Loading...
HomeMy WebLinkAboutStorm Drainage Calcs V1Southridge South Subdivision – Phase 1 Meridian, Idaho Storm Drain Management & Engineering Drainage Report Developer Challenger Development Meridian, ID 83642 Engineer The Land Group, Inc. 462 East Shore Drive, Suite 100 Eagle, Idaho 83616 Contact: Jason Densmer, PE Ph: 208-939-4041 October 26, 2021 TLG Project No. 121027 10/27/2021 12/06/21 FP-2021-0059 Southridge South Subdivision – Phase 1 Meridian, ID Storm Water Management Report Report Purpose & Site Description The purpose of this report is to evaluate and document the post-development storm drain characteristics of the Southridge South Subdivision – Phase 1 project. This report analyzes the storm drainage conditions and provides calculations confirming the adequacy of proposed storm drain facilities to meet the project needs. The proposed Southridge South Subdivision – Phase 1 project is located located south of Overland Road, between Linder Rd and Ten Mile, within the City of Meridian, Idaho. The proposed improvements consist of single family homes with associated site improvements including new access roads, landscaping and underground utilities. Geotechnical conditions at the site were evaluated by Site Consulting, LLC and their findings are attached as Appendix C. The site geotechnical evaluation provides guidance on design and project construction considerations. Relative to storm drainage systems, recommendations for groundwater and soil infiltration rates are provided. The geotechnical engineer’s recommendations have been incorporated to the proposed design and systems. Proposed Systems Appendix A provides an overview of the proposed drainage basins. Storm Drainage Routing & Treatment Within each drainage basin, stormwater runoff is collected from roadways that are sloped to the gutters along the road edges, which then transport the collected drainage to catch basins. Once inside the system, stormwater flows through a drainage piping network to sand & grease traps which remove heavy sediment and light oils prior to discharge into underground seepage beds. The seepage bed provides final treatment with an 18-inch layer of ASTM C33 filter sand. Peak Rate of Discharge and Storage Volume The peak rate of discharge for the roadway drainage systems were calculated using the Ada County Highway District’s published spreadsheets. Calculation worksheets for peak flow and required storage volume in each drainage basin are provided in Appendix B. 12/06/21 FP-2021-0059 Southridge South Subdivision – Phase 1 Meridian, ID Storm Water Management Report Appendix A Site Drainage Areas 12/06/21 FP-2021-0059 EP EP EP EP EP EP EP O O O O O O O O O O O O O SD SD SD SD EP EP EP EP EP EP SD SD S D R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W G G G G G G G G G G G G G G G G G G Southridge South Subdivision – Phase 1 Meridian, ID Storm Water Management Report Appendix B Drainage Calculations 12/06/21 FP-2021-0059 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities (25 max) 8 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 8,477 Acres 0.19 6 Determine the Weighted Runoff Coefficient (C) 0.90 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.90 7 I100, TC<=60 8 i 2.58 in/hr 9 Q peak 0.45 cfs 10 V 605 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 378 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 61 ft 3 Primary Treatment/Storage Basin V 545 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 605 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 47,575 44,282 Acres 2.11 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 2.72 cfs 10 V 3,644 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 2,277 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 364 ft 3 Primary Treatment/Storage Basin V 3,280 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,644 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 2 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 3 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 76,980 58,074 Acres 3.10 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 4.00 cfs 10 V 5,358 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 3,348 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 536 ft 3 Primary Treatment/Storage Basin V 4,822 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 5,358 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 3 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 4 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 20,644 19,931 Acres 0.93 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 1.20 cfs 10 V 1,610 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 1,006 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 161 ft 3 Primary Treatment/Storage Basin V 1,449 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 1,610 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 4 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 5 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 42,144 36,621 Acres 1.81 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 2.33 cfs 10 V 3,125 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 1,953 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 312 ft 3 Primary Treatment/Storage Basin V 2,812 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 3,125 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 5 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 6 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 57,020 48,874 Acres 2.43 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 3.14 cfs 10 V 4,201 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 2,625 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 420 ft 3 Primary Treatment/Storage Basin V 3,781 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 4,201 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 6 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 7 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 14,513 2,889 Acres 0.40 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 0.52 cfs 10 V 690 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 431 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 69 ft 3 Primary Treatment/Storage Basin V 621 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 690 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Peak Discharge Rate using the Rational Method calculated for post-development Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 8 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 Click to Show More Subbasins Subbasin 1 Subbasin 2 Subbasin 3 Subbasin 4 Subbasin 5 Subbasin 6 Subbasin 7 Subbasin 8 Subbasin 9 Subbasin 10 5 Area of Drainage Subbasin (SF or Acres) SF 2,897 2,912 Acres 0.13 6 Determine the Weighted Runoff Coefficient (C) 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.50 7 I100, TC<=60 8 i 2.58 in/hr 9 Qpeak 0.17 cfs 10 V 230 ft 3 V = Ci (Tc=60)Ax3600 11 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V rr 144 ft 3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 23 ft 3 Primary Treatment/Storage Basin V 207 ft 3 Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 230 ft 3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on Tc Calculate the Post-Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 8 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Steps for Sizing Basins: Size for forebay and print then size for primary storage/treatment basin. User input in yellow cells. 1 Project Name 2 Enter number of Basins (25 max) 3 3 Number of Cells (Forebay+Primary=2, Primary Only=1) 1 4 Design Storm 100 'Q,V' Link to: 5 Weighted Runoff Coefficient C 0.90 6 Area A (Acres) 0.19 acres 7 Approved Discharge Rate (if applicable) 0.00 cfs 8 V 605 ft3 Toggle between Forebay and Primary Basin, enter data and print for each Forebay 9 Select Forebay Shape 10 Width of Forebay Bottom W 33.0 ft 11 Length of Forebay Bottom L 40.0 ft 12 Side Slopes (H:1) H:1 4.00 13 Enter Bottom Elevation 2684.88 ft 14 Enter Top Bank Elevation 2686.38 ft 15 Enter Water Surface Elevation (WSE) 2685.88 ft 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 ft 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 ft 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note: infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom slope<1% or 0 outflow 22 Infiltration Area for Forebay ASand 330 ft2 Enter 0 for no infiltration 23 Adjusted Storage Required i total Q Runoff Vol Perc Vol Pre-Dev Discharge Total Discharge Max Vol Reqd Min Hr in/hr cfs ft3 ft3 ft3 ft3 ft3 60 1.00 0.96 0.17 605 165 0 165 440 24 Depth-Storage Relationship: 2684.88 2684.88 4.000 33.0 40.0 1,320 0.00 0 2684.88 4.000 33.0 40.0 1,320 0.00 0 2685.88 4.000 41.0 48.0 1,968 0.00 1,644 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 1.00 ft depth for storage STORAGE OK 25 Does forebay have capacity? YES 26 Time to drain forebay 3.3 hours 90% volume in 48-hours minimum OK Storm Duration Saved Stage (ft) New Stage (ft) Steps for Sizing Basins: Size for forebay and print then size for primary storage/treatment basin. User input in yellow cells. 1 Project Name 2 2 Enter number of Basins (25 max) 3 3 Number of Cells (Forebay+Primary=2, Primary Only=1) 1 4 Design Storm 100 'Q,V7' Link to: 5 Weighted Runoff Coefficient C 0.50 6 Area A (Acres) 0.40 acres 7 Approved Discharge Rate (if applicable) 0.00 cfs 8 V 690 ft3 Toggle between Forebay and Primary Basin, enter data and print for each Forebay 9 Select Forebay Shape 10 Width of Forebay Bottom W 33.0 ft 11 Length of Forebay Bottom L 40.0 ft 12 Side Slopes (H:1) H:1 4.00 13 Enter Bottom Elevation 2664.87 ft 14 Enter Top Bank Elevation 2666.37 ft 15 Enter Water Surface Elevation (WSE) 2665.87 ft 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 ft 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 ft 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note: infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom slope<1% or 0 outflow 22 Infiltration Area for Forebay ASand 1,320 ft2 Enter 0 for no infiltration 23 Adjusted Storage Required i total Q Runoff Vol Perc Vol Pre-Dev Discharge Total Discharge Max Vol Reqd Min Hr in/hr cfs ft3 ft3 ft3 ft3 ft3 60 1.00 0.96 0.19 690 660 0 660 30 24 Depth-Storage Relationship: 2664.87 2664.87 4.000 33.0 40.0 1,320 0.00 0 2665.87 4.000 41.0 48.0 1,968 0.00 1,644 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 1.00 ft depth for storage STORAGE OK 25 Does forebay have capacity? YES 26 Time to drain forebay 0.9 hours 90% volume in 48-hours minimum OK Saved Surface Steps for Sizing Basins: Size for forebay and print then size for primary storage/treatment basin. User input in yellow cells. 1 Project Name 3 2 Enter number of Basins (25 max) 3 3 Number of Cells (Forebay+Primary=2, Primary Only=1) 1 4 Design Storm 100 'Q,V8' Link to: 5 Weighted Runoff Coefficient C 0.50 6 Area A (Acres) 0.13 acres 7 Approved Discharge Rate (if applicable) 0.00 cfs 8 V 230 ft3 Toggle between Forebay and Primary Basin, enter data and print for each Forebay 9 Select Forebay Shape 10 Width of Forebay Bottom W 33.0 ft 11 Length of Forebay Bottom L 20.0 ft 12 Side Slopes (H:1) H:1 4.00 13 Enter Bottom Elevation 2667.35 ft 14 Enter Top Bank Elevation 2668.85 ft 15 Enter Water Surface Elevation (WSE) 2668.35 ft 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 ft 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 ft 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 21 Infiltration Area for Forebay Infiltration? 6.00 in/hr Note: infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom slope<1% or 0 outflow 22 Infiltration Area for Forebay ASand 660 ft2 Enter 0 for no infiltration 23 Adjusted Storage Required i total Q Runoff Vol Perc Vol Pre-Dev Discharge Total Discharge Max Vol Reqd Min Hr in/hr cfs ft3 ft3 ft3 ft3 ft3 60 1.00 0.96 0.06 230 330 0 330 0 24 Depth-Storage Relationship: 2667.35 2667.35 4.000 33.0 20.0 660 0.00 0 2668.35 4.000 41.0 28.0 1,148 0.00 904 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 1.00 ft depth for storage STORAGE OK 25 Does forebay have capacity? YES 26 Time to drain forebay 0.6 hours 90% volume in 48-hours minimum OK Saved Surface Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name 2 Enter number of Sand/Grease Traps (25 max) 5 Vault Size Number of S/G Traps Peak Flow Q-cfs Baffle Spacing (inch) Throat width (inch) Area (ft2) Velocity 0.5 fps max. Is the Velocity ok? 1000 G 1 2.72 18 48 6.00 0.45 YES Reference for Throat widths (inch) Boise Vault Lar-ken ADS WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name 2 2 Enter number of Sand/Grease Traps (25 max) 5 Vault Size Number of S/G Traps Peak Flow Q-cfs Baffle Spacing (inch) Throat width (inch) Area (ft2) Velocity 0.5 fps max. Is the Velocity ok? 1500 G 1 4 20 60 8.33 0.48 YES Reference for Throat widths (inch) Boise Vault Lar-ken ADS WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Tank 2 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name 3 2 Enter number of Sand/Grease Traps (25 max) 5 Vault Size Number of S/G Traps Peak Flow Q-cfs Baffle Spacing (inch) Throat width (inch) Area (ft2) Velocity 0.5 fps max. Is the Velocity ok? 1000 G 1 1.2 18 48 6.00 0.20 YES Reference for Throat widths (inch) Boise Vault Lar-ken ADS WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Tank 3 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name 4 2 Enter number of Sand/Grease Traps (25 max) 5 Vault Size Number of S/G Traps Peak Flow Q-cfs Baffle Spacing (inch) Throat width (inch) Area (ft2) Velocity 0.5 fps max. Is the Velocity ok? 1000 G 1 1.25 18 48 6.00 0.21 YES Reference for Throat widths (inch) Boise Vault Lar-ken ADS WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Tank 4 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name 5 2 Enter number of Sand/Grease Traps (25 max) 5 Vault Size Number of S/G Traps Peak Flow Q-cfs Baffle Spacing (inch) Throat width (inch) Area (ft2) Velocity 0.5 fps max. Is the Velocity ok? 1000 G 1 3.14 20 48 6.67 0.47 YES Reference for Throat widths (inch) Boise Vault Lar-ken ADS WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Tank 5 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 5 3 Design Storm 100 'Q,V2' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 2.11 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 4,555 ft3 25% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 11.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 45.5 ft3/ft 15 Calculate Design Length L 100 ft 100.0743792 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 100 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 8.2 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 100 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Southridge South Phase 1, Facility 2 NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:22 AM 12/06/21 FP-2021-0059 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 2 Enter number of Seepage Beds (25 max) 5 3 Design Storm 100 'Q,V3' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 3.10 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 6,697 ft3 25% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 11.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 43.8 ft3/ft 15 Calculate Design Length L 153 ft 153.0191149 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 153 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 7.9 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 153 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak Q,V" tab Southridge South Phase 1, Facility 3, Bed 2 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:22 AM 12/06/21 FP-2021-0059 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 3 2 Enter number of Seepage Beds (25 max) 5 3 Design Storm 100 'Q,V4' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 0.93 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 2,012 ft3 25% Sediment 8 Set Total Design Width of All Drain Rock W 8.0 ft 9 Set Total Design Depth of All Drain Rock D 9.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 29.5 ft3/ft 15 Calculate Design Length L 68 ft 68.28367768 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 68 ft 17 Variable Infiltration Window W SWW 8.0 ft 18 Time to Drain 6.6 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 68 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak Q,V" tab Southridge South Phase 1, Facility 4, Bed 3 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:22 AM 12/06/21 FP-2021-0059 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 4 2 Enter number of Seepage Beds (25 max) 5 3 Design Storm 100 'Q,V5' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 1.81 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 3,906 ft3 25% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 5.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 24.5 ft3/ft 15 Calculate Design Length L 159 ft 159.3184184 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 159 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 4.4 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 159 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak Q,V" tab Southridge South Phase 1, Facility 5, Bed 4 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:22 AM 12/06/21 FP-2021-0059 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 5 2 Enter number of Seepage Beds (25 max) 5 3 Design Storm 100 'Q,V6' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 2.43 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 5,251 ft3 25% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 11.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.35 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 45.5 ft3/ft 15 Calculate Design Length L 115 ft 115.3671066 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 115 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 8.2 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 115 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak Q,V" tab Southridge South Phase 1, Facility 6, Bed 5 G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:22 AM 12/06/21 FP-2021-0059 Southridge South Subdivision – Phase 1 Meridian, ID Storm Water Management Report Appendix C Geotechnical Report 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 12/06/21 FP-2021-0059 Area A at Stage (ft 2 ) Surface Area A at Stage (ft 2 ) OVERIDE Volume Below Stage (ft3) Saved Stage (ft) New Stage (ft) Side Slope (H:V) Basin Width at Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (ft 2 ) Storm Duration ACHD Calculation Sheet for Sizing Basins NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 8, Pond 3 1-Basin Forebay 3-Rectangle G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Area A at Stage (ft 2 ) Surface Area A at Stage (ft 2 ) OVERIDE Volume Below Stage (ft3) Saved Stage (ft) New Stage (ft) Side Slope (H:V) Basin Width at Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (ft 2 ) Storm Duration ACHD Calculation Sheet for Sizing Basins NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. Southridge South Phase 1, Facility 7, Pond 2 1-Basin Forebay 3-Rectangle G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Volume Below Stage (ft3) Side Slope (H:V) Basin Width at Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (ft2) Saved Surface Area A at Stage (ft 2 ) Surface Area A at Stage (ft 2 ) OVERIDE Southridge South Phase 1 3-Rectangle 1-Basin Forebay NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. ACHD Calculation Sheet for Sizing Basins G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.0, May 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 min G:\2021\121027\CAD\Calcs and Reports\121027 ACHD_SD_CALCS_112018.xlsm Version 10.5, November 2018 10/11/2021, 10:19 AM 12/06/21 FP-2021-0059 G G G G G G S AN SAN SAN SAN SAN SAN SAN MTR WTR SD 8''PI R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W FACILITY 7a 2889 SF FACILITY 7b 14513 SF Q100=1.41 cfs Qq25=1.01 cfs Q100=1.61 CFS Q25=0.94 CFS Q100=2.28 CFS Q25=1.63 CFS Q100=1.72 CFS Q25=1.23 CFS Q100=0.59 CFS Q25=0.42 CFS Q100=0.61 CFS Q25=0.44 CFS Q100=1.08 CFS Q25=0.78 CFS Q100=1.25 CFS Q25=0.89 CFS Q100=1.45 CFS Q25=1.04 CFS Q100=1.69 CFS Q25=1.21 CFS TEMPORARY DRINAGE SWALE V100=605 CF TEMPORARY DRAINAGE SWALE V100=690 CF FACILITY 8b 2912 SF FACILITY 8a 2897 SF TEMPORARY DRAINAGE SWALE V100=230 CF FACILITY 1 AREA 8477 SF FACILITY 6b AREA 48874 SF FACILITY 6a AREA 57020 SF FACILITY 2b AREA 44282 SF FACILITY 2a AREA 47575 SF FACILITY 3a AREA 76980 SF FACILITY 3b AREA 58074 SF FACILITY 5a AREA 42144 SF FACILITY 4a AREA 20644 SF FACILITY 4b AREA 19931 SF FACILITY 5b AREA 36621 SF Horizontal Scale: 0 80' 160' 1" = 80' Drainage Map File Location: \oak\cad\2021\121027\cad\calcs and reports\121027 drainage map.dwg Last Plotted By: jason densmer Date Plotted: Wednesday, October 27 2021 at 09:32 AM #### #### Southridge South Subdivision Phase 1 Drainage Map MERIDIAN, IDAHO 121027 App A Drainage Map Revisions 1. Date of Issuance: Project No.: Project Milestone: ---- 1 CONSTRUCTION NOT FOR 12/06/21 FP-2021-0059