HomeMy WebLinkAboutChange Order 2 with Corollo Engineers for Centrate Tank Construction
City of Meridian
Public Works Dept.
'R J~~ (j :E~ I 'lI~ ]]
';:EP '¡ \, f)ít[,f;
1 ",.".,. {,d J,
Memo
City OfMe:ÓdÜm
City Clerk OffiCE
To:
Will Berg; Tara Green
From: Jon Mills, Staff Engineer
cc:
File
Date: 02/16/2006
Re:
Proposed Agenda Item for February 21, 2006 City Council Meeting
The Public Works Department respectfully requests the following items be placed on the
February 21 City Council agenda, under Consent Agenda, for Council's consideration:
~ 1. ChanÇle Order No.2 for the Centrate Tank Construction
This change order reflects cost and schedule changes from minor and moderate design
changes, material quantities, and word change directives accumulated during the process of
construction. These items are outlined and detailed in the attached change order and
requests for change order.
Recommended Council Action: The Public Works Department recommends
that City Council approve the Second Change Order for the Centrate Tank
Project and authorize the Mayor to sign it. .
2. Chanae Order No.1 for the Expansion of Well 20
This change order reflects the adjustment of cost and schedule due to value engineering and
unforeseen circumstances. Each item is detailed in the attachea change order and change
order requests.
Recommended Council Action: The Public Works Department recommends
that City Council approve the First Change Order for the Expansion of Well 20
and authorize the Mayor to sign it.
Thank you for your consideration. Please contact me if you have any questions regarding
any of these items.
. Page 1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
CHANGE ORDER NO.2
PROJECT:
City of Meridian WWTP - Centrate Equalization Tank Project
DATE OF ISSUANCE;
February 13, 2006
EFFECTIVE DATE: February 13, 2006
OWNER:
CONTRACTOR:
City of Meridian
RSCI
ENGINEER: 'Carollo Engineers
You are directed to make the following changes in the Contract Documents.
Add anchor bolts for future buílding enclosure to the top of the Centrate Pump Station foundation walls.
WCD IE - Revise Centrate Drain Manhole and Non-Potable Water Valve
WCD IE - Contract Credit to delete Slice Gate in Centrate Drain Manhole
WCD lC - Revise Centrate Drain.
WCD 2 - Add Plug Valve to Centrate Drain Pump Station
WCD 3A - Provide 2" Potable Water Connection and Backflow Preventer to Truck Wash Building
WCD 3B - Remove and Replace Sludge Drying Bed wall for Drain and Non-Potable Water Connections
WCD 4 - Over-excavate and backfill below Centrate Equalization Tank.
WCD 5 - Install tracer wire on buried utilities
WCD 6 - Credit for revised grading and paving around Centrate Equalization Tank
WCD 7 - Credit to delete chemical feed tubing,
WCD 8 - Relocated Non-potable Water Hydrallt at Centrate Equalization Tank
RFC 2 - Epoxy coat Centrate Equalization Tank floor to protect galvanized hardware.
Reason for Change Order: Additional unforeseen conditions not included in the Contract.
Attachments: RSCI Proposed Change Order No.1, Sept. 21,2005 for $172.59 (RFI)
RSCI Proposed Change Order No.3, Feb. 8,2006 for ($1,528.88) (WCD Ie) Credit
RSCI Proposed Change Order No.4, Sept. 30, 2005 for $10,299.22.(WCD 4)
RSCI Proposed Change Order No.5, Nov. 4,2005 for $(3I9.54).(WCD IE) Credit
RSCI Proposed Change Order No.7, Nov. 4, 2005 for $9,853.22.(WCD 3B)
RSCI Proposed Change Order No.8, Nov. 4, 2005 for $6,086.40.(WCD 3A)
RSCI Proposed Change Order No.9, Nov. 7, 2005 for $384.96.(WCD 5)
RSCI Proposed Change Order No. 11, Feb 8,2006 for $9156.34 (WCD 8)
RSCI Proposed Change Order No. 13, Feb 8, 2006 for $9156.34 (WCD 8)
RSCI Proposed Change Order No. 14, Feb 8,2006 for ($1,156.34) (WCD 6) Credit
RSCI Proposed Change Order No. 15 Feb 8, 2006 for ($672.59) (WCD 7) Credit
(Change Order 2 contains 14 total pages)
Page 1 of 2
Co pI..{
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
Substantial Completion: 270 Days - December 2, 2005
$ 474,065.00 Ready for final payment: 300 Days ~ January 1. 2006
days Or œ,tes
Net Changes from previous Change Orders No.1 Net Changes from previous Change Orders No- ~
$ 112,050.00 0
Days
Contract Price prior to tills Change Order Contract Times prior to this Change order
Substantial Completion: 270 Davs - December 2, 2005
$ 586.1 15.00 Ready for final payment: 300 Days - January 1. 2006
days or dates
Net Innease (decrease of this Change Order) Net Increase (decrease of this Change Order)
$ 35,271.20 90
days
Contract Price with all approved Change Orders. Contract Times with all approved Change Orders
Substantial Completion: 360 Days - March 2. 2006
$ 621.386.20 Ready for final payment: 390 Days - April 1. 2006
days or dates
RECOMMENDED BY ENGINEER:
ACCEPTED BY CONTRACTOR:
By:
By: '
/T/~
fSontractor (Authorized Signature)
2//<1/0("
Date:
-za:::r
Date:
APPROVED BY OWNER:
Tammy de Weerd, Mayor
Attest:
William G. Berg, Jr., City Clerk
Brad Watson, P.E., Public Works
Date:
Date:
Date:
Page 2 of 2
Lopt.!
.R.SCI.
1854 East Lanark Street
11eriàian,TID 83642
Phone: 208-887 -140]
Fax: 208-888-9130
PROPOSED CHANGE ORDER
No. 00001
TITLE:Install Anchor Bolts P1J.mp Station
PROJECT: Centrate Equalization Project
DATE: 9/21/2005
JOB: 323
TO:
Attn: William J Benko, P .E.
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, ill 83713
Phone: 208-376-2288 Fax: 208-376-2251 .
CONTRACT NO:
RE: To:
,"n~IFi!~' ,.. '-"'~""""iI"k'm\m"""'%\""""""'m' """""-"".."'...
1Jj)1J11,." umro; ""'¡(P;¡1O.l1\(."""Ù>:'ith"" "":'i.'"
...~,' ~~'.~ ¡JM . "fI,X~;?....."..W?I\;'" . ,,\. "..,'
From:
Number:
OCt ê'fti\~~!.1rJj1t'J ;;' :'" ::;t, i~¡C~tL~'Af1ï'ÿ iJ n ,,¡ ts- . '.. ."; ;t',þ¡_"t;~:TJ{i\Rh¥e '.' TåiIlfu!¿"ij¡Btfii~íih:t
00001 8"xl/2 Anchor Bolts 74.000 $0.59 5.00% $2.18 $45-84
00002 Layout 2.000 $26.67 0-00% $0-00 $53.34
00003 Laborer 3-000 $11.31 0.00% $0,00 $36.93
Unit Cost:
Unit Tax:
Unit Total:
Subtotal:
$133.93
$2.18
$136.11
$136.11
ijijtriþ.ïion :' :,,:>~J)~'liêi~~riit;::Máf;Wdl~~~t~K~
Fee 15.000% $20.42
Profit 10.000% $13.61
SUBTOTAL $170.14
Bond 1.440% $2.45
Total Cost:
$172.59
By:
By:
Pat Finn
William J Benko, P.B.
Date:
Date:
:XBodition (!>
, RSCl
1854 East Lanark Street
Meridian, ill 83642
PROPOSED CHANGE ORDER
No. 00003
Phone: 208-887-1401
Fax: 208-888-9130
TITLE:
WCD 001C Centrate Drain Connections
DATE: 2/8/2006
JOB: 323
PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.E.
Carollo Engineers '
12592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
CONTRACT NO: S324814
RE:
To:
From:
Number:
Î~nt"j;:,,»é~ripÜQ~
00001 6" 45 dcg.
00002 6x4 Tee
00003 6x6 Sanitary Y's
00004 8" CD line
,'",'.',""....
'""""
- t"(!!'t1äntiïf"Utdts"
2.000 Ea
LOOO Ea
2.000 Ea
.125.000 Lf
-2.000 Ea
Voit,Phee
$7.56
SI 1.48
S15.87
S3.47
$530.00
Tax Ra'te"I'ax .£muuIl:tNet~Añttili1î
5_00% $0.76 $15_88
5.00% $057 $12.05
5_00% $159 $33.33
5.00% ($21.69) ($455.44)
5.00% ($53.00) ($1,1 !3..()())
00005
Manholes w/lids
Unit Cost
Unit Tax::
Unit Total:
Subtotal:
($1,435.41)
($71.77)
($1,507.18)
($1,507.18)
ri~~cAptioit::
Bond
:Mårkup .P~rcen tMai)ffiiþ7AniÒi.iit:~~
1.440% ($21.70)
Total Cost:
($1,528.88)
APPROV7:
By: -- /-
,
Susan Record
By:
William J Benko, P.E.
Date:
Date:
E.pcdition ~
RSCI"
CHANGE ORDER REQUEST
No. 00004
1854*East Lanark Street
Meridian, ID 83642
Phone: 208-887-1401
Fax: 208-888-9130
TITLE:
Over Excavation Tank Foundation
DATE: 9/30/2005
JOB: 323
TO:
PROJECT: Centrate Equalization Project
Attn: William J Benko, P.E.
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
CONTRACT NO: S324814
RE: To:
DÊ$2~Qi~9:f!:ä~JI~f;'~',;;;
Jteøf .','. '
WAI
WAI
WAI
WAI
WAl
WAJ
WAJ
WAJ
WAJ
WA4
WA4
WAS
WA6
From:
. Number:
ne$çiipœi~jL . ,¿\,i,;':~j~c.wt;,,' ,J;¡iilît~*t~,itJfriiti .
Strata Tech for Visual 2.000 HRS
Subgrade Insp.
Dewatering Pump
Excavator - Cesco Inv 1029042
Operators
Backhoe. CAT Invoice 70X
5804347
,';,riöft~~T¡,i7~æiÌÌ;1&të\;fàX':AriitJlint Nèt Ämount
$39-00 0.00% $0,00 $78.00
$380.00 0,00% $0,00 $380.00
$2,565.70 4.36% $111.79 $2,565.70
$26.67 0.00% $0.00 $253.37
$819-80 4-12% $33.75 $819.80
$26.67 0.00% $0.1;)0 $240.03
$9.25 5.00% $52.56 $I,05Ll7
$26.67 0.00% $0.00 $426.72
$899.50 3.89% $35.00 $89950
$0-74 5.00% $22.20 $444.00
$9.25 5.00"/0 $11.51 $230.14
$26.67 0.00"10 $0_00 $453_39
$26.67 0.00"10 $0,00 $453.39
$26.67 0.00% $0.00 $266.70
Unit COSt: $8,561.91
Unit Tax: $266.81
Unit Total: $8,828.71
Subtotal: $8,828.71
MlJrltÞ-pP,ercent Markup Amount
15.000% $1,324.31
$10,153.02
1.440% $146.20
LOOO EA
1.000 EA
9.500 MHRS
LOOO EA
Operators
Structural Fill . Mike's Invoice
105148
Operators
Roller - Cat Invoice 70X
5804433
Mirafi 50Ox . Specialty Const
Supply Iov 0052S59.IN ,-
Structural Fill- Mike's Invoice
Operator¡¡
Operators
Operators
9.000 MHRS
113.640 Cy
16,000 MHRS
1.000 EA
600.000 Sy
24.880 Cy
17.000 MHRS
17.000 MHRS
10.000 MHRS
Description
Fee
SUBTOTAL
Bond
Total Cost:
$10,299.22
RSCI
1854 East Lanark Street
Meridian, ill 83642
Phone: 208-887-1401
Fax: 208-888-9130
.TITLE:
Changes under WCD-OOlB
PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.K
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, 10 83713
Phone: 208-376-2288 Fax: 208-376-2251
RE: To:
nïts~:Ì~¡!fiôF't;RQPt>SAI# .
This proposal addresses changes directed under WCD-OOIB.
From:
-"";;'.'"
...".
ltemii"",,.':'j)é$Crlpfiih,,"i1:¡:';,:; .
0000 I 8" Mechanical Plug wi SS wingnut and Bolt.
00002 Riser & Valve Box
:i ,. .~~:: 'Q~ãhtibf" ~i:u.:ilitt i):" f'
1.000 LS
1.000 LS
1.000 LS
6.000 MHRS
1.000 LS
-1.000 Ea
00003
00004
00005
00006
Change MH configur;¡tion
Demo Concrete Encasement on existing line.
Demo Equipment (Compressor & Breaker)
Shear Gate
JI~~Çïflptiijn ,,;
SUBTOTAL
Bond
PROPOSED CHANGE ORDER
No. 00005
DATE: 11/4/2005
JOB: 323
CONTRACT NO: S324814
Number:
.".
"',,,-,:¡:
vrrli¡Pri~~ ""\
$45_00
$225.00
$0.00
$22.50
$75.00
$795.00
TaxR~t~"Ìh Âkó~ntN(;i~~ilii't
0.00% $0_00 $45.00
0.00% $0..00 $225.00
0-00% $0.00 $0.00
0.00% SO.oo $135.00
0.00% $0-00 $75.00
0.00% $0.00 ($795.00)
Unit Cost:
Unit Tax:
Unit Total:
($315.00)
$0.00
($315.00)
, ($315.00)
Subtotal:
";,Mã;ikup:P'~~c~nt .M¡aildtp'Àifio¡¡Üt;{
($315.00)
($4.54) ,
1.440%
Total Cost:
($319.54)
APPRO V AL.J:
By: - rv-
.
Susan Record
Date:
E>pcdjrion 0)
By:
William J Benko, P.R
Date:
, RSCl
1854 East Lanark Street
. Meridian, ill 83641
Phone: 108-887-1401
Fax: 208-888-9130
PROPOSED CHANGE ORDER
No. 00007
TITLE:
Demo and Add Stair per WCD-O03B
PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.E.
Carollo Engineers'
12592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
RE: To:
:QE$ÇQIPTIOS OJi'.PROPOSAfJiX
From:
..-.
This proposal addresses additional work directed under WCD-OO3B-
Item
0001
0001 A
000 IB
OoolC
000 ID
0002
0002A
0002A
0003
0OO3A
0003B
0003C
00030
0OO3E
0003F
0OO3G
0004
0004A
00O4B
0005B
.. Desciiption,,'c..
DEMOLITION
...
Q:iïånfitr Utìiti- ....
0
1.000 LS
1.000 LS
16.000 MHS
1.000 LS
DATE: 11/4/2005
JOB: 323
CONTRACT NO: S324814
.."
..Unit PTice
SO_OO
$500.00
$558_10
$22.50
S370.00
SO-OO
$22.50
$50_00
$0.00
$22.50
$22.50
$22.50
$22.50
$0..25
$85.00
$0.50
SO.OO
$45_00
$22.50
$1,395.79
Number:
" ,', ,"--
.....
Acore .. Concrete cutting for Demo
Equipment Rental for Demo .
Labor for Demo
Haul Off Spoils
EARTHWORK
Labor - Additional Backfill & Prep Work
Backhoe & CompaCtOr
CONCRETE WORK
Labor- FrS Retaining Wall Ftg
Labor - Frs Retaining Wall
Labor - FrS Stair Landings
Labor - FrS Stairs
Labor - Install Reinforcemrot
0
8-000 MHRS
4.000 His
0
6.000 MHRS
40_000 MHRS
12.000 MHRS
48_000 MHRS
1250.000 LBS
12-000 CY
1250.000 LBS
TaxR~t~~Tax kri;~lÚ~et:aiiJriti
0.00% SO.OO $0.00
0.00% $0.00 $500.00
0.00% SO_DO $558_10
0.00% $0.00 $360.00
0.00% SO_DO S370.00
0.00% SO-OO SO.OO
0.00% $0.00 $180.00
0.00% $0-00 $200.00
0.00% $0.00 : $0.00
0.00% $0.00 $135_00
0_00% $0.00 S9O0.00
0.00% SO_OO S270.00
0-00% SO.OO $1,080.00
0.00% SO-OO $312_50
0.00% SO.OO $1,020.00
0.00% SO.OO $625.00
0.00% SO_OO $0-00
0.00% SO.OO $270_00
0.00% $0.00 $270.00
0.00% $0.00 $1,395.79
Unit Cost:
Unit Tax:
Unit Total:
$8,446.39
$0.00
$8,446.39
Purchase Concrete (3 CY minimwn per pour)
Purchase Reinforcment
OTHER
0
6-000 EA
t 2-000 MHRS
1.000 Lot
Stair Treads
Jack & Bore 6ft for 3/4" & 4" Conduits
Handrail (Hobson Fabricating)
APPROVAL:
Date:
E.<,..;;õ",,'"
By:
Susan Record
By:
Date:
William J Benko, P .E.
. Rscr
PROPOSED CHANGE ORDER
No. 00007
1854 East Lanark Street
- Meridian, ID 83642
Phone: 208-887-1401
Fax; 208-888-9130
TITLE:
Demo and Add Stair per WCD-O03B
DATE: 11/4/2005
JOB: 323
. PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.E.
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, ill 83713
Phone: 208.376-2288 Fax: 208-376-2251
CONTRACT NO: 8324814
RE: To:
fjIt$qRJP'I'IOl'{iOF--PRÔ;t>QSAiP "
From:
Number:
",..
..'.., "
. ,
--""""'"
,..;.:':i:.
Dê~CriJÌtion ,
Fee
SUBTOTAL' --
Subtotal: $8,446.39
,.'i" '"' _Markup Pettent :M~k"p"}{ij(nø12'¡
15.000% $1,266.96
$9,713.35
$139.87
1.440%
Bond
Total Cost:
$9,853.22
APPROVAL~
By: - /J.--
,
Susan Record
By:
William J Benko, P .E.
Date:
Date:
Expe<liÚ",,<!O
Pagd of2
. RSCI
1854 East Lanark Stree:t
Meridian, ID 83642
Phone: 208-887-1401
Fax: 208-888-9130
PROPOSED CHANGE ORDER
No. 00008
TITLE:
Changes per WCD-O03A
PROJECT: Centrate Equalization Project
TO:
Attn: Willîam J Benko, P.E.
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
RE: To:
DESCJïœftONO F PROPOSAl;'..
From:
This proposal addresses additional work required under WCD-OO3A.
"',.
"..,
. ...
......
..- . 'cc,'o'-,' .,..
Itein,'jJ~ DeSë:riptiOli"
00001 Materials - 2" Backflow
00002 Materials - Meter
00003 Add Bo!lards
00004 Labor - Additional Excavation & Backfill (55 If).
00005 Equipment - Backhoe & Compactor Rental
00006 Quote from Ridgeway.
00007 3/4" wat...line ûom CO#\
,QuanÜ1¥f' 'Units': ,:;;¡' ':'"
LOOO LS
1.000 L.S
LOOO ea
12.000 MHRS
6.000 Ars
1.000 LS
-45.000 LF
J:je~~rriptioft'~' þ
Fee on RSCI (15%)
Fe~ on Subs (5%)
SUBTOTAL
Bond
DATE: ] 1/4/2005
JOB: 323
CONTRACT NO: 8324814
Number:
Uriit Price
$265_00
$0.00
$225.00
$22_50
$50.00
$5,292.62
$15-00
, Tax hte'T~x~o~rit'Ni~L~.ilit
0.00% $0.00 $265.00
0.00% $0.00 $0.00
0-00% $0.00 $225.00
0.00% . $0.00 $270.00
0-00% $0.00 $300.00
0.00% $0.00 $5,292.62
0_00% $0.00 ($675.00)
Unit Cost:
Unit Tax:
Unit Total:
$5,677.62
$0.00
$5,677.62
$5,677.62
Subtotal:
Markup Percent M~rk~p'Krifti~~if-
$57.75
$264.63
$6,000.00
$86.40
1.440%
Total Cost:
$6,086.40
APPROV/;-
By: -r
Susan Record
Date:
Ex¡>«lilion @
By:
William J Benko, P .E.
Date:
///
PROPOSED CHANGE ORDER
No. 00009
Phone: 208-887~] 40]
Fax: 208-888-9130
)ROJECT: Centrate Equalization Project
DATE: 11/7/2005
JOB: 323
ro:
Attn: William J Benko, P .E.
Carollo Engineers
12592 W- Explorer Dr., Suite 200
Boise, II) 83713
Phone: 208-376-2288 Fax: 208-376-2251
CONTRACT NO: S324814
RE: To:
»ESCRIPTIO rfo'F '~RØPOSAL
ldditiona] work per WCD-OOS to insta]] tracing wire and terminate in boxes supplied by the owner.
From:
Number:
tern
)001
)002
Description
Tracing Wire
Labor
Quantity Units
1000.000 LF
8.000 MRS
Unit Price Tax Rate Tax Amount Net Amount
$0.15 0.00% $0.00 $150.00
$22.50 0.00% $0.00 $180.00
Subtotal:
$330.00
$0.00
$330.00
$330.00
Unit Cost:
Unit Tax:
Unit Total:
SUBTOTAL
Bond
Markup:P~rctnt Markup Amount
15_000% $49.50
$379.50
$5.46
1.440%
Description
Fee
$384.96 V
Total Cost:
By:
//v
...
By:
Susan Record
Willîam J Benko, P .E.
Date:
Date:
:~p"d;tion <'J>
, \ RSCI
1854 East Lanark Street
. Meridian, ill 83642
Phone: 208-887-1401
Fax: 208-888-9130
TITLE:
Coating Inside of Tank
PROJECT: Centrate Equalization Project
TO:
Attn: Willîam J Benko, roE.
Carollo Engineers,
12592 W. Explorer Dr., Suite 200
Boise, ill 83713
Phone: 208-376-2288 Fax: 208-376-2251
RE: To:
DESCRIPTION OF PROPOSAL
From:
PROPOSED CHANGE ORDER
No. 00012
DATE: 1/9/2006
JOB: 323
CONTRACT NO: S324814
Number:
This proposal addresses coating the inside of the tank per the attached product infoonation.
Item 'Description Quantity Units Unit Price Tax Rate Tax Amount Net Amount
Ol--QI Labor for Mob & Sandblasting 64.000 MHRS $25.00 0.00% $0.00 $1,600.00
01-02 Rent for Sandblaster, Compressor, Hoses, Hood, Ete. 1.000 EA $500.00 0.00% $0.00 $500.00
01-03 Sand 1.000 LS $237.00 0.00% $0.00 $237,00
01-04' Mise Sandblasting Supplies & Smal1 Tools \.000 LS $125.00 0.00% $0.00 $125.00
01-05 Clean-up and Demob Sandblasting 8.000' MHRS $25.00 0.00% $0.00 $200.00
02-01 Epoxy Systems Quote 1.000 LS $5,024.00 0.00% $0.00 $5,024.00
02-02 Heating Equipment 1.000 LS $150.00 0.00% $0.00 $150.00
02-03 Set. remove, and maintain Temp Heat 3.000 MHRS $25.00 0-00% $0.00 $75.00
Description
RSCI Fee (15%)
Fee on Subs (5%)
SUBTOTAL
Bond
Unit Cost:
Unit Tax:
Unit Total:
$7,911.00
$0.00
$7,911.00
$7,911.00
Subtotal:
Markup Percent Markup Amount
$433.05
$251.20
$8,595.25
$123.77
1.440%
. Total Cost:
$8,719.02
AFPROV AL:
By: .// ~
Susan Record
Date:
ExP<'"<õo<> ~
By:
William J Benko, P.E.
Date:
RSCl
PROPOSED CHANGE ORDER
No. 00013
1854 East Lanark Street
Meñdian, ID 83642
Phone: 208-887-1401
Fax: 208-888-9130
TITLE:
WCD 008 Move Hydrant
DATE: 2/2/2006
JOB: 323
PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.E.
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
CONTRACT NO: 8324814
RE: To:
~SW~{Q~¿!ø.I~;~ij.~
Wark as per WCD 008
From:
Number:
liili..'- ,"
00001
Ridgeway Industrial
i: ..i~t~:;'($ni:t~ . ':!:;tili~~i;{:!;;~m¡~¡BJä';i~~';Áiili{_il~fu~~n t
1.000 Job $859.97 0.00% $0.00 $859.97
Unit Cost:
Unit Tax:
Unit Total:
Subtotal:
$859.97
$0.00
$859~97
$859.97
~tiaiEr¿;¡;;¿I;;;'~~~;rl~;]i !~~\!4itW!IIJi1~F;;.HEiliij'" it", . '.' t.I:~fiìití~,~JJ'I1,~\;~i;:':ü;fií'):1
gø¡g1lþil<.. m~ . >,' . ., .rl!¡-.JliAIm,¡g¡p, ,'4!teJ1 J~ III JJ:fY._~IQ;f!tIO:UJ,O H- ..!. ,.' \;
Fee
SUBTOTAL
5.000%
Bond
1.440%
$43.00
$902.97
$13.00
Total Cost:
$915.97
APPROV AL:
- By:
By:
Susan Record
William J Benko, P .E.
Date:
Date:
Exp<dition @
,~ R8CI
. 1854 East Lanark Street
. Meridian, ill 83642
Phone: 208-887-1401
Fax: 208-888-9130
TITLE:
WCD 006 Rev. Grading/Paving
PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.E.
Carollo Engineers
12592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
RE:
To:
From:
ikliv:1";':~[!i>~fipH()n .
00001 Asphalt
00002 Acore lnÎnimw:n charge
00003 Gravel around Tank & fwnp Stat.
00004 Install illy well 8 ft deep 12" dia. pipe
00005 Drain rock in bottom of dryvvc:1I
00006 Road mix for road crossings
00007 Labor for road crossings
. ,,_,:~nli:tY;~' ~{Uillt~::
-2200.000 SF
1.000 Lot
2000-000 SF
1.000 Job
5,000 Cy
3.900 CY
3.000 Mnhrs
. .
',.", .-.
. ..
Ì)e!i~ípt1bn"
Bond
PROPOSED CHANGE ORDER
No. 00014
DATE: 2/812006
JOB: 323
CONTRACT NO: S324814
Number:
'ÖntfPrice . :';,:11nita:t~1itíL~:Þöilijtt~\~Giiû
$1.00 0-00% $0_00 ($2,200.00)
$200.00 0.00% $0.00 $200.00
SO.30 0.00% $0.00 S500.oo
$96.00 0.00% SO.OO S96_00
S9.75 5.00% S2.44 $51.19
$9.25 5.00% $L80 $37.88
$25-00 0.00% $0.00 $75.00
Unit Cost:
Unit Tax:
Unit Total:
($1.144.18)
$4.24
($1,139.93)
($1,139.93)
Subtotal:
..: " 'i' 'i' 'J\lårkup::R;~fêerii",Mifk~ìí:"liijti..~~
1.440% ($16.41)
Total Cost:
($1,15634)
APPROV~
By: . ,../--
p
Susan Record
Date:
Ex~b"" @
By:
William J Benko. P .E.
Date:
PROPOSED CHANGE ORDER
No. 00015
:! RSCI
- 1854 East Lanark Street
~ Meridian, ID 83642
Phone: 208-887-1401
Fax: 208-888-9130
TITLE:
WCD 007 Delete Alum Sample Tube
DATE: 2/8/2006
JOB: 323
PROJECT: Centrate Equalization Project
TO:
Attn: William J Benko, P.E.
Carollo Engineers
11592 W. Explorer Dr., Suite 200
Boise, ID 83713
Phone: 208-376-2288 Fax: 208-376-2251
CONTRACT NO: 5324814
RE:
To:
From:
Number:
1~f:5~"'~aptio¡(!j1"
00001 I" braided poly lin"
00002 Pull string
"'-'1"<'-"'-'-'
. '1. :iu'ht1íYci~J1JÜœii¿:{~ '>:~.-~.... ':iJm(p~iœ '!""';::;¡:il':ax" Ràt¡Hifitt~~ùiltÑ~ÌrS~t
-554.000 Lf $1.26 0.00% $0.00 ($698.04)
1.000 Ea $35.00 0.00% $0.00 $35.00
De~¿fiptibíÌM,' c,""
Bond
Unit Cost: ($663.04)
Unit Tax: $0.00
Unit Total: ($663.04)
Subtotal: ($663.04)
~M~~ ku p¡~~",qdÖ1\¡M: affip.ü1i~'
1.440% ($9.55)
Total Cost:
($672.59)
APPROV k-
By: -/ -
,
Susan Record
By:
William J Benko, P.E.
Date:
Date:
ExpcdiÜ"" OJ)