Loading...
HomeMy WebLinkAboutPre-app Notes V1APPLICATION TYPES Preliminary Plat - PP: CHECKED PLATS ONLY Number of Building Lots: 132 PROJECT INFORMATION Gross Density: 2.85 Name: JOHN WARDLE, BRIGHTON CORPORATION Address: 12601 W. EXPLORER DRIVE SUITE 200 83713 Phone: 208-287-0518 Email: jwardle@brightoncorp.com Pre-Application Request Applicant Information Type of Review Requested Subject Property Information Location/street address: Assessor's parcel number (s): S1131417210 Township, range, section: 3N1E31 Application Information Project/Application Name: APEX West Description of Work: Preliminary Plat 46.31 Acres Project Description Additional Attendee(s) Name: Michael Wardle Business Name: Brighton Development Address: 2929 W Navigator Dr Meridian, Idaho 83642 Phone: 208-378-4000 Email: mwardle@brightoncorp.com Name: Josh Beach Business Name: Brighton Development Address: 2929 West Navigator Drive, Ste. 400 MERIDIAN, ID 83642 Phone: Email: jbeach@brightoncorp.com File number: PREAPP-2021-0053 Assigned Planner: Sonya Allen Scheduled Date: 05/25/2021 Scheduled Time: 9:30 AM Planning Division PREAPPLICATION MEETING 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 1 I acknowledge a neighborhood meeting is required prior to application submittal: CHECKED I acknowledge pre-app notes are good for 4 months: CHECKED I acknowledge that a Site Plan will be uploaded in the attachment section: CHECKED In Reclaimed Water Buffer: No Irrigation District: Boise Kuna Number of Residential Units: 132 Percentage of Site Devoted to Landscaping: 16% Primary Irrigation Source: surface Secondary Irrigation Source: well Who will own and Maintain the Pressurized Irrigation System in this Development: HOA PROPERTY INFORMATION Prior Approvals (File Numbers): H-2015-0019 (South Meridian AZ); H-2020-0056 (PP) TYPE OF USE PROPOSED Residential: CHECKED Single-Family Detached: CHECKED ZONING DISTRICT(S) R-2: CHECKED R-8: CHECKED Review Type Reviewer Review Notes Addressing Plan Review Notes Terri Ricks No comments at this time. TLR Building Plan Review Notes Bret Caulder Proposed structures to comply with the 2018 Building Codes MFD Plan Review Notes Joe Bongiorno There will need to be secondary access provided after the first 30 building lots, or everything in this phase will have fire sprinklers installed. A detailed phasing plan will be required. Parks Plan Review Notes Kimberly Warren Multi-use pathways required: one north-south connection along the Watkins drain, or along the midmile collector. one pathway along the length of the Pipeline easement through the site. Connect the first pathway to the pipeline. Dedicate easements for both. 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 2 Planning Review Notes Sonya Allen * Annexation of Parcel #R7824220042 will need to be finalized before submittal of preliminary plat application (Shafer View AZ). * Comply with the terms of the existing Development Agreement(s); or apply for a modification. * Preliminary plat to subdivide property - comply with subdivision design & improvement standards in UDC 11- 6C-3 & dimensional standards in UDC Table 11-2A-6 for the R-8 district - ALL of the parcels need to be included in the boundary of the plat, remnant portions can't be left out. * Submit phasing plan * Construct collector street consistent with Master Street Map. * Extend stub streets & provide stub streets to adjacent properties. * Extend collector street along west boundary to connect to Quartz Creek. * Provide qualified open space & site amenities per the standards in UDC 11-3G-3. * The McBirney Lateral crosses this site; comply with the standards in UDC 11-3A-6. * Comply with Williams Pipeline development standards. see comments Wastewater Plan Review Notes Tyson Glock ‡Why are they not bring the sewer to the east through one of the roads? ‡Flow is committed ‡Ensure no sewer services cross infiltration trenches ‡Ensure no permanent structures (trees, bushes, buildings, carports, trash receptacle walls, fences, infiltration trenches, light poles, etc.) are built within the utility easement. Water Plan Review Notes Kyle Radek Offsite water main will be required to make second water connection to E Quartz Creek St to NW. Some water mains will need to be upsized to 12 inch to build 1/2 mile grid. 33 E Broadway Avenue, Suite 102ƔMeridian, Idaho 83642 Phone: (208)884-5533ƔFacsimile: (208) 888-6854ƔWebsite: www.meridaincity.org 3 APEX West APEX Northwest APEX Southeast 18 19 20 11 12 10 13 14 9 8 4 5 15 14 13 12 11 9 8 1 23 38 39 37 36 32 33 34 35 26 21 44 43 42 41 2 6 3 1 2 3 21 22 10 20 5 18 6 17 4 16 7 31 30 29 9 8 13 10 22 14 28 25 26 11 24 17 28 24 40 6 25 LEGEND 0 200 400 600 Plan Scale: 1" = 200' DEVELOPER BRIGHTON PROJECT: SHEET NO. 5/13/21 APEX WEST SUBDIVISION SEWER EXHIBIT 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 kmengllp.com 21-028 1 OF 2 1 Joshua Beach From: Bill Parsons <bparsons@meridiancity.org> Sent: Friday, October 8, 2021 1:19 PM To: Joshua Beach Subject: RE: pre-app notes System has been updated. Bill Parsons, AICP | Planning Supervisor City of Meridian | Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208‐884‐5533 | Direct: 208‐489‐0571 Built for Business, Designed for Living All e‐mail messages sent to or received by City of Meridian e‐mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law. From: Joshua Beach <JBeach@brightoncorp.com> Sent: Friday, October 8, 2021 1:15 PM To: Bill Parsons <bparsons@meridiancity.org> Subject: Re: pre‐app notes External Sender - Please use caution with links or attachments. Will do. Thank, Bill. Josh Beach On Oct 8, 2021, at 1:14 PM, Bill Parsons <bparsons@meridiancity.org> wrote: Good Afternoon Josh, If nothing has changed I don’t see a need to meet again. With our new process, pre‐application meeting notes are no longer required to be submitted with your application. Once you are ready to submit your application, please insert today’s date as the date that you held your pre‐application meeting and I will change the date in our system. Take Care, Bill Parsons, AICP | Planning Supervisor City of Meridian | Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208‐884‐5533 | Direct: 208‐489‐0571 <image001.gif> 2 Built for Business, Designed for Living All e‐mail messages sent to or received by City of Meridian e‐mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law. From: Joshua Beach <JBeach@brightoncorp.com> Sent: Friday, October 8, 2021 9:30 AM To: Bill Parsons <bparsons@meridiancity.org> Cc: Alan Tiefenbach <atiefenbach@meridiancity.org>; Sonya Allen <sallen@meridiancity.org>; Joseph Dodson <jdodson@meridiancity.org> Subject: pre‐app notes External Sender - Please use caution with links or attachments. Bill, I’m prepping to submit two applications and it appears that the pre‐app notes for both projects (Apex West and Quartet South) are over the 4 month limit. Nothing about the projects has changed since the pre‐app meetings. Can I still use the attached pre‐app notes for my submittal? Josh Beach | Assistant Project Manager-Entitlement BRIGHTON CORPORATION Brighton – Creating Great Places 2929 W. Navigator Dr., Suite 400, Meridian, ID 83642 Mobile 208.871.3812 brightoncorp.com 27 30 29 31 16 15 14 13 12 11 10 5 2 3 4 7 6 8 9 5 10 12 22 3 7 19 1 6 7 8 1 9 2 3 4 2 27 20 19 18 17 16 5 4 12 23 15 21 3 11 21 4 14 22 5 15 23 6 16 24 7 8 17 9 18 19 2 10 20 10,415 SF 13,558 SF 20,121 SF 8,580 SF 10,620 SF 9,286 SF 11,544 SF 9,351 SF 21,063 SF 10,729 SF 8,250 SF 3,656 SF 4,079 SF 8,245 SF 8,250 SF 7,500 SF 7,500 SF 8,250 SF 7,500 SF 9,872 SF 10,660 SF 8,250 SF 8,871 SF 8,250 SF 12,657 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 13,197 SF 7,922 SF 7,920 SF 7,920 SF 7,918 SF 8,250 SF 8,249 SF 8,250 SF 8,552 SF 10,746 SF 8,974 SF 8,822 SF 8,259 SF 7,500 SF 7,669 SF 2,737 SF 7,500 SF 7,500 SF 8,250 SF 8,974 SF 8,250 SF 7,500 SF 8,668 SF 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,500 SF 7,201 SF 7,500 SF 7,500 SF 9,000 SF 8,084 SF 7,507 SF 3,635 SF 7,500 SF 32,070 SF 7,500 SF 17,378 SF 11,457 SF 10,692 SF 8,318 SF 7,500 SF 7,500 SF 7,500 SF 3,732 SF 8,250 SF 8,250 SF 8,250 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 8,380 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,499 SF 3,656 SF 8,250 SF 3,948 SF 6,000 SF 11,084 SF 8,776 SF 8,250 SF 7,500 SF 8,047 SF 8,250 SF 2,500 SF 8,251 SF 2,795 SF 8,885 SF 8,162 SF 8,250 SF 8,250 SF 8,253 SF 4,077 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 7,500 SF 8,266 SF 10,798 SF 7,500 SF 7,500 SF 7,500 SF 4,982 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,002 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,000 SF 6,007 SF 6,000 SF 6,000 SF BLOCK 7 BLOCK 6 BLOCK 4 BLOCK 5 BLOCK 3 13 7 9,651 SF 1 1,867 SF 6 3 2 4 1 27,458 SF 28,357 SF 31,102 SF 37,507 SF 48,741 SF BLOCK 8 BLOCK 2 1 25 2,961 SF 2,342 SF 1 BLOCK 1 5 106,719 SF 0 50 100 150 Plan Scale: 1" = 50' DEVELOPER BRIGHTON PROJECT: SHEET NO. 5/13/21 APEX WEST SUBDIVISION PLAT LAYOUT 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 kmengllp.com 21-028 1 OF 2 E. CRESCENDO ST. APEX NORTHWEST SUBDIVISION NO. 2 S. APEX AVE.