WESTERN STATES CAT
TRUCK SHOP PARKING LOT EXPANSION
Storm Drainage Design Narrative
These calculations have been performed according to the City of Meridian Design Standards.
1.1 Property Description
This project is taking place on an existing site. It expands an existing parking lot at the Western
States CAT Truck Shop, at 400 E. Overland Road, in Meridian Idaho. The existing parking area
currently drains to the north, using a valley gutter to convey water into the Western States
equipment yard where it infiltrates.
The existing area to be converted to parking lot is currently a combination of landscaping and
drive lane, being used as an exit from the truck shop. The existing stormwater that encounters
the drive lane is conveyed down curb and gutter, and again sent into the Western States
equipment yard. There are 4 roof drains that also drain into the existing area to be improved,
conveying stormwater from the rooftop of the main Truck Shop Building.
The new parking area stormwater design is intended to contain all stormwater produced in the
improved area, conveying to a seepage bed to be constructed in the improvement area. The
existing portion of the parking lot that conveys its stormwater to the equipment yard will remain
as-is, in its existing configuration. Infiltration tests have not yet been performed, based on soil
strata from surrounding areas and anticipated ground water elevations, a conservative
infiltration rate of 1 in/hour has been used for seepage bed sizing. Infiltration testing will be
performed after issuance of the CZC occurs, and there is sufficient space in the improvement
area to increase the size of the seepage bed if necessary.
1.2 Stormwater System Description
The proposed on-site stormwater system consists of two drainage basin areas both of which are
conveyed to the same seepage bed. The seepage bed has been designed for a 100-year storm
event.
The water in drainage basin 1 will be conveyed to 2 drop inlets and discharged into the seepage
bed using a perforated pipe. The water from drainage basin 2 will be conveyed to one drop inlet
and conveyed to the seepage bed. All conveyance occurs in 12” diameter storm pipe. The
seepage bed will be filled with drain rock with a void volume of 40%. See Appendix A –
Stormwater Plan for delineation of the basins and description of the system.
12/27/21
A-2021-0223
Page 2 221182
1.3 Design Criteria
The stormwater facilities were designed in accordance with the ACHD Policy Manual Section
8000 and Section 8200 relating to stormwater. See appendix B for calculations.
The design criteria for this seepage beds are:
▪ Store 100-year storm event at a 1-hour duration
▪ Infiltrate the 90% storm in 48 hours
▪ Minimum cover of 1.5-feet, unless under roadway or sidewalk then the
minimum cover is 1-foot
▪ Washed Drain Rock is 1.5-2 inches
▪ 1.5 -feet of ASTM C33 filter sand
▪ Sediment increase factor of 25%
▪ 3-feet minimum from groundwater
1.4 Calculations
1.4.1 Design Inputs
▪ Total acreage included in calculations is 0.97 acres.
▪ The runoff coefficient for the future building is 0.95 with a total area of 10,194 square
feet.
▪ The runoff coefficient for concrete and asphalt is 0.90, with a total area of 32,663 square
feet.
▪ The runoff coefficient for landscaping is 0.20, with a total area of 12,526 square feet.
▪ Time of concentration is 5 minutes.
▪ Sedimentation Increase Factor is 1.25
1.4.2 Summary of Calculations
▪ Seepage bed dimensions – 65’ X 25’ X 6’
▪ Seepage bed storage volume – 3900 CF
▪ Storm drainpipe sized for 100-year event – 12” Diameter
▪ Sand and grease trap size sized for 25-year event
See appendix B for calculations.
12/27/21
A-2021-0223
ROW
ROW ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW
ROW
ROW
P/L
P/L
P/L
P/L P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L P/L
P/L
P/L
P/L
P/L
P/L P/L
P/L
EP
EP
EP EP
EP
E
P
EP
SAW
SAW
SAW
SAW
12''SD>
12''SD> 12''SD>
65.00'
25.00'
12''SD>
12''SD<
12''SD<
STORMWATER PLAN
C-103
--- ---
131 SW 5th Avenue, Suite A
Meridian, Idaho 83642
(208) 288-1992
PROJECT NO.
SHEET NO.
221182
DRAWN: CHECK:
Page 3 221182
Appendix B: Stormwater Calculations
Project:
Client:
Designer:
Location:
Date & Time:
Flow, Q = CIA (cfs)
Pre-Developed Runoff Coefficient, Cpre = 0.00
Developed Runoff Coefficient, Cw = 0.74
Storm Event = 100 year
Total Area, A = 0.97 acres
Time of Concentration, tc = 5 min
Infiltration Area, Ai = 1,625 sqft
Available Facility Volume, Va = 3900 cuft
Infiltration Rate, Ir = 1 in/hour
= 0.0014 ft/min
Infiltrated Flow Rate, Qi = Ai x Ir = 2.3 cfm
Offsite Historical Discharge Rate, Qd = Cpre x I x A (see table below)
Maximum Flow, Qpeak = Cw x I x A - Qd (see table below)
Pond Volume, V = Qpeak x t - Qi x (t + tc) - (Qd x t) (see table below)
Sedimentation Increase Factor, fv = 1.15
Required Facility Volume, Vr = V x fv (see table below)
Time to infiltrate, ti = (Vr / Qi) / 60
I V Vr
hours minutes in/hr cfs cfm cfs cfm cf cf
0.08 5 4.38 0.00 0.0 3.14 188.6 921 1,059
0.17 10 3.16 0.00 0.0 2.27 136.1 1,327 1,526
0.25 15 2.57 0.00 0.0 1.84 110.7 1,615 1,857
0.33 20 2.17 0.00 0.0 1.56 93.5 1,813 2,085
0.50 30 1.73 0.00 0.0 1.24 74.5 2,156 2,480
0.67 40 1.47 0.00 0.0 1.06 63.3 2,431 2,795
0.83 50 1.24 0.00 0.0 0.89 53.4 2,546 2,928
1 60 1.06 0.00 0.0 0.76 45.7 2,592 2,981
2 120 0.61 0.00 0.0 0.44 26.3 2,870 3,301
3 180 0.45 0.00 0.0 0.32 19.4 3,071 3,532
4 240 0.36 0.00 0.0 0.26 15.5 3,168 3,643
5 300 0.30 0.00 0.0 0.22 12.9 3,188 3,666
6 360 0.26 0.00 0.0 0.19 11.2 3,207 3,688
8 480 0.21 0.00 0.0 0.15 9.0 3,247 3,734 <<<<<
10 600 0.17 0.00 0.0 0.12 7.3 3,027 3,482
12 720 0.15 0.00 0.0 0.11 6.5 3,015 3,467
18 1080 0.11 0.00 0.0 0.08 4.7 2,668 3,068
24 1440 0.08 0.00 0.0 0.06 3.6 1,886 2,169
Maximum Required Pond Volume, Vr = 3,734 cf < 3900 cf, VOLUME OK!
Storm Duration Resulting in Max Volume = 8 hours
Approximate Time to Infiltrate, ti = 27.6 hours = 1.1 days
Truck Shop Parking Lot Expansion
Western States CAT
Centanni
131 S.W. 5TH Avenue, Suite A, Meridian, Idaho 83642 Meridian, ID
Phone: 208.288.1992 - Fax: 208.288.1999 12/21/2021 10:57
IDF CURVE ZONE A - STORM WATER INFILTRATION FACILITY
Duration, t Qd Qpeak
12/27/21
A-2021-0223
Page 4 221182
Project:
Client:
Designer:
Description:
Date:
MAXIMUM RUNOFF AREA ALLOWABLE PER PIPE DIAMETER
Qstorm = C*i*Aacres
1.49 0.464
n n
Qstorm = C*i*Aacres
Runoff Coefficient, C = 0.74
Manning's Coefficient, n = 0.011
Storm Event = 100 year
Time of Concentration, tc = 5 minutes
Rainfall Intensity, i = 3.81 in/hr
Hydraulic Slope, S = 0.4 %
Qpipe = Qstorm, solve for drainage area capacity based on pipe diameter
Qpipe
C*i
Qpipe
Apipe
(sqft) (acres)
12 in 1.98 30568 0.70 12 in
15 in 3.06 47265 1.09 15 in
18 in 4.82 74418 1.71 18 in
21 in 6.50 100403 2.30 21 in
24 in 8.47 130859 3.00 24 in
30 in 15.36 237263 5.45 30 in
PIPE SIZE DETERMINATION
Basin/
Inlet
Runoff
Area Qpipe Vpipe
(sf) (sf) (acres) (cfs) (fps)
S 55,382 55,382 1.27 3.58 4.56
Cumulative Area
Downstream
Pipe Size
(in)
12 in
Upstream Basins Included
Phone: 208.288.1992 - Fax: 208.288.1999
STORM DRAIN PIPE SIZING
Truck Shop PL
WS CAT
Centanni
Vpipe =
Storm Pipe
Qpipe = *Apipe*R2/3*S 1/2 = *D8/3*S1/2
Aacres =
131 S.W. 5TH Avenue, Suite A, Meridian, Idaho 83642
0.12
0.10
Pipe
Dia., D
(in) Qpipe
(cfs)
Serviceable
Runoff Area Design Pipe
Slope (%)
0.22
0.16
Pipe
Dia., D
(in)
0.15
0.10
TS
12/27/21
A-2021-0223
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
WESTERN STATES CAT
TRUCK SHOP PARKING LOT EXPANSION
NO. REVISIONS DATE
This document or any part thereof in detail or design
concept is the personal property of Keller Associates,
Inc. and shall not be copied in any form without the
written authorization of Keller Associates, Inc.
PRELIMINARY
Not For
Construction
0 20 40
GENERAL SHEET NOTES
SHEET KEYNOTES
01 25' X 65' X 6' SEEPAGE BED
02 12" STORM PIPE
03 STANDARD DROP INLET
04 12" PERFORATED PIPE
05 1000 GAL SAND AND GREASE TRAP
06 STORM CATCH MANHOLE
03
06
02
02
03
01
02
04
06
05
DRAINAGE BASIN 1
DRAINAGE BASIN 2
LEGEND
APPENDIX A
STORMWATER PLAN
WESTERN STATES CAT
TRUCK SHOP PARKING LOT EXPANSION
EXISTING PARKING
AREA - DRAINING
TO EQUIPEMENT
YARD
NEW PARKING
AREAS - DRAINING
TO NEW SEEPAGE
BED
GB GB
GB
GB
GB
GB
12/27/21
A-2021-0223