HomeMy WebLinkAbout101-1A0018-C1.1 VICINITY MAP V1Restaurant #:
Issue Date:
Drawing
REVISION
ARCHITECTS PROJECT
Job # 1A0018
11-29-21
19G0026
OLIVE GARDEN
P78DOM-L
SEC CHINDEN BLVD.
& LINDER RD.
MERIDIAN
ID, 83646
ACS Architectural
acs-architects.com
101 Shipyard Way
Suite B
Newport Beach, CA
92663
T 714 436-9000
Construction
Services
Inc
NPB MKE ATL
CONSULTING ARCHITECT
111 East Broadway, Suite 600
Salt Lake City, UT 84111
Tel. No. (385) 212-3176
KHA PROJECT #093863001
11/29/2021
FROM SURVEY
FROM SURVEY
SITE DEVELOPMENT PLANS
FOR
OLIVE GARDEN
SOUTHEAST CORNER OF CHINDEN & LINDER, MERIDIAN ID,
83646
SHEET INDEX
VICINITY MAP
NORTH
BASIS OF BEARING
LEGAL DESCRIPTION
BENCHMARK
CONSULTANTS
PROPERTY OWNER:
DMG REAL ESTATE PARTNERS LLC
DEVELOPER:
DARDEN
CIVIL ENGINEER:
KIMLEY-HORN
SURVEYOR:
BLEW & ASSOCIATES
ARCHITECT
ACS
MECHANICAL ENGINEER
ZERO & ASSOCIATES
ELECTRICAL ENGINEER
ZERO & ASSOCIATES
GEOTECHNICAL ENGINEER
INTERTEK PSI
AGENCY CONTACTS
SITE INFORMATION
1 . ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF SITE IMPROVEMENTS SHALL MEET OR EXCEED THE
STANDARDS AND SPECIFICATIONS SET FORTH BY CITY OF MERIDIAN AND APPLICABLE STATE AND FEDERAL
REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY
APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W.
OR EASEMENTS SHALL BE INSPECTED AND APPROVED BY THE CITY OF MERIDIAN PUBLIC WORKS INSPECTOR
AND WITH THE DEPARTMENT OF TRANSPORTATION INSPECTOR. INSPECTION SERVICES AND
CONSTRUCTION CERTIFICATION TO BE PROVIDED BY ENGINEER OF RECORD.
2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,
WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS
BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT
LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF THE UTILITIES. PRIOR
TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS,
ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE
PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE
AGENCIES. THE CONTRACTOR SHALL NOTIFY THE CITY OF MERIDIAN PUBLIC WORKS INSPECTOR AT LEAST
48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND
ALL PUBLIC IMPROVEMENTS.
4. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF MERIDIAN AND ALL UTILITY
COMPANIES INVOLVED WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING
CONSTRUCTION AND TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A
MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL
PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.
5. THE CONTRACTOR SHALL HAVE ONE (1 ) SIGNED COPY OF THE APPROVED PLANS, ONE (1 ) COPY OF THE
APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION
AGREEMENTS NEEDED FOR THE JOB, ON-SITE AT ALL TIMES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO,
EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.
7. IF DURING THE CONSTRUCTION PROCESS CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS
SUBCONTRACTORS, OR OTHER AFFECTED PARTIES, WHICH COULD INDICATE A SITUATION THAT IS NOT
IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER
IMMEDIATELY.
8. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID
STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
9. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH THE M.U.T.C.D. TO
THE APPROPRIATE RIGHT-OF-WAY AUTHORITY (CITY, COUNTY, OR STATE) FOR APPROVAL, PRIOR TO ANY
CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE
CONSTRUCTION ACTIVITIES.
1 0. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE
COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE
PROVIDED, INSTALLED, CONSTRUCTED, REMOVED AND RELOCATED UNLESS SPECIFICALLY NOTED
OTHERWISE.
1 1 . THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL
CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.
1 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD
DRAWINGS KEPT AT THE CONSTRUCTION SITE, AND AVAILABLE TO THE CITY OF MERIDIAN PUBLIC WORKS
INSPECTOR AT ALL TIMES. AS-BUILT INFORMATION TO BE GIVEN TO ENGINEER UPON PROJECT COMPLETION.
1 3. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF
PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE CONSULTANT ENGINEER FOR CLARIFICATION,
AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
1 4. ALL STRUCTURAL EROSION CONTROL MEASURES SHALL BE INSTALLED, AT THE LIMITS OF CONSTRUCTION,
PRIOR TO ANY OTHER GROUND-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BE
MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS
ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.
1 5. THE CONTRACTOR SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE
POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE
CONSTRUCTED PRIOR TO INSTALLATION OF WATER LINES AND DRY UTILITIES.
1 6. ALL WORK WITHIN CHINDEN IS SUBJECT TO THE JURISDICTION OF THE (IDAHO TRANSPORTATION
DEPARTMENT, DISTRICT 3).
1 7. ALL OPERATIONS CONDUCTED ON THE PREMISES, INCLUDING THE WARMING UP, REPAIR, ARRIVAL,
DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND
ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE PERIOD BETWEEN 6:00 A.M.
AND 1 1 :00 P.M. EVERYDAY UNLESS OTHERWISE APPROVED BY THE CITY.
1 8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL UTILITY RELOCATIONS CONSISTENT
WITH THE CONTRACTOR'S SCHEDULE FOR THIS PROJECT, WHETHER SHOWN OR NOT SHOWN AS IT
RELATES TO THE CONSTRUCTION ACTIVITIES CONTEMPLATED IN THESE PLANS.
1 9. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL TEMPORARY POWER, TELEPHONE AND WATER
TO THE SITE, PAYING ALL FEES EXCLUDING TAP FEES AND SYSTEM DEVELOPMENT FEES, REFERRING TO
ARCHITECTURAL PLANS FOR THE EXACT LOCATION AND DIMENSIONS OF BUILDING EXITS, RAMPS, TRUCK
DOCKS, AND UTILITY ENTRANCE LOCATIONS.
20. IN GENERAL, LIMITS OF SITE WORK ARE UP TO THE FACE OF BUILDING.
21 . THE CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF
VESTIBULE, SLOPED PAVING, EXIT PORCHES, RAMPS AND TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND
EXACT UTILITY ENTRANCE LOCATIONS.
22. CONTRACTOR TO MAINTAIN ALL SHRUB AND GROUND COVER AREAS FREE FROM WEEDS AND
UNDESIRABLE VEGETATION THROUGH MAINTENANCE PERIOD.
GENERAL NOTES
FROM SURVEY
TOTAL SITE AREA 1 .37 ACRES (59,555.75 S.F.)
TOTAL BUILDING AREA 7,81 8 S.F.
PARKING REQUIREMENTS 1 STALL / 250 S.F.
PARKING STALLS REQUIRED 32 STALLS
PARKING STALLS PROVIDED 65 STALLS
PLANNING/ZONING :
CITY OF MERIDIAN
ENGINEERING:
CITY OF MERIDIAN
FIRE DEPARTMENT:
JACKSON CODE CONSULTANTS
1 857 N LAKES PLACE
GAS SERVICE:
INTERMOUNTAIN GAS
555 S. COLE RD.
ELECTRIC:
IDAHO POWER
WATER DEPARTMENT:
CITY OF MERIDIAN: PUBLIC WORKS
SANITARY SEWER:
CITY OF MERIDIAN: PUBLIC WORKS
STORM DRAIN:
CITY OF MERIDIAN: PUBLIC WORKS
PROJECT
LOCATION
GENERAL
NOTES
C1 .1
W CHINDEN BLVD
N LINDER ROAD
McMILLIAN ROAD
USTICK ROAD
TEN MILE ROAD
BLACK CAT ROAD
MERIDIAN ROAD
LOCUST GROVE ROAD
STATE STREET
CENTRAL VALLEY EXPRESSWAY
SHEET # SHEET NAME
C1 .1 GENERAL NOTES
C1 .2 ALTA SURVEY (FOR REFERENCE ONLY)
C1 .3 GENERAL CONSTRUCTION NOTES
C2.0 EROSION CONTROL COVER SHEET
C2.2 EROSION CONTROL PLAN
C2.3 EROSION CONTROL DETAILS
C3.1 SITE PLAN
C4.1 UTILITY PLAN
C6.1 GRADING AND DRAINAGE PLAN
C7.1 CONSTRUCTION DETAILS
C8.1 GEOTECHNICAL REPORT
C8.2 GEOTECHNICAL REPORT
C8.3 GEOTECHNICAL REPORT
C8.4 GEOTECHNICAL REPORT
C8.5 GEOTECHNICAL REPORT
CS1 DARDEN CIVIL SPECIFICATIONS
CS2 DARDEN CIVIL SPECIFICATIONS
CS3 DARDEN CIVIL SPECIFICATIONS
CS4 DARDEN CIVIL SPECIFICATIONS
CS5 DARDEN CIVIL SPECIFICATIONS
L1 .1 LANDSCAPE PLANTING PLAN
L1 .2 LANDSCAPE PLANTING DETAILS
LS1 DARDEN LANDSCAPE AND IRRIGATION
SPECIFICATIONS
L2.1 IRRIGATION PLAN
L2.2 IRRIGATION DETAILS
12/14/21
A-2021-0227