Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agency Comments
Page i Of 1 Kristy Vigil From: Bradley E. Miller Ibmiller@vanauker.com] Sent: Monday, March 26, 2007 12:36 PM To: Kristy Vigil Cc: 'Greg Schwanke'; Ron Van Auker, KBrown@baileyengineers.com; AJLopez@baileyengineers.com; Justin Lucas Subject: Creamline Park Subdivision Kristy._. Hope you are well. I have reviewed the Staff Report for the Creamline Park Subdivision and have a couple of items I wanted to mention, 1. Site SPE�cific Conditions. Section 16, The only perimeter fencing which is required is the vinyl fence on the west boundary lot Lots 3, 4 & 5_ We may provide additional perimeter fencing depending on the security and safety requirements of each use, but I want to make sure that this condition is not stating that we will provide perimeter fencing on the entire project. 2. Site S cific Conditions. Section 17. Our intent is to incorporate the ditch into the overall development without the need for fencing. It is likely however that certain uses or tenants on the north side of the ditch will require perimeter fencing around the lot. The lots on the south side of the ditch will be more commercial uses and the 8 Mile Lateral could be a great amenity. Can any fencing along the 8 Mlle Lateral be subject to the requirements of UDC 11-3A-6B2? 3. General Requirements. Section 1. The City Council waived the requirement that we cover the ditch, so this item needs to be modified. 4. General Re uirements. Section 2. We would like to have the right to submit for and receive building permits prior to the recordation of the Final Plat and other conditions stated in this section. We agree that a Certificate of Occupancy will not be issued until the Final Plat is recorded and the other conditions of this section are met. This Section 2 appears to be somewhat in conflict with Section 4. Section 4 appears to be consistent with what I am requesting. Please let me know you thoughts in regard to these items. Thanks, Brad 5/2/2007 Exhibit "B" March 23, 2007 MERIDIAN CITY COUNCIL MEETING March 27, 2007 FP 07-006 APPLICANT Creamline Park 9 ITEM NO. REQUEST Final Plat approval for 4 commercial building lots, 6 industrial lots and 3 common lots on 32.75 acres in I-L and C-G zones by Creamline Associates, LLC - 1200 W. Franklin Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: See Attached Comments CITY ATTORNEY CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: No Comment CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: ADA COUNTY HIGHWAY DISTRICT: SANITARY SERVICE COMPANY CENTRAL DISTRICT HEALTH: �Ve NAMPA MERIDIAN IRRIGATION: SETTLERS IRRIGATION: IDAHO POWER: US WEST: INTERMOUNTAIN GAS: See Attached Comments from Gas Co. MERIDIAN POST OFFICE: OTHER: Contacted: ' 'n , Date: Phone: Emailed: _ taff Initials: Materials presented at public meMringsall become prop erty of the City of Meridian. �M73 CENTRAL •• DISTRICT HEALTN DEPARTMENT Rezone # CENTRt.:..._ DISTRICT HEALTH DEP,,.ATMENT Environmental Health Division Conditional Use # Preliminary,mal / hort Plat P o? -©0 I"4 1 � Vto— P4' 1"r Return to: I❑ Boise ❑ Eagle Garden City ❑ Meridian Q Kuna ❑ACz Star ❑1. We have No Objections to this Proposal. City Of Meridian City Clerk Office ❑2. We recommend Denial of this Proposal. ❑3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. ❑7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. 211 After written approval from appropriate entities are submitted, we can approve this proposal for: central sewage ❑ community sewage system ❑ community water well ❑ interim sewage la -central water ❑ individual sewage ❑ individual water �9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: central sewage ❑ community sewage system ❑ community water ❑ sewage dry lines -`central water '®10. Run-off is not to create a mosquito breeding problem. ❑ 11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. b. We will require plans be submitted for a plan review for any: food establishment swimming pools or spas `� child care center &-beverage establishment grocery store ❑ 14. Please see attached stormwater management recommendations ❑ 15. Reviewed By: ate: 3 / -)c) / o % 15726-001EHO904 Review Sheet CENTRAL` •• DISTRICT 1WHEIALTH DEPARTMENT MAIN OFFICE 707 N.ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500 To prevent and treat disease and disability; to promote healthy lifestyles;, and to protect and promote the health and quality of our environment. - X%1 EIVED JUN 0 6 : 2W7 CirY of Meridian City Clerk Office 0770837 June .4, 2007. David Navarro Ada County Recorder 200 West Front Street Boise, ID 83702 RE: Creamline Park Subdivision Dear Mr. Navarro: Central District Health Department has reviewed and does approve the final plat for this subdivision for central water and central sewer facilities. Final approvawas grven7une 1 2007. Sanitary restrictions asrequired by Idaho Code, Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE) representing the_ City of Meridian and the QLPE approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been,constructed or if the developer y constructing those facilities. If the developer fails to .construct facilities then sanitary restrictions may reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. Serving Valley, Elmore, Boise, and Ada Counties Ada / Boise County Office Elmore County Office Valley County office N. Armstrong Pl. 520 E. 8th St. North Boise, ID 83704 Mountain Home; ID 83647 703 N. 1 st St. Enviro. Health: 327-7499 P.O. Box 1449 Family Planning: 327-7400 Enviro. Health: 587-9225 McCall, ID 83638 Immunizations: 327-7450 Family Health: 587-4407 Ph. 634-7194 Senior Nutrition: 3274460 WIC: 587-4409 FAX: 634-2174 WIC: 327-7488 FAX: 587-3521 FAX: 327-8500