Loading...
HomeMy WebLinkAboutFinalPlatMylar V1(E IDIAN — APPROVED DATE: 12/29/21 FILE NUMBEk FPS-2021a E IDI� Submittal Standards Standards City of Meridian Community Development ♦ All Applications must be submitted electronically through CITIZEN ACCESS PORTAL ♦ All Drawings/Documents will be submitted electronically through PROJECT DOX ♦ Upload all documents and drawings in the appropriate folders ♦ Upload all documents and drawings per required checklist, as Individual PDF's. ♦ Each checklist item must be named according to the naming convention listed below. ♦ All plans must have a space reserved in the upper left corner for City Approval stamps. ♦ Resubmittals must use the EXACT same file name as the original to allow versioning. Final Plat Mylar Checklist Items needed to obtain City Signatures on a Final Plat Document Naming Convention Submit a PDF copy of the signature sheets. The signatures of the Ada County Highway Signature Sheet(s) District and the Central District Health Department are required prior to submitting to the City of Meridian for signatures. Submit an electronic copy of the Final Plat In accord with the revisions noted in the site Revised Final Plat specific conditions of approval section in the staff report. Submit an electronic copy of the revised landscape plan if applicable). Revised Landscape Plan If your project has an irrigation system (pressurized or gravity), an irrigation certification Irrigation Certification letter from the engineer of record is required If your project has privately owned storm drainage, a storm drainage certification letter Storm Drainage Certification from the engineer of record is required *The highlighted item(s) above may not be required depending on the project. Please contact a planner to verify if these item(s) are required and received instructions on how to proceed with your submittal. Community Development ■ 33 E. Broadway Avenue, Ste. 102 Meridian, Idaho 83642 Phone: 208-884-5533 www.meridiancity.org_iplanning (Rev: 0710212020)