involve uses, actiYities, processes, materials, equipment and conditions of
operation that will be detrimental to any persons, property or the general welfare by
reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
2, PP Application (PP-05-059): The proposed preliminary plat substantially complies
with the Zoning Ordinance.
Bienville Square Subdivision
AZ-O5-057/PP-OS-OS9/GUP-OS-O52/RZ-OS-019/PS-OS-OO2 Page II
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Special Considerations:
Sidewalks: The applicant is proposing to construct 5-foot wide sidewalks on some of
the intel11al streets/drive aisles, The sidewalks may be detached from,the curb with a
5~foot wide landscape strip. The proposed landscape strips do not include trees, only
grass, The applicant is proposing to plant trees on the back side of the sidewalks, but
staff believes that the trees should be planted between the curb and the sidewalk to
provide the pedestrians with cover and to make the streetscape more attractive. The
width of the planter strip between the sidewalk and the curb should be increased to a
minimum of 8-feet wide and include Class II trees. Since the applicant has submitted
a plan which is conceptual in nature staff feels the sidewalk locations shall be made
consistent with the UDC including drive aisles which shall include at a minimum as'
attached sidewalk or 4' detached sidewalk.
Land Use Buffers: UDC requires landscape buffers between different land uses. Per
UDC 11 ~3B-9, a 25-foot wide landscape buffer is required between single-family
homes and C-G zoned property, The UDC requires the land use buffer to be provided
by the higher intensity use and to be located on the building site of the higher
intensity use, unless the adjacent and higher intensity use has not provided the buffer.
The applicant is showing a 3D-foot wide buffer between the single-family homes and
the detached single family residential lots, as well as the commercial and multifamily
lots on the landscape plan, but the buffer is not shown on the preliminary plat. The
applicant should be required to create a 3D-foot wide landscape buffer lot along the
lots that abut the single-family lots. Said buffer shall contain materials in accordance
with 'ODC ll-3B-9 and not include impervious surfaces such as parking areas or
driveways. The pathway proposed shall be landscaped in accordance with 'ODC 11-
3B-12. See Exhibit B below.
Landscape Street Buffers:
Arterials: UDC 11-2B requires a 35~foot wide street buffer along classified
arterial roadways and entryway couidors. Eagle Road is classified as an Artetial
Road. On the submitted landscape plan, the applicant is proposing to construct a
35-foot wide street buffer along Eagle road. The applicant should be required to
depict the required street buffers on the face of the final plat in an easement or
place the required buffers in common lots as per ODC 11-3B. See Exhibit B
below.
Commercial Streets: 'ODC 11 ~2B requires a lO-foot wide street buffer along
commercial roadways. On the submitted landscape plan, the applicant is
proposing to construct a la-foot wide street buffer along both sides of W.
Bourbon Street and Cajon Court. However, the street buffer easements are not
labeled on the plat. The applicant should be required to depict the required 10-
foot wide street buffer easements along local roads on the face of the final plat.
Ditches. Laterals, and Canals: There are several inigation laterals that bisect this -
parcel. Per UDC ll-3A-6, all iuigation ditches, laterals or canals, exclusive of
natural waterways, intersecting, crossing or lying adjacent and contiguous to the area
being subdivided shall be tiled, The applicant is proposing to tile all of the inigation
facilities located on site with the exception ofthe Finch Lateral. See Exhibit B below.
Pressure Irrigation: The City of Meridian requires that pressurized inigation systems
be supplied by a year-round source of water (UDC 11-3A-15). The applicant should
be required to utilize any existing surface or well water for the primary source. If a
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-05-052/RZ-05-0 19/PS-05-002 Page 12
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
surface or well source is not available, a single-point connection to the culinary water
system shall be required. If a single-point connection is used, the developer will be
responsible for the payment of assessments for the common areas prior to signature
on the final plat by the City Engineer. An underground, pressurized irrigation system
should be installed to all landscape areas per the approved specifications and in
accordance with City Code, See Site Exhibit B below.
Fencing: The applicant is showing a six foot cedar and block fence along the
perimeter of the propeliy which would meet the standards of the ODe. A detailed
fencing plan should be submitted upon application of the final plat (ODC 11-3A- 7),
If permanent fencing is not provided, temporary construction fencing to contain
debris must be installed around the perimeter prior to issuance of a building pennit,
All fencing should be installed in accordance with City Code. The applicant has
submitted a revised fencing request as directed by the Planning Commission on
2/2/06, The request isfor a six foot open vision fence along the Finch Lateral and a
composite fence along the southern boundary See Exhibit B below.
Cross-access Intel11al: There are some commercial lots that do not have fi:ontage on a
public street. h1stead the applicant is proposing to provide cross-access easements to
the lots that do not have public street frontage. Because several of the proposed lots
do not have frontage on a public street, the applicant should provide a cross
parking/cross access agreement for all of the lots within the office and conunercial
portions of the subdivision to use the driveways and parking aisles, The site will be
redesigned if not granted access to Eagle Road by the Meridian City Council and/or
ITD. The Commission has conditioned the Sadie Creek Project to provide at least one
of the non-signalized access points to Ustick Road to be designed to serve as a
commercial collector for interconnectivity to the north and south and vehicular
movement in the north/south direction, Maintenance of the drive aisles and parking
areas should be provided for in a note on the face of the final plat, AND/OR in a
document such as CCRs, See Exhibit B below,
Cross~access South: The applicant shall be required to provide cross access to the
parcels north of the site, The project is a portion of a larger site project (Kissler
Armexation) and the sites shall maintain consistent traffic flow for the entire site.
Eagle Road Access: The Idaho Transportation Department (ITD) has a policy for
access to a Type IV Principal Arterial will be at intersections only, and spaced at one-
half mile intervals in urban areas, ITD allows approaches (other than intersections) in
special cases and on a temporary basis. The access point shown at approximately
1,000 feet south of the Us tick Eagle Road intersection shall be eliminated as it does
not meet criteria of either ITD or the Meridian Comprehensive Plan. However, the
this property inunediately south of the site has been developed by Ada County which
makes a break in the area which does not allow for a frontagelbackage road to be
created on the south west side of Eagle and Us tick The applicant has an open
application with ITD for the access to Eagle Road.
CUP Application (CUP-05-052): The proposed Conditional Use request substantially
complies with the Zoning Ordinance.
1. Elevations: The applicant has submitted building elevations of the proposed structures.
The application lists the proposed building materials, including stone, brick, stucco and
timber to be accented with chrome, aluminum and gloss painted trims. ODC 11-3A-19
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9ICUP-OS-OS2/RZ-OS-0 19IPS-OS-002 Page 13
CITY OF MERfDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
requires al1 structures on property adjacent to an entryway conidor to comply with the.
design standards listed in tIlls section, Staff's interpretation of the UDC is that the
applicant may choose to place the "primary entrance" on an elevation other than the
public street side. However, the public street elevations (Ustick Road and the new road
on west boundary) must stilI meet the other standards listed in 11-3A-19 (except for the
primary entrance standards),
The elevations will need to be reviewed prior to issuance of CZC to comply with the
following ordinance standards:
a) Facades: Facades visible from a public street shall incorporate modulations in the
façade, roofline recesses, and projections along a minimum of twenty percent
(20%) of the length of the facade.
b) Roof lines: Roof design shall demonstrate two or more of the following; a)
overhanging eaves, b) sloped roofs; c) two (2) or more roof planes; d) valying
parapet heights; and e) cornices,
c) Mechanical equipment: All ground-level and rooftop mechanical equipment shall
be screened to the height of the unit as viewed from the property line.
d) Color and Materials: Exterior building walls shal1 demonstrate the appearance of
lllgh-quality materials of stone, blick, wood or other native materials, Smooth-
faced concrete block, tiIt~up concrete panels, or prefabricated steel panels are
prohibited except as accent materials.
2. Refuse/Service Area Screen: Neither the Site Plan or Landscape Plan call~out how or if
the refuse/service area on the west side of the buildings will be screened. UDC ll-3A-12
requires the visual and acoustic impacts of these functions are fully contained and out of
view from adjacent properties and public streets. The applicant's CZC application must
clearly demonstrate how this standard is met.
3. Cross Access: The property to the north will be providing two points of access for
intercol111ectivity and is directly tied with the existing Development Agreement for
providing a frontage road to Eagle Road, The applicant has provided a design consistent
with two points of access, one point at Sadie Creek Avenue and the second point for the
drive aisle approximately 700 feet west of the UstickiEagle intersection. There shall be
cross access with a section designed to meet private street standards with the second point
of access not designated as a public street.
4. Private Streets; The applicant is proposing to use Lot I Block 8 to provide future access
N. Castille Street. The applicant has submitted a Private Street application as required
by UDC 11-3F.3. The plivate street standards are listed in UDC 11-3F. The applicant -,
shall design and construct the private streets in compliance with the standards listed for
Private Streets in UDC 11-3F Private Streets. See Exhibit B. The Meridian Fire and
Police Departments are requesting a minimum of 24' paved sections for alleys which
shall not apply to the R.15 district as this would exceed the standards set forth by ACHD
and the UDc.
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-019/PS-05-002 Page 14
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
5. .common/Open Space: The applicant has a qualified application meeting the
requirements ofUDC 11-3G. The proposal is showing 16.4% of qualified open space in
the residential district which meets the requirements of a minimum of 5% open space,
6. Multi-Use Pathway: The applicant is not Showing but will be required to install a
multiuse pathway in accordance to the Comprehensive Plan, The pathway shall be along
the Finch Lateral in a location to be agreed upon with the Parks Director and Nampa
Meridian Irrigation District. CurTently, NMID has a 40' easement upon which the
applicant is proposing to install the pathway, All NMID standard conditions shall be
applied to this site and all pedestrian access easements shall be enacted.
Staff will require the applicant to construct or bond for improvements to the multi-use
pathway prior to occupancy of any commercial building. The pathway connection is
listed as an amenity to the residents and users of the site and will be essential for
pedestrian connection &om Ustick Road to Eagle Road, The pathway with the associated
landscape standards will also buffer the future commercial uses and the transitional
residential lot sizes to the existing large lot Ada County Subdivision which sulTounds the
site, Therefore, the pathway shall be a priority to be completed as SOO11 as practical with
the future development of the site,
7. Amenities: The applicant is required to provide one amenity per 20 acres. The applicant
is showing qualified site amenities as follows:
11~3G-3C-1 - Quality of life amenities - Picnic arealbasketball couri in Lot 10 Block 2
11-3G-3C-2 - Recreation amenities - Clubhouse, in Lot 12 Block 1, tennis couris in Lot
10 Block 2
11- 3G- 3C-3 - Bicycle circulation amenities - Several blocks are connected with an
intemal 5' pathway which will be required to connect to the required Multi-use Pathway
along the Finch Lateral.
Amenities are generally located centrally and in common lots, These common lots shall
be maintained by the Bienville Square (Home or Business) Owners Association, The
landscape architect shall certify that one tree per 8,000 square feet of lawn has been
provided on the landscape plan.
9b. Staff Recommendation: Based on the above analysis, staff [lids the AZIIRZIPP/CUP/PS
applications substantially confom1 with the adopted DA, Comprehensive Plan policies and UDC
standards. As noted under "Special Considerations," we recommend the building elevations be
submitted in compliance with the entryway conidor standards, the access point to Eagle Road be
eliminated and redesigned, and a private street section for cross access provided to the south be
added to the preliminary plat in place of the proposed Eagle Road access. We recommend
approval of the AZ/RZIPP/CUPIPS application with the conditions shown in Exhibit B.
10. EXHffilTS
A.
Drawings
1. Preliminary Plat (by Stanley Consultants, no date)
2. Landscape Plan (by The Land Group, dated October 13, 2005)
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-05-0S2/RZ-OS-O 19/PS-OS-OO2 Page IS
CTTY OF MERIDIAN PLANNTNG DEPARTMENT STAFF REPORT FOR THE HEARTNG DATE OF 02116/06
3. Site Plan (dated July 9, 2005)
B. Legal Descriptions
C. Conditions
1. Planning Department
2. Public Works
3, Fire Depaliment
4, Police Department
5. Parks Department
6. Sanitary Services
7. ACHD
D. Required Findings from UDC-
1. Annexation
2. Rezone
3. Prelinùnary Plat
4. Conditional Use Pennit
5. Private Street
6. Variance - To be completed after a reconunendation from the Plarming Commission
BieTlville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-O 19/PS-OS-OO2 Page 16
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
-------------" ,--,---------- --n_-'m____,---"-" "_.""'-----m_------__--" -----",
-- ,
Exhibit AI: Preliminary Plat 1 (Stanley Consultants) No date
--n--___.._----------------- --"'------~----,------ -----------""'------"----"'--'---
¡--
--'.'.
n_,_---__,-,-------
--"
ì
"1----
'"
,
\,
"----..,,-----..- -----
--""-"--"------10---
-..'
sa
f
¡¡,¡;fHiiik!HI1WIi
~¡¡;¡:¡ï!'J~¡i!~¡ii!;g
l_k,l- ]'11:' 'ii!
j'I/I":ll":il 'i 11 \..
,-.> f'-' ,'" ¿: ---" ,
w.,j';;'<"".'1:;;;¡
HiW'm ¡¡j¡j¡
;;Úi ,,', . --- ..
~¡;¡¡ ¡¡1[!í !l ¡!!~ iE!iiili~í i ¡!:~¡m i~~m;~ ¡~¡;j
mE -¡~HJ¡J¡jl';)j!¡¡'--':f;¡¡ jJdJ;~~í!~) !!
":¡-""¡"""'¡--"",t'"!'íì^"'--'-"'""~'i
"'-""-""'/1;"'" .æ¡!¡ ¡ll'¡"/j'ú-- î.
*1 ill ¡~¡\I: ti ¡is '\;11,xf! . j i b 11" :~J 1:;' î !
fi¡I"ii¡"~"j)'¡Î'-'!I"¡':-I';i¡-:' i
'ii' :!;;'~'Ili¡i! ¡¡'Wi '~'II ,¡¡~;!;IÍ;iJ '~
;,,¡,,",--1'1I1"II'III),I--}"I--,"" "
1/1" "'.("1' I!J~'" .;¡~ 'J"'.lij> ,i
b'¡11it!&'i~¡!i¡,,¡'!¡';d:.i:t¡'~Ij .
",I!,;,.¡hf., 11"!lI'¡Í¡ tm'f¡"Æ.',o _I 'T"TT'
q¡',!".l,fl¡,Iþ~---. ....!.,'--,I!--,-', P-"fl'
¡"~¡ '!;~ H '¡ ~ ijWIJ f; i ¡1 ¡ J¡k¡'~ j i ~I 'IIII-¡-!)
".. """ , -- I~¡U UI
W:I! : 1110-/11=1';11111",,' ¡!tri1~111
: ¡11 Pi nmH¡/i,r/¡iHWI!iHH f¡i-¡rl~ ~I
'Ii H!:¡¡:'/J'!"""'¡ ;,1", ;~: i.
-""¡il."!'.,'- "1'1---/ "11.. ,---
I". d!;iJ,djdl"¡.¡ ',' f~:¡;-;------'
;WI,,! ~¡ -.J¡~I !1!J,L:1':
" 'L .. - j f '.1
r
""'NY'""'" ---aUA"~
. l
. .....
""""",. ,",.'c..",'""-,.,---", '-'r---
""""<N_""'",.."""",,,
°"00""."
--.._----~----- -
Bienville Square Subdivision
Exhibit A Page]
¡
.',
',",
---..,-",---:..:,:.:~'
"!i
- -ï
'"1"'r
,J ---
n '.
¡i¡ ¡ I,; i
'~('1 ,; t
L~ ~ù.
i
;'
,
i'
j§
J,J
~@-~
i 1.J;
¡ 11--11"-'->
¡;: fT '
-I,m/H" i
: '--~lt
'U1~¡I¡;
fltrl: ,xw' f I
'11' '
"';~i-.L '
!!,c'--'."-:"~<
',VI \-1,
ÞUJ'" --
, jl
----",,----_..-
~:i;::.E'~:," .."
'.. """".."
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/]6/06
Exhibit A2:, Landscape Plan L1.0 (The Land Group) Dated October 13, 2005
"'~;~~~~"'-"~'~=-,,~::.:c'-" - ,~-~~~--,._-""'" "---M,___"".._"",--- ..--..'..-"..--""-.."-..'-.-,.""---""'--.,--.....--"..--....---,..,,,-
I
;t¡'-TCJ'>-"'- " ' , hi
Hi~! ~~~(; !r~ ':,;
:C;ì! ;;
I-
I
I
I
- p' j
¡':~<¡
'-'-"/
fL:~
" ,
HI'~¡€¿1:= ;_¿i/f:.. '"" itf'l ":', ,," t; I
II 'I' ',' {?--" tf,,---{--,":::,t"--F ~ r{\;=.'~~ ,- - 'if
: f . :' ,- r;;;~(§, C¡- ~_Oþ} <u"~¿"--" ((,
!:r,1;:i'[;~£/j" é~~:7~:}" ,'"" "'"',, ; f
~ ~~ "'~;~:::~-~~:,~ !~~j "', ;':¡:
,,--,Ð= I "JH' I'" cm~l~ ---,I'-"._---""ji¡"/
!,;tn};: ~:',---, i~i.I'~£BJlltlllæ:j.r~;;¡"'i q i
~,t.,,:,~¡;-! iæl¡II¡Ij';II'llrlll'l$ ~i :,i¡¡'
~¡U:à, ;. ,,';,t't' ~I!ILI'~I" -~¡';t_'E ,: ';':,
:{f;1fg~~~""~~¿;~~~;~~¡-c~""'"\!>,,.",,¡,,:,,,,"._."",I!" """":"";"."""";" ].'."."-".".":'.""£'1,.::,1- '!,',
~ ¡õ, 01 O"~ ,:~~!J", ,/
rrJ j {lrllltlU ~ ~ i!i~nrr !P/ìm:i~ "<Gf.' ,
H!,'I'I,!'II,£II,II",'fftl~'-":,'I~::"",II,',f"""'~/II'I!¡,,ll~'(To3 , ..., 'f
,r, 1", II,," ~: "" I: I 'J: I 'I' ~ !iil¡IiJh¡¡¡ïViilm!if¡m¡1!lllÍliiliiJiÌj¡I;i!iil¡'~<';:,~.:~ ! -J ' I'
',II 'I¡:i'~ 'III, I,' ¡q ¡1¡1:!Ii/!!'i!1I!11nrJ¡!/d;lhJI;:¡¡III!,J¡uI¡d LI; I
" ,-J "I"¡,,I¡¡JIJ'I"lf/¡¡!/III!¡JI!/¡"'I'llh<ø ""("
¡tml¡íJïijji}l!ti¡ fIn i, ¡itn iJ'}f1 ~ i I' I Hi,/! nl H /1; if I¡¡ì¡ Uir¡"H !II/JII'/'ll !2 '--
flffl'flJl¡llt! ((d <"'I'i;¡ 1,:li¡ ¡1"'¡il¡;:tI!H¡Jjl:J!~¡U11iIJ11~ '",'
¡",':!I",¡r ill!,,'1. il¡"! ~ ¡I¡!'~ ,..jl,¡jiw¡;"th,¡,jI/!I¡,¡'", ,,' :
'," ""', ';1/ !;/I:I!-/ji!i',¡,¡I¡liJ(jl¡¡:::" "~I
"I:':--"-"...:..;"::,:",:_~",."",,,:,,. Hi,! ,1¡ill/ji'l/did!!-!!!I)!!!,,/]',II!¡.'I¡~
' ' , .' I' r J"" '¡- 'I':' I..
'-""""',,"r','" Ii: :¡":';,; ;¡'~í 0 ,.11/ UI 1'ld'J",~¡!j'~Jil,(,lI/jl!¡/J¡¡i¡11"111
""u_u~--- ..-,-,'-1:",-'--.1 'JI, 1""jl/"-II-.I"Jj¡"¡
f ¡ , ' . 'i II I f ¡ Ii ¡ oj; I,) I . I /!
--,---"-,,._- --.- "", ! ¡!/¡¡¡'jl¡f¡,IU!ljlllll
" ;:,'i¡:: ¡~
.., '
, if....;"
,~¡ ~.1¡ 11; il;~
.... ,! F:
0
c:
:;
:j
0
""
en
~œ'" 1!!iHIPi!i¡'¡S = B'E:~:~~::~,;RE
"']""" -:-- """!!"""",,,,-"."--
..C,--):!; (~;:t)
~"'",," --'-
Bienvillc Square Subdivision
Exhibit A Page 2
CITY OF MERIDfAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02116/06
Exbibit A2: Landscape PIan L1.1(The Land Group) Dated October 13~ ZOOS
'""""""-""="== ,=~= -. - '--.,--,- --'-- ---'- -'-~1
//
:::1
<V
~
~
ii
"
t"
i¡
?
r-
-,
~':4 ~-,'j\
-,
BienvilIe Square Subdivision
Exhibit A Page 3
',1
.,1
-,!:";-'
¡ -,
---
",'
""<
--
-- - cc-------_..""=--.,...---,-,---~~"~--~-
' i:¡,;! I~~.",:~" BjENVILLE SQUAf~E ,- .. .. .!i.. /;;,;~:;r::\
'IUI¡' i .';'1 , ' ;:'~ {~i -H
f ¡, ,1 ,.,~,' MEF~IOiAtJ tD'\i-iO ;'i' "~~"~[~"'(i
~",--..,~ """'------",,~ " '- ,,~-- ----" ",:::~,;-
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
ExhibitA3: Site Plan
,:i
,-,,¡. "I
; 1)1
.. ,.~¡
I~ '~i,
. jø~
i,1
., .1
. ,,;,.,
;ì¡l.
1
I;
.--..--"..--- ----
-"--'"---.",..-----,,
li-,--
,¡¡ !
",-
1'"
'~:,
T
~J
't.>
'.;"
~
;:1
'I>, .
):fiij
f
", ,,- I
.~ "i'"
"-;c:!"
¡ I ~
I
ii,
if
..
--... -",
. ~
,J:, >
,,",
If
ï
Ii
¡ ¡
I I
I '
--- ".." - --. . -- .
"'--'----"-----"'----_'_--,,----._-
. '. ..
...-. ----.- "-,,_...
,,'.'
1- -
°;-
- "j!'
-~
.,.'1;,
t
! :
:jji~-Jl~,!1 ,
.o.{cC ¡ , t :-ll~'-,,: .~ :! 1 ..
¡cc.",)- !J,~1P"::-le! :: :!!
, . / ~""D ~: ,i'll' : : ¡ ; ;
-- --"!.)-~~-~:-:~-,V!¡ i!
')~r~:"'l¡H:Vi:
,,- '~., ;' r:;::';",; 'j,:-; ii
,I", ¡ :: I!' . I ;~t',ì'j!{' !
'f...--cl¡ ..". ' "¡;tl"" ";:/Ulji¡¡:
'~I! I; ,./ :, Q' ,i '
~Æ ."~~~~~~,,~,,~:,}j
'\<:))
\¡
I.
I
!
""""<,C-:':'::'::C-i
~. II i I
'II IJI'I'I'
I . i
: I
--------.--.--------------.---..--..------.---,--.,----...
Bienville Square Subdivision
Exhibit A Page 4
i' ,.,' i"I,' ;,,"1
¡ ¡
;¡ III
'\ ¡ ;i'
iI
i ¡
I
i !
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Exhibit B: Legal Description - Subdivision
DESCRIPTION FOR BIENVILLE SQUARE SUBDIVISION
OCTOBER 13, 2005
A PARCEL OF LAND 8EING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE Y. OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS;
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T. 3 N" R. 1
E, 8,M" THENCE S 00°00'00" E 677.57 ALONG THE EAST LINE OF SAID
SECTION 5 TO A POINT;
THENCE N 83°54'00" W 57,36 FEET TO A POINT ON THE WESTERL Y RIGHT
OF WAY OF EAGLE ROAD, THE REAL POINT OF BEGINNING OF THIS
DESCRIPTION;
THENCE S 01°14'39" W 97496 FEET ALONG SAID RIGHT OF WAY TO A
POINT;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 44°05'18" W 227,63 FEET TO A POINT;
THENCE N 72°24'04" W 221 ,28 FEET TO A POINT:
THENCE S 77"26'30" W 667.38 FEET TO A POINT;
THENCE N 72°35'42" W 233.35 FEET TO A POINT;
THENCE N O{)01S'11" W 1129,35 FEET ALONG BAja BOUNDARY TO A
POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE S 71 °28'10" E 803,90 FEET TO A POINT:
THENCE S 83"1'1 UÜ E 51021 FEET 1'0 THE REAL POINT OF BEGINNING
OF THiS DESCRIPTiON. COMPRISING 2/',36 ACRES, MORE OR LESs,
S,\D[F.,p,.'Rcn .--\
BienviJle Square Subdivision
Exhibit B Page 1
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
- -"'.~"'~--'^""~",","'"""",""~"""-,;,=~,,,;,,,.,^,....-~'.-<4_~"_.",,.<,
.'1/
I
-"~lir;
l
" >',:':' "-,
0
CO
::'!
(f)
tn
_..J
0
Q::
<1;
U
---
",.--.....""",-"""-",-.."",,.. """".,--..,,---.,., ",--...." ----, ",-- -'-~"'"'
"--, - """
uc::;nu-: R (I A" l,,:
s::: -~,)
--- -, -" t:[ì
z
0
DJ
:>
I
i
¡
~~~,
: """"..
I ..,....,.. : ::
I "........ I ',J
,. "',",,- : 1:'-,
------"'- y-' - -
" PREVIOU.s ANNEXATION -t!f1~
,'-,I)\': '---;eel_, """-'!l\:::>f,',-
I '-",," --J()b\¡ '-"O/()(I" ,-y;,.,:;:.,",'
I ;,1 87O" ';0 ¡ tì 1167- ¡"!-..~:!!.9"OO' [ N 8<J~¡'IOO'E (')r- '~I"-I-
"9- ,- "CAROL'S SU8DI~SJ~N o~~~
~'/ I
7821"
N 9~"!G (ii)" W
c:
~)
14
UNF'LA TTED
~\i,j¡~Lul ¡¡Iy'.) [/HIEJi f fCf;(
, BI:J~VIIJ;:- ~;I,JUÞ.r\r SUf3nl\"<::;IC:Î'~
/II)'-:¡QFI'I 1,\) n"l~ Nt.' ,i,; n¡: SEC 'I !e\(
,,-, i '.' ,- ,'-
, ,"-,"
. """""-'-
"":"
-_.--"
Bienville Square Subdivision
Exhibit B Page 3
e
Stanley Consultants
If),,,'-' '" ,'-',;,':',',----', ,,'
,;,y,
"-~--
"';,
" ,
'F
-','.".:-,
~,
.. :-;:-:':,;,-~-:~, "'J"
,...~-'""_.
I"
: ':,,_,,1;1
'"
-
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HE!>-RING DATE OF 02/16/06
Exbibit Ii: Legal Description - Annexation
DESCRIPTION FOR BIENVILlE SQUARE SUBDIVISION
ANNEXATION
OCTOBER 24, 2005
A PARCEL OF lAND BEING A PORTIONS OF THE NE Y. OF SECTION 5,
TOWNSHIP 3 NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN,
MERIDIAN, ADA COUNTY, IDAHO, BEING MORE PARTICULARLY
DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T. 3 N" R 1
E, B.M., THENCE S 00°00'00" E 955.14 ALONG THE EAST LINE OF SAID
SECTION 5 TO THE REAL POINT OF BEGINNING OF THIS DESCRIPTION;
THENCE S 00"00'00" E 691_06 FEET ALONG SArD SECTION LINE TO A
POINT:
THENCE N 90°00'00" W 78.21 FEET TO A POINT ON THE WESTERLY RIGHT
OF WAY OF EAGLE ROAD:
THENCE N 44°05'18" W 227.63 FEET TO A POINT;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 72"24'04" W 221,28 FEET TO A POINT;
THENCE S 77°26'30" W 667,38 FEET TO A POINT;
THENCE N 72°35'42" W 233.35 FEET TO A POINT;
THENCE N 00°15'11" W 569.21 FEET ALONG SAID BOUNDARY TO A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 87"06'00" E 335,19 FEET TO A POINT;
THENCE S 7QOTOIJ F 319_00 FEEì TO A POiNT:
THENCE N 77"06'00" E 267.75 FEET TO A POINT;
THENCE N 89"54'00' E 20000 FEET TO A POINT:
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Exhibit B: Legal Description - C.G (General Commercial)
DESCRIPTION FOR BIENVILLE SQUARE SUBDIVISION
C-G ZONE
OCTOBER 13, 2005
A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE Y. OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO, BEING MORE PARTICULARL Y DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T 3 n. R 1
E-. 8.M.. THENCE S 00"00'00" E 677.57 ALONG THE EAST LINE OF SAID
SECTION 5 TO THE REAL POINT OF BEGINNING OF THIS DESCRIPTION;
THENCE S 00"00'00" E 968,63 FEET ALONG SAID SECTION LINE TO A
POINT:
THENCE N 90.00'00" W 78.21 FEET TO A POINT ON THE WESTERLY RIGHT
OF WAY OF EAGLE ROAD;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 44°05'18" W 227.63 FEET TO A POINT;
THENCE N 00"37'20" E 786.75 FEET:
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 72°24'04" W 213.51 FEET TO A POINT;
THENCE S 83'54'00" E 434,01 fEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION, COMPRISING 8,73 ACRES, MORE OR LESS.
B/J' \IVfL L 1-('0\1 \fERCI.A L
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE I-lE~RING DATE OF 02/16/06
Exhibit B: Legal Description - R-15 (Medium High Density Residential)
DESCRIPTION FOR BIENV/llE SQUARE SUBDIVISION
R15 ZONE
OCTOBER 13, 2005
A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE Y. OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T- 3 N., R. 1
E, B.M., THENCE S aoaoo'OO" E 677.57 ALONG THE EAST LINE OF SAID
SECTION 5 TO A POINT;
THENCE N 83°54'00" W 434_01 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION:
THENCE S 00"37'20" W 786.75 FEET;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 72°24'04" W 7,77 FEET TO A POINT;
THENCE S 77"26'30" W 594,16 FEET To A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 00"37'20" E 132,52 FEET TO A POINT;
THENCE S 89°22'40" E 105.87 FEET TO A POINT OF CURVATURE;
THENCE 87.11 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50,00 FEET, A DElTA ANGLE OF 99°49'13", A TANGENT OF
59.40 FEET AND A CHORD BEARING N 40°42'43" E 76.50 FEET TO A POINT
OF TANGENCY;
THENCE N 09"11'53" W 17U4 FEET TO A POINT OF CURVATURE;
THENCE 205.40 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 57500 FEET, A DELTA ANGLE OF 20"28'023", A
TANGENT OF 103.81 rEEl AND A CHORD BEARING N 01'02'08' E 204,31
FEET TOA POINT OF TANGENCY;
THFNCE N ~¡ 1--;':0.,,' ~ 5<?f ":::!C;T "-0 A F)(JI~jT CF (::.Jf~\!';T!.IRr;
BIF~vrr.LE-R-15
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/1 6/06
THENCE 232.28 FEET ALONG A CURVE TO THE LEFT, SAID CURVE
HAVING A RADIUS OF 625,00 FEET, A DELTA ANGLE OF 21 °17'37", A
TANGENT OF 117.49 FEET AND A CHORD BEARING N 00"37'20" E 230.94
FEET TO A POINT OF TANGENCY;
THENCE N 10'O1'28"W 1'/1.52 FEET TO A POINT OF CURVATURE;
THENCE 69.25 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50.00 FEET, A DELTA ANGLE OF 79°21'123", A TANGENT OF
41.48 FEET AND A CHORD BEARING N 49°42'04" W 63.85 FEET TO A POINT
OF TANGENCY;
THENCE N 89"22'40" W 148.60 FEET TO A POINT OF CURVATURE:
THENCE 23.81 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 100,00 FEET, A DELTA ANGLE OF 13°38'38", A
TANGENT OF 11.96 FEET AND A CHORD BEARING N 82°33'21" W 23.76
FEET TO A POINT OF TANGENCY;
THENCE N 75°44'02" W 41.56 FEET TO A POINT ON A CURVE;
THENCE 18,13 FEET ALONG A CURVE TO THE RJGHT, SAID CURVE
HAVING A RADIUS OF 300,00 FEET, A DELTA ANGLE OF 03°27'42", A
TANGENT OF 9.07 FEET AND A CHORD BEARING N 15°59'49" W 18.12 FEET
TO A POINT OF REVERSED CURVATURE;
THENCE 93,21 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 300.00 FEET, A DELTA ANGLE OF 17°48'08". A TANGENT OF
46,98 FEET AND A CHORD BEARING N 08'49'36" E 92.84 FEET TO A POINT
ON A CURVE;
THENCE S 71 "28'10" E 609.64 FEET TO A POINT;
THENCE S 83°54'00" E 133,56 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION, COMPRISING 10,03 ACRES, MORE OR LESS.
BIE-'iVrLLE-R-J "
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Exhibit B: Legal Description - R-8 (Medium Density Residential)
DESCRIPTION FOR BIENV/llE SQUARE SUBDIVISION
R8Z0NE
OCTOBER 13, 2005
A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE Y. OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOl8E MERIDIAN, MERIOlAN, ADA
COUNTY, IDAHO, BEING MORE PARTlCULARl Y DESCRIBED AS FOLLOWS:
COMMENCING A T THE NORTHEAST CORNER OF SECTION 5, To 3 N, R. 1
E, 8.M., THENCE S 00°00'00" E 677.57 ALONG THE EAST LINE OF SAID
SECTION 5 TO A POINT;
THENCE N 83°54'00" W 567,57 FEET TO A POINT;
THENCE N 71 °28'1 O"W 609.64 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION;
THENCE N 71°28'10" W 194.26 FEET TO A POINT ON THE BOUNDARY OF
CAROL'S SUBDIVISION;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE 8 00°15'11" E 1129,35 FEET TO A POINT;
THENCE S 72°35'42" E 233.35 FEET TO A POINT;
THENCE N 77"26'30" E 73,22 FEET TO A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDNlSION:
THENCE N 00°37'20" E 132.52 FEET TO A POINT;
THENCE S 89°22'40" E 105.87 FEET TO A POINT OF CURVATURE;
THENCE 87.11 FEET ALONG A CURVE TO THE LEFT. SAJD CURVE HAVING
A RADIUS OF 5000 FEET, A DELTA ANGLE OF 99"W13 , A TANGEN r or;
59.40 FEET AND A CHORD BEARING N 40"42'43" E 76.50 FEET TO A POINT
OF TANGENCY;
THENCE N 09'11'53" W 171.74 FEET TO A P01NT OF CURVATURE;
Tf-IFW:T ?O5 ':1) FE¡:;:T /lL,)\I(:; .I\.':i.:r:!\!E TC Ti..I~;: r::'(:;liT ~;'\i[) ,,';' .0:;
>!;,"'I~I(,/. :. ":::f:-~:-T/[:El"':."'\'~:::I;:l)~"'-J?6(1.'_:".'"
BIE\IVIL LF-R-~:
CITY OF MERIDIAN PLANNfNG DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
TANGENT OF 103_81 FEET AND A CHORD BEARING N 01 "02'08" E 204.31
FEET TO A POINT OF TANGENCY;
THENCE N 11'16'08" E 5321 FEET TO A POINT OF CURVATURE;
THENCE 232.28 FEET ALONG A CURVE TO THE LEFT, SAID CURVE
HAVING A RADIUS OF 625,00 FEET, A DELTA ANGLE OF 21"17'37", A
TANGENT OF 117.49 FEET AND A CHORD BEARING N 00"37'20" E 230"94
FEET TO A POINT OF TANGENCY;
THENCE N 10o01'28"W 111.52 FEET TO A POINT OF CURVATURE;
THENCE 69,25 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50.00 FEET, A DELTA ANGLE OF 79"21'123", A TANGENT OF
41.48 FEET AND A CHORD BEARING N 49"42'04" W 63.85 FEET TO A POINT
OF TANGENCY;
THENCE N 89°22'40" W 148,60 FEET TO A POINT OF CURVATURE:
THENCE 23,81 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 100,00 FEET, A DELTA ANGLE OF 13°38'38", A
TANGENT OF 11.96 FEET AND A CHORD BEARING N 82°33'21" W 23,76
FEET TO A POINT OF TANGENCY;
THENCE N 75°44'02" W 41,56 FEET TO A POINT ON A CURVE;
THENCE 18,13 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 300.00 FEET, A DELTA ANGLE OF 03"27'42", A
TANGENT OF 9.07 FEET AND A CHORD BEARING N 15°59'49" E 18,12 FEET
TO A POINT OF REVERSED CURVATURE;
THENCE 93.21 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 300.00 FEET, A DELTA ANGLE OF 17°48'08". A TANGENT OF
46.98 FEET AND A CHORD BEARING N 08°49'36" E 92,84 FEET TO THE
REAL POINT OF BEGINNING OF THIS DESCRIPTION, COMPRISING 10.11
ACRES. MORE OR LESS,
BlENV/l.L.E.H.,S
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
1.1.9
1.1.10
1.1.11
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02116/06
C. Conditions of Approval
1. Planning Department
SITE SPECIFIC REQUIREMENTS- (Bienville Square)
1.1.1
The preliminary plat labeled as I prepared by Stanley Consultants, with no date, is approved, with
the conditions listed herein. All comments/conditions of the accompanying Almexation and
Zoning (AZ-05-057) and Conditional Use Permit (CuP-05-052) applications shal1 also be
considered conditions of the Preliminary Plat.
Create an open space lot for the proposed 30-foot wide landscape buffer along the south and west
boundaries. Said buffer area shall contain materials in accordance with ODC 11-3B and not
include impervious surfaces such as parking areas or driveways. A multi-use pathway shall be
located as depicted on the master site plan submitted February 13, 2006 and dated Febmary 8,
2006, the construction of the pathway shall comply with ODC 11-3A~8
Graphically depict on the face of the plat, the required 35-foot wide landscape buffer along Eagle
Road. Depict on the face of the final plat a 10-foot wide landscape buffer along both sides of W.
Burbon Street and N. Cajon Court. Said landscape buffers shall be in either a common lot or an
easement adjacent to the rights of way.
The landscape plan prepared by The Land Group, labeled Sheets LS 1.1, is not approved with
these applications a landscape plan consistent with ODC 11-3B shall be submitted with the final
plat which reflects any changes made to the preliminary plat to redesign the subdivision
consistent with approved access points. Including but not limited to ful1landscaping along Eagle
Road which culTently is listed as a right-inlright-out access,
A detailed fencing plan shall be submitted consistent with the master site plan dated February 8,
2006 and stamped received on February 13, 2006 for fencing along the Finch Lateral. All other
fencing shall remain consistent with the landscape plan dated October 13, 2006,
1,1,2
1,1.3
Prior to issuance of any certificate of occupancy the perimeter landscaping and fencing shall be
installed or a surety agreement shall be in place, Construction or bonding for the multi-use
pathway shall also be completed prior to issuance of any certificate of occupancy for Bienville
Square Subdivision.
With the final plat application, submitted revised copies of the landscape plan with the changes
listed above.
Maintenance of all common areas shall be the responsibility of the Bienville Square Subdivision
BusinesslHome Owners Association(s).
Any roof-mounted mechanical equipment will be screened from view from any public right-of-
way. The applicant shall submit drawings at the time of CZC submission that demonstrate this
condition is complied with,
The applicant shall comply with the outdoor lighting standards shown in ODC 11-3A-11.
The awnings on the east elevations shall extend at least 20 feet beyond the entry doors, measured
from the building face to the outer edge of the awning for the retail buildings. The applicant shall
submit a drawing at the time of CZC application submission to demonstrate compliance with this
condition.
1.1,12 Comply with ODC 11~3A-12 regarding a screen for the refuse/service area,
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARrNG DATE OF 02/16/06
. .
1,1.13 No iaigation pump station or facility is shown on the Site Plan. Ho.wever, if one is proposed for
the site, it must be located outside of any required street buffer. Impervious surfaces are
prohibited in said buffers.
1.1.14 Prior to the City Engineer's signature of the final plat, all existing structures sl~all be removed
from the site.
1.1.15
Provide cross access/cross parking agreel11ent(s) for all lots in Bienville Square Subdivision. All
cross access drive aisles shall only approach the ACHD approved points of access to the public
street system. Maintenance of the aisle and parking areas shall be provided for in a note on the
face of the final plat, AND/OR in a document such as CCR's.
Other than the points of access approved by ACHD, City of Meridian, and LTD, direct lot access
to Eagle Road, is prohibited. A note shall be placed on the final plat restricting access to Eagle
Road.
It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
Applicant shall be responsible for application and compliance with and NPDES Pem1itting that
may be required by the Environmental Protection Agency.
Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
1.1.16
1.1.17
1.1.18
1.1.19
GENERAL REQUIREMENTS-PRELIMINARY PLAT
1.1.20 Sidewalks shall be installed within the subdivision and on the perimeter of the
subdivision pursuant to City Code.
1.1.21
Where the applicant has submitted a preliminary landscape plan and where staff has reviewed
such plan, the landscaping shall be consistent with the preliminary plan with modifications as
proposed by staff.
All areas approved as open space shall be free of wet ponds or other such nuisances. All
stOlIDwater detention facilities incOlþorated into the approved open space are subject to UDC 11-
3A-18 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated
surface materials shall not be used in open space lots, except as pennitted under UDC Il-3A-18,
If the stonnwater detention facility cannot be incorporated into the approved open space and still
meet the standards of UDC 11-3A-18, then the applicant shall relocate the facility, This may
require losing a developable lot or developable area. It is the responsibility of the
developer to comply with ACHD, City of Meridian and all other regulatory requirements at the
time of final construction.
1.1.22
1.1.23
The applicant shall submit a detailed fencing plan with the final plat application for the
subdivision. If pennanent fencing is not provided, temporary construction fencing to contain
debris must be installed around the perimeter prior to issuance of a building pennit. All fencing
should be installed in accordance with City Code.
Any tree over 4" in caliper that is removed from the property shall be replaced by installing
additional trees, being the equivalent number of caliper inches of trees that were removed.
Required landscaping trees will not be considered as replacement trees for those trees that have to
be mitigated.
1.1.25 All iaigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or
lying adjacent and contiguous to the area being subdivided shall be tiled, unless otherwise
1.1.24
2,6
2,7
2.8
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
1.1.26
approved by the In-igation District(s). Plans will need to be approved by the appropriate
in-igation/drainage district, or lateral users association (ditch owners), with written approval or
non-approval submitted to the Public Works Department. If lateral users association approval can
not be obtained, altel11ate plans will be reviewed and approved by the City Engineer prior to final
plat signature,
Staff's failure to cite specific ordinance provisions or ten11S of the approved
annexationlconditional use does not relieve the applicant of responsibility for compliance,
Preliminary plat approval shall be subject to the expiration provisions set forth in ODC II-6A.
1.1.27
2. Public Works Department
2.1
Sanitary sewer service to this development is being proposed via extension of mains planned in
Sadie Creek Subdivision, CulTently there is no sewer adjacent to this site and the City of
Meridian does not guarantee service in the timelines outlined in the UDC.
The applicant shall install all mains necessalY to provide service; applicant shall coordinate main
size and routing with the Public Works Department, and execute standard fonns of easements for
any mains that are required to provide service, Minimum cover over seWer mains is tlu-ee feet, if
Cover from top of pipe to sub~grade is less than three feet than altel11ate materials shall be used in
confonnance of City of Meridian Public Works Departments Standard Specifications.
Water service to this site is being proposed via extension of mains in Sadie Creek Subdivision,
The applicant shall be responsible to install water mains to and through this development,
coordinate main size and routing with Public Works.
2.2
2.3
2.4
The applicant shall be required to COlU1ect to the existing main in N. Eagle Road with a 10-inch
mam,
2,5
The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public
right of way (include all water services and hydrants), The easements shall not be dedicated via
the plat. The description shall be consistent with the graphically depicted easements on the plat
but be recorded as a separate document using the City of Meridian's standard fonus. Submit an
executed easement (supplied by Public Works), a legal description, which must include the area
of the easement (marked EXHlBIT A) and an 8112" xII" map with bearings and distances
(marked EXHlBIT B) for review. Both exhibits must be sealed, signed and dated by a
Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this
document.
The applicant has not indicated who will own and operate the pressure in-igation system in this
proposed development. If it is to be maintained as a private system, plans and specifications will
be reviewed by the Public Works Department as part of the construction plan review. A "draft
copy" of the operations and maintenance manual will be required prior to plan approval with the
"final draft" being required prior to final plat signature on the last phase of this project.
If it is to be owned and maintained by an Irrigation District then evidence of a license agreement
shall be submitted prior to scheduling of a pre~construction meeting.
The City of Meridian requires that pressurized Înigation systems be supplied by a year-round
source of water (MCC 12~13~8.3). The applicant should be required to use any existing surface or
well water for the primary source. If a surface or well Source is not available, a single-point
connection to the culinary water system shall be required. If a single.point connection is utilized,
the developer will be responsible for the payment of assessments for the common areas prior to
signature on the final plat by the City Engineer,
All existing structures shall be removed prior to signature on the final plat by the City Engineer.
2,12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2,11
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE I-lEARING DATE OF 02/16/06
2.9
All in-igation ditches, laterals or canals,exclusive of natural waterways, intersecting, crossing or
lying adjacent and contiguous to the area being subdivided shall be tiled per ODC 11 ~3A~6.
Plans shall be approved by the appropriate inigation/drainage district, or lateral users association
(ditch owners), with written approval or non-approval submitted to the Public Wodes Department.
If lateral Users association approval can't be obtained, altemate plans shall be reviewed and
approved by the Meridian City Engineer prior to final plat signature,
Any existing domestic wells and/or septic systems within this project shall be removed from
domestic service per City Ordinance Section 9-1-4 and 9~4-8. Wells may be used for non-
domestic pUrposes such as landscape irrigation.
The applicant has not indicated how the stom1 drainage from the proposed private streets will be
disposed. A drainage plan designed by a State of Idaho licensed architect or engineer is required
and shall be submitted to the City Engineer COrd, 557, 10-1 ~9l) for all off-street parking areas
and private roads. Storm water treatment and disposal shall be designed in accordance with
Department of Environmental Quality 1997 publication Catalog of Sto11n Water Best
Management Practices for Idaho Cities and Counties and City of Meridian standards and policies,
Off-site disposal into surface water is prohibited unless the jurisdiction which has authority over
the receiving stream provides written authorization prior to development plan approval, The
applicant is responsible for filing all necessary applications with the Idaho Department of Water
Resources regarding Shallow Injection Wells.
2.10
Street signs are to be in place, water system shall be approved and activated, fencing installed,
drainage lots constructed, road base approved by the Ada County Highway District and the Final
Plat for this subdivision shall be recorded, prior to applying for building pennits,
A letter of credit or cash surety in the amount of 110% will be required for all uncompleted
fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to
signature on the final plat.
All development improvements, including but not limited to sewer, fencing, micro-paths,
pressurized irrigation and landscaping shall be installed and approved prior to obtaining
certificates of occupancy.
Applicant shall be required to pay Public Works development plan review, and constlllction
inspection fees, as determined during the plan review process, prior to signature on the final plat
per Resolution 02-374.
It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
Applicant shall be responsible for application and compliance with and NPDES Permitting that
may be required by the EnviroI1l11ental Protection Agency.
Applicant shall be responsible for application and compliance with any Section 404 Pennitting
that may be required by the Anny Corps of Engineers.
Developer shall coordinate mailbox locations with the Meridian Post Office.
All grading of the site shall be perfol111ed in confol111ance with MCC lI-12-3H.
Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
The engineer shall be required to certify that the street centerline elevations are set a minimum of
3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom
elevation of the crawl spaces of homes is at least l~foot above.
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3,10
3,11
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR TI-IE HEARING DATE OF 02/16/06
2,23
One hwldred watt, high~pressure sodium streetlights shall be required at locations designated by
the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical
locations are at street intersections and/or fire hydrants. Final design locations and quantity are
detennined after power designs are completed by Idaho Power Company, The street light
contractor shall obtain design and pennit from the Public Works Department prior to
commencing installations,
3. Meridian Fire Department
3,1
Acceptance of the water supply for fire protection will be by the Meridian Fire Department and
water quality by the Meridian Water Department for bacteria testing.
3.2
Final Approval of the fire hydrant locations shall be by the Meridian Fire Depatiment.
a. Fire Hydrants shall have the 4 Yz" outlet face the main street or parking lot aisle.
b. The Fire hydrant shall not face a street which does not have addresses on it.
c. Fire hydrant markers shall be provided per Public Works spec,
d, Locations with fire hydrants shall have the curb painted red 10' to each side of the
hydrant location.
e. Fire Hydrants shall be placed on corners when spacing pennits,
f. Fire hydrants shall not have any vertical obstructions to outlets within 10'.
g. Fire hydrants shall be place 18" above finish grade,
h. Fire hydrants shall be provided to meet the requirements of the JFC Section 509.5.
All entrance and internal roads shall have a turning radius of 28' inside and 48' outside radius.
Provide at least a 20' wide Fire Lane for all internal roadways all roadways shall be marked in
accordance with Appendix D Section D1O3.6 Signs.
Fire lanes and streets shall have a vertical clearance of 13'6". This includes mature landscaping.
Operational fire hydrants, temporary or pelIDanent street signs and access roads with an all
weather surface are required before combustible construction is brought on site,
Commercial and office occupancies will require a fire-flow consistent with the International Fire
Code to service the proposed project. Fire hydrants shall be placed per Appendix D,
The new commercial lot will have an unknown impact on Meridian Fire Department call volumes,
The Meridian Fire Department has experienced 2612 responses in the year 2004. According to a
report completed by Fire & Emergency Services Consulting Group our requests for service are
projected to reach 2800 in the year 2005 and 3800 by the year 2010.
The fire department requests that any future signalization installed as the result of the -
development of tlns project be equipped with Opticom Sensors to ensure a safe and efficient
response by fire and emergency medical service vehicles. This cost of this installation is to be
borne by the developer.
Maintain a separation of 5' from the building to the trash dumpster enclosure.
Provide a Knoxbox entry system for the complex prior to occupancy.
5.2
..- ."
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR TI-Œ HEARING DATE OF 02/16/06
3.Ï2
The applicant shall work with Planning Department staff to provide an address identification plan
and a sign which meets the requirements of the City of Meridian sign ordinance at the required
intersection( s).
3.13
The Fire Dept. has concerns about the ability to address the project and have the addresses visible
from the street which the project is addressed off of. Please contact Vicki Heugly (898-5500) to
address this concern prior to the public hearing,
3.14
Provide exterior egress lighting as required by the International Building & Fire Codes.
3.15
There shall be a fu-e hydrant within 100' of all fire department connections,
3.16
Where a pOliion of the facility or building hereafter constructed or moved into or within the
jurisdiction is more than 400 feet (122 m) fi:om a hydrant on a fITe apparatus access road, as
measured by an approved route around the exterior of the facility or building, on-site fire hydrants
and mains shall be provided where required by the code official. For buildings equipped throughout
with an approved automatic sprinkler system installed in accordance with Section 903.3,1.1 or
903.3.1.2 the distance requirement shall be 600 feet (183),
For Group R~3 and Group U occupancies, the distance requirement shall be 600 feet (183
m).
4.
4,1
For buildings equipped throughout with an approved automatic sprinkler system installed in
accordance with Section 903.3.1.1 or 903.3 .1.2, the distance requirement shall be 600 feet
(183 m).
Police Department
The proposed plat and/or site design encourages high-speed, cut-through traffic, The applicant
shall work with the Ada County Highway District to provide traffic calming design to decrease
travel speeds on Sadie Creek A venue.
The proposed drive through has limited visibility from a public street. Prior to the next public
hearing, the applicant shall meet with the Police Chief to discuss methods of increasing visibility
to the facility.
The proposed development and/or plat do not offer natural surveillance oPportunities of the
public areas. Prior to the next public hearing, the applicant shall meet with the Police Chief and/or
Planning Staff to discuss features that increase visibility, including but not limited to: doors and
windows that look out on the public areas, front porches, and adequate nighttime lighting. The
site plan and/or landscaping plan shall be revised in accord with those discussions.
The proposed after-hours walk-up facility (e.g. ATM) has limited visibility fTom a public street.
Prior to the next public hearing, the applicant shall meet with the Police Chief to discuss methods
of increasing visibility to the facility,
The loading areas shall be separated fTom all public parking areas.
Parks Department
Standard for Mitigation of trees: The standard established in the City of Meridian Landscape
Ordinance 11-3B will be followed,
4.2
4.3
4,4
4.5
5.
5.1
Standard Plan for Protection of Existing Trees during Construction: The standard established in
the City of Meridian Landscape Ordinance
7.4
7.5
7.6
7.7
7.8
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR nlE HEARING DATE OF 02/16/06
5.3
Tree Grate and Tree Box standard: The proposed tree grate shall be a 6 foot by 6 foot, cast iron,
French pattern tree grate. This grate shall be placed in a 6 foot by 6 foot inside diameter tree box
with a steel grate frame set in concrete. Prior to CZC approval, contact Meridian Parks and
Recreation Department for specifications and tree box construction drawings,
Sanitary Service Company
Please contact Bill Gregory at SSC (888-3999) for detailed review of your proposal and submit
stamped (approved) plans with your certificate of zoning compliance application.
6.
6.1
7. ACHD
Site Specific Conditions of Approval
7.1
Extend Sadie Creek Avenue into the site from the north property line, Transition the roadway
from a 40-foot commercial street section to a 36-foot wide street within 50-feet of right-of-way,
with curb, gutter and 5-foot wide concrete sidewalk.
7.2
Sadie Creek Avenue north of this site to Ustick Road will need to be constructed and dedicated
prior to, or in conjunction with final plat approval for this site.
7.3
All local streets in the subdivision should be constructed as 36-foot street sections within 50-feet
of right-of-way with curb, gutter and 5-foot wide concrete sidewalk.
The proposed alley may be constructed as a public alley if it is paved l6-feet wide within20-feet
of right-of-way. OR The proposed alley may be constructed as a private drive/street, if it is
signed accordingly.
Bourbon Street shall tenninate in a culdesac and shall not extend to SH-55.
Public road access to SH-55 is prohibited.
Provide a letter from ITD stating required improvements and access decisions.
Standard Conditions of Approval
Comply with all Standard Conditions of Approval.
7.9
7.10
7.11
7.12
Any existing irrigation facilities shall be relocated outside of the right-of-way.
Private sewer or water systems are prohibited from being located within any ACHD roadway or
right-of~way.
All utility relocation costs associated with improving street frontages abutting the site shall be
borne by the developer.
Replace any existing damaged curb, gutter and sidewalk and any that may be damaged dm-ing the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
7.19
7.20
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/1 6/06
7,13
Utility street cuts in pavement less than five years old are not allowed unless approved in writing
by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for
details,
7.14
All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the
State ofIdaho shall prepare and certify all improvement plans.
7.15
The applicant shall submit revised plans for staff approval, prior to issuance of building pennit
(or other required penllits), which incorporates any required design changes.
Construction, use and property development shall be in confonnance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
7,16
7.17
Payment of applicable road impact fees will be required prior to building construction in
accordance with Ordinance #200, also known as Ada County Highway District Impact Fee
Ordinance.
7.18
It is the responsibility of the applicant to verify all existing utilities within the right~of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The
applicant shall be required to call DIGLINE 0-800-342-1585) at least two full business days
prior to breaking ground within ACHD right~of~way. The applicant shall contact ACHD Traffic
Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during
any phase of construction.
No change in the tenus and conditions of this approval shall be valid unless they are in writing
and signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be Upon the applicant to
obtain written confinnation of any change ITom the Ada County Highway Disttict.
Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the subject property unless
a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect
at the time the change in use is sought.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Exhibit D. Required Findings from Zoning Ordinance
ODC 11-5B-3E. Annexation/Rezone Findings:
The commission and council shall review the pmiicular facts and circumstances of each
proposed zoning amendment in tem1S of the following standards and shall find adequate
evidence answering the following questions about the proposed zoning amendment:
Á. The map amendment complies with the applicable provisions of the comprehensive
plan;
In Chapter VII of the Comprehensive Plan, 'Mixed Use Regional' is defined as m"eas
including commercial and residential development consistent with auto and service
oriented uses. Staff finds that the requested General Commercial (C-G) zoning
designation is in accord with the Comprehensive Plan's Future Land Use Map, which
delineates the subject property as "Mixed Use~Regional". The purpose of the C-G district
is "to provide for a review of the impact of proposed commercial uses which are auto and
service oriented and are located in close proximity to major highway or mierial streets; to
fulfill the need of travel~related services as well as retail sales for the transient and
pennanent motoring public."
Staff finds that the proposed zoning is in general cO11Íom1ance with the comprehensive
plan (please see Section 7 of the Staff Report for detailed analysis of specific
comprehensive plan action items that apply to this development).
B. The map amendment complies with the regulations outlined for the proposed
district, specifically the purpose statement;;
ConcUlTent with the annexation and zoning application, the applicant has submitted a
prelinlinary that proposes commercial products for the subject site (PP-05-059/ CUP-05-
052). Staff does not anticipate that the applicant plans to rezone the subject property in
the future if the accompanying PP application is approved.
Staff finds that the various proposed commercial uses would be allowed (permitted)
within the requested C-G zone. The site is being proposed as three portions of
commercial, high density residential and medium low density residential and upon build
out staff would not anticipate changes of usage for this site.
C. The map amendment shall not be materially detrimental to the public health, safety,
and welfare;
The applicant has submitted elevations for the proposed conunercial and residential units
and has agreed to use the design guidelines for commercial projects along gateway
conidors when designing building facades, Staff finds that the proposed C-G zone with
the proposed retail, office and restaurant uses, if designed, constructed and operated in
accordance with adopted city ordinances, should be hannO1lious and appropriate in
appearance with the intended character of the vicinity. The site is intended for -
commercial uses which, based on the Comprehensive Plan description, will have such
uses as retail, wholesale, service and office uses, as well as appropriate public uses such
as government offices.
Staff finds that the R-15 zoning designation along a C-G General Commercial will be an
appropriate use buffer. Furthennore the R-8 proposed zoning designation along the
western boundary of the site further transitions these uses from the low density residential
uses west of the site.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
Staff finds that the proposed development will change the existing character of the area,
which is still largely rural. However, the proposed development is generally hal1nonious
with the intended character envisioned by the Comprehensive Plan. Staff does not find
that the proposed zoning/uses will adversely change the essential character of area.
The Commission and Council should rely on public testimony (oral and written) to
detennine whether or not the proposed use will be disturbing or hazardous to the existing
or future neighboring uses. Staff does not anticipate that the proposed uses will be
disturbing to future or existing neighbors, as long as landscaping, fencing and other
recommended conditions are exercised. FUliher, staff does not anticipate that the
proposed uses will be hazardous as long as the applicant complies with the conditions
contained in Exhibit C and all City Code provisions,
D. The map amendment shall not result in an adverse impact upon the delivery of
services by any political subdivision providing public services within the City
including, but not limited to, school districts; and,
The applicant will be responsible for the extension of all utilities necessary to serve this
proposed development. Pennanent sanitary sewer service to this development is to be
provided by the extension of sewer in Us tick Road and extended south through Sadie
Creek Avenue to be looped with extensions in Eagle Road. The applicant will be
responsible for the extension of utilities to and through this proposed development.
Sizing and routing shall be coordinated with the Public Works Department.
Other urban services, such as water, are near to this site and the applicant should be able
to extend such services to the site. Staff finds that the subject site is proposed for
development in a fashion similar to other properties in the area.
The applicant and/or future property owners will be required to pay park and highway
impact fees.
ACHD had not submitted a staff report with site specific and standard conditions which
will be attached as Exhibit C prior to the hearing date of November 17, 2005.
On December 13, 2005, a joint agency/department comments meeting was held with
representatives of key service providers to this property. Based on the joint
agency/department meeting and other comments received from agencies/departments,
staff finds that except for sanitary sewer, the public services listed above can be made
available to accommodate the proposed development. The Commission and Council
should reference any written and/or verbal testimony submitted by any public service
provider, regarding their ability to adequately service this project.
If approved, the developer will be financing the extension of sewer, water, local street
infrastructure, utilities and iITigation services to serve the project. The primary public
costs to serve the future residents will be fire, police and school facilities and services.
Staff finds there will not be excessive additional requirements at public cost and that the -
proposed zoning and subsequent development will not be detrimental to the community's
economic welfare.
E. The annexation is in the best of interest ofthe City (UDC 11-5B-3.E).
If the a licant enters into a Develo ment A "eement DA with the Cit stafffmds that
the annexation and zoning of this property to C-G. R-15 and R-8 would be in the best
interest of the City.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR HIE HEARING DATE OF 02/[6/06
2. -Preliminary Plat Findings: ODC 11-6B-6
In detel111ining the acceptance of a proposed subdivision, the Commission shall consider the objectives of
this Title and at least the following:
A. The plat is in conformance with the Comprehensive Plan;
Please see Annexation Findings Item A above.
B. Public services are available or can be made available and are adequate accommodate the
proposed development;
Please see Annexation Findings Items C and D above
C. The plat is in conformance with scheduled public improvements in accord
the City's capital improvement program;
Because the developer is installing sewer, water, and utilities for the development at their cost, the
subdivision will not require the expenditure of capital improvement funds,
D. There is public financial capability of supporting services for the proposed development;
Please see Exhibit B for comments and conditions from other agencies and departments.
E. The development will not be detrimental to the public heath, safety or general welfare; and
Staff is not aware of any health, safety or general welfare problems associated with the
development ofthis subdivision that should be brought to the Council or Commission's attention.
ACHD considers road safety issues in their analysis. Staff recommends that the Conmrission and
Council reference any public testimony that may be presented to detennine whether or not the
proposed subdivision may cause health, safety or environmental problems of which staff is
unaware,
F. The development preserves significant natural, scenic or historic features.
Staff is not aware of any natural, scenic or historic features which require preservation, The
applicant will be required to maintain, fence, and improve the wateIWays which are existing on this
site. Furthennore the applicant shall define with the Parks Department the location of a multiuse
pathway which will further enhance the natural features of the Finch Lateral as well as providing an
additional use buffer.
3. Conditional Use Findings UDC 1l-SB-6E
The Commission and Council shall review the particular facts and circumstances of each
proposed conditional use in tenns of the following, and may approve a conditional use pemlit if
they shall find evidence presented at the hearing(s) is adequate to establish:
1. That the site is large enough to accommodate the proposed use and meet all the
dimensional and development regulations in the district in which the use is located.
Staff finds that the site is 27.3 acres and is large enough to accommodate all required parking,
landscaping, loading and other standard regulations required by the ODC.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/16/06
2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in
accord with the requirements of this Title.
Staff finds that the proposed residential/retail/restaurant/office uses meets the objectives ofthe
Comprehensive Plan as listed in Section 7 of this repOli. Some of the standards ofthe UDC are
not culTently being shown by the applicant's site plan and building elevations, Specifically, the
site plan needs to reflect the elimination of access to Eagle Road and building elevations need
to be submitted in compliance with the entryway colTidor design standards, If the applicant
makes these changes, or an access variance is granted, this finding will be met.
3. That the design, construction, operation and maintenance will be compatible with other
uses in the general neighborhood and with the existing or intended character of the
general vicinity and that such use will not adversely change the essential character of the
same area.
Staff finds that the proposed retail uses complies with the uses permitted in the C-G zone and
those uses allowed under the Development Agreement. The building height, parking layout,
landscape buffer widths and other dimensional standards shown in the application generally
comply with the ODe. The property adjacent to the west boundary to approximately 320 feet
south of Us tick Road is zoned R-2 and is proposed as low density residential uses. The
applicant will be required to construct the proposed buffer between land uses to address this
less intensive use where commercial lots abut. The multifamily proposal is an appropliate
transition from the Commercial uses to the lower density residential uses which sunound the
site,
4. That the proposed use, if it complies with aU conditions of the approval imposed, will not
adversely affect other property in the vicinity.
Staff finds that the proposed development wíIlnot adversely affect other property in the
vicinity if the applicant complies with all CUPIPP/AZ IRZ conditions and constructs all
improvements and operates the use in accordance with the UDC standards. Traffic volumes
will significantly increase. However, both ACHD and ITD have reviewed the application and
placed special conditions on the applicant. These standards may include lighting, screening,
landscaping and other areas intended to mitigate potentially hallnful effects.
5. That the proposed use will be served adequately by essential public facilities and services
such as highways, streets, schools, parks, police and fire protection, drainage structures,
refuse disposal, water, and sewer.
Staff finds that sanitary sewer, domestic water and ilTigation are available to the subj ect
property, A recently completed public-private partnership to improve Ustick Road to five lanes
and ACHD includes planning to install a traffic signal at the west boundary of the site shown at -
Sadie Creek Avenue. The commercial land use should not have any impact on the school
system. Please refer to other comments prepared by the Meridian Fire Department.
6. That the proposed use will not create excessive additional costs for public facilities and
services and will not be detrimental to the economic welfare of the community.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR II-IE HEARING DATE OF 021I6/06
Staff finds that the applicant will pay to extend the sanitary sewer and water mains into the
site, No additional capital facility costs are expected from the City. The additional commercial
structures will improve the tax base for the City of Meridian. The applicant ancl!or future
property owners will be required to pay highway impact fees.
7. That the proposed use will not involve activities or processes, materials, equipment and
conditions of operation that will be detrimental to any persons, property or the general
welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
Staff finds that the proposed development will not involve uses that will create nuisances that
would be detrimental to the general welfare of the sulTounding area.
Staff recognizes the fact that traffic and noise will increase with the approval of this
subdivision; however, staff does not believe that the amount generated will be detrimental to
the general welfare of the public. Staff flllds the future buffer between land uses along the
property boundary and the use and Eagle Road buffers will help to mitigate noise, [lImes and
glare created by the additional traffic,
8.
That the proposed use will not result in the destruction, loss or damage of a natural,
scenic or historic feature considered to be of major importance.
The applicant will be required to comply with all state and local ordinances regarding
conveyance of water and maintaining historic points of access. The Ada County Histolic
Preservation Council's Site Inventory does not show any structures or places listed for the
subject property. We are unaware of any other scenic or historic features.
4. Private Street - UDC 11-3F-5
A. The Design of the private street meets the requirements of this Article;
The applicant will have to certify that the Ada County Street Naming Committee has accepted
the private street names, The design ofthe streets meets the standards as set forth in UDC 11-
3pw4, no gates are allowed or proposed. Roadway and stonn drainage shall be contained on
site. The street width shall be a minimum of 26 feet of paved surface for all private streets
other than alleys.
B. Granting approval of the private street would not cause damage hazard, or nuisance, or
other detriment to persons property, or uses in the vicinity; and
Staff does not anticipate any hazard, nuisance or other detriment from the plivate streets if
they are installed and maintained as designed.
C. The use and location of the private street shall not conflict with the comprehensive plan
and/or the regional transportation plan.
Staff does not anticipate any conflict with the comprehensive plan. See findings above for
comprehensive analysis.
PP 05-059
MERIDIAN PLANNING & ZONING MEETING
APPLICANT Red Cliff Development, LLC
February 2, 2006
ITEM NO.
8
REQUEST Continued Public Hearing from January 5,2006 - Request for Preliminary Plat
approval of 54 single family residential lots, 22 multi family residential lots, 14 common lots
and 7 commercial lots for Bienville Square Subdivision - 2935 North Eagle Road
AGENCY
COMMENTS
CITY CLERK:
CITY ENGINEER:
See Previous Item Packet
CITY PLANNING DIRECTOR:
CITY ATTORNEY
See Staff Report in Al Packet
CITY POLICE DEPT:
CITY FIRE DEPT:
CITY BUILDING DEPT:
CITY WATER DEPT:
CITY SEWER DEPT:
CITY PARKS DEPT:
MERIDIAN SCHOOL DISTRICT:
SANITARY SERVICES:
ADA COUNTY HIGHWAY DISTRICT:
CENTRAL DISTRICT HEALTH:
NAMPA MERIDIAN IRRIGATION:
SETTLERS'IRRIGATION:
IDAHO POWER:
INTERMOUNTAIN GAS:
OTH ER:
Date: ,;¡ I , } ()I nJ,;hone: d'11 0- ö30lJ>
~
Contacted:
Emailed:
IIc mee ings shall become property of the City of Meridian.
2 February 2006
.-RI1JCEIVED
FEB .- 2 2006
Meridian Planning and Zoning Commission
Meridian City Hall
33 East Idaho Avenue
Meridian, Idaho 83642
City Of Meridian
City Clerk Office
RE: Bienville Square Subdivision - Red Cliff
Dear Chairman and Commission members:
I do not want to be known as the whiner of Carol Subdivision but I am beginning to feel
that way, Tuesday, 24 January, residents of the Carol Subdivision received a notice from
Red Cliff that they would be meeting with us on Saturday, 28th at City Hall and enclosed
a printout of a brand new all commercial plan, BienviUe Square, for the properties at
Ustick and Eagle Rd, A good number of us attended even with the short notice and a
Saturday to boot. When we arrived we were met with an entirely different and updated
Bienville Square Subdivision plan, Although we were taken by surprised by this move,
we had a fairly decent exchange of information and ideas, One being that they were
going to tile in the Finch Lateral and if I understood it colTectly, they would then include
the maintenance road and property to the center of the canal into their subdivision. They
said that they had discussed this with Mr, John Anderson ofNampa/Meridian lITigation
District. Last fall I had checked with Mr. Anderson if there were any plans for the Finch
lateral. At that time he said there was none, I called and spoke with him Tuesday, 31
January, and he assured me that if anyone had met with Red Cliff it would have to have
been more than two years ago as there has been no recent discussion about the Finch
Lateral. He also said that if they wanted to tile the Lateral, which be fine with
Nampa/Meridian, it would not be done in the year 2006 and that the access road and the
canal area would stm be property ofNampa/Meridian and could not and would not be
included into the BienviUe Subdivision. I think this should be discussed with Red Cliff,
Also during the meeting, again, if! understood colTectly, Red Cliff was willing to erect a
property line fence or masonry wall north and south along the Leslie Way homes at the
west boundary: They seemed not so inc1Ìned to continue a fence/wall east and west at the
south boundary along the Finch LateraL There are a number of homes on Leslie Dr.
which back up to the Lateral and the residents would certainly appreciate a division of the
Carol Subdivision and Bienville Subdivision properties,
As a subdivision, we are also very concerned with the probable increase of traffic through
our neighborhood with the development ofBienville. We are already experiencing
people cutting through as a short cut to miss the Ustick and Eagle intersection, We
would like to have some declaration from Red Cliff, as we had from Landmark, to help
with closing Leslie Dr. and Eagle Rd.
Another problem, it seems, at one of the P & Z meetings some suggestions were made to
make Red Cliff's proposal more acceptable to the surrounding homes, My neighbors and
I felt that having LO as a buffer and pleasing landscaping was a very good suggestion, In
my opinion Carol Subdivision is ratner unique in that it is mature, has large lots and it is
small with only 49 residences. We would hope that whatever the development -in the
Bienville property, it will enhance the area not just become another high density, cookie
cutter subdivision.
Sincerely,
') -'J
:¡;) JUt- ITf¿U$~
Betty Rossow
2832 Leslie Dr.
Meridian 83642
887-0955
bltr3@netzero,com
STATE OF IDAHO
)
) §
)
COUNTY OF ADA
AFFIDAVIT OF POSTING
RECEIVED
Id N "J ~ r{)D"
"""~"')(~"I,.¡¡
CITY OF MERIDIAf'J
'¡..." ,
;! '/ CLERK (lc'n(~r:-
/, Mike Arnold Premier Si ns Inc 2100 E. Fairview Avenue Suite 7 855-0380
(name) (address) (phone)
Meridian Idaho . being first duly SWorn upon
(city) (state) oath, depose and say:
I personally posted the subject property with the hearing notice sign 10 days prior to the public
hearing for the Annexation of 17.25 acres into the Ci of Meridian and Zonin re uests for
all 27.30 acres to be CG for 2935 South Eaale Road.
Dated this
23rd, day of
January , 2006
'7$,/ L#
I (Signature)
SUBSCRIBED AND SWORN to before me the day and year first above written.
/Î
( . ";~I ,,¡;~' P ;!L2 Æ¿k./
~~~~Zn:ft~'~~~~~cLc<,-ù ~>
My Commission Expires: 7- 2.8. ¿; ?
"".." 1/, I,
,,\\~ rLE'" III;;
"",. \J~;;
",:-\ """""'" ,~~~
,^ "'~' A~"" ..,.. -;.
~ >" ,-'- ¡~"-:'
~ ';;:./0 ..-\-;.
~Ot;z ~:::
::: ~ (J!:::
~ \ ..olJn\,~ j 0 ff
-¿ .'-'" \oJ ",-,-.:to ~
'\ or """"""""""fJ'tf' ,,~
;~;; 1'4TE of \",
;;""'1/"""'\\'
Masterlaffid-posting
-'-""--,,, ""'-'-"----"~"- "-~."'..__.,"'-,.~,--'"
----:--'~..~--'""'._-!
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
STAFF REPORT
TO:
FROM:
SUBJECT:
.RECEIVED
..IAN 3 0 2006
CITY OF MERIDIAN
'-:::!TY CLERK OFFICF=
Planning & Zoning Commission
Hearing Date: January 5,2006
Continued to: February 2, 2006
P&Z Commission
':' i"/
ctG, I;(;¡i;~;;; '.' "
..
f'
"f,\ ¡i,
Joseph Guenther, Associate City Planner
Bienville Square Subdivision, All applications are for Bienville Square
Subdivision by Red Cliff Development, INe.
AZ-05-057 - Annexation and Zoning of 18.43 acres from RUT and R1 to R-8
(Mediwn Density Residential), R-15 (Medium High Density Residential) and C-
G (General Commercial).
RZ-05-019 -Rezone of 10.05 acres ofC-G (General Commercial) to R-8
(Mediwn Density Residential) and R-15 (Medium High Density Residential).
PP-05-059 - Preliminary plat for 54 single family residential lots, 22 multi-
family residential lots, 14 common lots, and 7 commercial lots on 27.30 acres.
QJP-05-052 - Conditional Use Pennit for mixed use development within 300-
feet of a residence.
PS-05~002 - Private Street for providing frontage to multi-family site.
V AR-05-023 -Variance to UDC 11.3H-4.2 for allowance of an access point to
Eagle Road/SH55.
1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Red Cliff Development, INC, is requesting approval of a Preliminary Plat with a
Conditional Use Pennit (CUP) to construct retail/restauranVand office uses as well as a mixture of
attached, detached and alley.accessed residences on approximately 27.36 acres within the Bienville
Square Subdivision development located approximately):;í mile south of the southwest comer of Us tick
Road and Eagle RoadlSH-55.
A portion of the subject property was in the Kissler, Cobb, Eagy annexation project AZ-03-018 and a
conesponding Development Agreement (DA). (Similarly, a portion of the Sadie Creek Promenade
Subdivision project immediately north of this site was also in that annexation application.) The DA
(Instrument No. 104107406) requires that any future use be approved either through a site' specific CUP
application or a Planned Development. A concept plan for the overall site was submitted with the
application for infonnation purposes (not for fonnal approval).
The Commission should note that the applicant has also submitted a Variance application that will be
before the City Council concunent with the subject applications. The Variance request proposes one new
approach to N. Eagle Road/State Highway 55, for one right-inlright-out access driveway. The Idaho
Transportation Department (ITD) has not approved any approach pennits on this site. The Variance
application pertains only to the right-inlright-out access lying approximately 1,000 feet south of Us tick
Road,
The overall design of the site is paramount on City Council and ITD approval of the Eagle Road
approach. However, if the applicant is unsuccessful in obtaining an approach, Staff feels the proposed
conditions and an amended Development Agreement for the 27.36 acres could sufficiently address
interconnectivity issues associated with development of the site. Currently the Sadie Creek Promenade
Subdivision property to the north provides one public street access to Ustick Road, and staff is proposing
cross access to the two other approved Ustick Road approaches,
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-0 19/PS-OS-002 Page 1
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DA TE OF 02/02/06
2; SUMMARY RECOMMENDATION
On December 8,2005, the Comnússion continued the Sadie Creek Promenade project to the January 5,
2006 healing in order to discuss both the subj ect propel1y and the Sadie Creek Promenade property at one
time. The original intent was to have a full hearing of both projects at that time and to address issues
common to both development proposals. On January 5, 2005 the Commission voted to table the item at
the applicant's request until the February 2,2006 hearing. The applicant was considering redesigning the
site, but has instead decided to proceed with the original configuration as advertised for the public
hearing; therefore no changes to the site layout were proposed prior to February 2,2006.
Staff is recommending approval of the subject applications (AZ-05-0S7/PP-OS-OS9/RZ-OS-019/PS-OS-002
and CuP-05-0S2) with the conditions noted in this report.
PROPOSED MOTIONS (to be considered after the public hearing)
Recommend Approval
I move to recommend approval of File Numbers AZ-OS-057/PP-05~OS9/CuP-05-052/Rz-OS-
019/PS-05-002 as presented in staff report for the hearing date of Febru81Y 2,2006 with the
undated preliminary plat drafted by Stanley Consultants with the following modifications to the
conditions of approval: (add any proposed modifications)
Recommend Denial
I move to recomniend denial of File Numbers AZ-05-057/PP-OS-OS9/CuP-OS-052/Rz-OS-
0 19/PS.05-002 for the following reasons: (you should state specific reasons for denial. You
should address how the applicant might re-do the application to gain your recommendation for
approval.)
Recommend Continuance
I move to continue File Numbers AZ-05.0S7/PP-OS-059/CuP-05.052/Rz-05~Ol9/PS-OS-002 for
the hearing date of February 2,2006, to~, 2006, and in addition to staff's comments, direct
the applicant to make the following changes: (insert comments here)
3. APPLICATION AND PROPERTY FACTS
a. Site Address/Location:
SW comer of Us tick Road and Eagle RoadlSH5S
Township 3N, Range IE, Section 5
b. Owners
Red Cliff Development, INC
2060 South Eagle Road
Meridian Id 83624
John Ewing
1500 El Dorado Street, Suite 4
Boise Id 83704
c. Applicant:
Red Cliff Development, INC
2060 South Eagle Road
Meridian Id 83624
d. Representative:
e, Present Zoning:
Ashley Ford, WRG Design, INC
General Retail and Commercial (C-G), Meridian, RUT ~Rl-Ada County
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-019/PS-OS-002 Page 2
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
f. Present Comprehensive Plan Designation:
Mixed Use-Regional - 2002 Comprehensive Future Land Use Map
g. Description of Applicant's Request:
1. See Exhibit Al (prepared by Stanley Consultants) for a copy of the proposed plat,
Exhibit A2 shows the proposed landscape plan, and Exhibit A3 shows a detailed site plan
which depicts the lot layout, building, parking and access locations with adjoining
subdivisions,
h, Applicant's Statement/Justification: The application notes that the mixed use regional
designation provides for the overall site to be developed with a mixture of Retail/Restaurant/
OfficelDrive through and other Conunercial uses oriented around automobile traffic, the rear
portions of the site are designed around transitional Uses of a mix of single~family detached
units and multi-family residential units. The applicant notes that the site is an ideal location
for a retail/residential complex and will provide the additional landscaping along drive aisles,
the design review for structures along the gateway conidor, and develop the new public street
to improve traffic movement in the area.
4. PROCESS FACTS
d.
e.
f.
5. LAND USE
a.
The subjeçt application will in fact constitute an annexation and zoning as detennined by
City Ordinance. By reason of the provisions of the Unified Development Code Title 11
Chapter 5 Article B Section 3, a public hearing is required before the City Council on tlllS
matter.
The subject applications will in fact constitute preliminary plats as detennined by City
Ordinance. By reason of the provisions of the Unified Development Code Title 11
Chapter 6, a public hearing is required before the City Council on this matter.
The subject application will in fact constitute a conditional use / planned development as
detennined by City Ordinance. By reason of the provisions of the Unified Development
Code Title 11 Chapter 5 Article B Section 6, a public hearing is required before the City
Council on this matter.
b.
c.
Newspaper notifications published on: December 19 and January 2,2005
Radius notices mailed to properties within 300 feet on: December 19, 2005
Applicant posted notice on site by: December 26, 2005
a. Existing Land Use(s): Bare land, two single family residences.
b. Description of Character of SUITounding Area: Large lot residential, highway~oriented
services, rapidly urbanizing
c. Adjacent Land Use and Zoning
1. North; Future pad sites within Sadie Creek Promenade proposal zoned C-G and
Ada County Rl.
2. West: Residential Subdivision zoned Meridian City R-2 and Ada County RI
3. South: Residential Subdivision zoned Meridian City R-2 and Ada County RI
4. East: Future pad sites within the Kissler Annexation project zoned C-G, Eagle
Road.
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-0 19/PS-OS-OO2 Page 3
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
d. History of Previous Actions: In ApÚI 2004, the owners and City entered into a Development
Agreement for various High Density Commercial, Multi-family Residential, transitional, and
office uses under File AZ-03-018. Some property was annexed and zoned to General Retail
and Commercial (C-G) with a Development Agreement while other portions ofthe property
were not included in the annexation leaving out parcels which were addressed with the
original conceptual plan. The 18.43 acre out parcel immediately south of the C-G site is
included with this project.
e, Existing Constraints and OPPortunities
1. Public Works
Location of sewer;
Location of water:
Extension of mains in Ustick Road/Sadie Creek Promenade
Extension of mains in Ustick Road/Sadie Creek Promenade
None
Issues or concerns:
2. Vegetation:
Agricul turallIn-iga ted
3. Flood plain: N/A
4. CanalslDitches lITigation; The Finch Lateral COurses the southern part of property
and the;: Milk Lateral courses the northern part of the property
5. Hazards; None identified
6. Size of Property: 27.3 acres
7. Description of Use: Retail, Office, Commercial, and Restaurant uses and associated
parking and landscape improvements along Eagle Road. Attached townhouse and single
family residential, front accessed and alley accessed products,
f. Subdivision Plat Infonnation
The submitted plat includes an R-8 proposed Zone with 54 single-family residential lots
of which 20 units with street side garages along the western property line are located in
Block 2 (lots 20-40) which are in the 6,000 to 8,000 square foot range. The 34 alley
accessed homes are located in Block 3 and are approximately 4,500 square foot in area.
These lots are designed to meet the minimum standards ofthe R-8 district.
The submitted plat also includes 22 lots in an R-15 proposed zone. These R-15 products
are designed around a modified townhouse design and each building would be contained
on a lot with potential for a future- condominium plat on the individual units. The
applicant has included a clubhouse and additional parking contained in common lots.
The submitted plat also contains seven lots in a C-G proposed zone with commercial
uses. Commercial uses are shown to be a mix of restaurant/retail and office spaces with
two approximate 12,000 square-foot bUildings and five approximate 6,000 square-foot
buildings.
g. Landscaping
1, Width of street buffer(s): per the Future Land Use Map, both Ustick Road and Eagle
Road are designated as "Entryway ColTidors." As such, the UDC (Table 11-2B-3)
requires a 35-foot wide street buffer adjacent to both roadways. The landscape plan
(Sheet Ll.I) proposes a 35-foot wide buffer along Eagle Road, If the applicant
proposes to construct the "Entryway ColTidor" buffers in easements they must meet
the landscaping standards required in the UDc.
Bienville Square Subdivision
AZ-O5-057IPP-O5-0S9/CUP-OS-OS2/RZ-OS-O 1 9IPS-O5-002 Page 4
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
2, Width ofbuffer(s) between land uses: Table 11-2B-3 requires a 25-foot wide buffer
between commercial uses on C-G-zoned land and residential uses. The properties to
the west are zoned R-2 (City of Meridian) and Rl (Ada County), and are cun-ently
residential. Lots adjacent to the site on the west and south as shown on the
landscape/site plan shall include a 25-foot pennanent easement or the 25 feet shall be
included in a conunon lot as defined by the landscaping standards of the ODC,
3. Percentage of site as open space: The ODC does not require open space or site
amenities for conunercial uses. The open space contained in the residential uses is
shown to be 3.3 acres or 16.4 percent and applied as an additional amenity. This
calculation should be reduced to not include any landscape buffers, The applicant
shall clarify these calculations to be consistent with the amenity standards found in
ODC Chapter 3, Article G.
4. Other landscaping standards: The landscape buffer along Eagle Road should be
constructed in accordance with ODC Chapter 3, Article B.
h. Planned Development Characteristics - N/A
i. Conditional Use Infonnation:
1, Non.residential square footage: To be detennined, 44,000 square feet shown
2. Proposed building height: 65 feet, or C-G standards
3. Percentage of site devoted to building coverage: Not defined
4. Percentage of site devoted to landscaping: 3.53 acres, 12.9%
5. Percentage of site devoted to paving: Not defined
6. Percentage of site devoted to other uses: N/ A
7. Number of Residential units:
N/A
j- Amenities - The applicant is providing a clubhouse in Lot 12 Block 1, recreational facilities in
Lot 20 Block 2 and additional open space for the residential amenities. The applicant is also
proposing a water feature in the turnabout in Block 6.
k. Off~Street Parking (residential uses) - provided within the R-15, to meet the multi-family
standards set forth in ODC 11-4-3.27
1. Proposed and Required Residential Standards - R-8 and R~15 bulk standards apply as found.in
ODC 1I.2A. .
R-8 (Standards)
Setbacks (*all streets local) Proposed Required
Front Living Area 15 15
Side Accessed Garage 15 15
Front Accessed Garage 20 20
Street side 15 15
Side 4 4
Rear 12 12
Frontage-alley loaded 45 40
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-0 I9/PS-OS-002 Page 5
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02102/06
Frontage-garage fronted 60 50
Lot Sizehalley loaded 4,630 4,000
Lot Size-garage fronted 6,023 5,000
Lot Size- Corner 5,188 5,000
R-15 (Standards)
Setbacks (*all streets local) Proposed Required
Front Living Area 10 10
Front Accessed Garage 20 20
Street side 20 20
Side 4 4
Rear 12 12
Frontage 20 0
Lot Size 2,400 8,424
Maximum building height 40 40
m. Proposed and Required Non~Residential Parking - One off-street parking space required for
every 500 square feet of gross floor area. Also, one Type A and one Type B parking space
required for the loading area (per UDC 11-3C~8). The proposed total building floor area is
40,000 s.f., which requires 80 parking spaces. The total number of parking spaces has not been
calculated. This may be addressed during detailed CuP review and building design review
but the design appears to meet the minimum standards of the UDC parking requirements.
n. Summary of Proposed Streets and/or Access (private, public, common drive, etc.):
The applicant is proposing one new access point to Eagle Road/SH55 to serve the Bienville
Square project at approximately 1,000 feet south of the Ustick/Eagle illtersection.
As noted previously, ITD must issue a right-in/righthout pennit for this access, and the access
is further contingent on the Meridian City Council granting a variance to UDC 11- 3H. ill
addition, the recorded DA between the applicant and the City requires either a public or
private street be constructed parallel to Eagle Road/SH55 that may connect to the north
boundary and may also connect to Eagle Road, if allowed by ITD at a point to be detennined
by ACHD. This project will connect with Sadie Creek Avenue, a proposed public street
connecting to Ustick Road through the Sadie Creek property, to meet the frontage road
requirement and possibly connect to Eagle Road.
In addition, the applicant will be required to connect to and provide cross access to the three
new access points to Ustick Road at the following locations in the proposed Sadie Creek
Promenade Subdivision applications:
. Driveway #1 - 400 feet west of Eagle (right-in/right-out with center median)
. Driveway #2 - 600 feet west of Eagle (full access)
. Driveway #3 - 1, I 00 feet west of Eagle (full access public street (Sadie Creek Avenue)
with proposed traffic signal)
UstickRoad, from Leslie Drive to Ally Street (on the east side of Eagle Road), including the
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-019/PS-OS-002 Page 6
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF O'ID'/O6
Eagle Road intersection, has just been widened and improved to 5 lanes. The intersection was
widened to include dual left tul1llanes,
The applicant's CuP site plan shows a cOlmection with the new public, commç:rcial street
extending south of Us tick Road, beginning approximately ~ mile West of Eagle Road/SH55,
The preliminary plat (Sheet 1) shows tlllS roadway (Sadie Creek Avenue) as a 50-foot street
section, continuing as a public street in a loop design around the R-8 development with
private streets providing frontage for the townhouse development. The area (Kissler
Annexation site) concept plan shows the road connecting to the property south of the site with
a looped design and possible connection to Eagle Road through this site. The area plan shows
private, intel1lal driveways connecting to this public street; such driveways run mostly
north/south connecting Sadie Creek Avenue to Ustick Road.
For a detailed report on both ITD's and ACHD's actions and comments, please see the
letters/reports submitted with the application materials.
6, AGENCY COMMENTS MEETING On October 28th 2005, staff held an agency comments
meeting. The agencies and departments present included: Meridian Fire Department, Meridian
Meridian Public Works Department, and the Sanitary Services Company. Staff has included all
comments and recommended actions as Conditions of Approval in Exhibit C.
7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed
Use-Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, this
designation is defined in part as an area that is situated in highly visible or transitioning parts of
the City where innovative and flexible design oPPortunities are encouraged. The MU~R has no
upper limit on the square footage of non-residential uses and is intended to allow a broad range of
uses.
Staff finds the following Comprehensive Plan policies to be applicable to this property and apply
to the proposed development (staff analysis in italics below policy):
.
Require that development projects have planned for the provision of all public services.
(Chapter VII, Goal III, Objective A, Action 1)
When the City established its Area of City Impact, it planned to provide City services to the
subject property. The City of Meridian plans to provide municipal services to the lands
proposed to be annexed in the following manner:
. The subject lands currently lie within the jurisdiction of the Meridian Rural Fire
District, Once annexed the lands will be under the jurisdiction of the Meridian
City Fire Department, who currently shares resource and personnel with the
Meridian Rural Fire Department.
The subject lands currently lie within the jurisdiction of the Ada County Sheriff's
Office, Once annexed the lands will be serviced by the Meridian Police
Department (MPD).
The roadways adjacent to the subject lands are currently owned and maintained
by the Ada County Highway District (ACHD). This service will not change,
The subject lands are currently serviced by the Meridian School District #2, This
service will not change.
The subject lands are currently serviced by the Meridian Library District. This
service will not change and the Meridian Library District should suffer no
revenue loss as a result of the subject annexation.
.
.
.
.
Bienville Square Subdivision
AZ~O5~O57/PP-O5-059/CUP-O5-052/RZ-O5-0 19/PS-O5-002 Page 7
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEh-RING DATE OF 02/02/06
.
Municipal, fee-supported, services will be provided by the Meridian Building Department,
the Meridian Public Works Department, the Meridian Water Department, the Meridian
Wastewater Department, the Meridian Planning Department, Meridian Dtility Billing
Services, and Sanitary Services Company.
Chapter VII, Goal I, Objective B: Plan for a V811ety of commercial and retail opportunities
within the Impact Area.
Staff finds that the site is designatedfor MU~R on the Comprehensive Plan Future Land Use
Map. Although strictly commercial uses have not been specifically plannedfor this property
on the Comprehensive Plan Future Land Use Map and through the Development Agreement
from the annexation, the overall site plan when combined with the proposed Sadie Creek
Promenade Subdivision meets the general classifications for mixed use regional.
. Chapter VII, Goal I, Objective B, Action 5: Locate new community commercial areas on
arterials or collectors near residential areas in such a way as to complement with adjoining
residential areas.
Ustick Road is classified as an arterial roadway. The applicant is proposing access from the
act/oining commercial areas from micro paths, sidewalks and shared streets which will
provide future connection to residential areas west of the site along Ustick Road. Staff
believes that the commercial areas proposed compliment the existing and planned residential
areas in the vicinity,
.
Chapter VII, Goal IV, Objective D: Encourage appropriate land uses along transportation
conidors.
Staff believes that the proposed land uses are appropriate along the adjoining transportation
corridors (Ustick Road and Eagle Road).
.
Chapter VII, Goal IV, Objective D, Action 2: Restrict curb cuts and access points on
collectors and arterial streets.
The ACHD evaluates access points in their analysis; no direct lot access is allowed to any of
the arterial/collector roadways. The proposed access points to the arterial streets generally
comply with ACHD 's standards, Please see the ACHD staff report and Exhibit B for the
conditions from ACHD, This site does not front on an ACHD controlled arterial road
although Sadie Creek Avenue provides a collector system for the internal circulation of
residents,
.
The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal
Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas.
ITD allows approaches (other than intersections) in special cases and on a temporary basis.
The Eagle Road access shall be eliminated from this project if the Meridian City Council
does not grant a variance and/or if ITD does not approve an approach for this site.
Protect existing residential properties from incompatible land use development on adjacent
parcels (Chapter VII, Goal IV, Objective C, Action 1)
The properties adjacent to the subject site are designated for a wide variety of uses. North of
the site is planned for commercial uses, east of the site are proposed commercial
developments also tied in with this project by development agreement, and west and south of
the site are very low density uses and expected to continue these uses as per the
Comprehensive Plan Future Land Use Map. The project provides a transition from the
Bienville Sql!are Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-0 19IPS~OS-002 Page 8
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
intense commercial uses along Eagle and Ustick Roads into a mix of residential densities
from the C-G District to the R-8 and R-15 Districts. The applicants have included residential
to residential use buffers along the south and west boundaries as well as additional open
spaces along the commercial corridors by providing amenities and open spaces.
.
Chapter VII, Goal IV, Objective D, Action 5: Require appropriate landscape and buffers
along transportation colTidor (setback, vegetation, low walls, berms, etc.).
The applicant is proposing to construct appropriate buffers along all of the adjacent arterial
streets. By ordinance, a minimum 25-foot wide landscape buffer is required adjacent to
residential uses and 35-foot wide landscape buffer to Gateway Corridors, The landscape
plan shows the appropriate landscape buffers.
Staff also finds the following 2002 Comprehensive Plan text policies to be applicable to this
application:
.
"Require all new parking lots to provide landscaping in internal islands," (Chapter V, Goal
III, Obj. D, #3, page 43)
"Eagle Road is the major north-south arterial in Ada County. The capacity of this arterial
should be protected by minimizing the number and location of private driveway access
connections to this important roadway. The City should recognize, adopt, and help implement
the Eagle Road Access Control Study, prepared by ACIID in 1997," (Chapter VI, page 71)
"The capacity of arterial. . .roadways can be greatly diminished by excessive driveway
connections to the roadways, The City should cooperate with ACIID to minimize access
points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page
72)
"Develop methods, such as cross-access agreements, frontage roads, to reduce the number of
existing access points on to arterial streets." (Chapter VI, Goal II, Obj, A, #12, page 79).
"Identify transitional zones to buffer commercial and residential uses, to allow uses such as
offices and other low intensity uses." (Chapter VII, Goal I, Obj. B, #7, page 102)
"Restrict curb cuts and access points on . , . arterial streets." (Chapter VII, Goal IV, Obj. D,
#5, page 107)
.
.
.
.
.
8. UNIFIED DEVELOPMENT CODE
a. Allowed Uses in the Commercial Districts: ODC Table 11-2B.2lists retail store/restaurant/
drive thru/ office/ financial institute uses as pennitted uses in the C-G zoning district.
b. Purpose Statement of Zone: The purpose of the Commercial Districts is to provide for the
retail and service needs of the community in accord with the Meridian Comprehensive Plan.
Four Districts are designated which differ in the size and scale of commercial structures
accommodated in the district, the scale and mix of allowed commercial uses, and the location
of the district in proximity to streets and highways. C~G General Retail and Service
Commercial District: The purpose of the C-G district is to provide for commercial uses which
are customarily operated entirely or almost entirely within a building; to provide for a review
of the impact of proposed commercial uses which are auto and service oriented and are located
in close proximity to major highway or arterial streets; to fulfill the need of travel-related
services as well as retail sales for the transient and pennanent motoring public, All such
districts shall be connected to the municipal water and sewer systems of the city, and shall not
constitute strip commercial development and encourage clustering of commercial
development.
c. General Off-Street Parking Standards (from ODC 11-3C-5);
Bienville Square Subdivision
AZ-O5-057/PP-OS-O59/CUP-OS-O52/RZ-O5-0 19/PS-O5-002 Page 9
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
The following standards shall apply for off-street vehicle parking for nonresidential uses: In all
Commercial Districts the requirement shall be one (I) space for every five hundred (500) square
feet of gross floor area.
d. Structures Subject to Design Standards (l1-3A-19.B.5): All structures on property adjacent to an
entryway con-idor (UsticldEagle Roads) are subject to the design standards listed in tIns section.
e. Outdoor storage/refuse areas (l1-3A-12): Outdoor utility meters, HV AC equipment, trash
dumpsters, trash compaction and other service functions shall be incorporated into the overall
design of buildings and landscaping so that the visual and acoustic impacts of these functions are
fully contained and out of view from adjacent properties and public streets.
9. ANALYSIS
9a. Analysis of Facts Leading to Staff Recommendation
The PP/ AZ/RZ/CUP/PS application appears to substantially comply with the Unified
Development Code. However, there are several areas of clarification and some modifications
required to both the site plan, cross access, public road design, and building elevations, Below
are several special considerations for the P&Z Commission to review at the public hearing:
Analysis of Facts Leading to Staff Recommendation
1. AZ Application (AZ-05-057): Based on the policies and goals contained in the
Comprehensive Plan and the general compliance of the proposed development with
the Zoning Ordinance, Staff believes that this is a good location for the proposed
development. Please see Exhibit D for detailed analysis of the required facts and
findings for a Zoning Amendment.
The annexation legal description submitted with the application (stamped on
10/24/2005 by Michael Marks, PLS) shows the property as contiguous to the existing
corporate boundary of the City of Meridian.
The applicant will be responsible for all costs associated with the sewer and water
service extension. Any existing domestic wells and/or septic systems within this
project will have to be removed from their domestic service when services are
available from the City of Meridian. Wells may be used for non-domestic pUrposes
such as landscape in-igation,
All future development of the subject property shall be constructed in accordance with
City of Meridian ordinances in effect at the time of development. All future uses shall
not involve uses, activities, processes, materials, equipment and conditions of
operation that will be detrimental to any persons, property or the general welfare by
reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
UDC 11-5B-3D provides the P&Z Commission and City Council the authority to
require a property owner to enter into a Development Agreement with the City of
Meridian that may require some written commitment for all future uses. Due to the
close proximity of existing and future residential uses. staff believes that a
Development Agreement is necesSary to ensure that this property is developed in a
fashion that is consistent with the comprehensive plan designation and does not
ne£!:atiyely impact nearby properties.
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-05-052/RZ-05-0 19/PS-05-002 Page 10
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Staff believes that the Development Agreement should include the following
proVlslOns:
Phasinll Plan: Generally, the applicant anticipates the phasing plan to begin with the
commercial lots near the Eagle Road intersection and then continue development to
the east. Construction is anticipated to reflect market demand and construction needs.
Staff is supportive of this request but believes that some of the amenities proposed
with the development should be constructed prior to the development build out.
Therefore, that prior to issuance of any certificate of zoning compliance all
landscaping shall be constructed along the southern and western property boundary
and along Eagle Road to the point of connection with adjoining projects. The
commercial/office lots should include either a pennanent easement or be redesigned to
include landscaping in common lots.
Non-Residential Buildinlls: The applicant has requested a maximum of 54,000 square
feet of retail/restaurant/office spaces. Staff proposes to limit the applicant to their
request with an allowance of up to 20% additional commercial square footage
(65,000) for more marketable conditions. The maximum square footage of one single
building shall not exceed Y2 of the maximum request.
Residential Buildinlls: The applicant has shown several elevations for both alley
accessed residential, townhouses, and detached single family residential products.
Staff supports these elevations but would also support better clarification of the
specific height, bulk, types of materials, and locations proposed for each type to
address the concerns of adjoining property owners and to include within the DA
Pathways: The applicant shall coordinate with the Meridian Parks Department and
Nampa Meridian Irrigation District to defme the location of the multiuse pathway,
bridge maintenance, and landscaping along the Pinch Lateral.
That the applicant will be responsible for all costs associated with the sewer and water
service extension. Any existing domestic wells and/or septic systems within this
project will have to be removed from their domestic service, per City Ordinance
Section 5- 7 ~517, when services are available from the City of Meridian. Wells may be
used for non-domestic purposes such as landscape irrigation.
That all future development of the subject property shall be constructed in accordance
with City of Meridian ordinances in effect at the time of development. All future uses
shall not involve uses, activities, processes, materials, equipment and conditions of
operation that will be detrimental to any persons, property or the general welfare by
reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
2. PP Application (PP-05-059): The proposed preliminary plat substantially complies
with the Zoning Ordinance.
Special Considerations:
Sidewalks: The applicant is proposing to construct 5-foot wide sidewalks on some of
the internal streets/drive aisles. The sidewalks may be detached from the curb with a
5-foot wide landscape strip, The proposed landscape strips do not include trees, only
grass. The applicant is proposing to plant trees on the back side of the sidewalks, but
staff believes that the trees should be planted between the curb and the sidewalk to
Bienville Square Subdivision
AZ-05-057IPP-05-059/CUP-05-052/RZ-05-019IPS-O5-002 Page II
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
provide the pedestrians with cover and to make the streetscape more attractive. The
width of the planter strip between the sidewalk and the curb should be increased to a
nlinimum of 8hfeet wide and include Class II trees. Since the applicant has subnlitted
a plan which is conceptual in nature staff feels the sidewalk locations shaH be made
consistent with the ODC including drive aisles which shaH include at a minimum a 5'
attached sidewalk or 4' detached sidewalk.
Land Use Buffers: ODC requires landscape buffers between different land uses. Per
ODC llh3B-9, a 25~foot wide landscape buffer is required between single-family
homes and C-G zoned property. The ODC requires the land use buffer to be provided
by the higher intensity use and to be located on the building site of the higher
intensity use, unless the adjacent and higher intensity use has not provided the buffer.
The applicant is showing a 30-foot wide buffer between the single-family homes and
the detached single family residential lots, as well as the commercial and multifamily
lots on the landscape plan, but the buffer is not shown on the preliminary plat. The
applicant should be required to create a 30hfoot wide landscape buffer lot along the
lots that abut the singlehfamily lots. Said buffer shall contain materials in accordance
with ODC 11- 3B-9 and not include impervious surfaces such as parking areas or
driveways. The pathway proposed shall be landscaped in accordance with ODC 11-
3B-12. See Exhibit B below.
Landscape Street Buffers:
Arterials: ODC II-2B requires a 35~foot wide street buffer along classified
arterial roadways and entryway cOlTidors. Eagle Road is classified as an Arterial
Road, On the submitted landscape plan, the applicant is proposing to construct a
35-foot wide street buffer along Eagle road. The applicant should be required to
depict the required street buffers on the face of the final plat in an easement or
place the required buffers in Common lots as per ODe II-3D. See Exhibit B
below.
Commercial Streets: ODC 11-2B requires a 10-foot wide street buffer along
Commercial roadways. On the submitted landscape plan, the applicant is
proposing to construct a to-foot wide street buffer along both sides of W.
Bourbon Street and Cajon Court, However, the street buffer easements are not
labeled on the plat. The applicant should be required to depict the required IOh
foot wide street buffer easements along local roads on the face of the final plat.
Ditches, Laterals, and Canals: There are several iITigation laterals that bisect this
parcel. Per ODC 11 h3A-6, all ÌlTÌgation ditches, laterals or canals, exclusive of
natural waterways, intersecting, crossing or lying adjacent and contiguous to the area
being subdivided shall be tiled. The applicant is proposing to tile all of the iITigation
facilities located on site. See Exhibit B below.
Pressure Irr:Ü!ation: The City of Meridian requires that pressurized iITigation systems
be supplied by a yeaNound source of water (ODC 11-3A-15). The applicant should
be required to utilize any existing surface or well water for the primary source. If a
surface or well source is not available, a singlehpoint connection to the culinary water
system shall be required. If a single-point connection is used, the developer will be
responsible for the payment of assessments for the common areas prior to signature
on the [mal plat by the City Engineer. An underground, pressurized ilTigation system
should be installed to aU landscape areas per the approved specifications and in
accordance with City Code. See Site Exhibit B below.
Bienville Square Subdivision
AZ-05-057/PP-05-059/CUP-O5-052/RZ-O5-019IPS-05-002 Page 12
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02102/06
Fencing: The applicant is showing a six foot cedar and block fence along the
perimeter of the property which would meet the standards of the UDc. A detailed
fencing plan should be submitted upon application of the final plat (UDC 11 ~3A- 7).
If permanent fencing is not provided, temporary construction fenCing to contain
debris must be installed around the perimeter prior to issuance of a building pennÎt.
All fencing should be installed in accordance with City Code. See Exhibit B below.
Cross-access Intemal: There are some commercial lots that do not have frontage on a
public street. Instead the applicant is proposing to provide cross-access easements to
the lots that do not have public street ITontage. Because several of the proposed lots
do not have frontage on a public street, the applicant should provide a cross
parking/cross access agreement for all of the lots within the office and commercial
portions of the subdivision to use the driveways and parking aisles. The site will be
redesigned if not granted access to Eagle Road by the Meridian City Council and/or
!TD, The Commission has conditioned the Sadie Creek Project to provide at least one
of the non-signalized access points to Ustick Road to be designed to serve as a
commercial collector for interconnectivity to the north and south and vehicular
movement in the north/south direction. Maintenance of the drive aisles and parking
areas should be provided for in a note on the face of the final plat, AND/OR in a
document such as CCRs. See Exhibit B below.
Cross-access South: The applicant shall be required to provide cross access to the
parcels north of the site. The project is a portion of a larger site project (Kissler
Annexation) and the sites shall maintain consistent traffic flow for the entire site.
Eagle Road Access: The Idaho Transportation Department (!TD) has a policy for
access to a Type N Principal Arterial will be at intersections only, and spaced at one-
half mile intervals in urban areas. !TD allows approaches (other than intersections) in
special cases and on a temporary basis. The access point shown at approximately
1,000 feet south of the Us tick Eagle Road intersection shall be eliminated as it does
not meet criteria of either !TD or the Meridian Comprehensive Plan. However, the
this property immediately south of the site has been developed by Ada County which
makes a break in the area which does not allow for a frontage/backage road to be
created on the south west side of Eagle and Ustick. The applicant has an open
application with !TD for the access to Eagle Road.
CuP Application (CuP-05-052): The proposed Conditional Use request substantially
complies with the Zoning Ordinance.
1. Elevations: The applicant has submitted building elevations of the proposed structures.
The application lists the proposed building materials, including stone, brick, stucco and
timber to be accented with chrome, aluminum and gloss painted trims. UDC 11-3A-19
requires all structures on property adjacent to an entryway corridor to comply with the
design standards listed in this section. Staffs intetpretation of the UDC is that the
applicant may choose to place the "primary entrance" on an elevation other than the
public street side. However, the public street elevations (Ustick Road and the new road
on west boundary) must still meet the other standards listed in 11-3A~19 (except for the
primary entrance standards).
The elevations will need to be reviewed prior to issuance of CZC to comply with the
following ordinance standards:
Bienville Square Subdivision
AZ-OS-OS7/PP-OS-OS9/CUP-OS-OS2/RZ-OS-O 19/PS-OS-OO2 Page 13
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
a) Facades: Facades visible fi.-om a public street shaH incorporate modulations in the
façade, roof line recesses, and proj ections along a minimum of twenty percent
(20%) of the length of the facade,
b) Roof lines: Roof design shall demonstrate two or more of the foIIowing: a)
overhanging eaves, b) sloped roofs; c) two (2) or more roof planes; d) varying
parapet heights; and e) cornices.
c) Mechanical equipment: All ground~level and rooftop mechanical equipment shall
be screened to the height of the unit as viewed from the property line,
d) Color and Materials: Exterior building walls shall demonstrate the appearance of
high.quality materials of stone, brick, wood or other native materials. Smooth-
faced concrete block, tilt-up concrete panels, or prefabricated steel panels are
prohibited except as accent materials.
2. Refuse/Service Area Screen: Neither the Site Plan or Landscape Plan call-out how or if
the refuse/service area on the west side of the buildings will be screened. UDC 11-3A-12
requires the visual and acoustic impacts of these functions are fully contained and out of
view from adjacent properties and public streets. The applicant's CZC application must
clearly demonstrate how this standard is met.
3. Cross Access: The property to the north will be providing two points of access for
interco111lectivity and is directly tied with the existing Development Agreement for
providing a frontage road to Eagle Road. The applicant has provided a design consistent
with two points of access, one point at Sadie Creek Avenue and the second point for the
drive aisle approximately 700 feet west of the Us tick/Eagle intersection. There shall be
cross access with a section designed to meet private street standards with the second point
of access not designated as a public street.
4. Private Streets: The applicant is proposing to use Lot 1 Block 8 to provide future access
N, Castille Street. The applicant has submitted a Private Street application as required
by UDC 1l~3F.3. The private street standards are listed in UDC 11-3F. The applicant
shall design and construct the private streets in compliance with the standards listed for
Private Streets in UDC 11-3F Private Streets. See Exhibit B. The Meridian Fire and
Police Departments are requesting a minimum of 24' paved sections for alleys which
shall not apply to the R-15 district as this would exceed the standards set forth by ACHD
and the UDC.
5. Common/ODen SDace: The applicant has a qualified application meeting the
requirements of UDC 11-3G. The proposal is showing 16.4% of qualified open space in
the residential district which meets the requirements of a minimum of 5% open space.
6, Multi-Use Pathway: The applicant is not showing but will be required to install a
multiuse pathway in accordance to the Comprehensive Plan. The pathway shall be along
the Finch Lateral in a location to be agreed upon with the Parks Director and Nampa
Meridian Irrigation District. Currently, NMID has a 40' easement upon which the
applicant is proposing to install the pathway. All NMID standard conditions shall be
applied to this site and all pedestrian access easements shall be enacted.
Bienville Square Subdivision
AZ-O5~O57 /PP-O5-059/CUP-05-052/RZ-O5-0 19/PS-O5-002 Page 14
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Staff has required the applicant to bond for improvements to the multi~use pathway with
this application, The pathway connection is listed as an amenity to the residents and users
of the site and will be essential for pedestrian connection from Usticlc Road to Eagle
Road. The pathway with the associated landscape standards will also buffer the fllture
commercial uses and the transitional residential lot sizes to the existing large lot Ad.-"}
County Subdivision which suHounds the site. Therefore, the pathway shall be a priority
to be completed as soon as practical with the future development of the site,
7. Amenities: The applicant is required to provide one amenity per 20 acres, The applicant
is showing qualified site amenities as follows:
11-3G-3C-1 - Quality of life amenities - Picnic arealbasketball court in Lot 10 Block 2
11-3G-3C-2 - Recreation amenities - Clubhouse, in Lot 12 Block 1, tennis courts in Lot
10 Block 2
11-3G-3C-3 - Bicycle circulation amenities - Several blocks are connected with all
internal 5' pathway which will be required to connect to the required Multi-use Pathway -
along the Finch Lateral. . .
Amenities are generally located centrally and in common lots. These common lots shall
be maintained by the Bienville Square (Home or Business) Owners Association. The
landscape architect shall certifY that one tree per 8,000 square feet of lawn has been
provided on the landscape plan,
9b. Staff Recommendation: Based on the above analysis, staff finds the AZIIRZIPP/CUPJPS
applications substantially confonn with the adopted DA, Comprehensive Plan policies and ODe
standards. As noted under "Special Considerations," we recommend the building elevations be
submitted in compliance with the entryway corridor standards, the access point to Eagle Road be
eliminated and redesigned, and a private street section for cross access provided to the south be
added to the prelinùnary plat in place of the proposed Eagle Road access. We recommend
approval ofthe AZlRZ/PP/CUP/PS application with the conditions shown in Exhibit B.
10. EXHIBITS
A. Drawings
1. Preliminary Plat (by Stanley Consultants, no date)
2. Landscape Plan (by The Land Group, dated October 13, 2005)
3. Site Plan (dated July 9,2005)
B. Legal Descriptions
C. Conditions
] . Planning Department
2. Public Works
3. Fire Department
4, Police Department
5. Parks Department
6. Sanitary Services
Bienville Square Subdivision
AZ-05~057/PP-05-059/CUP,O5-052/RZ-O5-0 19/PS-O5-002 Page 15
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
7. ACHD - Pending
D. Required Findings from UDC-
1. Annexation
2. Rezone
3. Preliminary Plat
4, Conditional Use Permit
5. Private Street
6. Variance - To be completed after a recommendation from the Planning Commission
Bienville Square Subdivision
AZ-OS-OS7 /PP-OS-OS9/CUP-OS-OS2/RZ-OS-O 19/PS-OS-OO2 Page 16
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exhibit Al:PreIiminary Plat 1 (Stanley Consultants) No date
r--
-----------------------'--------"----_._---._---~--_.._- --------"---------------n_____-----n___.__----------- ----------'_.,----------------
I
--
-------------.------------------ ----..----------------.-,.---------
,~
-0,._,-
'-, ,
i ¿,
,-
'.7"-
,1 -- -
,n 1';
~ l' /.
\t - !
- J "
i i ¡
í -.
--- """,.
/
- --
,g ',h"Fð Ii # "~'¡j~;hîh ¡Î~'¡' U ¡' " 1/ ,ij
I¡iii!i;---' f¡" "If ¡If lit I F.- ~'jl
i~fH ¡Ù!:¡}i.Hf if.! ';f!ìifli; ! i
¡!,!"j~¡"II' 'J"tr.' 'I
D{i¡UltîHHm ~f¡fl~'W h
f¡ II. ~fi'l ;. I!:, ,8 ,> [' .. J . í
iii:'!,~!dfj:.t !fJ'tl¡H5 :1
ill'I"i;'.~r'ã,l ~. ¡H:f~ n
¡-,,!¡u'H¡fijl 'P1!.,I. "'I
] ill I¡m !iî¡¡; : j ¡ I ifF ¡ ¡ijjlFi ¡ J ~' Ci~f-¡'
f"í¡!ní;!¡¡¡~ f: "" ~§¡
MB II .!
1m' I .1 "III-I-iII/II"" '1[11/-'-11:
"I'ImmmWîljlWW11Hirìf !'~~.L,I':",~_I~-.
'¡no~,R;"F j¡1Í~J¡¡ I!¡.~f '-.1-
iNJ!iflp,plí'¡~'¡lii.'i fI' f.!,.,¡-.1!,'
'¡¡liE ~. '¡ ,I i 'I -"
I!:. 'H ¡. ¡ Ii Îlr,L
r
/
. -'-
'~"VJl.C" UARE
I ,
,oc.-"." '",..,"'"""..,,~.."-..
""~""-""'-""""",
O""'" "'"
---------,---
;I~
~, ~
i'J
--@-~
"., "'~"'-'" '"
::~;;;¡",:;'~.,
'0 ""',"",",.
Bienville Square Subdivision
Exhibit A Page I
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exbibit A2: Landscape Plan Ll.O (The Land Group) Dated Octobel' 13, 2005
r~?"~~:':.:~,;',"~>~"'"'""",-"""-"-,,,,,",:,~-~,,",",-~- !~~..--._'---",.---.,..---------.._,.._.._--- _...,-", """-""""--,..".".--., ,.---""'-----'-.._--...._,-"--~_._,,
I
I
~::::'1
Ii:
I.
..."~~,,,!'rD:"~;~_(_".:,,'ED 1 ~'~""..:'
-." i'-)"j':~W
i '
'~",""
¡ {iY
!
"':':-: :¡
{/,' I
;" ,;- \'i: I~:
,,;
"'--_i
- ~~
7
r-
-,
Q
:,~j ;Å",-": ¡! 'Mh;' , ff¡liff 1¡t:IJ~:
It,. , !. ! [l\1 I(
'-- ,,-- ,
BrENV/LLE SQUARE
MEHID/AN. IDAHO
;-; dl~ {$~~~~
" ,;;" '-~.~ri..Ji
" ",.¿".,,~.,,'-'"
-
Bienville Square Subdivision
Exhibit A Page 2
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DA TE OF 02/02/06
Exhibit A2: Landscape Plan L1.1(The Land Group) Dated October 13, 2005
'"'-"~'~"":"""-",o'~!'.:~""""""L=~,,,,-~.o'=~:,!,,=~:,----_.._,--"'-'-----"~---'--" -""-"_.._-"-.,,----~----,,------- --- '--"~-.. ---'---'--"'.--.-.,,- ,,-----
.'C/"',-",
I;:' -, J(; rC(
I:: -'.) (-",;1
- (;iIf'y:"" !Ii'
I ~iiw\t;~II):,'~¡~l¿ r 1-
-,I;.:"':.-.._',-.,-._-,~.'-,,.' ,,'J',,- '../.>;,1
- : :;" - ;'" ' ~.-_. '/----
:1' , :, ;; ,! ¡ :
'. ~" :,
'¡
'~';,:_;;),~;;
,/
,,' "---.'
"-':--L:,- ,-f.',1-\.;,,-':~-:, )(î:
W <rpŒfïi;ì¡Æ --- - "
!~ mIHA,~
t:I '1!Ii¡l
« !¡if!'"
n .",.j,
~ ìiiii/;
6 Hum
ã ¡i-/'¡¡¡¡
o-j J 1;'/
;u "J "
to ,I'J~ !"
t<1.<' "I
." ¡¡ii'
ï: ¡ , (I'
,~ 'il~fJ
iÔ Iii,!
1, ;:.
;,.1';
:tJ ,- '1
r- " '.
j¡
""
,. ,
<'
I
11ì¡' 11
¡;¡ J
r
-,
~_C_!: :. ;: ¡¡(,1m,;! !I,f,M'I;- j;.:IJ"~:,
o;{\~ -,~
MERlO:AN. IDAHO
B/ENVILlE SQUARE
, I" i';j~',~,-,
"'f- "f'
!i;!I~ ~~~~}
Bienville Square Subdivision
Exhibit A Page 3
J¡
'J
- ,
f
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
ExhibitA3: Site Plan
" ,
','
'<'
, ",
!i'i!'
",C, "..
i ,c"
JWiJ
,",'
,,"', ,
;},::,
" " ' \,~;'
,;¡ ':",
"
,"'c"i,
, ,',
: ~
.,'
I : I¡:ii'l
n "--,, -n "C~£'-'!c~~~~=~":~~§:~i=~cci~.~-:==
i lii/'I;
I i,i, :
'Iilii:
: !!ill'
i iil! ;
, li,l,'
il/!ii
i i Ii!::
: :jll'lll
,,< ¡ ,
"~I IIi
. ,ii;!
I iiii
I ¡ ¡¡ !
"", I"'i
~ ,',I,,~-,~.~',:,--~, r'C~,",f¡ 'It, I",!,I/III,!
;i i-(¡/ .; ':~,c--,~,-_;jH, :! 1¡I:f
! ~ ~'~ /"li,i~;1~ LlIIII;
"1'1 '," "%;c-~~~~,:), '" /¡J!i¡ill!
- ' ~ --:""'----" --,-,;1 i II r
if ¡¡T;~ ~ f,":r:êq.Ii,/I/II¡
Ii !~?!!{i"! ¡ ~ ;:!::~I~I" '{Ii 'I II/'W
/'1 ;\ . '",," , ',""'" ", "'; . O¡;I i I' I ¡
I'¡~,j'; '" i ,;:i;'::fi "'j'J';ï jlii'
I¡ , ' '.l~,~;~~~~1~~111¡11'
: L,¡""""""",:~-"",-¡"-"",:-",,,~,"'-~C~","",:,¡",:",,,<~,:,,""':_;""""~~~"<"'~~¡ Ii::
-- - =~- " ~"I" ',,:) ¡ ill:
'I '1,/1
'I!I
III
¡Ii
, ,1/
Ii!
"1"
(?-'
T
-0
1;}
'-'""
10;.
" "Y'
'\)
'11>
~,
-',-", ,
"'-'
'--,
"
,',
""c"
"
", '
ritdr
,~ '
i
::'~ '
i Ii 'i
,;,e:!
i ,(
"""""<,,: ,
""--, "-'-'_::':/
.~: II" "
','HUIII! í
: I
BienviIle Square Subdivision
Exhibit A Page 4
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exhibit ß: Legal Description - Subdivision
DESCRIPTION FOR BIENVILLE SQUARE SUBDIVISION
OCTOBER 13, 2005
A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF ïHE NE y., OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T. 3 N., R. 1
E., B,M.. THENCE S 00"00'00" E 677.57 ALONG THE EAST LINE OF SAID
SECTION 5 TO A POINT;
THENCE N 83"54'00" W 57.36 FEET TO A POINT ON THE WESTERLY RIGHT
OF WAY OF EAGLE ROAD, THE REAL POINT OF BEGINNING OF THIS
DESCRIPTION;
THENCE S 01°14'39" W 974,96 FEET ALONG SAID RIGHT OF WAY To A
POINT;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 44"05'18" W 227,63 FEET TO A POINT;
THENCE N 72°24 '04" W 22128 FEET TO A POINT;
THENCE S 77"26'30" W 667,38 FEET TO A POINT;
THENCE N 72°35'42" W 233,35 FEET TO A POINT;
THENCE N 00°15'11" W 1129.35 FEET ALONG SAID BOUNDARY TO A
POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE S 71 "28'10" E 803.90 FEET TO A POINT;
THENCE S 83'54'00" E 510 2' FEET TO THE: REAL POINT OF BEGINNiNG
OF THIS DESCRIPTION. COMPRISING 27.36 ACRES, MORE OR LESS.
SADIE PARCEL A
Bienville Square Subdivision
Exhibit B Page I
CITY OF MER!DIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
"".","".-",,",~--,
z
0
;V (JJ
,/ 5
0
ill
.it ::>
:ìl( (I)
j (f)
---1
0
Ct:
<{
()
'T:"'/',;,:.,:,
"""""""---'-"'~-""""'--
'" ", "
'-"'-"--~,,-,, -- '-'-....
'<-"-;-"-"'~~'~'=""""'"'~"""""--~"'~---'-'--'
'-- """'~---~--~""~'"",
I
1,1>::,T/(I<
ROAri
,:';2
.:>:)
-- --" iT!
I
J
¡
~~~"
. "",
t..... I ,
, ----... , ,;
........ 1',--,
I' ""~ . c"',
-"---- ",I I
" . PREVIOUS ANNEXA TION ""'-~:" Þû' ;~
'hV c.
'0"1: C",?" ""'<l1111c-,p
----IN¡C, - --- JJO70C'" ";'.,-:,:)':$ 'ç:
. :') /:110S'¡!(I'¡ n 1?67,ì~"...~,:19.00' E N tffJ54'(JO'£ Pj¡","f~l"' '--
)..~ '; ,.l'j:' ' /7"2.(, , , ' 221 28' v~-~, ;"~,,::,~-:,:"":;"
-~ '~'<t';>" . <; "- %fi'.. "':"} -t'i::
't CAROL'S SUBDIVISION ~,- ':",-.'::"
f- I
/B 21'
~J 9:)"0(; GO" IN
5
14
UNPLA 1TEO
-<'
'---
,i\í,j¡\lt ,x p, fl'/~ E. ?}--¡ I E¡¡ r f Of;;:
, Bla~VILL¿::;QUArŒ SIJRf)IVI"';~()N
I IJ.I(ÞTH¡ 1.\) THC NF Î.-'( flf ':+C tin!',,'
"':'",/:' ,/:">c,
.---~-<--
Stanley Consultants ,,;-;
:~:-v" ":,,\1",'r:<, ',,";'-:--
", -
,:;;:/-,.," "c:/ "i\,.'C" ,,--
"-"-""""-""";'-...,._._-.~~-~-"-_.-.._~......-..
I ""I.i'"
"~j
Bienville Square Subdivision
Exhibit B Page 3
-.. ,
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exhibit B; Legal Description - Annexation
DESCRIPTION FOR BIENV/llE SQUARE SUBDIVISION
ANNEXATION
A PARCEL OF LAND BEING A PORTIONS OF THE NE Y. OF SECTION 5,
TOWNSHIP 3 NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN,
MERIDIAN, ADA COUNTY, fDAHO, BEING MORE PARTICULARLY
DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T, 3 N" R. 1
E, B,M" THENCE S 00°00'00" E 955,14 ALONG THE EAST LINE OF SAID
SECTION 5 TO THE REAL POINT OF BEGINNING OF THIS DESCRIPTION;
OCTOBER 24, 2005
THENCE S 00"00'00" E 691,06 FEET ALONG SAID SECTION LINE TO A
POINT:
THENCE N 99"00'00" W 78.21 FEET TO A POINT ON THE WESTERL Y RIGHT
OF WAY OF EAGLE ROAD;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 44°05'18" W 227,63 FEET TO A POINT;
THENCE N 72"24'04" W 221.28 FEET TO A POINT:
THENCE S 77°26'30' W 667,38 FEET TO A POINT:
THENCE N 72°35'42" W 233,35 FEET TO A POINT;
THENCE N 00°15' 11" W 569.21 FEET ALONG SAID BOUNDARY TO A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 87"06'00" E 335.19 FEET To A POINT;
THENCE N 89"54'00' E 20000 FEET TO A POINT;
THENCE S 79'OTOO' E 3 HU)O FEET TO A POINT;
THENCE N 77°06'00" E 267.75 FEET TO A POINT:
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exhibit B: Legal Description - C-G (General Commercial)
DESCRIPTION fOR BIENVlllE SQUARE SUBDIVISION
CoG ZONE
OCTOBER 13,2005
A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE Y., OF SECTION 6, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO, BEING MORE PARTICUlARl Y DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T. 3 N., R. 1
E., B.M" THENCE S 00.00'00" E 677,67 ALONG THE EAST LINE OF SAID
SECTION 5 TO THE REAL POINT OF BEGINNING OF THIS DESCRIPTION;
THENCE S ooaoo'OO" E 968.63 FEET ALONG SArD SECTION LINE TO A
POINT;
THENCE N 90°00'00" W 78.21 FEET TO A POINT ON THE WESTERLY RIGHT
OF WAY OF EAGLE ROAD;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 44°05'18" W 227,63 FEET TO A POINT;
THENCE N 72°24'04" W 213.51 FEET TO A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 00°37'20" E 786.75 FEET;
THENCE S 83'54'00" E 434,01 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTJON, COMPRISING 8.73 ACRES, MORE OR lESS.
BH:~vru 1< CO\f\Œ RCIA I
CITY OF MERIDIAN PLANNING DEPARTMENT STAff REPORT FOR THE HEARING DATE OF 02/02/06
Exllibit B: Legal Description - R-15 (Medium High Density Residential)
DESCRIPTION FOR BIENVILLE SQUARE SUBDIVISION
R15 ZONE
OCTOBER 13,2005
A PARCEL OF LAND BEING PORTIONS OF PARCEl "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE Y. OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO. BEING MORE PARTfCULARL Y DESCRIBED As FOLLOWS;
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T, 3 N" R. 1
E" B.M., THENCE S 00"00'00" E 677,57 ALONG THE EAST LINE OF SAID
SECTION 5 TO A POINT;
THENCE N 83°54'00" W 434,01 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION; .
THENCE S 00,"37'20" W 786,75 FEET;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE N 72°24'04" W 7,77 FEET TO A POINT;
THENCE S 77°26'30" W 594.16 FEET TO A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 00°37'20" E 132,52 FEET TO A POINT;
THENCE S 89°22'40" E 105.87 FEET TO A POINT OF CURVATURE;
THENCE 87.11 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50.00 FEET, A DELTA ANGLE OF 99"49'13", A TANGENT OF
59.40 FEET AND A CHORD BEARING N 40°42'43" E 76.50 FEET TO A POINT
OF TANGENCY;
THENCE N 09°11'53" W 171,74 FEET TO A POINT OF CURVATURE:
THENCE 205.40 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE.
HAVING A RADIUS OF 575,00 FEET, A DEL TA ANGLE OF 20>28'023", A
TANGENT OF 103,81 FEET AND A CHORD BEARING N 01 '02 'OB " E 204,31
FEET TO A POINT OF TANGENCY;
THENCE N '1/¡I~Îm;;' F: 53 ¿ i Ic,:" f' T 10 A remiT ry;;; C:LiPVATi.I¡?E
Bif!\\'ILLE-R-15
CJTY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
THENCE 232.28 FEET ALONG A CURVE TO THE LEFT, SAID CURVE
HAVING A RADIUS OF 625,00 FEET, A DEL TA ANGLE OF 21 °17'37", A
TANGENT OF 117.49 FEET AND A CHORD BEARING N 00'37'20" E 230,94
FEET TO A POINT OF TANGENCY;
THENCE N 10"01'28"W 111.52 FEET TO A POINT OF CURVATURE;
THENCE 69.25 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50,00 FEET, A DELTA ANGLE OF 79°21'123", A TANGENT OF
41.48 FEET AND A CHORD BEARING N 49042'04" W 63.85 FEET TO A POINT
OF TANGENCY;
THENCE N 89"22'40" W 148.60 FEET TO A POINT OF CURVATURE;
THENCE 23.81 FEET ALONG A CURVE TO THE RIGHT. SAID CURVE
HAVING A RADIUS OF 100.00 FEET, A DELTA ANGLE OF 13°38'38", A
TANGENT OF 11.96 FEET AND A CHORD BEARING N 82°33'21" W 23.76
FEET TO 'A POINT OF TANGENCY;
THENCE N 75°44'02" W 41.56 FEET TO A POINT ON A CURVE;
THENCE 18.13 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 300.00 FEET. A DELTA ANGLE OF 03°27'42", A
TANGENT OF 9-07 FEET AND A CHORD BEARING N 15°59'49" W 18.12 FEET
TO A POINT OF REVERSED CURVATURE;
THENCE 93,21 FEET ALONG A CURVE TO THE lEFT, SAID CURVE HAVING
A RADIUS OF 300,00 FEET, A DELTA ANGLE OF 17048'08", A TANGENT OF
46.98 FEET AND A CHORD BEARING N 08°49'36" E 92.84 FEET TO A POINT
ON A CURVE;
THENCE S 71028'10" E 609.64 FEET TO A POINT;
THENCE S 83°54'00" E 133.56 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION. COMPRISING 10,03 ACRES, MORE OR lESS.
BIE:\\'ILLE-R-¡:;
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exhibit B: Legal Description - R-8 (Medium Density Residential)
DESCRIPTION FOR BIENVILLE SQUARE SUBDIVISION
RBZONE
OCTOBER 13,2005
A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF
SURVEY NO, 6418 AND OF THE NE X OF SECTION 5, TOWNSHIP 3
NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA
COUNTY, IDAHO, BEING MORE PARTICULARL Y DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T, 3 N., R. 1
E" B.M, THENCE S 00°00'00" E 677.57 ALONG THE EAST LINE OF SAID
SECTION 5 TO A POINT;
THENCE N 83"54'00" W 567.57 FEET TO A POINT;
THENCE N 71 °28'1 O"W 609,64 FEET TO THE REAL POINT OF BEGINNING
OF THIS DESCRIPTION;
THENCE N 71°28'10" W 194.26 FEET TO A POINT ON THE BOUNDARY OF
CAROL'S SUBDIVISION;
ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING:
THENCE S 00°15'11" E 1129.35 FEET TOA POINT;
THENCE S 72°35'42" E 233,35 FEET TO A POINT;
THENCE N 77"26'30" E 73.22 FEET TO A POINT;
LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION:
THENCE N 00"37'20" E 132.52 FEET TO A POINT;
THENCE S 89°22'40" E 105.87 FEET TO A POINT OF CURVATURE;
THENCE 87.1 f FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50.00 FEET. A DEL TA ANGLE OF 9S! '~9' 3"', A T ANC3ENT OF
59.40 FEET AND A CHORD BEARING N 40<42'43" E 76.50 FEET TO A POINT
OF TANGENCY;
THENCE N 09"11 '5.3" W 171.74 FEET TO A POINT OF CURVATURE;
THENcr; ;;>0;> 'In FEE r /1 (¡ide 1\ ,.:ClriVE ì () THli'. r:iGi-H, <;p\!f) r:! n;"JF
it,,~,\f:l',j(;I- ,,:'.:¡C-.¡,,;;'t::r;'!il,UElr,:, 1')¡;'2').d'.iO¿;',t
BJENYJLU"R-:;;
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
TANGENT OF 103,81 FEET AND A CHORD BEARING N 01°02'08" E 204.31
FEET TO A POINT OF TANGENCY;
THENCE N 11"16'08" E 53,21 FEET TO A POINT OF CURVATURE;
THENCE 232.28 FEET ALONG A CURVE TO THE LEFT, SAID CURVE
HAVING A RADIUS OF 625.00 FEET, A DELTA ANGLE OF 21<17'37", A
TANGENT OF 117.49 FEET AND A CHORD BEARING N 00°37'20" E 230_94
FEET TO A POINT OF TANGENCY;
THENCE N 10o01'28"W 111.52 FEET TO A POINT OF CURVATURE;
THENCE 69,25 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 50,00 FEET, A DELTA ANGLE OF 79°21'123", A TANGENT OF
41.48 FEET AND A CHORD BEARING N 49"42'04" W 63,85 FEET TO A POINT
OF TANGENCY;
THENCEN 89°22'40" W 148,60 FEET TO A POINT OF CURVATURE;
THENCE 23.81 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 100,00 FEET, A DELTA ANGLE OF 13°38'38", A
TANGENT OF 11.96 FEET AND A CHORD BEARING N 82°33'21" W 23,76
FEET TO A POINT OF TANGENCY;
THENCE N 75°44'02" W 41.56 FEET TO A POINT ON A CURVE;
THENCE 18,13 FEET ALONG A CURVE TO THE RIGHT, SAID CURVE
HAVING A RADIUS OF 300.00 FEET, A DELTA ANGLE OF 03°27'42", A
TANGENT OF 9.07 FEET AND A CHORD BEARING N 15°59'49" E 18,12 FEET
TO A POINT OF REVERSED CURVATURE;
THENCE 93.21 FEET ALONG A CURVE TO THE LEFT, SAID CURVE HAVING
A RADIUS OF 300,00 FEET. A DELTA ANGLE OF 17°48'08", A TANGENT OF
46.98 FEET AND A CHORD BEARING N 08°49'36" E 92.84 FEET TO THE
REAL POINT OF BEGINNING OF THIS DESCRIPTION, COMPRISING 10.11
ACRES, MORE OR LESS.
BIENvrU.E-R-S
.~
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DA TE OF 02/02/06
C. Conditions of Approval
1. Planning Department
1.1.1
SITE SPECIFIC REQUIREMENTS- (Bienville Square)
1.1.2
The preliminary plat labeled as I prepared by Stanley Consultants, with no date, is approved, with
the conditions listed herein. All comments/conditions of the accompanying Annexation and
Zoning (AZ-05-057) and Conditional Use Pennit (CUP~05-052) applications shall also be
considered conditions of the Preliminary Plat.
Create an open space lot for the proposed 30-foot wide landscape buffer along the south and west
boundaries. Said buffer area shall contain materials in accordance with ODC 11-3B and not
include impervious surfaces such as parking areas or driveways.
Graphically depict on the face of the plat, the required 35-foot wide landscape buffer along Eagle
Road. Depict on the face of the final plat a 10-foot wide landscape buffer along both sides of W.
Burbon Street and N. Cajon Court. Said landscape buffers shall be in either a conunon lot or an
easement adjacent to the rights of way.
The landscape plan prepared by The Land Group, labeled Sheets LS 1.1, is not approved with
these applications a landscape plan consistent with ODC 11- 3B shall be submitted with the fmal
plat which refleCts any changes made to the preliminary plat to redesign the subdivision
consistent with approved access points. Including but not limited to full landscaping along Eagle
Road which cUlTentIy is listed as a right-inlright-out access.
With the final plat application, submitted revised copies of the landscape plan with the changes
listed above.
1.1.3
1.1.4
1.1.5
1.1.6
Maintenance of all common areas shall be the responsibility of the Bienville Square Subdivision
BusinesslHome Owners Association(s).
Any roof~mounted mechanical equipment will be screened from view from any public right-of-
way. The applicant shall submit drawings at the time of CZC submission that demonstrate this
condition is complied with.
The applicant shall comply with the outdoor lighting standards shown in ODC 1 l-3A-l 1.
The awnings on the east elevations shall extend at least 20 feet beyond the entry doors, measured
from the building face to the outer edge of the awning for the retail buildings. The applicant shall
submit a drawing at the time of CZC application submission to demonstrate compliance with this
condition.
1.1.7
1.1.8
1.1.9
Comply with ODC II-3A-I2 regarding a screen for the refuse/service area.
No ilTigation pump station or facility is shown on the Site Plan. However, if one is proposed for
the site, it must be located outside of any required street buffer, Impervious surfaces are
prohibited in said buffers.
Prior to the City Engineer's signature of the final plat, all existing structures shall be removed
from the site.
1.1.13 Provide cross access/cross parking agreement(s) for all lots in Bienville Square Subdivision. All
cross access drive aisles shall only approach the ACHD approved points of access to the public
street system. Maintenance of the aisle and parking areas shall be provided for in a note on the
face of the final plat, AND/OR in a document such as CCR's.
1.1.10
1.1.11
1.1.12
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
¡ .1.14 Other than the points of access approved by ACHD, City of Meridian, and ITD, direct lot access
to Eagle Road, is probibited. A note sball be placed on the final plat restricting access to Eagle
Road.
1.U5
It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
Applicant shall be responsible for application and compliance with and NPDES Pern-ritting that
may be required by the Enviromnental Protection Agency.
Compaction test results shall be submitted to the Meridian BUilding Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
1.1.16
1.1.17
GENERAL REQUIREMENTS-PRELIMINARY PLAT
LUg Sidewalks shall be installed within the subdivision and on the perimeter of the
subdivision pursuant to City Code.
LU9
Where the applicant has submitted a preliminary landscape plan and where staff has reviewed
such plan, the landscaping shall be consistent with the preliminary plan with modifications as
proposed by staff.
All areas approved as open space shall be free of wet ponds or other such nuisances. All
stonnwater detention facilities incorporated into the approved open space are subject to UDC 11 ~
3A~18 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated
surface materials shall not be used in open space lots, except as pennitted under UDC 1 1- 3A -18-
If the stonnwater detention facility cannot be incorporated into the approved open space and still
meet the standards of UDC 11-3A-18, then the applicant shall relocate the facility. This may
require losing a developable lot or developable area. It is the responsibility of the
developer to comply with ACHD, City of Meridian and all other regulatory requirements at the
time of final construction,
1.l.21 The applicant shall submit a detailed fencing plan with the [mal plat application for the
subdivision. If pennanent fencing is not provided, temporary construction fencing to contain
debris must be installed around the perimeter prior to issuance of a building pennit. All fencing
should be installed in accordance with City Code.
Ll.22 Any tree over 4" in caliper that is removed /Tom the property shall be replaced by installing
additional trees, being the equivalent number of caliper inches of trees that were removed.
Required landscaping trees will not be considered as replacement trees for those trees that have to
be mitigated.
L1.20
1.1.2.3 All iIrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or
lying adjacent and contiguous to the area being subdivided shall be tiled, unless otherwise
approved by the lITigation District(s). Plans will need to be approved by the appropriate
inigationldrainage district, or lateral users association (ditch owners), with written approval or
non~approval submitted to the Public Works Department. If lateral users association approval can
not be obtained, alternate plans will be reviewed and approved by the City Engineer prior to [mal
plat signature.
1.1.24 Staffs failure to cite specific ordinance provisions or tenus of the approved
annexation/conditional use does not relieve the applicant of responsibility for compliance.
1.1.25 Preliminary plat approval shall be subj ect to the expiration provisions set forth in UDC 11-6A.
2. Public Works Department
2.6
2.7
2.8
2.9
2.10
2.11
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
2:1
Sanitary sewer service to tIlls development is being proposed via extension of mains planned in
Sadie Creek Subdivision. CulTently there is no sewer adjacent to tIus site and tIle City of
Meridian does not guarantee service in the timelines outlined in the UDe.
The applicant shall install all mains necessary to provide service; applicant shall coordinate main
size and routing with the Public Works Department, and execute standard fo11ns of easements for
any mains that are required to provide service. Minimum cover Over sewer mains is three feet, if
Cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in
confol1llance of City of Meridian Public Works Departments Standard Specifications.
Water service to this site is being proposed via extension of mains in Sadie Creek Subdivision.
The applicant shall be responsible to install water mains to and through tIus development,
coordinate main size and routing with Public Works.
2.2
2.3
2.4
The applicant shall be required to connect to the existing main in N. Eagle Road with a 1 O~inch
mam.
2.5
The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public
right of way (include all water services and hydrants). The easements shall not be dedicated via
the plat. The description shal1 be consistent with the graphically depicted easements on the plat
but be recorded as a separate document using the City of Meridian's standard forms. Submit an
executed easeme11-t (supplied by Public Works), a legal description, which must include the area
of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances
(marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a
Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this
document.
The applicant has not indicated who will own and Operate the pressure irrigation system in this
proposed development. If it is to be maintained as a private system, plans and specifications wil1
be reviewed by the Public Works Department as part of the construction plan review. A "draft
copy" of the operations and maintenance manual will be required prior to plan approval with the
"final draft" being required prior to final plat signature on the last phase of this project.
If it is to be owned and maintained by an Irrigation District then evidence of a license agreement
shall be submitted prior to scheduling of a pre~construction meeting.
The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or
well water for the primary source. If a surface or well SOurce is not available, a single-point
connection to the culinary water system shal1 be required. If a single-point connection is utilized,
the developer will be responsible for the payment of assessments for the common areas prior to
signature on the [mal plat by the City Engineer.
All existing structures shall be removed prior to signature on the final plat by the City Engineer.
AIl irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or
lying adjacent and contiguous to the area being subdivided shall be tiled per ODC 11-3A-6.
Plans shall be approved by the appropriate in-igationldrainage district, or lateral users association
(ditch owners), with written approval or non.approval submitted to the Public Works Department.
If lateral users association approval can't be obtained, alternate plans shall be reviewed and
approved by the Meridian City Engineer prior to final plat signature.
Any existing domestic wells and/or septic systems within this project shall be removed from
domestic service per City Ordinance Section 9-1-4 and 9.4-8. Wells may be used for non-
domestic purposes such as landscape ilTigation,
The applicant has not indicated how the stonn drainage from the proposed private streets will be
CITY OF MERIDIAN PLANNINO DEPARTMENT STAFF REFORT FOR THE HEARING DATE OF 02/02/06
2.12
disposed. A drairutge plan designed by a State of Idaho licensed architect or engineer is required
and shall be submitted to the City Engjneer (Ord. 557, 10-1-91) for all off-street parking are",
and private roads. Stonn water treatment and disposal shall be designed in accordance with
Department of Enviromnental Quality 1997 publication Catalog of Stonn Water R-est
Management Proctices for Idaho Cities and Counties and City of Meridian standards and policies-
Off-site disposal into surface water is prohibited unless the jurisdiction whicb bas authority over
the receiving ,cream provide, written authorization prior to development plan approval. The
applicant is responsible for filing all necessary applications with the Idaho Department of Water
Resources regarding ShaIIow Injection WelIs,
St,eet signs are to be in place, water system shall be approved and activated, fencing installed,
drainage lots constructed, road base approved by the Ada Coonty Highway District and tbe Final
Plat for this subdivision shaII be recorded, prior to applying for building pennits.
A letter of credit or cash surety in the amount of 110% wiII be required for all uncompleted
fencing, landscaping, amenities, pressurized irogation, sanitary sewer, water, etc., prior to
signature on the final plat.
All development improvements, including but not limited to sewer, fencing, micro-paths,
pressurized irrigation and landscaping shall be instalIed and approved prior to obtaining
certificates of'occupancy.
Applicant shall be required to pay Public Works development plan review, and construction
insPection fees, as detennined during the pl"" review process. prior to 'i_ture on the finaI plat
per Resolution 02-374.
It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
Applicant shal1 be responsible for application and compliance with and NPDES Pennitting that
may be required by the Envirorunental Protection Agency.
Applicant shaH be æsponsible for application and compliance witb any Section 404 Pennitiing
that may be required by the Army COIþs of Engineers.
Developer shaIl coordinate mailbox locations with the Meridian Post Office.
All grading of the site shall be perfonned in confonnance with MCC 11-12~3H.
Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfiIl, where footing would sit atop fiII material.
The engineer shaIl be required to certifY that the street centerline elevations are set a minimum of
3~feet above the highest established peak groundwater elevation. This is to ensure that the bottom
elevation of the crawl spaces of homes is at least I-foot above.
One hundred wan, high-pressure sodium streetlights shaIl be reqtrired at locations designated by
the Public Works Department. Allsireetligbts ,ball be installed at subdivider's expense- Typical
locations are at street intersections and/or fire hYdrants, Final design locatio", and quantity are
detennined after power designs are completed by Idaho Power Company. The street light
contractor shall obtain design and pennit ftom the Public Works Department prior to
commencing instaIIations.
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
3. Meridian Fire Department
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
CITY OF MERIDIAN PLANNING DEFARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02106
. 3.1
Acceptance of the water supply for fIre protection will be by the Melidian Fire Departrneut and
water quality by the Meridian Water Department for bacteria testing.
3.2
Final Approval of the fire hydrant locations shall be by the Meridian Fire Department.
a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle.
b, The Fire hydrant shall not face a street which does not have addresses on it.
c. Fire hydrant markers shall be provided per Public Works spec.
d. Locations with fire hydrants shall have the curb painted red I 0' to each side of the
hydrant location.
e, Fire Hydrants shall be placed on comers when spacing permits,
f. Fire hydrants shall not have any vertical obstructions to outlets within 10'.
g. Fire hydrants shall be place 18" above finish grade.
h, Fire hydrants shall be provided to meet the requirements of the lFC Section 509.5.
3.3
All entrance and internal roads shall have a turning radius of 28' inside and 48' outside radius.
3.4
Provide at least a 20' wide Fire Lane for all internal roadways all roadways shall be marked in
accordance with Appendix D Section D1O3.6 Signs.
3.5
Fire lanes and streets sball bave a vertical clearance of 13' 6". This mcludes mature landscapmg.
Operational fire hydrants, temporary or pennanent street signs and access roads with an all
weather surface are required before combustible construction is brought on site.
Commercial and office occupancies will require a fire-flow consistent with the International Fire
Code to service the proposed project. Fire hydrants shall be placed per Appendix D.
The new commercial lot will have an unknown impact on Meridian Fire Department call volumes.
The Meridian Fire !>e¡>anmem bas experienced 2612 responses in the year 2004. According to a
report completed by Fire & Emergency Services Consulting Group our requests for service are
projected to reach 2800 in the year 2005 and 3800 by the year 2010.
The fIfe department requests that any future signalization installed as the result of the
development of this project be equipped with Opticom Sensors to ensure a safe and efficient
response by fire and emergency medical service vehicles. This cost of this installation is to be
borne by the developer.
Maintain a separation of 5' from the building to the trash dumpster enclosure.
Provide a Knoxbox entry system for the complex prior to Occupancy.
The applicant shall work with Planning Department staff to provide an address identification plan
and a sign which meets the requirements of the City of Meridian sign ordinance at the required
intersection( s ).
The Fire Dept. has concerns about the ability to address the project and have the addresses visible
ITom the street which the project is addressed off of Please cootact Vicki Heogly (898-5500) to
address this concern prior to the public hearing.
Provide exterior egress lighting as required by the futernational Building & Fire Codes.
5.3
6.
6.1
7.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
3.15
There shall be a fire hydrant within 100' of all fire department connections.
3.16
Where a portion of the facility or building hereaJJ:er constructed or moved into or within the
jurisdiction is more than 400 feet (122 m) from a hYdrnot on a fire apparatos access road, as
measured by an approved route around the exterior of the facility or building, on-site fu'e hydrants
and mains shall be provided where required by the code omcial. For buildings equipped throughout
with an approved auto:matic sprinkler system installed in accordance with Section 903.3.1.1 or
903.3.1.2 the distance requirement shall be 600 feet (183),
For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183
m).
4.
4.1
For buildings equipped throughout with an approved auto:matic sprinkler system installed in
accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet
(183 m).
4.2
Police Department
The proposed plat and/or site design encourages high~speed, cut-through tramc. The applicant
shall work with the Ada County Highway District to provide traŒc calming design to decrease
travel speeds on Sadie Creek Avenue.
The proposed drive through has limited visibility from a public street. Prior to the next public
hearing, the applicant shall meet with the Police Chief to discuss methods of increasing visibility
to the facility.
The proposed development and/or plat do not offer natural surveillance oPportunities of the
public areas. Prior to the next public hearing, the applicant shall meet with the Police Chief and/or
Planning Staff to discuss features that increase visibility, including but not limited to: doors and
windows that look out on the public areas, front porches, and adequate nighttime lighting, The
site plan and/or landscaping plan shall be revised in accord with those discussions.
The proposed after-hours walk-up facility (e.g. ATM) has limited visibility from a public street.
Prior to the next public hearing, the applicant shall meet with the Police Chief to discuss methods
of increasing visibility to the facility.
The loading areas shall be separated from all public parking areas.
Parks Department
Standard for Mitigation of trees: The standard established in the City of Meridian Landscape
Ordinance I I -3B will be followed,
Standard Plan for Protection of Existing Trees during Construction: The standard established in
the City of Meridian Landscape Ordinance
Tree Grate and Tree Box standard: The proposed tree grate shall be a 6 foot by 6 foot, cast iron,
French pattern tree grate. This grate shall be placed in a 6 foot by 6 foot inside diameter tree box
with a steel grate frame set in concrete. Prior to CZC approval, contact Meridian Parks and
Recreation Department for specifications and tree box construction drawings.
4.3
4.4
4.5
5.
5.1
5.2
Sanitary Service Company
Please contact Bill Gregory at sse (888-3999) for detailed review of your proposal and submit
stamped (approved) plans with your certificate of zoning compliance application.
ACHD
.,-,
CITY OF MERIOIAN PLANNING DEPARTMENT STAFF REFORT FOR THE HEARING DATE OF 02/02106
SÌfe Specific ConditiollS ojApproval
7.1
Extend Sadie Creek Avenue into the site from the north property line. Transition the roadway
from a 40-fool conunercial street section to a 36-fool wide street within 50-feet of right-of-way,
with curb, gutter and 5-foot wide concrete sidewalk.
7.2
Sadie Creek Avenue north ofthis site to Ustick Road will need to be constructed and dedicated
prior to, or in conjunction with final plat approval for this site.
7.3
All local streets in the subdivision should be constructed as 36-foot street sections within 50-feet
of right-of-way with curb, gutter and 5-foot wide concrete sidewalk.
7.4
The proposed alley may be constructed as a public alley if it is paved 16-feet wide within 20-tOO¡-
of right-of-way. OR The proposed alley may be constructed as a private drive/street, if it is
signed accordingly.
7.5
Bourbon Street shall terminate in a culdesac and shall not extend to SH*55.
7.6
Public road access to SH-55 is prohibited.
7.7
Provide a letter from ITD stating required improvements and access decisions.
7.8
Comply with all Standard Conditions of Approval.
Standard Conditions of Approval
7.9
7.10
7.11
7.12
7.13
7.14
7.15
Any existing inigation facilities shall be relocated outside of the right-of-way.
Private sewer or water systems are prohibited from being located within any ACfID roadway or
right-of~way.
All utility relocation costs associated with improving street frontages abutting the site shall be
borne by the developer.
Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
Utility street cuts in pavement less than five years old are not allowed unless approved in writing
by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for
details.
All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and aU
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the
State ofIdaho shall prepare and certify all improvement plans.
The applicant shall submit revised plans for staff approval, prior to issuance of building permit
(or other required pemrits), which incorporates any required design changes.
7.19
7.20
..."-.
CITY OF MERIDIAN PLANNINO DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02106
T16
Construction, use and property development shaIl be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for OCcupancy.
7,17
Payment of applicable road impact fees will be required prior to building construction in
accordance with Ordinance #200, also known as Ada County Highway District Impact Fee
Ordinance.
7.18
It is the responsibili1y of the applicant to verifY al] existing utilities within the right -of-way. The
applicant at no cost to ACHD shaIl repair existing utilities damaged by the applicant. The
applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days
prior to breaking groond witbin ACHD right-of-way. The applicant ,ball contact ACHD Traffic
Opermions 387-6190 in the event any ACHD conduits (spare or filled) are compromised during
any phase of construction.
No change in the terms and conditions of this approval shall he valid unless they are in writing
and signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shaIl be upon the applicant to
obtain written confirmation of any change &om the Ada County Highway District.
Any change by the applicant in the planned Use of the property which is the subject of this
application, shaIl require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned Use of the subj ect property unless
a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect
at the time the change in Use is sought.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Exhibit D. Required Findings from Zoning Ordinance
UDC 11-5B-3E, Nll1exation/Rezone Findings:
The commission and council shall review the Particular facts and circumstances of each
proposed zoning amendment in terms of the following standards and shall find adequate
evidence answering the following questions about the proposed zoning amendment:
A. The map amendment complies with the applicable provisions of the comprehensive
plan;
In Olap'er vn of the Comprehensive Plan, 'Mixed Use Regional' is defined as areas
including COmmercial and residential development consistent with anto and service
oriented uses. Stiff finds that the requested General Commercial (C-G) zoning
designation is in accmd with the Comprehensive Plan's Fnture Land Use Map, which
delineates the subject property as "Mixed Use-Regional". The purpose of the C-G district
is '10 provide for a review of the impact of proposed commercia] USes which are auto and
service oriented and are located in close proximity to major highway or arteria! streets; tu
fulfill the need of travel.related services as well as retail sales for the transient and
permanent motoring public."
Staff finds that the proposed zoning is in general conformance with the comprehensive
plan (please see Section 7 of the Staff Report for detailed analysis of specific
comprehensive plan action items that apply to this development).
ß. The map amendment complies with the regulations outlined for the proposed
district, specifically the purpose statement;;
ConcUlTent with the annexation and zoning application, the applicant has submitted a
preliminary that proposes commercial products for the subject site (PP-O5-059/ CuP-O5-
052). Staff does not anticipate that the applicant plans to rezone the subject property in
the future i[the accompanying PP application is approved.
Staff finds that the various proposed commercial Uses would be allowed (permitted)
within the requested C-G Zone. The site is being proposed as three portions of
commercial, high density residential and medium low density residential and upon build
out staff would not anticipate changes of usage for this site.
C, The map amendment ,hall not he materially detrimental to the puhlie health. ,afety,
and welfare;
The applicant has submitted elevations for the proposed commercial and residential units
and has agreed to use the design guidelines for COIDD1ercial P'"jecls along gateway
coITidors when designing building facades. Staff finds that the proposed C-G zone with
the proposed retail, office and restaurant uses, if designed, constructed and operated in
accordance with adopted city ordinances, should be harmonious and appropriate in
appearance with the intended character of the vicinity. The site is intended for
commercial Uses which, based on the Comprehensive Plan description, will have such
Uses as retail, wholesale, service and office uses, as well as appropriate public uses such
as government offices.
Staff finds that the R-15 zoning designation along a C.G General Commercial will be an
appropriate Use buffer, Furthermore the R-8 proposed zoning designation along the
western boundary of the site further transitions these Uses from the low density residential
Uses west of the site.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
Staff finds that the proposed development will change the existing character of the area,
which is still largely rural. However, the proposed development is generally ham10nious
with the intended character envisioned by the Comprehensive Plan. Staff does not find
that the proposed zoning/uses will adversely change the essential character of area.
The Commission and COlmcil ,hould æ]y on public te'timony (oral and written) to
determine whether or not the proposed Use will be disturbing or hazardous to the existing
or future neighboring uses. Staff does not anticipate that the proposed uses will be
disturbing to future or existing neighbors, as long as landscaping, fencing and other
recOmmended conditions are exercised. Further, staff does not anticipate that the
proposed Uses will be hazardous as long as the applicant complies with the conditions
contained in Exhibit C and all City Code Provisions.
D. The map amendment shall not result in an adverse impact upon the delivery of
services by any political subdivision providing public services within the City
including, but not limited to, school districts; and,
The applicant will be responsible for the extension of all utilities necessalY to serve this
proposed development. Pennanent sanitary- sewer service to this development is to be
provided ,by the extension of Sewer in Us tick Road and extended south through Sadie
Creek Avenue to be looped with extensions in Eagle Road. The applicant will be
responsible for the extension of utilities to and through this proposed development.
Sizing and routing shall be coordinated with the Public Works Department.
Other urban services, such as water, are near to this site and the applicant should be able
to extend such services to the site. Staff finds that the subject site is proposed for
development in a fashion similar to other properties in the area.
The applicant and/or future property owners will be required to pay park and highway
impact fees.
ACHD had not submitted a staff report with site specific and standard conditions which
will be attached as Exhibit C prior to the hearing date of November 17, 2005.
On December 13, 2005, a joint agency/department comments meeting was held with
representatives of key service providers to this property. Based on the joint
agency/department meeting and other comments received from agencies/departments,
staff finds that except for sanitary sewer, the public services listed above can be made
available to accommodate the proposed development. The Commission and Council
should reference any written and/or verbal testimony submitted by any public service
provider, regarding their ability to adequately service this project.
If approved, the developer will be financing the extension of sewer, water, local street
infrastructure, utilities and iuigation services to serve the project. The primary public
costs to serve the future residents will be fire, police and school facilities and services.
Staff finds there will not be excessive additional requirements at public cost and that the
proposed zoning and subsequent development will not be detrimental to the community's
economic welfare.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
2. . Preliminary Plat Findings: UDC 1l-6B-6
In detennining the acceptance of a proposed subdivision, the CofiUnission shall consider the objectives of
this Title and at least the following:
A. The plat is in conformance with tbe Comprehensive Plan;
Please see Annexation Findings Item A above.
B. Public services are available or can be made available and are adequate accommodate the
proposed development;
Please see Annexation Findings Items C and D above
C. The plat is in conformance with scheduled public improvements in accord
the City's capital improvement program;
Because the developer is installing sewer, water, and utilities for the development at their cost, the
subdivision will not require the expenditure of capital improvement funds.
D. There is public financial capability of supporting services for the proposed development;
Please see Exhibit B for comments and conditions from other agencies and departments.
E. The development will not be detrimental to the public heath, safety or general welfare; and
Staff is not aware of any health, safety or general welfare problems associated with the
development of this subdivision that should be brought to the Council or Commission's attention.
ACHD considers road safety issues in their analysis, Staff recommends that the Commission and
Council reference any public testimony that may be presented to determine whether or not the
proposed subdivision may cause health, safety or environmental problems of which staff is
unaware.
F. The development preserves significant natural, scenic or historic features.
Staff is not aware of any natural, scenic or historic features which require preservation. The
applicant will be required to maintain, fence, and improve the waterways which are existing on this
site. Furthenuore the applicant shall define with the Parks Department the location of a multiuse
pathway which will further enhance the natural features of the Finch Lateral as well as providing an
additional use buffer.
3. Conditional Use Findings UDC 1l-5B-6E
The Commission and Council shall review the particular facts and circumstances of each
proposed conditional use in tenus ofthe following, and may approve a conditional use permit if
they shall find evidence presented at the hearing(s) is adequate to establish:
1. That the site is large enough to accommodate the proposed use and meet all the
dimensional and development regulations in the district in which the use is located.
Staff finds that the site is 27.3 acres and is large enough to accommodate all required parking,
landscaping, loading and other standard regulations required by the UDC.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 02/02/06
2. That the proposed use wiIJ be harmonious with the MeJ"idian Comprehensive Plan and in
accord with the requirements of this Title.
Staff finds that the proposed residential/retaiVrestauranUoffice uses meets the objectives of the
Comprehensive Plan as listed in Section 7 oftbis report. Some of the standards of the UDC are
not cun-ently being shown by the applicant's site plan and building elevations. Specifically, the
site plan needs to reflect the elimination of access to Eagle Road and building elevations need
to be submitted in compliance with the entryway corridor design standards. If the applicant
makes these changes, or an access variance is granted, this finding will be met.
3. That the design, construction, operation and maintenance will be compatible with other
uses in the general neighborhood and with the existing or intended character of the
general vicinity and that such use will not adversely change the essential character of the
same area.
Staff finds that the proposed retail uses complies with the uses pennitted in the C-G zone and
those uses allowed under the Development Agreement. The bUilding height, parking layout,
landscape buffer widths and other dimensional standards shown in the application generally
comply with the UDC. The property adjacent to the west boundary to approximately 320 feet
south of Us tick -Road is zoned R-2 and is proposed as low density residential uses. The
applicant will be required to construct the proposed buffer between land uses to address this
less intensive use where commercial lots abut. The multifamily proposal is an appropriate
transition ITom the Commercial uses to the lower density residential uses which sun-ound the
site.
4. That the proposed use, if it complies with aU conditions of the approval imposed, wiJJ not
adversely affect other property in the vicinity.
Staff finds that the proposed development will not adversely affect other property in the
vicinity if the applicant complies with all CUP/PP/AZ IRZ conditions and constructs all
improvements and operates the use in accordance with the UDC standards. Traffic volumes
will significantly increase. However, both ACHD and ITD have reviewed the application and
placed special conditions on the applicant. These standards may include lighting, screening,
landscaping and other areas intended to mitigate potentially hannful effects.
5. That the proposed use wiIJ be served adequately by essential public facilities and services
such as highways, streets, schools, parks, police and fire protection, drainage structures,
refuse disposal, water, and sewer.
Staff finds that sanitary sewer, domestic water and in-igation are available to the subject
property. A recently completed public~private partnership to improve Ustick Road to five lanes
and ACHD includes planning to install a traffic signal at the west boundary of the site shown at
Sadie Creek Avenue. The commercial land use should not have any impact on the school
system. Please refer to other comments prepared by the Meridian Fire Department.
6. That the proposed use wiIJ not create excessive additional costs for public facilities and
services and will not be detrimental to the economic welfare of the community.
CITY OF MERIDIAN PLANNING DEPARTMENT STAFP REPORT FOR THE HEARING DATE OF 02102106
Staff finds that the applicant will pay to extend the sanitary seWer and water mains into the
site. No additional capital facility costs are expected from the City. The additional commercial
structures will improve the tax base for the City of Meridian, The applicant and/or Últure
property OWners will be required to pay highway impact fees, -
7. Tbat tbe proposed Use will uot involve activities or processes, materials, equipment aud
conditions of operation that will be detrimental to any persons, property or the general
welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
Staff finds that the proposed development will not involve nses that will create nnisances thaI
would be detrimental to the general welfare of the SUITounding area.
Staff recognizes the fact that traffic and noise will increase with the approval of this
subdivision; however, staff does not believe that the amount generated will be detrimental to
the general welfare of the public. Staff [lids the future buffer between land Uses along the
property boundary and the use and Eagle Road buffers will help to mitigate noise, fumes and
glare created by the additional traffic.
8.
That the proposed use will not result in the destruction, loss or damage of a natural,
scenic or historic feature considered to be of major importance.
The applicant will be required to comply with all state and local ordinances regarding
conveyance of water and maintaining historic points of access. The Ada County Historic
Preservation Council's Site Inventory does not show any structures or places listed for the
subj ect property. We are unaware of any other scenic or historic features.
4. Private Street- UDC 11-3F-S
A. The Design of the private street meets the requirements of this Article;
The applicant will have to certifY that the Ada County Street Naming Committee has accepted
the private street names. The design of the streets meets the standards as set forth in ODC 11-
3F-4, no gates are allowed or proposed. Roadway and stonn drainage shall be contained on
site. The street width shall be a minimum of 26 feet of paved surface for all private streets
other than alleys,
B. Granting approval of the private street would not cause damage hazard, or nuisance, or
other detriment to persons property, or uses in the vicinity; and
Staff does not anticipate any hazard, nuisance or other detriment from the private streets if
they are installed and maintained as designed.
C. The use and location of the private street shall not conflict with the comprehensive plan
and/or the regional transportation plan.
Staff does not anticipate any conflict with the comprehensive plan. See findings above for
comprehensive analysis.
STATE OF IDAHO
)
) §
)
COUNTY OF ADA
AFFIDAVIT OF POSTING
R~~ (~~ E~ IìtVI~r) ,
JJ~N 2 G 20m::;
GITY OF MERIDIAN
"'.¡-'"",¡ r¡ ERI/ ()t'r-;"""ç
{/'jj\,,--,-' !".," ,-,""1(,,-'
I, Mike Arnold Premier Si ns Inc 2100 E. Fairview Avenue Suite 7 855-0380
(name) (address) (phone)
Meridian Idaho being first duly Sworn Upon
(city) (state) oath, depose and say:
I personally posted the subject property with the hearing notice sign 10 days prior to the public
hearing for the Annexation of 17.25 acres to CG' Rezonin of 11,10 acres to R -8' 9.04 acres
to R"15 & 7.22 acres to CG' Variance A. . ,for access to Ea Ie Rd, Private Rd. A ,and a
Preliminary Plat ADD. ~Quare Su~
Dated this
24rd. day of
SUBSCRIBED AND SWORN to before me the day and year first above written.
""tlIIII"'1
""" t.. FLEa !IIII;
....~' ~ """"""" ~'~);;....
~ ""'1 A¡;""'" '-.-
.. -' '" ~
.. "0 ~' ~
:: ,~ !~ \. ~
§"{~ oj ~
- 'O#'-' \',;.- ~
~ \, lJ~\,;. .,/ /) ;
~ -', \J .,- . . ,
~ "/"."""""""""'~"'.'...:.':'
"'" 4~ c"" \ ,\\
IIII 'I.; . \",
11111111111"
Mas ter \a ffi d ~po sting
...' )
Notary PubJi or Idaho, ,
Residing a /~l/ /7/LÚ Cb-Z~ ~
My Commission Expires: 7.,2 ¿¡'Þ() 7
1
,- -----'-~~,-----,
-,--
'-:----1
, I
¡
...-.. ..- .,
CITY OF MERIDIAN
PUBLIC HEARING
SIGN-UP SHEET
DATE
February 2, 2006
ITEM #
6,7,8,9
PROJECT NUMBER
AZ. 05-057, RZ 05-019, PP 05-059, CUP 05-052
PROJECT NAME
Bienville Square Subdivision
FOR
AGAINST NEUTRAL
,-
/'
/
J
V
""
,/
l/
~.-
v'
-..----
P P 05-059
MERIDIAN PLANNING & ZONING MEETING
APPLICANT Red Cliff Development, LLC
January 5, 2006
ITEM NO.
24
REQUEST Preliminary Plat approval of 54 single family residential lots, 22 multi family
residential lots, 14 common lots and 7 commercial lots for Bienville Square Subdivision -
2935 North Eagle Road
AGENCY
COMMENTS
CITY CLERK:
CITY ENGINEER:
CITY PLANNING DIRECTOR:
CITY ATTORNEY
See memo for continuance in Al packet
CITY POLICE DEPT:
CITY FIRE DEPT:
CITY BUILDING DEPT:
CITY WATER DEPT:
CITY SEWER DEPT:
CITY PARKS DEPT:
MERIDIAN SCHOOL DISTRICT:
SANITARY SERVICES:
See attached Comments
ADA COUNTY HIGHWAY DISTRICT:
CENTRAL DISTRICT HEALTH:
See comments in Al packet
See comments in Al packet
NAMPA MERIDIAN IRRIGATION:
SETTLERS'IRRIGATION:
IDAHO POWER:
INTERMOUNTAIN GAS:
OTHER:
Contacted:
Emailed:
Date:
Phone:
Staff Initials:
Materials presented at public meetings shall become property of the City of Meridian.
i-l) RED CLIFF
DEVELOPMENT
No, 3090
p,
TO:
Meridian City Council
Meridian Planning & Zoning Commission
660 E. Watertower Ln.. Ste. 202
Meridian. Idaho 83642
RECEIVED
DEe 2 0 2005
CITY Of: MERIDIAN
CITY CLERK OFFICE
DATE: December 19. 2005
RE:
Bienville Square SUbdivision
We have recently met with the developers of the proposed Sadie Creek Promenade to coorWnate
street alignments and cross accesses. It 'pp""," that both projects will reqlrire changes to
accomplish a coorttinated development witJrin !he combined properties. As such, w. "'.
requesting that the hearing for Our project (Bienvüle Square) be POstponed for 30 days to allow
us sufficient time to make and review these changes with your staff and the neighborhood. We
feel thaI the cbanges win improve the OVerall development of this area and address the concerns
of the neighbors.
We thank you in advance for your consideration and look forward to working with your slaff in
these rev;sjons to the project. If you have any questions or concerns please feel fte. to contact
me.
~
Z~ C, Unger
VPlProject Manager'
'---..
RED ClIFF DEVELOPJIŒNr. 787 E. SlATE SnuœT, Surrn 125 . EAGLE, IDAHO 83616
(208) 472-9219 . REDCuFFDBV.COM
DEe 20 '05 13;40
C""'r- ""'.
,\~
~&~1~Z'~
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651.4395
FAX # 208-463.0092
22 November 2005
phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
Anna Canning, Planning Director
City of Meridian
660 E. Watertower Lane
Meridian, ID 83642
RE:
AZ 05-057, RZ 05-019 & PP 05-059, Bienvi1le Square Subdivision
Dear Anna:
Nampa & Meridian Inigation District has no comment on the above referenced applications for Annexation
& Zoning and Rezone,
However, Nan1pa & Meridian lITigation District requires that a Land Use Change Application be filed
before comments can be submitted for the Preliminary Plat. Please contact Donna Moore at 466~ 7861 for
further infonnation.
Al1laterals and waste ways must be protected. The District's Finch Lateral courses along the south
boundary of this proposed project. The District's Milk: Lateral also Courses along the east boundary of this
proposed project. These easements must be protected and any encroaclunent without a signed License
Agreement and approved plan, before any construction is started, is unacceptable.
All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site,
the Nampa & Meridian Irrigation District must review drainage plans. The developer must comply with
Idaho Code 31-3805. It is recommended that ini.gation water be made available to all developments within
the Nampa & Meridian Inigation District.
Sincerely,
f)&/}1 ~
Bill He1í'so~, Asst. Water Superintendent
Nampa & Meridian lITigation District
BH/dbg
C:
Water Superintendent
Crew Foreman
Rider
File - Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS. 40,000
~OP~
~&~~ "'. ?'~ '
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
23 November 2005
Ashley B. Ford, Planner
WRG Design, Inc.
453 S. Fitness Place
Eagle, 10 83616
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
RE:
Land Use Change Application - Bienville Sauâre Subdivision
Please note the District now requires three (3)~s of pl!!!!
Dear Ms. Ford:
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above-referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order or
cash as payment of the fees in order to speed the process up. If you submit a company or
personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P.
Anderson, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or John P. Anderson, at the District's shop.
Sincerely,
Dictãted by Ms. Moore and
mailed without signature
In her absence to avoid delay
Donna N. Moore, Asst. Secretary/Treasurer
NAMPA & MERIDIAN IRRIGATION DISTRICT
DNM/smc
CC: File
Water Superintendent
Anna Canning, Planning Director, City of Meridian
Red Cliff Development, Inc., 2060 S. Eagle Road, Meridian, 10
83642
enc.
APPROXIMATE IRRIGABLE ACRES
RIVER flOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
(ir'.rl:. ~~~TTR~~~ CENTRAL DISTRICT HEALTH DEPARTMENT
~HEAlTH Environmental Health Division - - -
DEPARTMENT -
Return to:
0 Boise
0 Eagle
0 Garden City
~eridian
0 Kuna
OACZ
0 Star
Rezone # AI;:- ó ç-~ ()j-7./'£Z 6.s.--0IC¡
Conditional Use # CIA ¡;J ð s- ----ð.J2..
Preliminary / Final/Short Plat .P J? -ó'J~-c)j-"L-
.
0 1, We have No Objections to this Proposal.
0 2, We recommend Denial of this Proposal.
0 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
0 4. We will require more data concerning soil conditions on this Proposal before we can comment.
05,
Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
0 high seasonal ground water 0 waste flow characteristics
0 or bedrock from original grade 0 other
0 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
0 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability,
Ms. After wri~pproval from appropriate entities are submitted, we can approve this proposal for:
~ ....eJ-eentral sewage 0 community sewage system 0 community water well
0 interim sewage ~ntral water
0 individual sewage 0 individual water
%-The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of Environmental Quality:
~I sewage 0 community sewage system 0 community water
0 sewage dry lines ~central water
~un-off is not to create a mosquito breeding problem.
0 11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
0 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
0 13. We will require plans be submitted for a plan review for any:
0 food establishment 0 swimming pools or spas
0 beverage establishment 0 grocery store
0 child care center
0 14. Please see attached stormwater management recommendations
015.
Date: ÆJ2..; þj-
Reviewed By: /-- ~~
15726-o01EHO904
Review Sheet
'\<:7
Joint School District No.2
911 Meridian Road. Meridian, Idaho 83642 . (208) 855-4500 . Fax (208) 888-6700
SUPERINTENDENT
Dr, Linda Clark
November 22, 2005
City of Meridian
660 E. Watertower Lane
Meridian, ill 83642
Dear Planners:
The Meridian School District has experienced phenomenal student growth the last ten
years. The high schools, middle schools, and elementary schools throughout the district
are operating over capacity. .
Approval of the Bienville SQuare Subdivision will have an impact on school enrollments
at River Valley Elementary. Lewis & Clark Middle and Meridian High School.
We can predict that these homes, when completed, will house forty-five (45) elementary
aged children, thirty-six (36) middle school aged children, and twenty-five (25) senior
high aged students. Additional students will further compound the current overcrowded
situation. Residents cannot be assured of attending the neighborhood school, as it may be
necessary to bus students to other schools across the district.
School capacity is addressed in Idaho Code 67-6508. The Meridian School District is
currently operating beyond capacity. Future development will continue to have an impact
on the district's capacity. If you have any questions, please contact me at 855-4500.
s~
~~7'?--
Building & Construction Manager