Loading...
HomeMy WebLinkAboutCherry Blossom Sub TED-2020-0003 Staff Report Page 1 DATE: 10/23/2020 TO: Cameron Arial, Planning Director FROM: Sonya Allen, Associate Planner 208-884-5533 SUBJECT: TED-2020-0003 Cherry Blossom Subdivision LOCATION: 615 W. Cherry Ln., in the NE ¼ of Section 12, Township 3N., Range 1W. (Parcel #R8512250150, R8512250140, S1212120850, and S1212120695) I. PROJECT DESCRIPTION Six (6) month time extension on the Preliminary Plat (H-2018-0018) in order to obtain the City Engineer’s signature on a final plat. II. APPLICANT INFORMATION A. Applicant: Jon Breckon, Breckon Land Design, Inc. – PO Box 44465, Boise, ID 83711 B. Owner: Doug Jayo, Jayo Land Development Company, Inc. – 10564 W. Business Park Ln., Boise, ID 83709 C. Representative: Same as Applicant III. STAFF ANALYSIS The preliminary plat (H-2018-0018) for this project was approved by City Council on September 4, 2018. The plat consists of 47 single-family residential building lots and 11 common lots on 10.25 acres of land in the R-8 zoning district. Note: The subject time extension request was submitted on August 18, 2020, prior to expiration of the preliminary plat on September 4, 2020. The Applicant requests approval of a six (6) month time extension in order to obtain the City Engineer’s signature on a final plat. The Applicant is currently routing the mylar for signature and should have it signed in the near future. STAFF REPORT COMMUNITY DEVELOPMENT DEPARTMENT Page 2 With all extensions, the Director may require the preliminary plat to comply with the current provisions of this title. Staff is not recommending any additional conditions of approval for this extension. IV. DECISION Staff: Staff recommends approval of the proposed one (1) year time extension on the preliminary plat to expire on March 4, 2021. Page 3 V. EXHIBITS A. Approved Preliminary Plat (dated: 6/8/2018) Page 4 B. Approved Landscape Plan (date: 6/8/2018) Page 5 VI. CITY/AGENCY COMMENTS & CONDITIONS A. Planning Division Site Specific Conditions: 1. Applicant shall comply with all terms of the annexation and associated development agreement provisions (Inst. #2018-117003) and the preliminary plat (H-2018-0018) approved for this property. 2. The applicant shall obtain the City Engineer’s signature on the final plat by March 4, 2021 in accord with UDC 11-6B-7 in order for the preliminary plat to remain valid; or another time extension may be requested.