Loading...
HomeMy WebLinkAboutConditionalUseModificationChecklist V1Planning Division CONDITIONAL USE PERMIT MODIFICATION Checklist Community Development  Planning Division  33 E. Broadway Avenue, Ste. 102 Meridian, Idaho 83642 Phone: 208-884-5533 www.meridiancity.org/planning (Rev: 08/01/2021) Submittal Standards ♦ All Applications must be submitted electronically through CITIZEN ACCESS PORTAL ♦ All Drawings/Documents will be submitted electronically through PROJECT DOX ♦ Upload all documents and drawings in the appropriate folders ♦ Upload all documents and drawings per required checklist, as Individual PDF’s. ♦ Each checklist item must be named according to the naming convention listed below. ♦ All plans must have a space reserved in the upper left corner for City Approval stamps. ♦ Resubmittals must use the EXACT same file name as the original to allow versioning. Description Document Naming Convention Narrative fully describing the proposed request Narrative Legal description of the subject property (Lot, Block, and Subdivision name if located in a recorded subdivision OR a metes and bounds legal description of the property if not in a subdivision) Legal Description Recorded warranty deed for the subject property Warranty Deed Affidavit of Legal Interest signed and notarized by the property owner (If owner is a corporation, submit a copy of the Articles of Incorporation. If you are not the owner listed on the Recorded Warranty Deed, Affidavit of Legal Interest is required.) Affidavit of Legal Interest Scaled vicinity map showing the location of the subject property Vicinity Map Approved site plan that is proposed to be modified CUP Approved Site Plan Scaled site plan showing proposed modification(s) Proposed Site Plan For new public utility construction (water, sewer, reclaimed water) applicants are required to submit: Submit a PDF version of conceptual engineering plans, including pipe sizes and profiles Public Utility Plan AutoCad version of the conceptual engineering plans in a format that complies with the specifications for project Drawings found here Autocad file *The highlighted item(s) above may not be required depending on the project. Please contact a planner to verify if these item(s) are required and received instructions on how to proceed with your submittal. 11/05/21 MCU-2021-0009