Kreizenbeck Constructors GM/GC Discovery Park Phase 2 AIA A133
Item#11. Mayor Robert E. Simison N�- City Council Members: E IDIA Treg Bernt Brad Hoaglun Joe Borton Jessica Perreault D A H 0 Luke Cavener Liz Strader MEMORANDUM TO: Mayor Simison and City Council FROM: Mike Barton,Parks Superintendent DATE: November 16,2021 RE: Discovery Park Phase 2, Guaranteed Maximum Price Amendment(GMP) On 12-17-19 Council approved an AIA A133 agreement with Kreizenbeck Constructors for CM/GC services for Discovery Park Phase 2. Shortly thereafter we began design but put the project on hold due to a lack of infrastructure in the area around the park. In 2021 the infrastructure around the park began to catch up so we restarted our design efforts. These designs were presented and our Parks and Recreation Commission and City Council. In the fall of 2021 the design was finalized and the project was put out to bid. We opened bids on 11-3-21 and received good responses from our bid request especially from the larger bid packages of site work, landscaping and electrical. The total of all bids, construction soft costs and contingency is 12,591,602.00. This amount does not include costs for owner provided items such as design,builders risk insurance, fixtures, signage and special inspections. The amount does not include the skate park and bike park as those will be self- managed design build contracts. We have an approved budget of 14,770,000.00 from park impact fees requested in FY20 and FY22. Therefore, we are asking your approval of a GMP amendment for the construction of Discovery Park Phase 2 in the amount of 12,591,602.00. Page 117 �TT!�AAIADocument Al 33 - 2009 Exhibit A NE Guaranteed Maximum Price Amendment This Amendment dated the 5", day of November in the year 2021 ,is incorporated into the accompanying AIA Document A 133T'" 2009, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 5th day of December in ADDITIONS AND DELETIONS; the year 2019(the"Agreement") The author of this document has added information needed for its (In wards, indicate day, month, and year.) completion,The author may also have revised the text of the original for the following PROJECT: AIA standard form.An Additions and (Name and address at location) Deletions Report that notes added information as well as revisions to the City of Meridian standard form text is available from Discovery Park Phase IT the author and should be reviewed.A 2121 E. Lake Hazel Road vertical line in the left margin of this Meridian,Idaho 83642 document indicates where the author has added necessary information THE OWNER: and where the author has added to or (Name, legal stalus, and address) deleted from the original AIA text. City of Meridian This document has important legal 33 East Broadway Avenue consequences.Consultation with an attorney is encouraged with respect Meridian,Idaho 83642 to its completion or modification. THE CONSTRUCTION MANAGER: AIA Document A201 TM-2007, (Name, legal status, and address) General Conditions of the Contract Kreizenbeck,LLC dba Kreizenbeck Constructors for Construction,is adopted in this 11724 West Executive Drive document by reference.Do not use Boise, Idaho 83713 with other general conditions unless this document is modified. (Paragraphs deleted) ARTICLE A.1 (Table deleted) (Paragraphs deleted) (Table deleted) §A.1.1 Guaranteed Maximum Price Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work,as that term is defined in Article 6 of this Agreement. §AAAA The Contract Sum is guaranteed by the Construction Manager not to exceed Twelve Million Five Hundred Ninety-One Thousand Six Hundred Two dollars and no cents($ 12,591,602.00.),subject to additions and deductions by Change Order as provided in the Contract Documents. §A.1.1.2 Itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, allowances,contingencies, alternates, the Construction Manager's Fee, and other items that comprise the Guaranteed Maximum Price. Init. AIA Document A133'"—2019 Exhibit A.Copyright©1991,2003,2009,and 2019 by The American Institute of Architects.All rights reserved.The"American Institute of Ar(:WW(;ls.""A)A;•Ihu AIA Lugo.Bind"AIA Contract Docurnnnls Hf(J'rerlistttrtnf lindamarks and may nut be used without permisslolf.This dacurnanlwas produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/2021,is not for resale,is licensed for ono-Ilme use l only,and may only be used in accordance with the AIA Contract Documents"Terms of Service.To report copyright violations,e-mail copyright@aia,o User Notes: (1261 page 118 Item#11. (Provide below or reference an attachment.) See attachment#1 to Exhibit A-GMP Amendment. §A.1.1.3 The Guaranteed Maximum Price is based on the following alternates,if any,which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the amount,for each and the date when the amount expires.) None §A.1,1.4 Allowances included in the Guaranteed Maximum Price,if any: (Identify allowance and state exclusions, if any,from the allowance price) Item Price($0.00) None §A.1.1.5 Assumptions,if any,on which the Guaranteed Maximum Price is based: See Attachment#2 to Exhibit A—GMP Amendment §A.1.1.6 The Guaranteed Maximum Price is based upon the following Supplementary and other Conditions of the Contract: See Attachment#3 to Exhibit A—GMP Amendment §A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Agreement.) See Attachment#3 to Exhibit A—GMP Amendment §A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Agreement.) See Attachment#3 to Exhibit A—GMP Amendment §A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Agreement.) None ARTICLE A.2 §A.2.1 The anticipated date of Substantial Completion established by this Amendment: See Attachment#4 to Exhibit A—GMP Amendment OWNER(Signature) CONSTRUCTIO ANAGER(Signature) Michael J.Berard,Manager Robert E. Simison, Mayor (Printed name and title) (Printed name and title) Init. AIA Document A133'"—2019 Exhibit A.Copyright©1991,2003,2009,and 2019 by The American Institute of Architects.All rights reserved.The"American institute of Arc hitecm.""AIA."the AIA Logo,and"AIA Con lric1 Documents"are registered trademarks and may nal he used wlIbout permission.This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/2021,is not for resale,is licensed fpr a only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.o User Notes: (1261 Page 119 Item#11. Kreizenbeck Constructors ATTACHMENT #1 TO EXHIBIT A - GMP AMENDMENT ITEMIZED GMP BREAKDOWN CITY OF MERIDIAN - DISCOVERY PARK PHASE 2 MERIDIAN, IDAHO 83642 www.kreizenbeck.com 11724 WEST EXECUTIVE DRIVE■ BOISE, IDAHo 83713 ■ 208.336.9500 208.336.7444 ICR No.RCE-764 Page 120 Item#11. Kreizenbeck Constructors ............................................................................................................................................................................................................... City of Meridian - Discovery Park Phase II Attachment#1 to GMP Exhibit A Itemized GMP Breakdown Schedule of Values Sitework $ 4,472,600.00 Landscaping $ 2,210,448.00 Tennis/Pickle Ball Courts $ 334,100.00 Fencing $ 325,000.00 Concrete $ 657,910.00 Masonry $ 142,033.00 Steel $ 32,780.00 Wood Framing $ 82,000.00 Roofing &Joint Sealants $ 102,865.00 Doors, Frames, Hardware&Coiling Doors $ 58,180.00 Finishes $ 90,955.00 Specialties $ 10,235.00 Shade Shelters $ 84,505.00 Plumbing $ 126,946.00 HVAC $ 50,213.00 Electrical $ 904,471.00 SUBTOTAL $ 9,685,241.00 Permits& Fees All By Owner Testing &Special Inspections By Owner Commissioning By Owner Builder's Risk Insurance By Owner General Conditions $ 1,455,554.00 Insurances General & Professional Liability) $ 154,299.00 Kreizenbeck Constructors Payment and Performance Bonds $ 103,668.00 CM/GC Contingency $ 564,755.00 -TOTAL $ 11,963,517.00 CM Fee-5.25% $ 628,085.00 -TOTAL $ 12,591,602.00 11724 WEST EXECUTIVE DRIVE ■ BOISE, IDAHO 83713 ■ 208.336.9500 208.336.7444 ICR NO. RCE-764 Page 121 Item#11. Kreizenbeck Constructors ATTACHMENT #2 TO EXHIBIT A - GMP AMENDMENT CLARIFICATIONS / ASSUMPTIONS / EXCLUSIONS CITY OF MERIDIAN - DISCOVERY PARK PHASE 2 MERIDIAN, IDAHO 83642 www.kreizenbeck.com 11724 WEST EXECUTIVE DRIVE■ BOISE, IDAHo 83713 ■ 208.336.9500 208.336.7444 ICR No.RCE-764 Page 122 Item#11. Kreizenbeck Constructors ATTACHMENT #2 TO EXHIBIT A — GMP AMENDMENT CLARIFICATIONS / ASSUMPTIONS / EXCLUSIONS CITY OF MERIDIAN — DISCOVERY PARK PHASE 2 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 Kreizenbeck Constructors has assumed the following clarifications, assumptions, and/or exclusions in the development of our GMP Proposal for the City of Meridian Discovery Park Phase 2 project. Clarifications /Assumptions / Exclusions: 1) The GMP and scope of work includes what is indicated on the contract documents, except for what may be clarified/assumed/excluded as per this list. Any work required that is not specifically indicated on the contract documents is excluded from the GMP and will require a change order to complete the additional work. 2) We have included the new work as identified on the contract documents, but have not anticipated any work of any kind to the existing buildings, site, or systems which is not specifically called out. 3) Our proposal does not include repair or correction of existing or deficient conditions. 4) We specifically exclude any design/engineering of any kind for any work other than the manufacturers standard design/engineering for shop fabricated wood trusses and/or shade shelter structures. 5) Usage of existing temporary utilities (electricity, water, etc.) is permitted and usage costs of utilities are at no charge to the Contractor. 6) We anticipate excavating the site to subgrade elevations (bottom of base course or subbase as applicable) at all asphalt and concrete locations based on the design sections indicated on the Civil Drawings. We exclude any removal or replacement of any unsuitable or unstable soils below the design sections. If unsuitable materials are encountered and additional cut/fill operations or geosynthetic fabrics are necessary, as determined by the Civil or Geotechnical Engineer, it will be at an additional cost and a Change Order to the GMP will be required to be issued. Note — The design on the plans will take precedence over any comments indicated in the soils report. 7) At all softball backstops, we included Schedule 80 posts with LG40 sleeves. (Schedule 80 sleeves are not compatible with the Schedule 80 posts for a tight fit.) As a result, Schedule 80 sleeves are specifically excluded. www.kreizenbeck.com 11724 WEST EXECUTIVE DRIVE■ BOISE, IDAHO 83713 ■ 208.336.9500 208.336.7444 ICR No.RCE-764 Page 123 Item#11. 8) Any/All AISC Certification Requirements or IAS AC172 accreditation requirements for a steel fabricator, joist/deck manufacturer, or erector are excluded. 9) All roof sheathing is anticipated to be 7/16" thick typical at all roof decking as indicated per the structural drawings. 10) All metal roofing, metal wall panels, metal fascia, metal soffits, and downspouts is to be pre-finished from the manufacturer and shall be from the manufacturers' standard colors — typical. Field painting is specifically excluded. 11) We did not include any work, of any kind, inside the skate park area — typical. 12) We did not include any work, of any kind, in the bike park/pump track area — typical. This exclusion includes the undefined area on the south, east and north sides between the bike park and back of concrete/work limit lines. 13) The following items have been specifically excluded from our GMP Proposal and are assumed to be by the Owner. • All Plan Review Fees, Building Permit Fees, ACHD Fees, Impact Fees, and/or other Agency Fees as required • All utility fees (sewer, water, Idaho Power, Intermountain Gas, Williams Pipeline, phone/internet/security, etc.) • Testing and Special Inspections of any kind • Commissioning • Geotechnical Report • Builder's Risk / Property Insurance is by Owner • A&E Fees • Design or Engineering of any kind. • Delegated design submittals requiring professional engineering other than specifically listed in this letter. • Errors and Omissions of the Architect/Engineer • Abatement or removal of asbestos / hazardous materials of any kind (If encountered, they will be removed by the Owner) • Any/all issues of any kind related to unforeseen conditions, unsuitable soils, and/or unsuitable moisture conditions • All signage and/or wayfinding that is not specifically identified on the plans. • All phone/data/tv/security cabling and/or equipment • Furnishings, Fixtures and Equipment of any kind • Owner's Contingency www.kreizenbeck.com 11724 WEST EXECUTIVE DRIVE■ BOISE, IDAHO 83713 ■ 208.336.9500 208.336.7444 ICR No.RCE-764 Page 124 Item#11. Kreizenbeck Constructors ATTACHMENT #3 TO EXHIBIT A - GMP AMENDMENT CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN - DISCOVERY PARK PHASE 2 MERIDIAN, IDAHO 83642 www.kreizenbeck.com 11724 WEST EXECUTIVE DRIVE■ BOISE, IDAHo 83713 ■ 208.336.9500 208.336.7444 ICR No.RCE-764 Page 125 Item#11. ATTACHMENT #3 TO EXHIBIT A— GMP AMENDMENT CONTRACT DOCUMENT SCHEDULE CITY OF MERIDIAN DISCOVERY PARK PHASE II 2121 E. LAKE HAZEL ROAD MERIDIAN, IDAHO 83642 KC PROJECT NO. 20-080 November 5, 2021 PROJECT DOCUMENTS as issued by JENSEN BELTS ASSOCIATES, dated 09/29/21, and prepared by the following project team: Architect: INSIGHT ARCHITECTS Landscape Architect—JENSEN BELTS ASSOCIATES Civil Engineer— ERICKSON CIVIL, INC Mechanical Engineer- MUSGROVE ENIGINEERING, P.A ADDENDUM — Addendum No. One Dated 10/18/2021 Addendum No. Two Dated 10/27/2021 SPECIFICATIONS — Project manual as issued by JENSEN BELTS ASSOCIATES dated 09/29/2021 OTHER DOCUMENTS - DRAWINGS — 0.0 COVER SHEET L1.0 SITE PLAN—OVERALL L1.1 SITE PLAN—AREA A L1.2 SITE PLAN—AREA B L1.3 SITE PLAN- AREA C L1.4 SITE PLAN—AREA D L1.5 SITE PLAN- AREA E L1.6 SITE PLAN—AREA F L1.7 SITE PLAN -AREA G L1.8 SITE PLAN—AREA H L1.9 SITE PLAN -AREA I L1.10 SITE PLAN -AREA J L1.11 SITE PLAN -AREA K L1.12 SITE PLAN—AREA L L1.13 SITE PLAN—AREA M L1.14 SITE PLAN-AREA N L1.15 SITE PLAN—AREA O L1.16 SITE DETAILS L1.17 SITE DETAILS L1.18 SITE DETAILS L1.19 SITE DETAILS L1.20 SITE DETAILS L1.21 SITE DETAILS C1.0 CIVIL COVER SHEET CIA CIVIL NOTES C1.3 DEMOLITION PLAN C.GD.0 GRADING PLAN—OVERALL C.GD.1 GRADING PLAN—AREA A C.GD.2 GRADING PLAN—AREA B C.GD.3 GRADING PLAN -AREA C C.GDA GRADING PLAN—AREA D C.GD.5 GRADING PLAN—AREA E C.GD.6 GRADING PLAN—AREA F C.GD.7 GRADING PLAN—AREA G C.GD.8 GRADING PLAN -AREA H C.GD.9 GRADING PLAN—AREA I C.GD.10 GRADING PLAN—AREA J C.GD.11 GRADING PLAN—AREA K C.GD.12 GRADING PLAN—AREA L C.RD.0 ROADWAY—TYP SECTIONS C.RD.1 ROADWAY—S.RECREATION WAY C.RD.2 ROADWAY—S.RECREATION WAY C.RD.3 ROADWAY—S.RECREATION WAY C.RS.1 ROADWAY—S.RECREATION WAY STRIPING&SIGNAGE C.SD.0 STORM DRAIN—OVERALL C.SD.1 STORM DRAIN—AREAS 1,2,4,5&6 CITY OF MERIDIAN—DISCOVERY PARK PHASE II Page 1 of 2 Page 126 Item#11. .2 STORM DRAIN-AREAS 3&28 C.SD.3 STORM DRAIN-AREAS 7,8,9, 10, 11, 12&13 C.SDA STORM DRAIN-AREAS 14, 15, 16, 17, 18, 19&20 C.SD.5 STORM DRAIN-AREAS 21,22,23,24,25,26&27 C.SD.6 STORM DRAIN-ACDH AREA 1 &2 C.DT.0 DETAILS-0 C.DT.1 DETAILS-1 C.DT.2 DETAILS-2 C.DT.3 DETAILS-3 C.DTA DETAILS-4 C.DT.5 DETAILS-5 C.DT.6 DETAILS-6 C.DT.7 DETAILS-7 C.DT.8 DETAILS-8 C.DT.9 DETAILS-9 C.DT.10 DETAILS-10 C.UT.1 WATER PLAN C.UT.2 SEWER LINE A-STA 1-15 TO 16+55 C.UT.3 SEWER LINE A-STA 16+65 TO 25+03.06/SEWER LINE C-STA 1+00 TO 1+48 C.UT.4 SEWER LINE B-STA 1+00 TO 5+58.44/EXISTING RESTROOM CONNECTION TO SEWER C.UT.5 SEWER&WATER DETAILS C.UT.5 SEWER&WATER DETAILS C.UT.6 SEWER&WATER DETAILS C.G1.1 GRAVITIY IRRIGATION-LINE A G.G1.2 GRAVITY IRRIGATION-LINE B ESC.0 SWPP COVET SHEET&DETAILS ESC.1 SWPP-PLAN AREA A ESC.2 SWPP-PLAN AREA B ESC.3 SWPP-BMP DETAILS L2.0 PLANTING PLAN-OVERALL L2.1 PLANTING PLAN-AREA A L2.2 PLANTING PLAN-AREA B L2.3 PLANTING PLAN-AREA C L2.4 PLANTING PLAN-AREA D L2.5 PLANTING PLAN-AREA E L2.6 PLANTING PLAN-AREA F L2.7 PLANTING PLAN-AREA G L2.8 PLANTING PLAN-AREA H L2.9 PLANTING PLAN-AREA I L2.10 PLANTING PLAN-AREA J L2.11 PLANTING PLAN-AREA K L2.12 PLANTING PLAN-AREA L L2.13 PLANTING PLAN-AREA M L2.14 PLANTING PLAN-AREA N L2.15 PLANTING PLAN-AREA O L2.16 PLANTING DETAILS L3.0 IRRIGATION PLAN-OVERALL L3.1 IRRIGATION PLAN-AREA A L3.2 IRRIGATION PLAN-AREA B L3.3 IRRIGATION PLAN-AREA C L3.4 IRRIGATION PLAN-AREA D L3.5 IRRIGATION PLAN-AREA E L3.6 IRRIGATION PLAN-AREA F L3.7 IRRIGATION PLAN-AREA G L3.8 IRRIGATION PLAN-AREA H L3.9 IRRIGATION PLAN-AREA I L3.10 IRRIGATION PLAN-AREA K L3.11 IRRIGATION PLAN-AREA K L3.12 IRRIGATION PLAN-AREA L L3.13 IRRIGATION PLAN-AREA M L3.14 IRRIGATION PLAN-AREA N L3.15 IRRIGATION PLAN-AREA O L3.16 IRRIGATION DETAILS L3.17 IRRIGATION DETAILS L3.18 IRRIGATION DETAILS G1.0 COMFORT STA.COVER SHEET G1.1 SHOT TI COVER SHEET G2.0 ACCESSIBILITY SHEET A1.0 ARCHITECTURE SITE PLAN A2.0 COMFORT STATIONS PLAN A3.0 TRASH ENCLOSURE PLANS A3.1 SHELTER PLANS A3.2 WORKSHOP TI PLANS A4.0 EXTERIOR ELEVATIONS A5.0 BUILDING SECTION AND INT ELEV A6.0 RCP AND WALL SECTIONS A7.0 DETAILS A8.0 DETAILS AND SCHEDULES S1.0 STRUCTURAL ELEMENTS S1.1 GENERAL STRUCTURAL NOTES(G.S.N) S1.2 SPECIAL INSPECTIONS S2.1 FOUNDATION PLAN S2.2 ROOF FRAMING PLAN S3.1 DETAILS S3.2 DETAILS M0.0 MECHANICAL COVER SHEET M1.0 HVAC PLAN COMFORT STATION M1.1 HVAC PLAN WORKSHOP STATION M2.0 HVAC SCHEDULES AND DETAILS P1.0 WASTE AND VENT PLAN COMFORT STATION P1.1 WATER PLAN COMFORT STATION P1.2 PLUMBING PLANS WORKSHOP TI P2.0 PLUMBING DETAILS P3.0 PLUMBING SCHEDULES E0.0 ELECTRICAL COVERF SHEET E0.1 ENERGY CODE E1.0 ELECTRICAL OVERALL SITE PLAN E1.1 ELECTRICAL SITE PLAN-AREA A E1.2 ELECTRICAL SITE PLAN-AREA B E1.3 ELECTRICAL SITE PLAN-AREA C E1.4 ELECTRICAL SITE PLAN-AREA D E1.5 ELECTRICAL SITE PLAN-AREA E E1.6 ELECTRICAL SITE PLAN-AREA F E1.7 ELECTRICAL SITE PLAN-AREA G E1.8 ELECTRICAL SITE PLAN-AREA H E2.0 LIGHTING PLAN E2.1 MECHANICAL POWER PLAN E2.2 ELECTRICAL PLAN E2.3 WORKSHOIP POWER PLAN E3.0 ONE-LINE DIAGRAMS E3.1 EKECTRICAL SCHEDULES AND DETAILS E3.3 ELECTRICAL DETAILS E4.0 MERIDIAN ELECTRICAL DETAILS E4.1 MERIDIAN ELECTRICAL DETAILS E4.2 MERIDIAN ELECTRICAL DETAILS CITY OF MERIDIAN-DISCOVERY PARK PHASE II Page 2 of 2 Page 127 Item#11. Kreizenbeck Constructors ATTACHMENT #4 TO EXHIBIT A - GMP AMENDMENT MASTER PROJECT SCHEDULE CITY OF MERIDIAN - DISCOVERY PARK PHASE 2 MERIDIAN, IDAHO 83642 www.kreizenbeck.com 11724 WEST EXECUTIVE DRIVE■ BOISE, IDAHo 83713 ■ 208.336.9500 208.336.7444 ICR No.RCE-764 Page 128 Item#11. Master Project Schedule 1000 Obtain Bid Documents from Architect/City 1d 040CT21* 040CT21 Obtain Bid Documents from Architect/City 1001 Submit Plans to City&ACHD for Permits 4d 05OCT21 080CT21 TSubmit Plans to City&ACHD for Permits 1002 KC-Finalize Bid Requirements to Subcontractors 4d 05OCT21 08OCT21 JKC-Finalize Bid Requirements to Subcontractors 1003 Subcontractor Bidding 15d 11OCT21 29OCT21 Subcontractor Bidding 1004 KC-Prepare GMP&Submit to City 6d 01NOV21 08NOV21 KC-Prepare GMP&Submit to City 1010 City-Review Kreizenbeck GMP/Project Scope 5d 09NOV21 15NOV21 City-Review Kreizenbeck GMP/Project Scope 1015 City Council Meeting 1d 16NOV21 16NOV21 7TCity Council Meeting 1030 Obtain City ApprovaVContract/NTP-Owner 5d 17NOV21 23NOV21 Obtain City Approval/Contract/NTP-Owner I 1035 Issue Subcontracts 5d 24NOV21 30NOV21 Issue Subcontracts I 1 1040 Building&ACHD Permits Issued 44d 11OCT21 09DEC21 I I Building&ACHD Permits Issued I I I 1050 Initial Submittals Due 18d 01DEC21 24DEC21 L Initial Submittals Due I I I 1060 Begin to Procure Lead Items/Materials 48d 27DEC21 02MAR22 I Begin to Procure Lead Items/Materials I 1100 Construction-Discovery Park Phase 2 1 582d 01FEB22 30APR24 Construction-Discovery Park Pha 8030 Substantial Completion 1d 01MAY24 �011MAY24 Substantial Completion Start date 20 EP21 O Early bar Finish date 01MAY24 KREIZENBECK CONSTRUCTORS Early start point Data date 20SEP21 Run date 06OCT21 Discovery Park - Phase 2 0 Early finish point aenum r Master Project Schedule 11/05/21 O Progress bar O Critical bar iIIIIIIIIIIIIIIIIIIIIIIII,Summary bar Start milestone point Primavera Systems,Inc.1 10 Finish milestone ooinl Page 129 Item#11. Additions and Deletions Report for AIA® Document A 133TM — 2019 Exhibit A This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 17:24:01 ET on 11/05/2021. PAGE 1 This Amendment dated the 51h day of November in the year 2021 ,is incorporated into the accompanying AIA Document !33T"'�9,A 133TM-2009,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 5th day of December in the year 2019(the "Agreement") City of Meridian Discovery Park Phase I.I 2121 E.Lake Hazel Road Meridian,Idaho 83642 City of Meridian 33 East Broadway Avenue Meridian,Idaho 83642 Kreizenbeck,LLC dba Kreizenbeck_Construetors 1 l 724 West Executive Drive TABLE OF ARTICLES. A.4— GUARANTEED MAXIMUM PRICE Ars-r—DATE-OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A,3—INFORMATION UPON WHICH AMENDMENT S4LW-D PROFESSIONALS, AND StiPPLIER Hoist Idaho 83713 ARTICLE AA GUARANTEED MAXIMUM PRICE j AAA� Max-mum Oriwn , Guaranteed iAAGov Pun-suent to Seetien 3.2.6 aR-he Agreement,the Owner and Gensiraetion Manager-hereby amend the AgFeemepit lie establish a Gutiranteed k4aximum Priee. As agreed by ilbe Owner and Constmetion Manager,!he Guam Agreement, Additions and Deletions Report for AIA Document A133'"—2019 Exhibit A.Copyright @ 1991,2003,2009,and 2019 by The American Institute of Architects. All rights reserved The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/ for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyngh e-mail copyright@aia.org. Page 130 User Notes: (1261 Item#11. AAA he Cot e!Stim is guaFrapt § A.,2 itemiaet--Staterr+en"f-the--Guaranteed-Max!Fnum Mo r>,w.,,:ded below I kemiEed.tote..en .r..h,e C_,,,,,.anteed AR.,,.:.,.um Pfiee organized by tmde emegeFies, win :C Aid 4 The C..,,struetion M.,,..,.e0s Fee is.et forth in SeetieR!. t 2 of lit e A gr emenl-. €.1.3 of the Agreement x A�Alternates R A d d !;d A 1t.,niates :l",.,y ine1u ed in the liar" ARTICLE A.1 Item Price following eaceuttten of Lhis Exhi . Item Prise Gnnditions faAsceptance §A.1,1.6 Unit priGes,A.1.1 Guaranteed Maximum Price Pursuant to Section 2.2.6 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work,as that term is defined in Article 6 of this Agreement. A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Twelve Million Five Hundred Ninety-One Thousand Six Hundred Two dollars and no cents($ 12,591,602.00.).subicet to additions and deductions by Chanue Order as provided in the Contract Documents. A.1.11 itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price or anixed by trade Gate ❑ries allowances contingencies.alternates the Construction Manager's Fee,and other items that comprise the Guaranteed Maximum Price. (Provide below w-refere►rce an uNachmenlJ See attachment#1 to Exhibit A-GMP Amendment. A.1.1.3 The Guaranteed Maximum Price is based on the following alternates if any,which are described in the Contract Documents and arc hereby accepted ted by the Owner: Stale the-numhers or other idertti ication of accepled alternates. If the Contract Documents per►rtil the Owner to acc _ii Olher olle-Plafes subsggueni to the execution o this Amendment,attach a schedule o such other alternales shotvin•the a+ttotent for each and the date when the amount ex ires. None A.1.1.4 Allowances included in the Guaranteed Maximum Price if any: (Ident , appf i2r)allowance_and state exclusions, dany, from the allowtntc•e Pike) Additions and Deletions Report for AIA Document A133-—2019 Exhibit A.Copyright©1991,2003,2009,and 2019 by The American Institute of Architects. All rights reserved,The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used Z without permission.This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/ for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyngh e-mail copyright@aia.org. Page 131 User Notes: (1261 Item#11. Item Un4s-and Limitation FINS8-PAFUfI AQ) Item Price JJM None PAGE 2 6 A.1.1.5 Assumptions, if any,on which the Guaranteed Maximum Price is based: See Attachment#2 to Exhibit A-GMP Amendment A.1.1.6 The Guaranteed Maximum Price based upon the following Supplementary and other Conditions of the - - _ _ .._ _. .. .. ........ ._...._...._...-...--- Contract: See Attachment#3 to Exhibit A-GMP Amendment §A.1_.1.7 The GuaranteedMaximum Price is based,upon the following Specifications: (Eifller_lrsr Lhe Snecificcrlfonc here, or ig er•to an exhihil atlached to this Agreement.) See Attachment#3 to Exhibit A-GMP Amendment $A.1.1.8 The Guaranteed Maximum Price is based upon the following GrawinM: (Ei►her list the Drawines-Here or►-efer to an exhibit attached to this Agree►rrenL) See Attachment#3 to Exhibit A-GMP Amendment §A.1.1.9 The Guaranteed Maximum Price_is_based upon the following other documents and infortnalion: (List any o1her cocuments or in ormatimi here,of refer►o an exhibit altachad to Mis Areemeni.) None ARTICLE A.2 $A.2.1 The anticipated date of Substantial Completion established by this Amendment: See Attachment#4 to Exhibit A-GMP Amendment OWNER(.5i nalui CONSTRUCTION MANAGER(Signaturel Michael J. Berard.Manager (Printed name and title) (Printed name and 011W PAGE 3 ARTICLE AX2 RATS F GO MENCEMENT AND SUBSTANTIAL COMPt ETinlu C A 7 1 The date..C..em .efteewent lie 11 ME shall W ]---T4e-&te of emeetition of this Amendment. f 1 risimblishedu as foliows; Additions and Deletions Report for AIA Document A133'"—2019 Exhibit A.Copyright©1991,2003,2009,and 2019 by The American Institute of Architects. All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used 3 without permission.This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/ for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents"Terms of Service.To report copyrigh e-mail copyright@aia.org, Page 132 User Notes: (1261 Item#11. if R-date o k mmeHee..en t.F H' e W eFk:s a at seleetedt iL en the date oF......,...o, m en tahal1 be the date.,F exeeu v-i--m-ia--e--rm.. vrrxvrrr, I h041Wa%Ped49ffi-L1[p VA4.4-Substa-tial Go... lotion tlF r 1 By the following date, e Wof1i . eOH._Of the elltiFe 117O ,file f`OnSir-M Oil MOF� hall., I.r: FJkdC ft� �xt'►'e 1".l. �h..t lr.,,..le.;r, ., _.-•, 1.r,,�:,n oe fol11�o,wingdaieti Pe"n of Work Substantial-completen Date ITTded in this Seefien A.2.3, 4qW-].-,..d 4,,..ages if any}shall b_am i_.... .at_fOF!h i„_See ion 6.1.6oa•_ihe Agreement. ARTlCLS A J NFOR uATION UPON W141 H AMENDMENT IS 13ASE-D Paeumews and the Wiewow. Women Title Bate Raw SWIM Title Bate Rages § A:3..3:Plie 3t1,...,ing Di,awiiigr. emi-e hib,-ofk&-ked-t., NumbeF Title Bate A.3.1.4 The Sustainabi lify Pion,if any: S-0 r r,�on.The -i-rrlvrirarrra�r-e--nc ....a..till.. C/irCiSTPr! Agr-eerneffo Additions and Deletions Report for AIA Document A133TI—2019 Exhibit A.Copyright @ 1991,2003,2009,and 2019 by The American Institute of Architects. All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used 4 without permission This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/ for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyngh e-mail copyright@aia org. Ljge 133 User Notes: (1261 Item#11. TWO Date Pages rWn Rem PFIGe §-A-3.1 A Assumptions -niw-r�m 7 ARTICLE AA CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, SNALS-,-AND SUPPLIERS § AAA 14ie Conswuetioa Manag -1 shall retain the eensultants,e9fitffi ws,design professionals,find suppliers ( , This Amendment to the Agreement enteFed into as of the day and year AH1 wFitten flbeNN& Additions and Deletions Report for AIA Document A133"—2019 Exhibit A.Copyright @ 1991,2003,2009,and 2019 by The American Institute of Architects. All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used 5 without permission.This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/ for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyrig e-mail copyright@aia.org. Page 134 User Notes: (1261 Item#11. Certification of Document's Authenticity AIA® Document D401 TM - 2003 I, Steffany Johnson,hereby certify,to the best of my knowledge,information and belief,that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 17:24:01 ET on l 1/05/2021 under Order No. 9043950261 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA'Document Al33TM—2019 Exhibit A, Guaranteed Maximum Price Amendment,as published by the AIA in its software,other than those additions and deletions shown in the associated Additions and Deletions Report. (Signe fA (Title) (Dated) AIA Document D401 TM—2003.Copyright©1992 and 2003 by The American Institute of Architects.All rights reserved.The"American Institute of Architects," "AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 17:24:01 ET on 11/05/2021 under Order No.9043950261 which expires on 12/29/2021,is not for resale,is licensed for one-time use only,a be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. pa a 135 User Notes: (1261 9 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith Item#11. 07 - Impact Fund 5290 - Parks and Recreation Construction Division From 10/1/2021 Through 9/30/2022 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 96927 Discovery Park 10121 Discovery Park 14,120,000.04 184.68 14,119,815.36 100.00% 10121.n Discovery Park Phase 2 0.00 50,000.00 (50,000.00) 0.00% Pre-Construction Carr. . . Carryforward 307,778.16 0.00 307,778.16 100.00% Total Capital Outlay 14,427,778.20 50,184.68 14,377,593.52 99.65% TOTAL EXPENDITURES 14,427,778.20 50,184.68 14,377,593.52 99.65% Date: 11/9/21 04:06:47 PM Page: 1 Page 136