Loading...
HomeMy WebLinkAboutPZ - Landscape J J 0 D � O�jo O2 o O Q 4 w o a 0 '0 - BAER 0 0 greg@baerdg.com O o 0 0 o Ph. 208.859.1980 0 p o o F6Cy1E L.C40 L9 a- O LA- 16794 0 4 flSCA�� p • #logo C) � 0 cz + -0 �® 00 2 All, °00 ao o �I �' O O O 0 O � o • . o a� 0 ° cz o I > 1 1 0 Cz O 000 + + 2 op Q� Cz > (n � ' � U (n 70 jo �= U ®� o O ®' evisions KEYNOTES Project Name: 21046 Drawn by. MC 1 . HATCH SHOWS EXISTING GRASS AREA TO REMAIN, FIELD ADJUST GRASS Checked by. GB AS REQUIRED 0 20 40 Date: 9/30/21 2. REMOVE EXISTING GRASS TO ACCOMMODATE PLANTING BED AREA AND Sheet No.: ADJUST IRRIGATION AS REQUIRED Scale 1" = 20'-0" Ll ■ O J GENERAL LANDSCAPE NOTES - AGENCY SUBMITTAL PLANT SCHEDULE 01 1 . CONTRACTOR SHALL LOCATE AND IDENTIFY EXISTING UNDERGROUND AND D O SHRUBS BOTANICAL NAME COMMON NAME SIZE MATURE SIZE HXW QTY OVERHEAD UTILITIES WITHIN CONTRACT WORK AREAS PRIOR TO Aucuba japonica 'Gold Dust' Gold Dust Japanese Laurel 2 GAL. 5`X5` 23 CONSTRUCTION. CONTACT DIG LINE, INC. @ 1 .800.342.1885. PROVIDEADEQUATE MEANS OF PROTECTION OF UTILITIES AND SERVICES DESIGNATED TO REMAIN. REPAIR UTILITIES DAMAGED DURING SITE WORK OPERATIONS AT CONTRACTOR'S EXPENSE. Berberis thunbergii 'Maria' TM Sunjoy Gold Pillar Japanese Barberry 2 GAL. 4`X2` 8 Z ° 2. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. (� Berberis thunbergii 'Orange Rocket' Orange Rocket Japanese Barberry 2 GAL. 4`X2` 25 W 3. ALL TOPSOIL TO BE AMENDED AT A RATIO OF 3 CU. YDS. OF ORGANIC MATTER PER 1000 SQ. FT. ROTO—TILL ORGANIC MATER INTO THE TOP BAER 0 Euonymus fortunei `Moonshadow` TM Moonshadow Euonymus 2 GAL. 3`X5` 24 6 INCHES OF TOPSOIL. greg@baerdg.com �+ 4. ALL SHRUB BEDS SHALL HAVE A MIN 12 INCHES OF TOPSOIL, ALL Ph. 208.859.1980 " TOPSOIL AND ALL LAWN Hydrangea paniculata 'Renhy' Vanilla Strawberry Hydrangea 2 GAL. 6`X6` 13 PLANTER ISLANDS SHALL HAVE MIN 12 O AREAS SHALL HAVE MIN 6" TOPSOIL. SPREAD, COMPACT AND FINE �!PCEOFID�y� GRADE SMOOTHLY TO 3 INCHES BELOW THE SURFACE OF WALKWAYS Gc,IEL.c o I *% Juniperus chinensis 'Daub's Frosted' Daub's Frosted Juniper 2 GAL. 1 .5`x5` 13 AND CURBS. �•� P 9�� v� 5. FINISH GRADES ARE TO BE SMOOTH WITH POSITIVE DRAINAGE IN LA�167� ACCORDANCE WITH THE GRADING PLAN. • Physocarpus opulifolius Undid TM Coppertina Ninebark 5 GAL. 6`X6` 14 •i�O 4�•• 6. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE ::::: OF ROCKS (LARGER THAN 2 INCHES), WEEDS, ROOTS, GRASS, OR Pinus mugo `Pumilio` Mugo Pine 5 GAL. 5`X5` 16 OTHER FOREIGN MATERIAL THAT IS HARMFUL TO PLANT GROWTH. TOPSOIL SHALL HAVE A PH OF 5.5 TO 7.0. Rhododendron x 'P.J.M. Compact' PJM Compact Rhododendron 2 GAL. 20 7. WHERE POSSIBLE, RE—USE EXISTING SURFACE TOPSOIL FROM SITE. VERIFY TOPSOIL WILL MEET THE REQUIREMENTS AND AMEND AS NECESSARY. IMPORT WHEN EXISTING TOPSOIL QUANTITIES ARE Rhus aromatica `Gro—Low` Gro—Low Fragrant Sumac 2 GAL. 3`X6` 6 INSUFFICIENT. 0 8. IF IMPORTING TOPSOIL FROM OFFSITE, OBTAIN FROM LOCAL SOURCES GRASSES BOTANICAL NAME COMMON NAME SIZE MATURE SIZE HXW QTY THAT HAVE SIMILAR SOIL CHARACTERISTICS TO THE PROJECT SITE. NEW O TOPSOIL MUST BE FERTILE, FRIABLE, NATURAL LOAM, REASONABLY -_ Hakonechloa macra `All Gold` Japanese Forest Grass 1 GAL. 1 `X2` 45 FREE OF SUBSOIL, CLAY CLUMPS, WEEDS, ROOTS, STONES LARGER GENERAL IRRIGATION NOTES - AGENCY SUBMITTAL W • THAN 1 INCH. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE. COPIES OF THE TESTING 1 . ALL PLANT MATERIALS TO BE WATERED BY THE DEVELOPMENT -> Pennisetum alopecuroides `Hameln` Hameln Dwarf Fountain Grass 1 GAL. 2`X2` 45 AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE SUBMITTED TO OR SUBDIVISION PRESSURIZED IRRIGATION SYSTEM. \\r THE LANDSCAPE ARCHITECT. IRRIGATION OF COMMON AREAS SHALL BE VIA THE SUBDIVISION'S PRESSURIZED IRRIGATION SYSTEM. IRRIGATION Pennisetum alopecuroides 'Burgundy Bunny' Burgundy Bunny Dwarf Fountain Grass 1 GAL. 1 `X1 ` 100 9. ALL PLANTED BEDS TO RECEIVE A MIN. 3" DEPTH 3/4" MINUS BLACK OF INDIVIDUAL LOTS AND LANDSCAPING ALONG THE FRONTAGE :3 a14= AND TAN ROCK MULCH. INSTALL A PERMEABLE FABRIC WEED BARRIER �^ OF PRIVATE LOTS SHALL BE VIA METERED, POTABLE WATER VJ UNDER MULCH. IMPERMEABLE PLASTIC WEED BARRIERS ARE AND THE RESPONSIBILITY OF THE INDIVIDUAL LOT OWNERS. GROUND COVERS BOTANICAL NAME COMMON NAME QTY PROHIBITED. STAPLE ALL EDGES 10' MAX. ♦I 2. COVERAGE; THE IRRIGATION SYSTEM SHALL BE DESIGNED TO W Turf Sod Rhizomatous Rhizomatous Tall Fescue 9,637 sf 10. TREES PLANTED IN PARK STRIPS TO BE CENTERED IN STRIP. PROVIDE ONE HUNDRED PERCENT (100%) COVERAGE WITH Q� HEAD TO HEAD SPACING OR TRIANGULAR SPACING AS 11. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT CONSENT FROM THE APPROPRIATE. LANDSCAPE ARCHITECT. 3. MATCHED PRECIPITATION RATES: SPRINKLER HEADS SHALL LANDSCAPE LEGEND 12. CONTRACTOR SHALL STAKE ALL TREES NECESSARY TO PREVENT THEM HAVE MATCHED PRECIPITATION RATES WITHIN EACH CONTROL FROM BEING BLOWN OVER. VALVE. Cz 13. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR ONE YEAR AFTER 4. IRRIGATION DISTRICTS: SPRINKLER HEADS IRRIGATING LAWN THE DATE OF ACCEPTANCE BY OWNER. CONTRACTOR SHALL REPLACE OR OTHER HIGH WATER DEMAND AREAS SHALL BE CIRCUITED--+ 40'X40' STREET ALL PLANT MATERIAL FOUND DEAD OR UNHEALTHY IMMEDIATELY WITH SO THAT THEY ARE ON THE SEPARATE ZONE OR DISTRICT .� CLEAR VISION TRIANGLE THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. FROM THOSE IRRIGATING TREES, SHRUBS, OR OTHER REDUCED WATER DEMAND AREAS. W 14. FERTILIZE ALL TREES WITH 'AGRIFORM' PLANTING TABLETS. FOLLOW a) MANUFACTURER'S RECOMMENDATIONS. 5. OVERSPRAY: SPRINKLER HEADS SHALL BE ADJUSTED TO Q REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES SUCH AS 15. CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE CLEAN UP OF ANY STREETS, SIDEWALKS, DRIVEWAYS, AND PARKING AREAS. Cz TOPSOIL OR OTHER DEBRIS ON SITE CREATED FROM LANDSCAPE CONSTRUCTION OPERATIONS. .W -Lj � 0 REMOVE DEAD/DAMAGED ti BRANCHES AND PRUNE TO MARK THE NORTH SIDE OF THE TREE �-,' ; IN THE NURSERY, AND ROTATE TREE INTERNATIONAL SOCIETY OF TO FACE NORTH AT THE SITE WHEN EVER - 't ARBORICULTURE POSSIBLE. J`I �� Cz STANDARDS; IMPROPERLY PRUNED TREES (AS 3 MIN. MULCH LA �� 70 DETERMINED BY THE PREVAILING WIND DIRECTION SET TOP OF ROOT BALL -�_ LANDSCAPE ARCHITECT) FINISH GRADE 2" ABOVE FINISH GRADE SHALL BE REMOVED AND RUBBER CINCH TIE RUBBER CINCH TIE REPLACED. - 111111 III_ ENSURE POSITIVE DRAINAGE 2 x 2 x 8 CEDAR STAKE —DO NOT 2%2" CEDAR STAKE (LENGTH AS REQUIRED) AMENDED - I=III \\�\\\\\ \�\\\ \\ \ IIII=III= PLANT PIT WITH AWAY FROM TREE TRUNK ' ' PENETRATE ROOTBALL. SEE NOTE 1. DO NOT PENETRATE ROOTBALL. SET STAKE EACH TREE MUST BE PLANTED SUCH THAT BACKFILL ' \� \� � ANGLED SIDES � AND ROOT BALL. DO NOT SET STAKES PARALLEL TO PREVAILING SET STAKES PARALLEL TO PREVAILING WIND THE TRUNK FLARE IS VISIBLE AT THE TOP = = III= =1�i C INSTALL EARTHEN SAUCER WIND OF THE ROOT BALL. TREES WHERE THE TRUNK = I= IIII=IIII=III = - FLARE IS NOT VISIBLE SHALL BE REJECTED. -I = —IIII=IIII=IIII=IIII— FERTILIZER TABLETS TO RETAIN WATER. 3" THICK MULCH LAYER, KEEP MULCH 3" DO NOT COVER THE TOP OF THE ROOT UNDISTURBED SOIL ROOT BALL (� REMOVE BURLAP, TWINE, _ ° AWAY FROM TRUNK BALL WITH SOIL. 2 x ROOTBALL ^ AND WIRE BASKET FROM (3) 0— TOP 1/2 OF ROOTBALL, SET TOP OF ROOT BALL 1"-2" HIGHER ENSURE POSITIVE DRAINAGE AWAY FROM TREE REMOVE ALL NAILS, FROM BACKFILL WITH SOIL PLANTING MIX. THAN ADJAC SOS AND 2EN3"GR ADE INTHAN LOAMY TRUNK EARTHEN AND R OR BALL. DOINNOT INSTALL SHRUB PLANTING DETAIL AND ROOTBALL. IF SYNTHETIC ADJACENT GRADE IN CLAY SOILS. 11 3 8„ NTS Q CZ BURLAP IS UTILIZED TO REMOVE ALL TWINE, ROPE AND WIRE, AND WRAP THE ROOTBALL, IT FINISH GRADE 3" DEPTH MULCH. DO NOT PLACE BURLAP FROM TOP HALF OF ROOT BALL SHALL BE COMPLETELY MULCH IN CONTACT WITH TREE TRUNK. - REMOVED. ONLY IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND U BIODEGRADEABLE BURLAP COMMERCIAL SLOW RELEASE FERTILIZER THE ROOT BALL, CUT THE WIRE BASKET IN FOUR C: SHALL BE LEFT ON THE ;; \ TABLETS TAMP SOIL AROUND ROOT BALL PLACES AND FOLD DOWN 8 INTO PLANTING HOLE. Cz BOTTOM OF THE ROOTBALL. - - ` , BASE FIRMLY WITH FOOT PRESSURE 2x ROOTBALL DIAMETER J �,\\ SET ROOTBALL ON NATIVE UNDISTURBED SO THAT ROOT BALL DOES NOT SHIFT. PLACE ROOT BALL ON UNEXCAVATED 3x ROOTBALL DIAMETER OR TAMPED SOIL. TURF g MULCH AT 2x ROOTBALL DIAMETER SUBSOIL PLANTER BEDS evisions 3x ROOTBALL DIAMETER NOTES: NOTES: 1. DO NOT HEAVILY PRUNE TREE AT PLANTING. PRUNE ONLY CROSSOVER LIMBS, CO—DOMINANT LEADERS, AND BROKEN AND l III I1=III 4 II1�5>' ARE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR DEAD BRANCHES. DO NOT PRUNE TERMINAL BUDS OF BRANCHES EXTENDING TO THE CROWN. WARRANTY PERIOD. I I I I=1I I- 30°1=1 I IIF F -1 I I I I=1 -1 I I -1 I I- -III-I I 2. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. 2. WRAP TREE TRUNKS ONLY UPON APPROVAL OF THE LANDSCAPE ARCHITECT. =IIj, IIII=I EaIla I' 111 T1I 1' TOPSOIL Project Name: 21046 SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. FINISH GRADE —I I I.;I I I �I I li i I�= 3. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 3. STAKE TREES AS NECESSARY. STAKES MUST BE REMOVED WITHIN 12 MONTHS OF PLANTING. Drawn by. MC CUT EDGE Checked by. GB CONIFER TREE DETAIL TREE PLANTING DETAIL EDGING DETAIL Date: 9/30/21 1 NTS 2 NTS 4 sheet No.: NTS L 11