HomeMy WebLinkAboutChange Order 1 with Guho Corp. for Expansion of Well 20
City of Meridian
Public Works Dept.
,
RECEIVED
FEB 1ti 2006
Memo
City Of Meridian
City Clerk Office
To:
Will Berg; Tara Green
From: Jon Mills, Staff Engineer
cc:
File
Date: 02/16/2006
Re:
Proposed Agenda Item for February 21, 2006 City Council Meeting
The Public Works Department respectfully requests the following items be placed on the
February 21 City Council agenda, under Consent Agenda, for Council's consideration:
1. Chanae Order No.2 for the Centrate Tank Construction
This change order reflects cost and schedule changes from minor and moderate design
changes, material quantities, and word change directives accumulated during the process of
construction. These items are outlined and detailed in the attached change order and
requests for change order.
Recommended Council Action: The Public Works Department recommends
that City Council approve the Second Change Order for the Centrate Tank
Project and authorize the Mayor to sign it.
*' 2. Chanae Order No.1 for the Expansion of Well 20
This change order reflects the adjustment of cost and schedule due to value engineering and
unforeseen circumstances. Each item is detailed in the attached change order and change
order requests. .
Recommended Council Action: The Public Works Department recommends
that City Council approve the First Change Order for the Expansion of Well 20
and authorize the Mayor to sign it.
Thank you for your consideration. Please contact me if you have any questions regarding
any of these items.
. Page 1
~
CHANGE ORDER NO.1
DATE OF ISSUANCE: _2/21/2006
EFFECTIVE DATE _2/21/2006
OWNER City of Meridian
CONTRACTOR: Guho COrD.
Contract: Well 20 Expansion
ENGINEER: CH2M Hill
'.co..- ,."" -"_."~"'-"..",,..-_._"'~-, -.-.---"'- ",,--
You are directed to make the following changes in the Contract Documents:
Description:
1 ) See attached
Attachments: (List documents supporting change):
Change Requests 1-9, Request summary & balance sheet
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 454.132.00
Net Increase (Decrease) from previous Change Orders
No. -1L to -1L
$ 0
Contract Price prior to this Change Order:
$ 454.132.00
Net increase (decrease) of this Change Order:
$ 1,218.70
Contract Price with all approved Change Orders:
$ 455.350.70
RECOMMENDED:
By:
ENGI
Date:' cn-/;~~~'
I . I
EJCDC 1910-8-8 (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee
and endorsed by The Associated General Contractors of America
and the Construction Specifications Institute.
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion: 11/05/2005
Ready for final payment: 11/05/2005
(days or dates)
Net change from previous Change Orders No. - to No. _:
, Substantial Completion:
Ready for final payment:
(days)
Contract Times prior to this Change Order: ',,- .,
Substantial Completion: 11/05/2005
Ready for final payment: 11/05/2005
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion: 148
Ready for final payment: 148
(days)
Contract Times with all approved Change Orders:
Substantial Completion: 4101/2006
Ready for final payment: 4/01/2006
(days or dates)
Tammy de Weerd, Mayor
Attest:
William Berg Jr., City Clerk
Council Approval
C~py
Well 20B Change Order Requests and Credit Balance
Request number Description Date Amount
1 Stainless Steel Credit/Mechanical seals 6/23/2005 $3,248.00
2 Reduce Well Casino from 12" to 10" 7/20/2005 $1,140.00
3 Deduct for Standard Motor 7/25/2005 $1,430.00
4 Relocate Existinq Generator and Communication Conduit 11/1/2005 $7,205.00
5 Cost for Field Order #4 11/1/2005 $77.00
6 Contract Extension 11/17/2005 $0.00
7 Sump Pump for Level Sensor Manhole (see line item below) 11/22/2005 (See Below
8 Repair Conduit and Wirina for Flowmeter 12/16/2005 $766.70
9 Substitute Concrete Pavinq for Asphalt 12/29/2005 $0.00
Total requested changes $2,230.70
Misc. Improvements Item Total line item $5,000.00
Line Item #16) Proposed Cost $3,988.00
line item balance $1,012.00
Total "amoûïitfne_saTY for Chanae,Orider>I,:¡¡! ;~::',:i!>!:. ,\&\:~~;' 'Ii", '; ,~,Jd it 'j, ' , " /::~:t:ii, \{';)', $~';218;70
Nov 17 05 03:28p
Lisa Owen
(208)
'"1'HlæE G~^TIONS STRONG"
. SINCE In9.
Date:
6/23/05
City of Meridian
Attn:Jon Mills
660 E. Watertower
Meridian. 10 83642
Phone: 794-7296
Re: Proposal
Fax: 698-9551
#1
millsj@meridiancitv orq
Project:
Well #20 Expansion'
Description:
Scope of Additional Work:
Value engineering cost savings split
Subcontractors
Pump Tech sredit for StainleSs Steel
Pump Tech charge for 2 each1 -11/16 seal
Pump Tech charge to modify & machine pump head for seal
$
$
$
$
(9,600.00)
2,554.00
550.00
(60496.00)
Guho Corp.
Value engineering cost savings split $
$
$
$
Overhead. Profit Bonds and Insurance
Subtotal
0%
Total Credit
Sincerely,
Nick J. Guho .
Ow""5 Acceptance 5;9na\"", ~4~ Da\" 'I I . 't- ~
, 391 w. StatÆr., $lIite G . Eagle, Idaho 83616 . (208) 939-8850 . Fax (208) 939-8928
Idaho License #12569-AAA-1-3
--"--'-_U_-'.
939-8928
$
/PJ
p.2
($6,496.00)
3,246,00
$0.00
($3,248"00)
$0.00
($3,248.00)
Nov 17 05 03:29p
Lísa Ow@n
(208)
939-8928
p.3
~
-THItE¡;; G£NEßJl.T!ONSSTRONO"
,SINCE 19111.
Date:
7120/05
City of Meridian
Attn:Jon Mills
660 E Watertower
Meridian, 1083642
Phone: 794-7296
Fax: 898-9551
#2.
millsi@meridiancitv.orq
Re: Proposal
Project
Well #20 Expansion
Description:
Reduce size of well casing from 12" to 10 "
Scope of Additional Work:
Reduce size of of well casing from 12" to 10" in orderto accomdate 1" PVC line that needs to be placed between
existing well casing and pump column down to the pump bowls. Design tlows can be obtained through the 10"
column as per the manufactures specifications according to Barry with Pump Tech. Cost saving is as follows as
well as additional clearances needed to help ensure installation of the 1" PVC line
So bcontrae:tors .
Pump Tech
(1,140.0Ö)
$
.$
$
$
(1,140.00)
($1,140.00)
Guho Corp.
Materials $
labor $,
Equipment $
$
$0,00
Overhead, Profit Bonds and Insurance
Subtotal
0%
($1.140,00)
$0.00
($1,140.00)
Total Credit
Sincerely,
Nick J, Guho
Owner's Acceptance signature ~ DateLI ~3 1
391 W. State It.. Suile G . Eagle, Idaho 83616 . (2ÓS) 93~-$850 . Fax (208) 939-8928
Idaho License #12569-AAA-1-3
e>S-
-.-- "'--..--"--..,,... ,. . .
Nov 17 05 03:29p
Lisa Owen
(208) 939-8928
p.4
"'l'HII.EE GENEJ:tATION$ STIWNIr
'SINCE ~"}'"
Date:
7/25/05
City of Meridian
Attn:Jon Mills
660 E. Watertower
Merìdian , 10 83642
Phone: 794-7296
Re: Proposal
Fax: 898--9551
#3
millsi(éì)meridianc¡!Y.orq
Project:
Well #20 Expansion
Description:
Deduct for standard motor
Scope of Additional Work:
Supply a'nd install standard inverted duty premium efficiency motor inlieu of motor specified.
Subcontractors
Pump Tech
$
$
$
$
(1,430.00)
(1,430.00)
Guho Corp.
Materials $
Labor $
Equipment $
$
Overhead. Profit Bonds and Insurance
Subtotal
0%
Total Credit
Sincerely,
NickJ, Guho. .
OwnerSAcceptancesignature~~ Date 1/ I Z3
391 W. State .. Suite G. Eagle. Idaho 83616. (208) 939-8850. Fax (208) 939-8928
Idaho Llcense#12569-AAA-1-3
..------.-,
($1,430.00)
$0.00
($1.430.00)
$0.00
($1.430.00)
--
/07
Nov 17 OSO3=29p
Lisa Owen
(208) 939-8928
p.S
"TIUŒ:E GENER.-\.TlONS STRONG"
'SINCE 191.11-
Date:
11/1/05
City of Meridian
Attn:Jon Mills
660 E. Watertower
Meridian. JD 83642
Phone: 794-7296
Re: Proposal
Fax: 898-9551
#4
millsì@meridiancitV.orq
Project:
Well #20 Expansion
Description:
Scope of Additional Work:
Relocate existing underground generetar feeder and comunication conduits- Existing conduits to existing
generator were located in new addition footing. See attached work sheets. .
Subcontractors
Lea Electric
$ 6,095.00
$
$
$ 6,095.00
Materials $
2 days Supervision @ $350 Labor $ 700,00
Equipment $
$ lOO.DO
Guho Corp.
$6,095.00
$700,00
Subtotal
$6,795.00
$410.00
$7,205.00
Overhead, Profit Bonds and Insurance
Total Cost with Overhead & Profit
Since~el ,
, [
...-"1/" 1/1.4-
/',. ~tv ,,< ,'~Pt-/
r. , ",
~lr -
OWners ~eptance signature ~" Date II I Z:3
391 W. State sisuite G . Ea,gle, Idaho 83616. (208) 939-8850. Fax (20B) 939-8928
, Idaho Uoense #12569-AAA-1-3
.--
I O~
Nov 17 05 03:29p
Date:
City of Meridian
Attn;Jon Mills
660 E- Watertower
Meridian, 10 83642
,-Phone: 794-7296
Re: Proposal
Project:
Lisa Owen
"TflIŒJ;:GENERATlONS STRONG('
. SINCE 19}9.
11/1/05
Fax: 898-9551
#5
millsi@meridiancitV.orQ
Well #20 Expansion
Description:
Scope of Additional Work:
Cost to supply and install Field Order #4 items1, 2, 3. See attached.
Subcontractors
Lea Electric
Guho Corp.
Sincerely,
Nick J. Guho
$
$
$
$
Materials $
Labor $
Equipment $
$
(208)
939-8928
70.00
70.00
Overhead, Profit 8onds and Insurance
Subtotal
10%
Total Cost with OVerhead & Profit
Owner's Acceptance signature
Date If
f "bJ / oS-
391 W. State ., Suite G - Eagle, Idaho 83616 - (208) 939.se50 . Fax (20B) 939..8928
Idaho License #12569-AAA-1-3
-,,- - ...
p.S
$70.00
$0.00
$70.00
$7_00
$77.00
Nov 17 OS 03:29p
Lisa Owen
(208)
939-8928
p.?
OTtilIE!': GEN"El<A'l"IONIj S'l.nOKG"'
'SINCE 1919. ,
Date:
11/17/05
City of Meridian
Attn:Jon Mills
660 E.. Watertower
Meridian, 10 83642
Phone: 794-7296
Re: Proposal
Fax: 898-9551
#6
millsj@meridiancity.orq
Project:
Well #20 Expansion
Description:
EXtension of contract time
Scope of Additional Work:
Due to Cost saving proposals 1, 2 and 3 we were required to resubmitt submittals on well casing and pump motor
and seals, This caused a project time delay of 55 calender days. Due to proposal #4 Relocation of existíng
conduits located in new foundatíon of addition th:~ ~ct time ww need to be extended by 10 calendar days. This
will increase the existing contract time by a total ~"calendar days.
Subcontractors 'Ie (~A-c'L ;;>~..S'
$
$
$
$
$0.00
Guho Corp.
Materials $
labor $
Equipment $
$
$0.00
Overhead, Profit Bonds and Insurance
Subtotal
10%
$0,00
$0.00
$0.00
Total Cost with Overhead & Profit
Sfncerely,
c cry IN .w 9 flI'MJ r 0/ ð Þlt<t5 M f7 €/Z.. /1 h ,. i.
M~,...Jc; /t^lD t(Pt:>~ scrI:rz:..D~ OF 1Z7~'"
Date It
/1..J/05
Nick J. Guho
Owner's Acceptance signature
391 W. State -, Suite G . Eagle, Idaho 83616' (208) 939-8850. Fax (208) 13313--8928
Idaho License #12569-AAA-1-3
~ ' ,-
~.
Date:
City of Meridian
Attn:.Jon Mms
660 E. Watertower
Meridian. ID 83642
Phone: 794.7296
Re: Proposal
Þroject:
,~~UlfO"""
~ ('OUP ,
r¡ J ,,- " . . ~':'
, li'tv""/t.\,, C'ON'tfl,""1'O ..
"1TIRli:R (iRNml^"m"ll':l SrIlON(}"
-!'IfNŒ!', IPJI.
11/22/05
Fax: 898-9551
#7
~riØiallcitv,org
Descrl lion' install suinp pump in existing level sensing manl10le and pipe dìcharge to existing 4" cleanout
p. on north side of new addition
Scope of Addltlol1a Work~
Supply and install Little Giant 9E CIA-RFS sump pump with il1tegral ramole float svvitctl at existing level sensíng
manhole with SO LF of 1 1/2" PVC discharge line tie into existing 4~ clean out. 011 Norln side of new addl'tion. GFI
110v outlet and circuit to be installed manhole and ran 50 LF to new electrical panels on west side of new addition.
Subcontractors
Lea Electric
Gullo CorD,
Sincerely,
Nick J. Guho
Well #20 Expansion
$
$
$
$
Male-rials $
Labor $
Equipment $
$
Overhead, Profit Bands and Insurance
1.888,00
1,888,00
373.00.
115,00
650,00
, ,738,00
Subtotal
Total Cost with Overhead & Profit
Owner's Acraptance signature
Date-.!L_LP-!-1. 06
391 W, Slate., Sl,Jite G . !:aglp.. IdAho 836'1 B . (208) 939-8850 . FuJI (206) 939~928
Idaho Lic~lise #1?569,AAA,1-3
$1.88KOO
$1,738,00
$3.626.00
$362.QO
$3,988.00
... . 0'
~.."
~
",.
"m",U'. GENEltJ\TIONS 5TItOl'ltG"
.SINCE tgt.p.
Date;
12/15/05
City of MerIdian
Attn:Jon Mills
660 E. Watertower
Meridian I JD 83642
Phone: 794-7296
Re: Proposal
Fax: 898-9551
:MJ
millsj¡~meríd¡ancitv.orQ
Project:
Well #20 Expal'sion
Description:
Repair Còndult and wirìng for flowmeter
Scope of Additional Work:
Repair oooduir and wire for flowmeter damageC during excavation of collduits; for new generator. Flowmeter
conduit was nat identífied on the plans and was located just below the existing asphalt
Sl!ÞcontractDrs
Lea Electric
$
$
$
$
691.00
$697. 00
697,00
ßuho COrg.
Materials $
Labor" $
Equipment $
$
$0,00
Overhead, Profit Bonds and Insurance
Subtotal
10%
$697.00
$69.70
$766.70
Total Cost wíth Overhead & Profit
Owner's Acceptance ~ignature
391W.
Date It- 1l!1.-J {),ç-
. Suite G . Eii\gle, Idaho 838113 . (208) 93$-418:60 . F~II': «DB) 939..a928
Id~hD lIc:ansøt12569--AM-1-3
t, '
Date:
12129/05
City of Meridian
Attn~Jon Mills
660 E. watertower
, Meridian. ID 83642
Phone: 794-7296 Fax: 898-.9551
Re: PfOposal
'#9
ProjeCt
-Tft~ GEND.4TuiNS BTu.ONG"
.1'I1NC~ 18111-
milf$;@meridÎancitv,orQ
Well #20 ËXpan6ion
Description:
Substitute 4" 3,000 ÞSI concrete in lieu of 2 112" asphalt
Scope of Additional Work:
In$taIl4" concrete paving in lieu of 2 112" asphalt due to winter weather conditions, Concrete work to be
completed by January 1 O. 2006, weather pelTTlittíng. An extension of contract time will be needed to' complete
testing and concrate work, provided there is aooeptable weather. There will be no additional cost for the upgrade
to concrete.
Subcontractor,
Guho CorD.
sincereIY'<";P" ,,/
.,~ "
~Ck.{~UhO
OWner's Acceptance signature
$
$
$
Materials $
Labor $
Equipment $
$
Overhead, Profit Bonds and Insurctnce
SuÞtotal
10%
Total COliit with Overhead & Profit
--,.." .
Date () I ¡ &3 I 06
391 w. Sb,Q , Suite G . Eagle, Idaho 83616 . (208) 939~850 . Fa(. (208) '39-8928
Idaho License #12569-AAA-1-3
$0.00
$0-00
$0.00
$0,00
SO.OO
.-.
.
. .
...
.-.'
. :