Loading...
HomeMy WebLinkAboutCOM21-0202 Plan Accept V1___________________________________________________________________________________________________________________ Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387 6100 • FX 345-7650 • www.achdidaho.org Kent Goldthorpe, President Dave McKinney, Vice-President Jim D. Hansen, Commissioner Mary May, Commissioner Alexis Pickering, Commissioner August 13, 2021 The Land Group, Inc. Attn: Jason Densmer, PE RE: COM21-0202 / 4923 N Cortona / McMillan & Ten Mile Commercial PLAN ACCEPTANCE The District has reviewed the plans for the above referenced project and they are accepted for public street construction once the following items are complete: 1. Notice: Please provide a copy of this letter to the contractor(s) that will be applying for permits to work within the right-of-way. The project number listed above (COM#) will assist ACHD permit staff in setting up the permit and save time for all parties. 2. Provide one-original set of civil plans for ACHD stamp and approval. If construction does not commence and the project is delayed, the approval is subject to withdrawal under the following conditions. A new review will need to be conducted that will be subject to an additional plan review fee: • Changes in federal regulations that would result in necessary changes to the plan; i.e. ADA Requirements, water quality requirements, etc. • Expiration of the preliminary plat. 3. Once approved by the District, provide one 11x17 and one full size copy of the stamped plans to ACHD Development Review. The ACHD Construction Division will not issue a permit for work in the right-of-way until this is complete. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Engineer to certify that existing pedestrian ramps meet all ADA criteria for the dimensional standards with the proposed improvement plans, as approved. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. ACHD inspection is required. When ready to request occupancy sign-off, please call 387-6380 and provide all information as shown in the top title bar of this letter, i.e.; the City’s file number, the site address, and the name of the project. Please include your name and return phone number. 12/15/21 A-2021-0201 Requirements Prior to Starting Work 1. Any work in the public right-of-way requires a permit from the ACHD Construction Division. You can contact the Construction Division at 387-6280 to obtain a permit to work in the right-of-way. 2. Notice: ACHD is now accepting SWPPP/ESC submittals on CD or thumb drive. SWPPP/ESC plans will no longer be accepted by ACHD for review prior to plan acceptance and/or prior to submitting an application for permit to work within the right-of-way. At the time of request for a preconstruction conference or permit to work in the ACHD right-of-way, the applicant/owner must submit an Erosion and Sediment Control/Construction Site Discharge Control Narrative and Map prepared by a Certified Plan Designer to ACHD Construction, Building A-2, 3775 Adams St., Garden City, Idaho - fax 387-6289. Provide the ACHD Construction Division one copy of the Erosion & Sediment Control Plan for offsite utility work i.e. the typewritten narrative & associated map for ACHD stamp and approval. Note: this must be separate from what has been submitted for the subdivision work. Please go to the attached link for submittal requirements: http://www.achdidaho.org/Departments/Engineering/Stormwater/constErosionControl.aspx 3. Comply with all Standard Requirements of approval. If you have any questions you may contact me at 387-6184 or kbader@achdidaho.org. Sincerely, Kaci Bader Development Review Coordinator ACHD Development Services 12/15/21 A-2021-0201 Web links to standard Development Services forms Bridge Design Checklist: http://www.achdidaho.org/Documents/Forms/mostDocs/BridgeReviewChecklist.pdf Confirmation Agreement for Master Perpetual Storm Water Drainage Easement: http://www.achdidaho.org/Documents/Forms/mostDocs/StormwaterDrainageConfirmationAgreement.p df Master Storm Drain Easement Plat Note: http://www.achdidaho.org/Documents/Forms/mostDocs/StormDrainageEasementPlatNote.pdf Current Fee Schedule: http://www.achdidaho.org/Documents/Forms/mostDocs/DevServicesFeeSched.pdf Driveway Approach Request: (Required for new connections to the public roadway) http://www.achdidaho.org/Documents/Forms/mostDocs/DrivewayApproachRequest.pdf Fire Dept Approval Form: http://www.achdidaho.org/Documents/Forms/mostDocs/FireDeptApproval.pdf License Agreement Application: http://www.achdidaho.org/Documents/Forms/mostDocs/DevelopmentCommercialLicenseAgreement.pd f Plan Checklist: http://www.achdidaho.org/Documents/Forms/mostDocs/PlanChecklist.pdf Civil Plan Completeness Checklist: http://www.achdidaho.org/Documents/Forms/mostDocs/CivilPlanCompletenessChecklist.pdf Plat Checklist: http://www.achdidaho.org/Documents/Forms/mostDocs/PlatSubmittal.pdf Impact Fee Schedule: http://www.achdidaho.org/Documents/Engineering/ImpactFees/Ordinance231/ExhibitA_FeeSchedule.p df Impact Fee Information: http://www.achdidaho.org/Departments/Engineering/DevelopmentServices/impactFees.aspx Impact Fee Information: http://achdweb.achdidaho.org/Departments/Engineering/DevelopmentServices/impactFees.aspx Pavement Cut Request: http://hdlf.achdidaho.org/Forms/RoadMoratorium 12/15/21 A-2021-0201