HomeMy WebLinkAboutJUB Engineers Sewer Master Plan Updates Task Order 11278.AItem #22.
C� fIEN,
IN4,
IDAHG-.
MEMO TO CITY COUNCIL
Request to Include Topic on the City Council Agenda
From: Sandra Ramirez, Purchasing Meeting Date: 11/9/2021
Presenter: N/A Estimated Time: 0.0
Topic: Approval of Task Order
Recommended Council Action:
Approve Task Order 11278.a to JUB Engineers for Sewer Master Plan Updates for the Not -to -
Exceed amount of $244,300.00 and authorize Procurement Manager to sign Purchase Order for the
Not -to -Exceed amount of $244,300.00.
Background:
Task Order agreement for updates to hydraulic model design.
Page 258
Item #22.
TASK ORDER NO. 11278.a
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (OWNER) AND J-U-B ENGINEERS, INC. (ENGINEER)
This Task Order is made this9th day of November2021 and entered into by and between
the City of Meridian, a municipal corporation organized under the laws of the State of
Idaho, hereinafter referred to as "City", and accepted by J-U-B ENGINEERS, INC.,
hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and
conditions contained in the Master Agreement (category 2E) between the above
mentioned parties dated October 1, 2019. The Project Name for this Task Order is as
follows:
SEWER MASTER PLAN UPDATE FY22
PROJECT UNDERSTANDING -SUMMARY
The CLIENT regularly updates their Collection System Master Plan. The City has
experienced significant growth since the last update was completed in 2017. This project
will update the hydraulic model of the collection system, including the existing, committed
and master plan models. Modeling assumptions, land use designations and unit flows will
be updated. Flow monitoring was completed separately in FY21.
The updated Master Plan will provide the conceptual layout of the sewer trunk lines 10-
inch and larger required to serve the City's impact area. Minor modifications to the Master
Plan made by the City since the last update will also be incorporated. A Capital
Improvement Plan will be developed to provide a prioritization for capital improvement
projects based on the results of the system analysis and the growth projections.
SCOPE OF WORK
Task 1 — Management and Meetings
1. Subtask 001: Project Management
a. Set up project into J-U-B's financial and record keeping systems for document
retention and project controls.
b. Conduct project planning and risk assessment.
c. Coordinate quality assurance / quality control (QA/QC) processes.
d. Communicate and coordinate J-U-B team activities with kickoff and progress
meetings as required.
Task Order 11278.a Sewer Master Plan Update
JUB
Page 1 of 12
Page 259
Item #22.
e. Regularly monitor project status, budget and schedule.
f. During periods of project activity, provide a regular report to CLIENT on
project status, budget and schedule.
g. Provide a monthly invoice including budget status.
h. Provide ongoing document handling and filing.
2. Subtask 002: Meetings
a. Attend the following meetings throughout the duration of the projects:
i. Kick-off meeting
ii. Land use and density review meeting
Asset Management Program review meeting
iv. CIP review meeting
b. Attend up to three (3) other meetings to discuss project issues or
deliverables.
3. Subtask 003: Project Closeout
a. Archive paper and electronic files and records.
b. Communicate the project completion to CLIENT and other affected agencies
and stakeholders, as required.
c. Close financial billing and accounting records in J-U-B's financial and record -
keeping systems.
Task 2 — Model Update and Analysis
1. Subtask 001: Data Collection and Modeling Assumptions Update
a. Obtain and review updated GIS information from the City for all sewer lines,
including rim and invert elevations.
b. Obtain updated condition assessment and prioritization scores for each sewer
line in the existing system from the City's asset management program.
c. Lift Stations — Obtain and review pump curves, SCADA pumping data,
operation set points and record drawings.
d. Obtain permit information for all permitted/significant users, including current
permit limits and future permit limits.
e. Obtain current well backwash discharge rates.
f. Obtain and review water meter data from Meridian Utility Billing for use in
updating existing sanitary flows.
g. Update the modeling assumptions to be used in the hydraulic model. Submit
updated modeling assumptions to the City for review.
h. Address comments received through internal QA/QC and City review of the
modeling assumptions. Incorporate the revised modeling assumptions into
the Master Plan document as an appendix.
2. Subtask 002: Existing Model Scenario Update
a. Existing System Layer Update
Task Order 11278.a Sewer Master Plan Update
JUB
Page 2 of 12
Page 260
Item #22.
i. Using GIS information provided by the City (sewer lines and manholes),
update rim elevations, invert elevations, and pipe sizes in the model
collection system layer. Rim and invert source information will also be
maintained in the system layer. The collection system layer will be
updated with the best available data for trunk lines >_ 10-inches in
diameter. Pipes smaller than 10-inch in diameter will be considered non-
critical, but those in the existing GIS layer will be included in the model to
facilitate flow routing.
ii. Identify critical information gaps (>_ 10-inches) that require field survey or
record drawing information. Provide a list of needed record drawings
and/or needed survey information to the City.
Discrepancies, missing data and questions on rim and invert elevations
will be discussed with the City and resolved with one of the following: field
survey by City staff, record drawings, straight grading or interpolation.
iv. Non -critical information gaps (<10 inches) in rim and invert data will be
approximated in the model using straight grading or interpolation.
v. Based on record drawings or field survey information provided by the City,
add information to the collection system layer.
b. Existing Flow Generation Layer Update
i. Update existing land use layer using parcel characteristics found in the
county parcel GIS data.
ii. Develop existing sanitary flows by analyzing average winter water meter
data from each parcel from Dec 2020, Jan 2021, and Feb 2021.
Summarize unit flows for each land use type for use in future model
scenarios.
c. Update Existing Model Scenario
Load the updated layers and parameters into the new model, including the
collection system layer, sanitary flows, infiltration flows and inflow
parameters.
Develop the following modeling scenarios:
(a) Calibration — Peak infiltration, no inflow event, sanitary flows
(b) Existing Model — Peak infiltration, design inflow event, existing sanitary
flows
Run the model for each scenario and resolve any errors, inconsistencies
or issues identified.
d. Model Calibration
i. Calibrate the model for the dry weather scenario. Update seasonal
infiltration assumptions for each major sewer basin in the system based
on recent gravity flow monitoring, WRRF flow data and lift station flow
data. Calibration will identify the peak seasonal infiltration in each basin
and confirm diurnal curves used in the model.
ii. Prepare flow graphs summarizing the model calibration. Incorporate the
calibration graphs into the Master Plan document as an appendix.
e. Existing Model Scenario Capacity Analysis
Task Order 11278.a Sewer Master Plan Update
JUB
Page 3 of 12
Page 261
Item #22.
i. Determine the allowable backwash rates for wells with treatment resulting
in backwash discharges to the collection system under existing conditions.
ii. Add the design storm and current well backwash rates for use in Existing
Model scenario analysis.
Analyze the model for the Existing scenario.
iv. Identify collection system bottlenecks or trunks showing stress with
respect to recommended design parameters in the existing collection
system for existing flows.
v. Summarize flows into existing lift stations and the remaining pumping
capacity.
3. Subtask 003: Committed Model Scenario Update
a. Committed Flow Generation Layer Update
i. Develop the 2021 committed flow layer for sanitary flows. Based on the
most recent City limits as defined in the Ada County GIS. Unit flows
developed in Subtask 2 will be used to estimate committed sanitary flows.
ii. Update the expired plats list and remove these parcels from the 2021
committed flow layer.
Develop the associated infiltration flows for the 2021 committed flow layer.
Infiltration values from the calibration will be applied to similar areas
nearby.
iv. Estimate the difference between the existing service area and the
committed model service area and the corresponding flow.
v. Coordinate with the City to update the City's WRRF benchmarking
spreadsheet with the 2021 committed flow layers. Add benchmarking for
each of the City's existing regional lift stations (South Black Cat LS, North
Black Cat LS, Oaks/North McDermott LS).
b. Update Committed Model Scenario
i. Load the updated layers and parameters into the model.
ii. Develop the following modeling scenario:
(a) Committed Model — Peak infiltration, design inflow event, committed
sanitary flows
Run the model for the Committed Model scenario and resolve any errors,
inconsistencies or issues identified.
c. Committed Model Scenario Capacity Analysis
Task Order 11278.a Sewer Master Plan Update
JUB
Page 4 of 12
Page 262
Item #22.
i. Analyze the model for the Committed scenario.
ii. Identify collection system bottlenecks or trunks showing stress with
respect to recommended design parameters in the existing collection
system for committed flows.
iii. Summarize committed flows into existing lift stations and the remaining
pumping capacity.
4. Subtask 004: Demographics
a. Obtain and review planning documents including the current comprehensive plan,
specific area plans and associated updates such as Ten Mile, Downtown and the Fields
District, and other current City planning documents.
b. Determine populations and sewer availability for the existing service area. Utilizing
the existing sewer model, City utility billing data and Ada County GIS parcel data;
determine parcels where sewer is available, parcels that are connected to the sewer,
developed parcels not connected to the sewer, undeveloped parcels and associated
populations.
c. Determine current and recent development density trends in the existing service
area. For budget purposes it is assumed that up to ten (10) recent developments will be
analyzed to determine current land development densities. Current development
densities will be used to project future development densities for similar land use types.
d. Compare current densities to Comprehensive Plan densities and establish future
land use densities for use in the Master Plan. Review downtown Boise City
development trends for reference and use in future density assumptions for downtown
Meridian.
e. Develop build -out population projections for the ultimate service area based on
Comprehensive Plan designations.
f. Meet with City staff from Planning and Engineering to review master planning
boundary, future densities, land use assumptions and population projections. Meeting
provided in Task 100.
g. Revise and update densities and population projections based on discussions with
the City.
5. Subtask 005: Master Plan Model Scenario Update
a. Master Plan Collection System Layer Update
Task Order 11278.a Sewer Master Plan Update
JUB
Page 5 of 12
Page 263
Item #22.
i. Update conceptual horizontal and vertical alignments, as well as pipe size, for
future trunk lines 10-inch and larger in diameter required to serve the City's
master planning boundary. Incorporate modifications to the Master Plan System
Layer made through on -call analyses since the previous Master Plan. Modify the
Master Plan System Layer to account for expansion of the existing system and
recent development.
ii. Examine current Master Plan routes for general constructability and improved
routing efficiencies. Incorporate any current City capital improvement projects.
b. Master Plan Service Area Layer Update
i. Update Master Plan service areas and injection points that define how an area
is provided sewer service. Incorporate modifications to the Master Plan Service
Area Layer made through on -call analyses since the previous Master Plan.
Modify the Master Plan Service Area Layer to account for expansion of the
existing system and recent development.
c. Master Plan Flow Generation Layer Update
i. Update future land use type assignments to each parcel in the City's Impact
Area using the current comprehensive plan. Include land use types from area
specific plans such as Ten Mile, Downtown and the Fields District. Unit flows
developed from the water meter analysis will be used to estimate flows. Densities
developed during the demographic analysis will also be utilized. Existing and
Committed Flows will be maintained as developed in the Existing Model and
Committed.
ii. Update the master plan infiltration flow layer based on the new model
calibration. Infiltration values from the calibration will be applied to similar areas
nearby.
iii. Develop an alternate Master Plan Flow Generation Layer that examines
increased densities for specific areas of the City. Committed and master plan
sanitary flows will be increased by 20 percent. Existing sanitary flows will be held
constant except for those within the downtown redevelopment area defined by
the planning document "Destination: Downtown."
d. Update Committed Model Scenario
i. Load the updated layers and parameters into the model.
Develop the following modeling scenarios:
(a) Master Plan Model — Peak infiltration, design inflow event, master plan
sanitary flows
(b) Increased Density Model — Peak infiltration design inflow event,
increased density master plan sanitary flows
iii. Run the model for each scenario and resolve any errors, inconsistencies or
issues identified.
e. Master Plan Model Scenario Capacity Analysis
Task Order 11278.a Sewer Master Plan Update
JUB
Page 6 of 12
Page 264
Item #22.
i. Determine the allowable backwash rates for wells with treatment resulting in
backwash discharges to the collection system under master plan conditions.
Include analysis for wells where future treatment is planned (Well 26, 31, 10B, 24
and 32).
ii. Analyze the model for the Master Plan scenario.
iii. Identify collection system bottlenecks or trunks showing stress with respect to
recommended design parameters in the existing collection system for master
plan flows.
iv. Summarize master plan flows into existing lift stations and the remaining
pumping capacity.
v. Evaluate the impacts that increasing densities has on model results by
comparing the Master Plan Model and Increased Density Model results.
vi. Compare model results to the 2017 Meridian Sewer Master Plan. Highlight
and discuss any significant differences.
Deliverables
Updated WRRF benchmarking spreadsheet based on the 2021 committed flow
layer.
Task 3 — Capital Improvement Plan
1. Subtask 001: Asset Management Program Coordination
a. Incorporate planned rehabilitation and replacement projects from the asset
management program into the overall collection system Capital Improvement
Plan (CIP). One meeting with City staff is assumed for budgeting purposes.
b. Update the downtown sewer realignment plan based on recent completed
and current projects.
2. Subtask 002: Area Phasing Plans
a. Update the Southwest Phasing Plan outlining temporary inter -basin pumping
in the southwest area to account for growth since the previous master plan.
b. Summarize the Northwest Phasing Plan outlining potential growth patterns
and different City approaches to expanding the collection system
infrastructure in the area. Identify which alternative to include in the CIP
through discussion with the City
3. Subtask 003: Lift Station Phasing Plan
a. Update phasing plans for each existing and planned regional lift station.
Include information on major components, required upgrades and capacity
limitations.
4. Subtask 004: Capital Improvement Plan
a. Develop potential capital improvement projects to address the bottlenecks
and capacity problems identified in the Existing, Committed and Master Plan
model analyses. Includes potential capital improvements needed for the
Increased Density Model scenario. Include projects from area phasing plans,
lift station phasing plans, and rehabilitation and replacement projects.
Task Order 11278.a Sewer Master Plan Update
JUB
Page 7 of 12
Page 265
Item #22.
b. Review the potential capital improvements with the City and select preferred
improvements. Discuss yearly goals for replacement and rehabilitation
projects. One meeting with City staff is assumed for budgeting purposes.
c. Prepare planning level opinion of probable capital costs for each of the
preferred capital improvements and update preliminary unit costs for future
replacement and rehabilitation projects.
d. Develop and run a model scenario that contains all of the preferred CIP
projects to confirm the capacity problems have been resolved.
e. Develop a CIP that summarizes needed capital improvement projects,
replacement and rehabilitation projects and associated costs. Develop an
implementation schedule for the CIP. Evaluate the current budget versus
needs outlined in the CIP and the City's replacement and rehabilitation goals.
f. Include projects currently under construction and/or planned in the CIP.
Task 4 — Documentation
Subtask 001: Draft Master Plan Report
a. Prepare a draft of chapters 1-3 of the Master Plan document (1-Introduction
and Background; 2-Existing System Summary; 3-Existing Model). Figures
associated with these chapters include maps of the service area, existing land
use designations, existing collection system pipe size, existing reserve capacity,
and existing depth over diameter. The modeling assumptions and model
calibration appendices will be included.
b. Address comments received through internal QA/QC and City review of
Chapters 1-3 of the Master Plan document. Revise as necessary.
c. Prepare a draft of Chapters 4-6 of the Master Plan document (4-Committed
Model; 5-Demographics; 6-Master Plan Model). Figures associated with these
chapters include maps of the committed model service area, future land use
designations, committed model reserve capacity of existing pipes, committed
model depth over diameter of existing pipes, master plan collection system pipe
size, master plan reserve capacity of existing pipes, and master plan depth over
diameter of existing pipes.
d. Address comments received through internal QA/QC and City review of
Chapters 4-6 of the Master Plan document. Revise as necessary.
e. Draft chapters 7-8 (7-Capital Improvement Plan; 8-Summary) and the
Executive Summary. Combine with previously completed chapters 1-6.
Assimilate into one document including all figures and appendices. Perform
Task Order 11278.a Sewer Master Plan Update
JUB
Page 8 of 12
Page 266
Item #22.
QA/QC review of the complete Master Plan Report by senior level staff
independent from the project.
f. Address comments received through internal QA/QC and City review of the
draft Master Plan Report. Revise as necessary.
2. Subtask 002: Final Master Plan Report
a. Submit one electronic copy (PDF) of the complete sealed Master Plan Report
to DEQ for review and approval.
b. Address comments received from DEQ. Document DEQ comments,
resolutions and approval in an appendix. Submit to City.
Deliverables
Draft Master Plan Report chapters 1-3 for City review — (PDF)
Draft Master Plan Report chapters 4-6 for City review — (PDF)
Draft Master Plan Report chapters 1-8, ES for City review — (PDF)
Final Master Plan Report — Five (5) hard copies and a PDF
GIS shapefiles containing master plan and model results
Updated hydraulic model files
Task 5 — Management Reserve Fund
The Management Reserve Fund establishes a pre -authorized budget for
additional tasks that may be requested by the CLIENT's Authorized
Representative and performed by J-U-B upon mutual agreement of scope,
budget, and schedule.
2. J-U-B will not exceed the pre -authorized amount without CLIENT approval.
ASSUMPTIONS
While preparing our scope of services and fee schedule, we have made the following
assumptions:
• Individual water meter usage can be linked to the corresponding parcel and used
for sanitary flow generation.
Task Order 11278.a Sewer Master Plan Update
JUB
Page 9 of 12
Page 267
Item #22.
• Additional wet weather calibration is not planned since a rain fall event was not
captured during the recent flow monitoring project.
• A parcel is included in the committed model if it has been annexed into City.
Parcels with expired preliminary plats are not included in the committed model.
City to provide expired plat list.
• City will provide direction on growth patterns to assist in future land use and
demographic assumptions.
• The previous master planning boundary will be used as the starting point for this
analysis and discussion.
• Only one alternative from the Northwest Phasing Plan will be included in the CIP.
• Results and maps will be based on the Master Plan Model scenario. Maps of the
Increased Density Scenario will not be included, only discussions in the master
plan report.
• Not necessary to field survey flow lines of drains/creeks where master plan
sewer crossings are proposed to confirm viability of the vertical alignment. Can
be added as an additional service, if necessary.
• City will provide yearly programmed budget amounts for replacement and
rehabilitation projects.
• Provide on -going review of J-U-B's work within a time acceptable to the City and
J-U-B.
• CLIENT is responsible for completing, or authorizing others to complete, all tasks
not specifically included above in PART 2 that may be required for the project
including, but not limited to:
o Provide record drawings of new existing collection system components
(trunk sewers 10 inches or larger) that may be required for modeling. We
anticipate that most of the information on the existing trunk lines is
contained in the City's current GIS layer.
o Provide design plans of any City Capital Improvements that are currently
in the planning or design phases.
o Provide asset management data, rehabilitation and replacement projects
and planned budgets to support the development of the CIP.
• Additional Services - CLIENT reserves the right to add future tasks for
subsequent phases or related work to the scope of services upon mutual
Task Order 11278.a Sewer Master Plan Update
JUB
Page 10 of 12
Page 268
Item #22.
agreement of scope, additional fees, and schedule. These future tasks, to be
added by amendment at a later date as Additional Services, may include:
o Surveying: Field survey flow lines of drains/creeks where master plan
sewer crossings are proposed to confirm viability of the vertical alignment.
o Additional Model Scenarios: Developing and analyzing additional model
scenarios beyond those specified in Part 2.
■ Other additional services as directed by the City.
TIME OF COMPLETION and COMPENSATION SCHEDULE
COMPENSATION AND COMPLETION SCHEDULE
Task Description Estimated Completion Date Compensation
1
Project Management
Concurrent with work progress
$15,600
2
Model Update and Analysis
Duration of task approximately 9
$150,700
months. Priority given to
completing Master Plan for Can
Ada LS Basin (6 months after
NTP).
3
Capital Improvement Plan
Duration of task approximately 2
$45,300
months
4
Documentation
Draft for CLIENT review XX
$27,700
months after executed contract,
notice to proceed, and receipt of all
required data:
Chp 1-3 = 6 months
Chp 4-6 = 9 months
Complete Draft = 11 months
5
Management Reserve Fund
As mutually agreed to by CLIENT
$5,000
and J-U-B
TASK ORDER TOTAL: $244,300.00
The Not -To -Exceed amount to complete all services listed above for this Task Order No.
11278.a is two hundred forty-four thousand three hundred dollars ($244,300.00). No
compensation will be paid over the Not -to -Exceed amount without prior written approval
by the City in the form of a Change Order. No travel or expenses will be reimbursed
through this agreement. All costs must be incorporated in the individual tasks within the
Compensation and Completion Schedule above.
CITY OF MERIDIAN
BY:
KEITH WATTS, Procurement Manager
Task Order 11278.a Sewer Master Plan Update
JUB
J-U-B ENGINEERS
BY:
Page 11 of 12
Page 269
Item #22.
Dated: 11-9-2021
Council Approved:
11-9-2021
City Project Manager:
Tyson Glock
Task Order 11278.a Sewer Master Plan Update
JUB
Dated: 10/25/2021
Page 12 of 12
Page 270
CONTRACT CHECKLIST
I.
PROJECT INFORMATION
Date: 10/8/2021
REQUESTING DEPARTMENT Public Works
Project Name:
Sewer Master Plan Update (2022)
Project Manager: Tyson Glock
Contract Amount: $244,300
Contractor/Consultant/Design Engineer:
JUB Engineering, Inc
Is this a change order? Yes ❑ No ❑✓ Change Order No.
II. BUDGET INFORMATION
(Project Manager to Complete)
III. Contract Type
Fund: 60
Budget Available (Purchasing attach report):
Department 3210
Yes 0 No ❑
Construction ❑
GL Account 55080
FY Budget: 14*e"@ 2022
Task Order ❑
Project Number: 11278.a
Enhancement: Yes ❑ No 0
Professional Service 0
Equipment ❑
Will the project cross fiscal years? Yes ❑
No
Grant ❑
IV. GRANT INFORMATION - to be completed only on Grant funded
projects
Grant #: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status (Federal Funded)
N/A
N/A N/A
Print and Attach the determination Print, attach and amend bid by addendum (if changed) www.sam.gov Print and attach
V.
BASIS OF AWARD
BID
RFP / RFQ
TASK ORDER
Award based on Low Bid
Highest Ranked Vendor Selected
Master Agreement Category 2E
Date MSA Roster Approved: 10/1/2019
(Bid Results Attached) Yes ❑ No ❑
(Ratings Attached) Yes ❑ No ❑
Typical Award Yes ❑ No ❑
If no please state circumstances and conclusion:
Date Award Posted: N/A
7 day protest period ends: N/A
VI.
CONTRACTOR / CONSULTANT REQUIRED INFORMATION
PW License N/A
Expiration Date: N/A Corporation Status Goodstanding
Insurance Certificates Received (Date):
8/20/2021 Expiration Date: 4/1/2022 Rating: A++
Payment and Performance Bonds Received (Date):
N/A Rating:
Builders Risk Ins. Req'd: Yes ❑
No ❑ If yes, has policy been purchased?
(Only applicabale for projects above $1,000,000)
VII. TASK ORDER SELECTION (Project Manager to Complete)
Reason Consultant Selected 0 1 Performance on past projects
Check all that apply ❑✓ Quality of work 0 On Budget
0 On Time ❑ Accuracy of Construction Est
2 Qualified Personnel
❑� 3 Availability of personnel
n 4 Local of oersonnel
Description of negotiation process and fee evaluation:
The fee is in line with past Master Plan Updates and takes into consideration additional work that we have not requested in the past. Scope/fee was reviewed by Tyson Glock,
Laurelei McVey, Warren Stewart, and Clint Dolsby.
Warren Stewart
ter supervisor Name
Vill. AWARD INFORMATION
Date Submitted to Clerk for Agenda: 11/1/2021 Approval Date 11-9-2021 By: Mayor, Robert E. Simison
Purchase Order No.: Date Issued: WH5 submitted
(Only for PW Construction Projects)
NTP Date
Page 271
Contract Request Check ist.5.24.2016.Final
C�QfEIDFZ IAN,—
�J
CITY OF MERIDIAN
Purchasing Department
33 E BROADWAY AVE, STE 106
MERIDIAN, ID 83642
TEL: (208) 489-0417
FAX: (208) 887-4813
SUGGESTED
VENDOR JUB Engineering, Inc
250 South Beechwood Ave
Boise, ID 83709
SHIP TO DATE OF
CITY OF • 1 1
Dept Name PURCHASE ORDER NUMBER MUST APPEAR ON ALL INVOI
AVAILABLE BUDGET AMOUNT
$339,642.00
IS BUDGET AMENDMENT REQUIRED?
2i7
CITY SUPPORT TICKET NO.
N
r-
N
0)
cu
PROJECT
-I
NET 30____1
PRE -PAID
•:
I Tyson Glock
Tyson Glock
PROJECT NAME: Sewer Master Plan Update (2022) 1
Description of Purchase Quantity and Pricing ACCOUNTING CODES
PART NUMBER / DESCRIPTION I COMMITMENT NAME / DEPT EXPENSE OR PROJECT /
QTY UNIT UNIT PRICE FUND TOTAL AMOUNT
TASK ORDER / CONTRACT / PROJECT DESCRIPTION CODE GL ACCOUNT # COMMITMENT #
Sewer Master Plan Update (2022)
NOTES: Council Approval Date: 11-9-2021
$244,300.00
• DEPARTMENT
Item #22. City Of Meridian
Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Sandra
60 - Enterprise
Fund
3210 - PW - Engineering
From 10/1/2021 Through
9/30/2022
Percent of
Budget with
Current Year
Budget
Budget
Amendments
Actual
Remaining
Remaining
OPERATING COSTS
55080 Professional Svc - PW
Wastewater
440,000.04
0.00
440,000.04
100.00%
10023.r On -Call Master Planning
0.00
30,000.00
(30,000.00)
0.00%
Support Svcs Fy22
Carr... Carryforward
171,046.92
0.00
171,046.92
100.00%
Total OPERATING COSTS
611,046.96
30,000.00
581,046.96
95.09%
TOTAL EXPENDITURES
611,046.96
30,000.00
581,046.96
95.09%
Date: 11/1/21 09:10:02 AM
Page 273