Loading...
HomeMy WebLinkAboutChange Order 2 with Corollo Engineers for Centrate Tank Construction City of Meridian Public Works Dept. 'R J~~ (j :E~ I 'lI~ ]] ';:EP '¡ \, f)ít[,f; 1 ",.".,. {,d J, Memo City OfMe:ÓdÜm City Clerk OffiCE To: Will Berg; Tara Green From: Jon Mills, Staff Engineer cc: File Date: 02/16/2006 Re: Proposed Agenda Item for February 21, 2006 City Council Meeting The Public Works Department respectfully requests the following items be placed on the February 21 City Council agenda, under Consent Agenda, for Council's consideration: ~ 1. ChanÇle Order No.2 for the Centrate Tank Construction This change order reflects cost and schedule changes from minor and moderate design changes, material quantities, and word change directives accumulated during the process of construction. These items are outlined and detailed in the attached change order and requests for change order. Recommended Council Action: The Public Works Department recommends that City Council approve the Second Change Order for the Centrate Tank Project and authorize the Mayor to sign it. . 2. Chanae Order No.1 for the Expansion of Well 20 This change order reflects the adjustment of cost and schedule due to value engineering and unforeseen circumstances. Each item is detailed in the attachea change order and change order requests. Recommended Council Action: The Public Works Department recommends that City Council approve the First Change Order for the Expansion of Well 20 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if you have any questions regarding any of these items. . Page 1 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. CHANGE ORDER NO.2 PROJECT: City of Meridian WWTP - Centrate Equalization Tank Project DATE OF ISSUANCE; February 13, 2006 EFFECTIVE DATE: February 13, 2006 OWNER: CONTRACTOR: City of Meridian RSCI ENGINEER: 'Carollo Engineers You are directed to make the following changes in the Contract Documents. Add anchor bolts for future buílding enclosure to the top of the Centrate Pump Station foundation walls. WCD IE - Revise Centrate Drain Manhole and Non-Potable Water Valve WCD IE - Contract Credit to delete Slice Gate in Centrate Drain Manhole WCD lC - Revise Centrate Drain. WCD 2 - Add Plug Valve to Centrate Drain Pump Station WCD 3A - Provide 2" Potable Water Connection and Backflow Preventer to Truck Wash Building WCD 3B - Remove and Replace Sludge Drying Bed wall for Drain and Non-Potable Water Connections WCD 4 - Over-excavate and backfill below Centrate Equalization Tank. WCD 5 - Install tracer wire on buried utilities WCD 6 - Credit for revised grading and paving around Centrate Equalization Tank WCD 7 - Credit to delete chemical feed tubing, WCD 8 - Relocated Non-potable Water Hydrallt at Centrate Equalization Tank RFC 2 - Epoxy coat Centrate Equalization Tank floor to protect galvanized hardware. Reason for Change Order: Additional unforeseen conditions not included in the Contract. Attachments: RSCI Proposed Change Order No.1, Sept. 21,2005 for $172.59 (RFI) RSCI Proposed Change Order No.3, Feb. 8,2006 for ($1,528.88) (WCD Ie) Credit RSCI Proposed Change Order No.4, Sept. 30, 2005 for $10,299.22.(WCD 4) RSCI Proposed Change Order No.5, Nov. 4,2005 for $(3I9.54).(WCD IE) Credit RSCI Proposed Change Order No.7, Nov. 4, 2005 for $9,853.22.(WCD 3B) RSCI Proposed Change Order No.8, Nov. 4, 2005 for $6,086.40.(WCD 3A) RSCI Proposed Change Order No.9, Nov. 7, 2005 for $384.96.(WCD 5) RSCI Proposed Change Order No. 11, Feb 8,2006 for $9156.34 (WCD 8) RSCI Proposed Change Order No. 13, Feb 8, 2006 for $9156.34 (WCD 8) RSCI Proposed Change Order No. 14, Feb 8,2006 for ($1,156.34) (WCD 6) Credit RSCI Proposed Change Order No. 15 Feb 8, 2006 for ($672.59) (WCD 7) Credit (Change Order 2 contains 14 total pages) Page 1 of 2 Co pI..{ CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 270 Days - December 2, 2005 $ 474,065.00 Ready for final payment: 300 Days ~ January 1. 2006 days Or œ,tes Net Changes from previous Change Orders No.1 Net Changes from previous Change Orders No- ~ $ 112,050.00 0 Days Contract Price prior to tills Change Order Contract Times prior to this Change order Substantial Completion: 270 Davs - December 2, 2005 $ 586.1 15.00 Ready for final payment: 300 Days - January 1. 2006 days or dates Net Innease (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 35,271.20 90 days Contract Price with all approved Change Orders. Contract Times with all approved Change Orders Substantial Completion: 360 Days - March 2. 2006 $ 621.386.20 Ready for final payment: 390 Days - April 1. 2006 days or dates RECOMMENDED BY ENGINEER: ACCEPTED BY CONTRACTOR: By: By: ' /T/~ fSontractor (Authorized Signature) 2//<1/0(" Date: -za:::r Date: APPROVED BY OWNER: Tammy de Weerd, Mayor Attest: William G. Berg, Jr., City Clerk Brad Watson, P.E., Public Works Date: Date: Date: Page 2 of 2 Lopt.! .R.SCI. 1854 East Lanark Street 11eriàian,TID 83642 Phone: 208-887 -140] Fax: 208-888-9130 PROPOSED CHANGE ORDER No. 00001 TITLE:Install Anchor Bolts P1J.mp Station PROJECT: Centrate Equalization Project DATE: 9/21/2005 JOB: 323 TO: Attn: William J Benko, P .E. Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, ill 83713 Phone: 208-376-2288 Fax: 208-376-2251 . CONTRACT NO: RE: To: ,"n~IFi!~' ,.. '-"'~""""iI"k'm\m"""'%\""""""'m' """""-"".."'... 1Jj)1J11,." umro; ""'¡(P;¡1O.l1\(."""Ù>:'ith"" "":'i.'" ...~,' ~~'.~ ¡JM . "f I,X~;?....."..W?I\;'" . ,,\. "..,' From: Number: OCt ê'fti\~~!.1rJj1t'J ;;' :'" ::;t, i~¡C~tL~'Af1ï'ÿ iJ n ,,¡ ts- . '.. ."; ;t',þ¡_"t;~:TJ{i\Rh¥e '.' TåiIlfu!¿"ij¡Btfii~íih:t 00001 8"xl/2 Anchor Bolts 74.000 $0.59 5.00% $2.18 $45-84 00002 Layout 2.000 $26.67 0-00% $0-00 $53.34 00003 Laborer 3-000 $11.31 0.00% $0,00 $36.93 Unit Cost: Unit Tax: Unit Total: Subtotal: $133.93 $2.18 $136.11 $136.11 ijijtriþ.ïion :' :,,:>~J)~'liêi~~riit;::Máf;Wdl~~~t~K~ Fee 15.000% $20.42 Profit 10.000% $13.61 SUBTOTAL $170.14 Bond 1.440% $2.45 Total Cost: $172.59 By: By: Pat Finn William J Benko, P.B. Date: Date: :XBodition (!> , RSCl 1854 East Lanark Street Meridian, ill 83642 PROPOSED CHANGE ORDER No. 00003 Phone: 208-887-1401 Fax: 208-888-9130 TITLE: WCD 001C Centrate Drain Connections DATE: 2/8/2006 JOB: 323 PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.E. Carollo Engineers ' 12592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 CONTRACT NO: S324814 RE: To: From: Number: Î~nt"j;:,,»é~ripÜQ~ 00001 6" 45 dcg. 00002 6x4 Tee 00003 6x6 Sanitary Y's 00004 8" CD line ,'",'.',"".... '"""" - t"(!!'t1äntiïf"Utdts" 2.000 Ea LOOO Ea 2.000 Ea .125.000 Lf -2.000 Ea Voit,Phee $7.56 SI 1.48 S15.87 S3.47 $530.00 Tax Ra'te"I'ax .£muuIl:tNet~Añttili1î 5_00% $0.76 $15_88 5.00% $057 $12.05 5_00% $159 $33.33 5.00% ($21.69) ($455.44) 5.00% ($53.00) ($1,1 !3..()()) 00005 Manholes w/lids Unit Cost Unit Tax:: Unit Total: Subtotal: ($1,435.41) ($71.77) ($1,507.18) ($1,507.18) ri~~cAptioit:: Bond :Mårkup .P~rcen tMai)ffiiþ7AniÒi.iit:~~ 1.440% ($21.70) Total Cost: ($1,528.88) APPROV7: By: -- /- , Susan Record By: William J Benko, P.E. Date: Date: E.pcdition ~ RSCI" CHANGE ORDER REQUEST No. 00004 1854*East Lanark Street Meridian, ID 83642 Phone: 208-887-1401 Fax: 208-888-9130 TITLE: Over Excavation Tank Foundation DATE: 9/30/2005 JOB: 323 TO: PROJECT: Centrate Equalization Project Attn: William J Benko, P.E. Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 CONTRACT NO: S324814 RE: To: DÊ$2~Qi~9:f!:ä~JI~f;'~',;;; Jteøf .','. ' WAI WAI WAI WAI WAl WAJ WAJ WAJ WAJ WA4 WA4 WAS WA6 From: . Number: ne$çiipœi~jL . ,¿\,i,;':~j~c.wt;,,' ,J;¡iilît~*t~,itJfriiti . Strata Tech for Visual 2.000 HRS Subgrade Insp. Dewatering Pump Excavator - Cesco Inv 1029042 Operators Backhoe. CAT Invoice 70X 5804347 ,';,riöft~~T¡,i7~æiÌÌ;1&të\;fàX':AriitJlint Nèt Ämount $39-00 0.00% $0,00 $78.00 $380.00 0,00% $0,00 $380.00 $2,565.70 4.36% $111.79 $2,565.70 $26.67 0.00% $0.00 $253.37 $819-80 4-12% $33.75 $819.80 $26.67 0.00% $0.1;)0 $240.03 $9.25 5.00% $52.56 $I,05Ll7 $26.67 0.00% $0.00 $426.72 $899.50 3.89% $35.00 $89950 $0-74 5.00% $22.20 $444.00 $9.25 5.00"/0 $11.51 $230.14 $26.67 0.00"10 $0_00 $453_39 $26.67 0.00"10 $0,00 $453.39 $26.67 0.00% $0.00 $266.70 Unit COSt: $8,561.91 Unit Tax: $266.81 Unit Total: $8,828.71 Subtotal: $8,828.71 MlJrltÞ-pP,ercent Markup Amount 15.000% $1,324.31 $10,153.02 1.440% $146.20 LOOO EA 1.000 EA 9.500 MHRS LOOO EA Operators Structural Fill . Mike's Invoice 105148 Operators Roller - Cat Invoice 70X 5804433 Mirafi 50Ox . Specialty Const Supply Iov 0052S59.IN ,- Structural Fill- Mike's Invoice Operator¡¡ Operators Operators 9.000 MHRS 113.640 Cy 16,000 MHRS 1.000 EA 600.000 Sy 24.880 Cy 17.000 MHRS 17.000 MHRS 10.000 MHRS Description Fee SUBTOTAL Bond Total Cost: $10,299.22 RSCI 1854 East Lanark Street Meridian, ill 83642 Phone: 208-887-1401 Fax: 208-888-9130 .TITLE: Changes under WCD-OOlB PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.K Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, 10 83713 Phone: 208-376-2288 Fax: 208-376-2251 RE: To: nïts~:Ì~¡!fiôF't;RQPt>SAI# . This proposal addresses changes directed under WCD-OOIB. From: -"";;'.'" ...". ltemii"",,.':'j)é$Crlpfiih,,"i1:¡:';,:; . 0000 I 8" Mechanical Plug wi SS wingnut and Bolt. 00002 Riser & Valve Box :i ,. .~~:: 'Q~ãhtibf" ~i:u.:ilitt i):" f' 1.000 LS 1.000 LS 1.000 LS 6.000 MHRS 1.000 LS -1.000 Ea 00003 00004 00005 00006 Change MH configur;¡tion Demo Concrete Encasement on existing line. Demo Equipment (Compressor & Breaker) Shear Gate JI~~Çïflptiijn ,,; SUBTOTAL Bond PROPOSED CHANGE ORDER No. 00005 DATE: 11/4/2005 JOB: 323 CONTRACT NO: S324814 Number: .". "',,,-,:¡: vrrli¡Pri~~ ""\ $45_00 $225.00 $0.00 $22.50 $75.00 $795.00 TaxR~t~"Ìh Âkó~ntN(;i~~ilii't 0.00% $0_00 $45.00 0.00% $0..00 $225.00 0-00% $0.00 $0.00 0.00% SO.oo $135.00 0.00% $0-00 $75.00 0.00% $0.00 ($795.00) Unit Cost: Unit Tax: Unit Total: ($315.00) $0.00 ($315.00) , ($315.00) Subtotal: ";,Mã;ikup:P'~~c~nt .M¡aildtp'Àifio¡¡Üt;{ ($315.00) ($4.54) , 1.440% Total Cost: ($319.54) APPRO V AL.J: By: - rv- . Susan Record Date: E>pcdjrion 0) By: William J Benko, P.R Date: , RSCl 1854 East Lanark Street . Meridian, ill 83641 Phone: 108-887-1401 Fax: 208-888-9130 PROPOSED CHANGE ORDER No. 00007 TITLE: Demo and Add Stair per WCD-O03B PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.E. Carollo Engineers' 12592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 RE: To: :QE$ÇQIPTIOS OJi'.PROPOSAfJiX From: ..-. This proposal addresses additional work directed under WCD-OO3B- Item 0001 0001 A 000 IB OoolC 000 ID 0002 0002A 0002A 0003 0OO3A 0003B 0003C 00030 0OO3E 0003F 0OO3G 0004 0004A 00O4B 0005B .. Desciiption,,'c.. DEMOLITION ... Q:iïånfitr Utìiti- .... 0 1.000 LS 1.000 LS 16.000 MHS 1.000 LS DATE: 11/4/2005 JOB: 323 CONTRACT NO: S324814 .." ..Unit PTice SO_OO $500.00 $558_10 $22.50 S370.00 SO-OO $22.50 $50_00 $0.00 $22.50 $22.50 $22.50 $22.50 $0..25 $85.00 $0.50 SO.OO $45_00 $22.50 $1,395.79 Number: " ,', ,"-- ..... Acore .. Concrete cutting for Demo Equipment Rental for Demo . Labor for Demo Haul Off Spoils EARTHWORK Labor - Additional Backfill & Prep Work Backhoe & CompaCtOr CONCRETE WORK Labor- FrS Retaining Wall Ftg Labor - Frs Retaining Wall Labor - FrS Stair Landings Labor - FrS Stairs Labor - Install Reinforcemrot 0 8-000 MHRS 4.000 His 0 6.000 MHRS 40_000 MHRS 12.000 MHRS 48_000 MHRS 1250.000 LBS 12-000 CY 1250.000 LBS TaxR~t~~Tax kri;~lÚ~et:aiiJriti 0.00% SO.OO $0.00 0.00% $0.00 $500.00 0.00% SO_DO $558_10 0.00% $0.00 $360.00 0.00% SO_DO S370.00 0.00% SO-OO SO.OO 0.00% $0.00 $180.00 0.00% $0-00 $200.00 0.00% $0.00 : $0.00 0.00% $0.00 $135_00 0_00% $0.00 S9O0.00 0.00% SO_OO S270.00 0-00% SO.OO $1,080.00 0.00% SO-OO $312_50 0.00% SO.OO $1,020.00 0.00% SO.OO $625.00 0.00% SO_OO $0-00 0.00% SO.OO $270_00 0.00% $0.00 $270.00 0.00% $0.00 $1,395.79 Unit Cost: Unit Tax: Unit Total: $8,446.39 $0.00 $8,446.39 Purchase Concrete (3 CY minimwn per pour) Purchase Reinforcment OTHER 0 6-000 EA t 2-000 MHRS 1.000 Lot Stair Treads Jack & Bore 6ft for 3/4" & 4" Conduits Handrail (Hobson Fabricating) APPROVAL: Date: E.<,..;;õ",,'" By: Susan Record By: Date: William J Benko, P .E. . Rscr PROPOSED CHANGE ORDER No. 00007 1854 East Lanark Street - Meridian, ID 83642 Phone: 208-887-1401 Fax; 208-888-9130 TITLE: Demo and Add Stair per WCD-O03B DATE: 11/4/2005 JOB: 323 . PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.E. Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, ill 83713 Phone: 208.376-2288 Fax: 208-376-2251 CONTRACT NO: 8324814 RE: To: fjIt$qRJP'I'IOl'{iOF--PRÔ;t>QSAiP " From: Number: ",.. ..'.., " . , --""""'" ,..;.:':i:. Dê~CriJÌtion , Fee SUBTOTAL' -- Subtotal: $8,446.39 ,.'i" '"' _Markup Pettent :M~k"p"}{ij(nø12'¡ 15.000% $1,266.96 $9,713.35 $139.87 1.440% Bond Total Cost: $9,853.22 APPROVAL~ By: - /J.-- , Susan Record By: William J Benko, P .E. Date: Date: Expe<liÚ",,<!O Pagd of2 . RSCI 1854 East Lanark Stree:t Meridian, ID 83642 Phone: 208-887-1401 Fax: 208-888-9130 PROPOSED CHANGE ORDER No. 00008 TITLE: Changes per WCD-O03A PROJECT: Centrate Equalization Project TO: Attn: Willîam J Benko, P.E. Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 RE: To: DESCJïœftONO F PROPOSAl;'.. From: This proposal addresses additional work required under WCD-OO3A. "',. ".., . ... ...... ..- . 'cc,'o'-,' .,.. Itein,'jJ~ DeSë:riptiOli" 00001 Materials - 2" Backflow 00002 Materials - Meter 00003 Add Bo!lards 00004 Labor - Additional Excavation & Backfill (55 If). 00005 Equipment - Backhoe & Compactor Rental 00006 Quote from Ridgeway. 00007 3/4" wat...line ûom CO#\ ,QuanÜ1¥f' 'Units': ,:;;¡' ':'" LOOO LS 1.000 L.S LOOO ea 12.000 MHRS 6.000 Ars 1.000 LS -45.000 LF J:je~~rriptioft'~' þ Fee on RSCI (15%) Fe~ on Subs (5%) SUBTOTAL Bond DATE: ] 1/4/2005 JOB: 323 CONTRACT NO: 8324814 Number: Uriit Price $265_00 $0.00 $225.00 $22_50 $50.00 $5,292.62 $15-00 , Tax hte'T~x~o~rit'Ni~L~.ilit 0.00% $0.00 $265.00 0.00% $0.00 $0.00 0-00% $0.00 $225.00 0.00% . $0.00 $270.00 0-00% $0.00 $300.00 0.00% $0.00 $5,292.62 0_00% $0.00 ($675.00) Unit Cost: Unit Tax: Unit Total: $5,677.62 $0.00 $5,677.62 $5,677.62 Subtotal: Markup Percent M~rk~p'Krifti~~if- $57.75 $264.63 $6,000.00 $86.40 1.440% Total Cost: $6,086.40 APPROV/;- By: -r Susan Record Date: Ex¡>«lilion @ By: William J Benko, P .E. Date: /// PROPOSED CHANGE ORDER No. 00009 Phone: 208-887~] 40] Fax: 208-888-9130 )ROJECT: Centrate Equalization Project DATE: 11/7/2005 JOB: 323 ro: Attn: William J Benko, P .E. Carollo Engineers 12592 W- Explorer Dr., Suite 200 Boise, II) 83713 Phone: 208-376-2288 Fax: 208-376-2251 CONTRACT NO: S324814 RE: To: »ESCRIPTIO rfo'F '~RØPOSAL ldditiona] work per WCD-OOS to insta]] tracing wire and terminate in boxes supplied by the owner. From: Number: tern )001 )002 Description Tracing Wire Labor Quantity Units 1000.000 LF 8.000 MRS Unit Price Tax Rate Tax Amount Net Amount $0.15 0.00% $0.00 $150.00 $22.50 0.00% $0.00 $180.00 Subtotal: $330.00 $0.00 $330.00 $330.00 Unit Cost: Unit Tax: Unit Total: SUBTOTAL Bond Markup:P~rctnt Markup Amount 15_000% $49.50 $379.50 $5.46 1.440% Description Fee $384.96 V Total Cost: By: //v ... By: Susan Record Willîam J Benko, P .E. Date: Date: :~p"d;tion <'J> , \ RSCI 1854 East Lanark Street . Meridian, ill 83642 Phone: 208-887-1401 Fax: 208-888-9130 TITLE: Coating Inside of Tank PROJECT: Centrate Equalization Project TO: Attn: Willîam J Benko, roE. Carollo Engineers, 12592 W. Explorer Dr., Suite 200 Boise, ill 83713 Phone: 208-376-2288 Fax: 208-376-2251 RE: To: DESCRIPTION OF PROPOSAL From: PROPOSED CHANGE ORDER No. 00012 DATE: 1/9/2006 JOB: 323 CONTRACT NO: S324814 Number: This proposal addresses coating the inside of the tank per the attached product infoonation. Item 'Description Quantity Units Unit Price Tax Rate Tax Amount Net Amount Ol--QI Labor for Mob & Sandblasting 64.000 MHRS $25.00 0.00% $0.00 $1,600.00 01-02 Rent for Sandblaster, Compressor, Hoses, Hood, Ete. 1.000 EA $500.00 0.00% $0.00 $500.00 01-03 Sand 1.000 LS $237.00 0.00% $0.00 $237,00 01-04' Mise Sandblasting Supplies & Smal1 Tools \.000 LS $125.00 0.00% $0.00 $125.00 01-05 Clean-up and Demob Sandblasting 8.000' MHRS $25.00 0.00% $0.00 $200.00 02-01 Epoxy Systems Quote 1.000 LS $5,024.00 0.00% $0.00 $5,024.00 02-02 Heating Equipment 1.000 LS $150.00 0.00% $0.00 $150.00 02-03 Set. remove, and maintain Temp Heat 3.000 MHRS $25.00 0-00% $0.00 $75.00 Description RSCI Fee (15%) Fee on Subs (5%) SUBTOTAL Bond Unit Cost: Unit Tax: Unit Total: $7,911.00 $0.00 $7,911.00 $7,911.00 Subtotal: Markup Percent Markup Amount $433.05 $251.20 $8,595.25 $123.77 1.440% . Total Cost: $8,719.02 AFPROV AL: By: .// ~ Susan Record Date: ExP<'"<õo<> ~ By: William J Benko, P.E. Date: RSCl PROPOSED CHANGE ORDER No. 00013 1854 East Lanark Street Meñdian, ID 83642 Phone: 208-887-1401 Fax: 208-888-9130 TITLE: WCD 008 Move Hydrant DATE: 2/2/2006 JOB: 323 PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.E. Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 CONTRACT NO: 8324814 RE: To: ~SW~{Q~¿!ø.I~;~ij.~ Wark as per WCD 008 From: Number: liili..'- ," 00001 Ridgeway Industrial i: ..i~t~:;'($ni:t~ . ':!:;tili~~i;{:!;;~m¡~¡BJä';i~~';Áiili{_il~fu~~n t 1.000 Job $859.97 0.00% $0.00 $859.97 Unit Cost: Unit Tax: Unit Total: Subtotal: $859.97 $0.00 $859~97 $859.97 ~tiaiEr¿;¡;;¿I;;;'~~~;rl~;]i !~~\!4itW!IIJi1~F;;.HEiliij'" it", . '.' t.I:~fiìití~,~JJ'I1,~\;~i;:':ü;fií'):1 gø¡g1lþil<.. m~ . >,' . ., .rl!¡-.JliAIm,¡g¡p, ,'4!teJ1 J~ III JJ:fY._~IQ;f!tIO:UJ,O H- ..!. ,.' \; Fee SUBTOTAL 5.000% Bond 1.440% $43.00 $902.97 $13.00 Total Cost: $915.97 APPROV AL: - By: By: Susan Record William J Benko, P .E. Date: Date: Exp<dition @ ,~ R8CI . 1854 East Lanark Street . Meridian, ill 83642 Phone: 208-887-1401 Fax: 208-888-9130 TITLE: WCD 006 Rev. Grading/Paving PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.E. Carollo Engineers 12592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 RE: To: From: ikliv:1";':~[!i>~fipH()n . 00001 Asphalt 00002 Acore lnÎnimw:n charge 00003 Gravel around Tank & fwnp Stat. 00004 Install illy well 8 ft deep 12" dia. pipe 00005 Drain rock in bottom of dryvvc:1I 00006 Road mix for road crossings 00007 Labor for road crossings . ,,_,:~nli:tY;~' ~{Uillt~:: -2200.000 SF 1.000 Lot 2000-000 SF 1.000 Job 5,000 Cy 3.900 CY 3.000 Mnhrs . . ',.", .-. . .. Ì)e!i~ípt1bn" Bond PROPOSED CHANGE ORDER No. 00014 DATE: 2/812006 JOB: 323 CONTRACT NO: S324814 Number: 'ÖntfPrice . :';,:11nita:t~1itíL~:Þöilijtt~\~Giiû $1.00 0-00% $0_00 ($2,200.00) $200.00 0.00% $0.00 $200.00 SO.30 0.00% $0.00 S500.oo $96.00 0.00% SO.OO S96_00 S9.75 5.00% S2.44 $51.19 $9.25 5.00% $L80 $37.88 $25-00 0.00% $0.00 $75.00 Unit Cost: Unit Tax: Unit Total: ($1.144.18) $4.24 ($1,139.93) ($1,139.93) Subtotal: ..: " 'i' 'i' 'J\lårkup::R;~fêerii",Mifk~ìí:"liijti..~~ 1.440% ($16.41) Total Cost: ($1,15634) APPROV~ By: . ,../-- p Susan Record Date: Ex~b"" @ By: William J Benko. P .E. Date: PROPOSED CHANGE ORDER No. 00015 :! RSCI - 1854 East Lanark Street ~ Meridian, ID 83642 Phone: 208-887-1401 Fax: 208-888-9130 TITLE: WCD 007 Delete Alum Sample Tube DATE: 2/8/2006 JOB: 323 PROJECT: Centrate Equalization Project TO: Attn: William J Benko, P.E. Carollo Engineers 11592 W. Explorer Dr., Suite 200 Boise, ID 83713 Phone: 208-376-2288 Fax: 208-376-2251 CONTRACT NO: 5324814 RE: To: From: Number: 1~f:5~"'~aptio¡(!j1" 00001 I" braided poly lin" 00002 Pull string "'-'1"<'-"'-'-' . '1. :iu'ht1íYci~J1JÜœii¿:{~ '>:~.-~.... ':iJm(p~iœ '!""';::;¡:il':ax" Ràt¡Hifitt~~ùiltÑ~ÌrS~t -554.000 Lf $1.26 0.00% $0.00 ($698.04) 1.000 Ea $35.00 0.00% $0.00 $35.00 De~¿fiptibíÌM,' c,"" Bond Unit Cost: ($663.04) Unit Tax: $0.00 Unit Total: ($663.04) Subtotal: ($663.04) ~M~~ ku p¡~~",qdÖ1\¡M: affip.ü1i~' 1.440% ($9.55) Total Cost: ($672.59) APPROV k- By: -/ - , Susan Record By: William J Benko, P.E. Date: Date: ExpcdiÜ"" OJ)