HomeMy WebLinkAbout2021-09-24 ACHD Joshua Beach
Subject: FW:TIS Review 1 - Eagle View Landing Phase 2
From: Paige Bankhead <pbankhead@achdidaho.org>
Sent: Friday, September 24, 2021 12:31 PM
To: Christopher Bender<C.Bender@fehrandpeers.com>; Mindy Wallace<Mwallace@achdidaho.org>
Cc: Preston Stinger<P.Stinger@feh rand peers.com>;Tonn Petersen <tonn@bvadev.com>;Jon Wardle
<jwardle@brightoncorp.com>; Geoffrey M. Wardle<gwardle@clarkwardle.com>; Bill Parsons
<bparsons@meridiancity.org>
Subject: RE:TIS Review 1- Eagle View Landing Phase 2
Hello,
Thank you for your patience on this. We accept the study, however, please note that the 2022 background volumes at
the intersection of Silverstone Way/Overland Road (before adding the ICCU Phase 1&2 trips) do not reflect the volumes
that would result from applying the growth rate to the existing traffic volumes, as what was done for the 2021 and 2023
background volumes in the study. Some of the volumes at the Silverstone Way/Overland Road intersection for the 2022
background conditions are less than the 2021 background conditions.This will not be acceptable in the future.
Respectfully,
Paige Bankhead, E.I.
Assistant Traffic Engineer
Ada County Highway District
Development Services
1301 N. Orchard St. Ste. 200
Phone: (208) 387-6293
-041; �7 v,"I" .
ACIJIQ
or
1