Loading...
HomeMy WebLinkAbout2021-12-03 COMPASS Communities in Motion 2040 2. 0 Development Review The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 2.0 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 2.0 goals. Development Name: Apex East Agency: City of Meridian CIM Vision Category: Future Neighborhood New households: 97 New jobs: 0 Exceeds CIM forecast: No CIM Corridor: Lake Hazel Road Level of Stress considers facility type, number of vehicle Pedestrian level of stress: R lanes, and speed. Roads with G or PG ratings better Bicycle level of stress: R support bicyclists and pedestrians of all ages and comfort levels. Housing within 1 mile: 540 A good jobs/housing balance - a ratio between 1 and Jobs within 1 mile: 80 1.5 - reduces traffic congestion. Higher numbers Jobs/Housing Ratio: 0.1 indicate the need for more housing and lower numbers indicate an employment need. Developments within 1.5 miles of police and fire i!. Nearest police station: 4.5 mi. Nearest fire station: 0.1 mi. stations ensure that emergency services are more efficient and reduce the cost of these important public services. Farmland consumed: Yes ,Farmland contributes to the local economy, creates Farmland within 1 mile: 834 acres additional jobs, and provides food security to the region. •� Development in farm areas decreases the productivity and sustainability of farmland. Nearest bus stop: 3.6 mi. Residents who live or work less than 1/2 mile from Nearest public school: 1.5 mi. critical services have more transportation choices. Nearest public park: 0.3 mi. Walking and biking reduces congestion by taking cars off Rim: Nearest grocery store: 2.6 mi. the road, while supporting a healthy and active lifestyle. Recommendations The proposal is in a developing residential area of south Meridian. The COMPASS FY2022-2028 Transportation Improvement Plan shows that Eagle Road, a major arterial nearby the project, will be widened to 5-lanes from Lake Hazel to Victory in 2021-2023 (see figure 1 and 2). The project also includes a multi-use pathway along the southern boundary of the plat which provides access to Discovery Park. Consider a pedestrian crossing for residents to safely access Discovery Park when crossing Recreation Avenue. More information about COMPASS and Communities in Motion 2040 2.0: Web: www.compassidaho.orq Email infoCa)compassidaho.orq .�'�. CO M PAS S More information about the development review process: ��r���ll► 1111 r http://www.compassidaho.orci/dashboard/devreview.htm . WIN COMMUNITY PLANNING ASSOCIATION ' of Southwest Idaho Eagle Road, Amity Road to Victory Road, Meridian Regionally Significant; Inflated TIPAch6evement: vkw-t�d Key# : RD207.33 System Performance Requesting Agency. ACHD Active Transportation Project Year; 2021-2022 Total Previous Allocations: $4.932 Safety Total Programmed Budget. $483 Total Cost tPrev. +Prog,}; $5.415 Project Description Widen Eagle Road from Amity Road to Victory Road In the City of Merldlan to five lanes with curb,gutter. sidewalk. and level three bike Imes-Project includes enhanced pedestrian crossing facility at Rurne Drive and a roundabout at Eagle Road and Zaldia Drlve- runding Source Local(Regionally Significant) Program Hwy-Local Partnerships Local Match 100.00% Cast Preliminary Preliminary Right-of-Way Utllitles Construction Construction Total Faderal Share Local Share Yearn Englneering Englnaering Engineering Consultl ng 2022 0 0 0 0 0 483 I 483 I 0 4Z.i Fund 30 30 30 $0 $o SAN $463 s0 $483 Totals: Figure 1:COMPASS FY 2022-2028 Transportation Improvement Program,Project Key#RD207-33 Eagle Road, Lake Hazel Road to Amity Road, Meridian 13_gplr:r;An� �..� Regionally Significant; � � inflated TIP Achievement: � � , � -. Key# . RD216.04 System Performance Requesting Agency: ACHD Active Transportation Project Year: 2023 _ = . Total Previous Allocations: $0 Safety Total Programmed Budget., $6.682 Total Cost(Prev.+Prog.�: $6.682 Project Description Widen Eagle Road from lake Hazel Road to Amity Road in the GIty of Meridian to jive lanes with curb, gutter,sidewalk,and a level three bike facility- Project includes a roundabout at Taconic Drive- runding Source Local (Regionally Significant) Program Hwy-Local Partnerships Local Match 100.00 Cost Preliminary Pretrminary Right-of-Way Utill6as Constructlon Construction Total Federal Share Local Share Yearn Engineering Engineering Engineering ConsulLing 2022 0 15 1,320 0 0 0 1.335 0 1.5m 2023 0 0 0 152 46 5,169 5,347 0 5,347 Fu nd yb 1i15 $1,320 $1 S2 $a A169 $602 s0 $6,682 Totals: Figure 2:COMPASS FY 2022-2028 Transportation Improvement Program,Project Key#RD216-04 Fiscal Impact Analysis Supplemental for the Development Review Checklist The purpose of the fiscal impact analysis is to better estimate expected revenues and costs to local governments as a result of new development so that the public, stakeholders, and the decision- makers can better manage growth. Capital and operating expenditures are determined by various factors that determine service and infrastructure needs, including persons per household, student generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip lengths, construction values, income, discretionary spending, and employment densities. The COMPASS Development Checklist considers the level of fiscal benefits, how many public agencies benefit or are burdened by additional growth, and how long the proposal will take to achieve a fiscal break-even point, if at all. More information about the COMPASS Fiscal Impact Tool is available at: www.compassidaho.org/prodserv/fiscal impact.htm. Overall Net Fiscal Impact Net Fiscal Impact, by Agency City O County Highway District O School District O Break Even: 6 Years