Loading...
HomeMy WebLinkAboutStaff Comments CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 STAFJ<' REPORT Planning & Zoning COlmnission Hearing Date: February 16, 2006 '~¡ .; ;, ¡,~ ~U /tllYlf 1~!1¡ '--/YLtirldi tXn '~,t; ~, " - '-'.\He,} ,~ ::'\- /I '-~;"~>r~, ,,-:--<,'" --",-'/."'-.1.",--,-,,-," 'y-,,!-,,~- -'"".., '~ 19D~ TO: FROM: P&Z Commission Joseph Guenther, Associate Planner SUBJECT: Gateway Marketplace PP-06-002 - Prelilninary plat for 23 lots on 22.85 acres for Gateway Marketplace by Landmark Development Group, LLC. 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, Landmark Development Group, LLC, is requesting approval of a Preliminary Plat with a Variance to Chapter 3 Article H ofUDC to construct up to 250,000 square feet of retail and restaurant uses on approximately 22.85 acres within the Gateway Marketplace development at the Southeast comer of Us tick Road and Eagle Road/SH-55. This is the second application and would be the second commercial project constructed within the Kissler annexation project AZ-03-018. The 36.33-acre site was approved for annexation with a Development Agreement (DA) in April 2004 under the name Kissler Annexation (see File No. AZ-03-018). The DA (Instrument No. 104107406) requires that any future use be consistent with the approved plans for the annexation. A concept plan for the overall site was submitted with the preliminary plat application showing building layouts and drive aisles. The Commission should note that a variance application, submitted concurrently with tills prelinlinmy plat application will be before the City Council at a date to be determined, the variance request proposes two new approach to N. Eagle Road/State Highway 55, one for right-inlright-out access driveway and one planned for a full access point. The Idaho Transportation Department (ITD) has not approved any approach permits on tllis site and has made comment that this site does not qualify for access by standard district policy. The overall design of the site is paramount on the approval of the Eagle Road approaches. If the City Council dellies the approaches, Staff feels the design of the plat does not adequately provide a frontage connection from Ustick Road, the future collector road west of the site, or south to the future signalized intersection with River Valley Drive. The Development Agreement for the 22.85 acres does sufficiently address the interconnectivity of the site as a public street access to Ustick Road and two approved approaches have been provided for by ACHD as well as a frontage road was required for tills site by the Development Agreement. 2. SUMMARY RECOMMENDATION Staff is recommending continuance of the subject application (PP-06-002). Staff is recommending that the Commission require the applicant to re-submit an amended plat wmch: 1) provides more articulation to the building design and does not constitute a strip development, 2) provides a frontagelbackage road east/west and connects with a private or limited access commercial street to Ustick, and 3) provides a better design for cross access to the parcels east and south of the site. The ACHD staff report supports the requirements of cross access to adjacent parcels and compliance with the Eagle Road Corridor Study. PROPOSED MOTIONS (to be considered after the public hearing) Recommend Denial I move to recommend denial of File Number PP-06-002 for the following reasons: (you should state specific reasons for denial. You should address how the applicant might re-do the application to gain your recommendation for approval.) Gateway Marketplace Subdivision PP-O6-002 RE C E I-VED FEBJ 3 2006 Crry OF rv1ERIDIAN page 1 '--~'TY r'.! !=p;.r r,CCr('~ ~- --- -- - - '-",- '-..> ,..-- CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 Recommend Continuance (Recommend Approval) I move to continue File Nmnbers PP-06-002 for the hearing date of February 16, 2006, to -' 2006, For approval: and direct staff to draft findings and conditions for approval to (date certain) and in addition to staffs comments, direct the applicant to make the following changes: (inseli COmments here) 3. APPLICATION AND PROPERTY FACTS a. Site Address/Location: SE comer of Us tick Road and Eagle Road/SH55 Township 3N, Range IE, Section 4 b. Owner James Kissler 1125 W. An1ity Boise Id 83705 c. Applicant: Landmark Development Group, LLC Tmnara Thompson 1882 Toluka Way Boise ill 83702 d. Representative: e. Present Zoning: Tamara Thompson, Landmark General Retail and Commercial (C-G) (AZ-03-018 f. Present Comprehensive Plan Designation: Mixed Use-Regional- 2002 Comprehensive Future Land Use Map g. Description of Applicant's Request: 1. See Exhibit A (prepared by Landmark Development Group LLC) for a copy of the detailed site plan which depicts the lot layout, building, parking and access locations. Exhibit B shows the proposed landscape plan. h. Applicant's Statement/Justification: The application notes that the mixed use regional designation provides for the overall site to be developed with a mixture of RetaillRestaurant /Drive thru and other Commercial uses oriented around automobile traffic. The applicant notes that the site is an ideal location for a retail complex and will provide the additional landscaping along drive aisles, the design review for structures along the gateway corridor. 4. PROCESS FACTS c. The subject applications will in fact constitute preliminary plats as determined by City Ordinance. By reason ofthe provisions of the Unified Development Code Title 11 Chapter 6, a public hearing is required before the City Council on this matter. Newspaper notifications published on: 13th of February m1d 30th of January, 2006 (for Planning & Zoning Commission) Radius notices mailed to properties witilln 300 feet on: January 20, 2006 (for Planning & Zoning Commission) Applicant posted notice on site by: February 6,2006 (for Planning & Zoning Commission). a. b. d. 5. LAND USE a. Existing Land Use(s): Bare land, single family residence Gateway Marketplace Subdivision PP-O6-002 page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/]6/2006 b. Description of Character of Surrounding Area: Large lot residential, llighway-oriented services, rapidly urbanizing. c. Adjacent Land Use and Zoning 1. North: Future pad sites witilln SclmÜtchger Subdivision, Lowe's site zoned C-G. 2. West: Sadie Creek Promenade Subdivision, Bienville Subdivision proposals, zoned C-G, Rl, and RUT 3. South: undeveloped parcels zoned C-G with Redfeather Annexation. 4. East: Una Mas conceptual project and ACHD future right of way, zoned RUT- proposed zone C.G d. History of Previous Actions: In April 2004, the owners and City entered into a Development Agreement for various High Density Commercial, Multi-family Residential, transitional, and office uses under File AZ-03~0 18. Some property was annexed and zoned to General Retail and Commercial (C-G) with a Development Agreement while other portions of the propeliy (on the west side of Eagle Road) were not included in the annexation leaving out parcels which were addressed with the original conceptual plan. e. Existing Constraints and Opportunities 1. Public Works Location of sewer: Location of water: Extension of mains in Ustick Road Extension of mains in Ustick Road Issues or concerns: Water main connection in Eagle Road is required. 2. Vegetation: Agric ul tural/Irri gated 3. Flood plain: N/ A 4. Canals/Ditches Irrigation: The Milk Lateral bisects the property 5. Hazards: None identified 6. Size of Property: 22.85 acres 7. Description of Use: Up to 250,000 square feet of Retail, COlmnercial, and Restaurant uses and associated parking and landscape improvements. f. Subdivision Plat Information- The submitted plat contains 23 lots in a C-G proposed zone with commercial uses. Commercial uses are shown to be a mix of restaurant/retail spaces with six approximate 30,000 square foot buildings and 8 approximate 3,000 to 6,000 square foot buildings and 8 approximate 2,000 square foot attached buildings, and one approximate 40,000 square foot office/retail building. g. Landscaping ~ 1. Width of street buffer(s): Per the Future Land Use Map, both Ustick Road and Eagle Road are designated as "Entryway Corridors." As such, the UDC (Table 11-2B-3) requires a 35-foot wide street buffer adjacent to both roadways. The landscape plan (Sheet L1.1) proposes a 35-foot wide buffer along both Ustick and Eagle Roads. Ifthe applicant proposes to construct the "Entryway Corridor" buffers in easements they must meet the landscaping standards required in the UDC. Gateway Marketplace Subdivision PP-O6-002 page 3 CITY Of MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 2. Percentage of site as open space: The UDC does not require open space or site amenities for cOlmnercial uses. 4. Other landscaping standards: The landscape buffer along Ustick Road should be constructed in accordance with UDC Chapter 3, Article B. h. Planned Development Characteristics - N/ A i. Conditional Use Information: 1. Non-residential square footage: 250,000 2. Proposed building height: 65 feet 3. Percentage of site devoted to building coverage: 25% 4. Percentage of site devoted to landscaping: Not defined 5. Percentage of site devoted to paving: Not defined 6. Percentage of site devoted to other uses: N/ A 7. Number of Residential units: N/A j. Amenities - The applicant is not required to provide an amenity k. Off-Street Parking (residential uses) - N/A 1. Proposed and Required Residential Standards - N/ A m. Proposed and Required Non-Residential Parking - One off-street parking space required for every 500 square feet of gross í1oor area. Also, one Type A and one Type B parking space required for the loading area (per UDC 11-3C-8). The proposed total building í1oor area is 250,000 s.f., wllich requires 500 parking spaces. There are no Type A or Type B spaces shown, and the total number of parking spaces has not been calculated. Tills may be addressed during detailed CUP review, CZC review, and/or building design review but the design appears to meet the minimum standards of the UDC parking requirements. n. Summmy of Proposed Streets and/or Access (private, public, common drive, etc.): . The applicant is proposing two new access points to Eagle RoadlSH55 to serve the Gateway Marketplace project at approximately 700 feet and 1200 feet south of the Ustick/Eagle Intersection. As noted above, ITD must issue a right-inlright-out pennit and a full access permit for tills site, and the access is further contingent on the Meridian City COlUlCil granting a variance to UDC 11 ~3H. At tills time the policy in place would be for backage roads to serve this site and provide connection to the Y2 mile and the collector road systems. ITD has submitted a letter indicating that they will not make a decision on approving access to Eagle Road until such a time as the Meridian City Council has fonnally acted on the Variance request. City staff does not support any access to Eagle Road in tills location. In addition, the recorded DA between the applicant and the City requires either a public or private street be constructed parallel to Eagle Road/SH55 that may connect to the north boundary and may also COlmect to Eagle Road, if allowed by ITD at a point to be determined by ACHD. ACHD has stated that the applicant shall provide cross access south and east to connect to the future collector roadway east of the site and the connection to the signalized access proposed south of the site at River Valley Drive. This project along with the Una Mas Project east ofthe site will connect with Ally Street, a proposed public street serving as a collector roadway to the entire area. Gateway Marketplace Subdivision PP-06-002 page 4 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR TI-lE HEARING DATE OF 2/16/2006 In addition, the applicant is proposing two new access points to Ustick Road at the following locations: . Driveway #1 - 350 feet east of Eagle (right-inlright-out with center median) . Driveway #2 - 700 feet east of Eagle (full access) Ustick Road, from Leslie Drive to Ally Street (on the east side of Eagle Road), including the Eagle Road intersection, has just been widened and improved to five lanes. The intersection was widened to include dual left turn lanes. The applicant's prelin1inary plan does not show a new public, cross access, or commercial street extending south of Us tick Road for future connection to the east and south. The preliminary plat (Sheet PP-l) shows a loading road as an approxilnate 40-foot street section from the full access on Ustick, continuing as a cOlmnercial service drive to the end of the southem boundary ofthe site where one east-west break is proposed. The area (Kissler Annexation site) concept plan shows the road cOlmectil1g to the properties south and east of the site with a frontagelbackage road system. The area plan (Una Mas Annexation) shows private, internal driveways connecting to the future public street; such driveways run mostly east/west connecting the Kissler site to Ally Street and ultimately Ustick Road. For a detailed report on both ITD's and ACHD's actions and cOlmnents, please see the letters/reports sublnitted with the application. 6. AGENCY COMMENTS MEETING On December 281h 2005, staff held an agency comments meeting. The agencies and departments present included: Meridian Fire Department, Meridian Meridian Public Works Department, and the Sanitary Services Company. Staffwill included all comments and recommended actions as Conditions of Approval if the Meridian Planning Commission requests approval of the design as presented. If the Meridian Planning Commission agrees with the staff analysis that a redraw of the plat will be required of the site then staff will provide comments at such time as a new proposal is ready for Commission review. 7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed Use-Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, tills designation is defined in part as an area that is situated in highly visible or transitioning parts of the City where innovative and flexible design opportunities are encouraged. The MU-R has no upper limit on the square footage of non-residential uses and is intended to allow a broad range of uses. Staff finds the following Comprehensive Plan policies to be applicable to tills property and apply to the proposed development (staff analysis in italics below policy): . Require that development projects have planned for the provision of all public services. (Chapter VII, Goal TII, Objective A, Action 1) When the City established its Area of City Impact, it planned to provide City services to the subject property. The City of Meridian plans to provide municipal services to the lands proposed to be annexed in the following manner: . The subject lands currently lie within the jurisdiction of the Meridian Rural Fire District. Once annexed the lands will be under the jurisdiction of the Meridian City Fire Department, who currently shares resource and personnel with the Meridian Rural Fire Department. Gateway Marketplace Subdivision PP-O6-002 page 5 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/J 6/2006 . The subject lands currently lie within the jurisdiction of the Ada County Sheriff's Office. Once annexed the lands will be serviced by the Meridian Police Department (MPD). The roadways adjacent to the subject lands are currently owned and maintained by the Ada County Highway District (ACHD). This service will not change. The subject lands are current(y serviced by the Meridian School District #2. This service will not change. The subject lands are currently serviced by the Meridian Library District. This service will not change and the Meridian Librmy District should suffer no revenue loss as a result of the subject annexation. . . . . Municipal, fee-supported, services will be provided by the Meridian Building Department, the Meridian Public Works Department, the Meridian Water Department, the Meridian Wastewater Department, the Meridian Planning Department, Meridian Utility Billing Services, and Sanitary Services Company. . Chapter VII, Goal I, Objective B: Plan for a variety of commercial and retail opportUllities witilln the Impact Area. Stafffinds that the site is designated for MU-R on the Comprehensive Plan Future Land Use Map. Although strictly commercial uses have not been specifically plannedfor this property on the Comprehensive Plan Future Land Use Map the Development Agreementfrom the annexation shows this portion as commercial and consistent with the overall site plan when combined with the proposed Bienville Subdivision, and Sadie Creek Promenade Subdivision which are all bound by the same development agreement. The bulk proposal of uses would also meet the general class(ficationsfor mixed use regional. . Chapter VII, Goal I, Objective B, Action 5: Locate new community commercial areas on arterials or collectors near residential areas in such a way as to complement with adjoining residential areas. Ustick Road is classified as an arterial roadway. The applicant is not proposing access from the adjoining commercial areas by way of cross access, sidewalks or shared streets which will provide future connection to residential areas east of the site along Ustick Road. Staff believes that the commercial areas proposed compliment the existing and planned residential areas in the vicinity but better connection must be planned to facilitate non-arterial commercial collector connection to the site . Chapter VII, Goal IV, Objective D: Encourage appropriate land uses along transportation corridors. Staff believes that the proposed land uses are appropriate along the acijoining transportation corridors (Ustick Road and Eagle Road). Staffsupports the proposed uses at this site as they are consistent with the Mixed use regional district and the approved development agreement. . Chapter VII, Goal IV, Objective D, Action 2: Restrict curb cuts and access points on collectors and arterial streets. The ACHD evaluates access points in their analysis; no direct lot access is allowed to any of the arteriallcollector roadways. The proposed access points to the arterial streets generally comply with ACHD 's standards as detailed in the staff report. Please see the ACHD staff report contained in the file. ITD has indicated that they will not act on the proposed access points to Eagle Road until Gatcway Marketplace Subdivision PP-06-002 page 6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE Of 2116/2006 such a time as the Meridian City Council acts on the variance requests. The Idaho Tramportation Department (ITD) has a policy jar access to a Type IV Principal Arterial will be at intersections only, and spaced at one-halfmile inten;als in urban areas. ITD allows approaches (other than intersectiom) in special cases and on a tempoI'm]! basis. The Eagle Road access shall be eliminatedfrom this project. . Chapter VII, Goal IV, Objective D, Action 5: Require appropriate lmldscape and buffers along transportation corridor (setback, vegetation, low walls, berms, etc.). The applicant is proposing to construct appropriate bullers along all of the adjacent arterial streets. By Ordinance, a minimum 35-100t wide landscape bufjér to Gateway Corridors. The landscape plan shows the appropriate landscape buffers. Staff also finds the following 2002 Comprehensive Plan text policies to be applicable to this application: . "Require all new parking lots to provide landscaping in intemal islands." (Chapter V, Goal III, Obj. D, #3, page 43) "Eagle Road is the major north-south arterial in Ada County. The capacity of tills arterial should be protected by mirumizing the number and location of private driveway access connections to tills important roadway. The City should recognize, adopt, and help implement the Eagle Road Access Control Study, prepared by ACHD in 1997." (Chapter VI, page 71) "The capacity of arterial. . .roadways can be greatly dimirushed by excessive driveway connections to the roadways. The City should cooperate with ACHD to minimize access points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page 72) "Develop methods, such as cross-access agreements, frontage roads, to reduce the number of existing access points on to arterial streets." (Chapter VI, Goal II, Obj. A, #12, page 79). "Identify transitional zones to buffer commercial and residential uses, to allow uses such as offices and other low intensity uses." (Chapter VII, Goal I, Obj. B, #7, page 102) "Restrict curb cuts and access points on . . . arterial streets." (Chapter VII, Goal IV, Obj. D, #5, page 107) . . . . . 8. UNIFIED DEVELOPMENT CODE a. Allowed Uses in the Commercial Districts: UDC Table 11-2B-2lists retail store/restaurant/drive thru/ office/ financial institute uses as permitted uses in the C-G zoning district. b. Purpose Statement of Zone: The purpose of the Commercial Districts is to provide for the retail and service needs ofthe commuruty in accord with the Meridian Comprehensive Plan. Four Districts are designated which differ in the size and scale of commercial structures accommodated in the district, the scale and nlix of allowed commercial uses, and the location of the district in proxilnity to streets and illghways. C-G General Retail And Service Commercial District: The purpose of the C-G district is to provide for commercial uses which are customarily operated entirely or almost entirely within a building; to provide for a review of the impact of proposed commercial uses willch are auto and service oriented and are located in close proximity to major highway or arterial streets; to fulfill the need oftravel-related services as well as retail sales for the transient and permanent motoring public. All such districts shall be connected to the municipal water and sewer systems of the city, and shall not constitute strip commercial development and encourage clustering of commercial development. Gateway Marketplace Subdivision PP-06-002 page 7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 c. General Off-Street Parking Standards (from UDC 11-3C-5): The following standards shall apply for off-street vehicle parking for nonresidential uses: In all Commercial Districts the requirement shall be one (1) space for every five hundred (500) square feet of grOSS floor area. d. Structures Subject to Design Standards (11-3A-19B5): All stl11ctmes on property adjacent to an entryway corridor (Ustick/Eagle Roads) are subject to the design standm-ds listed in this section. e. Outdoor storage/refuse areas (l1.3A-12): Outdoor utility meters, HV AC equipment, trash dumpsters, trash compaction and other service functions shall be incorporated into the overall design of buildings and landscaping so that the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. f. Development along State and Federal Highways (1l-3H-4B2): If an applicant proposes a change or increase in intensity of use, the owner shall develop or otherwise acquire access to a street other than the state llighway. The use of the existing approach shall cease and the approach shall be abandoned and removed. a. No new approaches directly accessing a state illghway shall be allowed. b. Public street connections to the state illghway shall only be allowed at: 1. the section line road; and ii. the half-mile mark between section line roads. These half-mile connecting streets shall be collector roads. Section 11- 3H-3: The applicant shall construct a street, generally paralleling the state l1ighway, be designed to accommodate future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half mile collector road. The intent is to provide for future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half-mile collector road. The street shall be designed to collect and distribute traffic (emphasis added). 9. ANALYSIS 9a. Analysis of Facts Leading to Staff Recommendation The PP application does not substantially comply with the Uillfied Development Code. However, there are several areas of clarification and some modifications required to both the site plan and plat layout in order for staff to recommend full approval of the application. Below are several special considerations for the P&Z Commission to review at the public hearing: Analysis of Facts Leading to Staff Recommendation PP Application (PP-06-002): The proposed preliminary plat can be conditioned to comply with the Unified Development Code. Gateway Marketplace Subdivision PP-06-002 page 8 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE I-fEARING DATE OF 2/16/2006 Based on the poJicies and goals contained in the Comprehensive Plan and the general compliance of the proposed development with the Unified Development Code, Staff believes that this is a good location for the proposed development. Please see Exhibit D for detailed analysis- of the required facts and findings for a Zoning Amendment. Non-Residential BuildinQ:s: The applicant has requested a maximum of 250,000 square feet of retail/restaurant/office spaces. Staff does not propose to limit the applicant to their request as tills area is designated as commercial, is surrounded by other commercial uses and is a prime location for intense commercial uses designed in a clustered fashion. Drive Thru Separation: The applicant has requested several lots to be drive thru retail uses willch have a spacing requirement of 300'. Since the site plan is conceptual in nature staff feels that the applicant shall design the site to meet the 300' standard separation for illive thru uses with this application. If a drive-thru use is proposed witilln 300' of another drive thru then, a conditional use application must be approved. Access to SH 55/ EaQ:le Road: The applicant has requested an access point to Eagle Road. According to ITD records, the applicant has sublnitted a request for access permit but is not vested with an access point for tills location as the change in use is the decidi11g factor as to when an access point be granted. Currently the site has no access to Eagle Road and the use is agricultural/residential where the plat will change the use to commercial and is subject to the design requirements ofUDC 11-3H. UDC requires that all access for Gateway Marketplace Subdivision shall be taken from Ustick Road at points detennined by ACHD. Uses: All other lots shall be lilnited to Office/Retail/Restaurant/Drive thru uses mld General Commercial uses listed as permitted in UDC Table 11-2B-2. Any uses (excepting Drive thru) not listed as permitted shall be subject to conditional approval. Sidewalks: The applicant is not proposing to construct intemal sidewalks on some of the intemal streets/drive aisles. The design does show the incorporation of the eight-foot walkway which is directed to the main access to the commercial building. When and if the plat is resubmitted as recommended, the applicant shall provide a more defined pedestrian access corridor showing collector designed roadways with a detached sidewalk on one side, designed in compliance with the Private Street standards listed in UDC 11-3F. Since the applicant has sublnitted a plan willch is conceptual in nature staff feels the sidewalk locations shall be made consistent with the UDC including drive aisles which shall include a detached sidewalk. The second drive aisle access point to Ustick Road shall be designed with the private street sections as listed in UDC 11-3F and subject to including sidewalks. Landscape Street Buffers: Arterials: UDC 11-2B requires a 35-foot wide street buffer along classified arterial roadways and entryway corridors. Eagle Road mld Ustick Road are classified as Arterial Roads. On the submitted landscape plan, the applicant is proposing to construct a 35-foot wide street buffer along Ustick Road and Eagle Road. The applicant should be required to depict the required street buffers on the face of the final plat in an easement or place the required buffers in common lots as per UDC 11-3B. See Exhibit B below. Commercial Streets: UDC 11-2B requires a 10-foot wide street buffer along commercial roadways. The submitted plat does not include commercial cross access east and south. Staff feels that a designed commercial cross access street shall be provided mld subject to the landscape standards for commercial street buffers. Within the lO-foot street buffer, a detached sidewalk shall be provided. Ditches. Laterals. and Canals: There are several irrigation laterals that bisect tills parcel. Per UDC Gateway Marketplace Subdivision PP-O6-002 page 9 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR T/-IE HEARING DATE OF 2/16/2006 ] 1-3A-6, all inigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled. The applicant is proposing to tile all of the irrigation facilities located on site. See Exhibit B below. Pressure Irrigation: The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (UDC 1] -3A-15). The applicant should be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is used, the developer will be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. An underground, pressurized irrigation system should be installed to all landscape areas per the approved specifications m1d in accordance with City Code. See Site Exhibit B below. Fencing; The applicant is not showing any fencing on any of the submitted plans. A detailed fencing plan should be subnlitted upon application of the final plat (UDC 11- 3A- 7). If permanent fencing is not provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building permit. All fencing should be installed in accordance with City Code. See Exhibit B below. Cross-access Intemal: There are some conunercial lots that do not have frontage on a public street. Instead the applicant is proposing to provide cross-access easements to the lots that do not have public street frontage. Because several of the proposed lots do not have frontage on a public street, the applicant should provide a cross parking/cross access agreement for all of the lots witilln the retail and other commercial portions of the subdivision to use the driveways and parking aisles. The site should be redesigned to provide a backage road on Eagle Road. Access to Eagle road shall be determined by the Meridian City Council and at least the non-signalized access point to Us tick Road shall be designed to serve as a commercial collector for i11tercOlmectivity to the south and vellicular movement in the north/south direction in cooperation with the parcel east of the site. Maintenance of the drive aisles and parking areas should be provided for in a note on the face of the final plat, AND/OR in a document such as CCRs. See Exhibit B below. Cross-access South: The applicant shall be required to provide cross access to the parcels south of the site. The project is a portion of a larger site project (Kissler Annexation) and the sites shall maintain consistent traffic flow for the entire site. Eagle Road Access: The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas. ITD allows approaches (other than intersections) in special cases and on a tempormy basis. The access points shown at approximately 700 feet south and 1,200 feet south of the Ustick Eagle Road intersection shall be eliminated as it does not meet criteria of either ITD or the Meridian Comprehensive Plan. Loading Space Parking: UDC 11-3C~8 requires off-street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application shall clearly demonstrate that both a Type A and Type B space are available on site, located near the refuse/service area bellind the building. Elevations: The applicant has not submitted building elevations of the proposed structures. The application lists the proposed building materials, including stone, brick, stucco and timber to be accented with chrome, aluminum and gloss painted trims. UDC 11- 3A-19 requires all structures on property adjacent to an entryway conidor to comply with the design standards listed in tills section. Staff s interpretation of the UDC is that the applicant may choose to place the "primary Gateway Marketplace Subdivision PP-O6-002 page 10 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 entrance" on an elevation other than the public street side. However, the public street elevations (Us tick Road and Eagle Road) must still meet the other standards listed in 11-3A-19 (except for the primmy entrance standards). The elevations will need to be reviewed prior to issuance of CZC to comply with the following ordinance standards: a) Facades: Facades visible from a public street shall incorporate modulations in the façade, roof line recesses, and projections along a minimum of twenty percent (20%) of the length of the facade. b) Roof lines: Roof design shall demonstrate two or more of the following: a) overhanging eaves, b) sloped roofs; c) two (2) or more roof planes; d) varying parapet heights; and e) comices. c) Mechanical equipment: All ground-level and rooftop mechanical equipment shall be screened to the height of the unit as viewed from the property line. d) Color and Materials: Exterior building walls shall demonstrate the appearance of high- quality materials of stone, brick, wood or other native materials. Smooth-faced concrete block, tilthup concrete panels, or prefabricated steel panels are prohibited except as accent materials. Refuse/Service Area Screen: Neither the Site Plan or Landscape Plan call-out how or if the refuse/service area on the east side of the buildings will be screened. UDC 11-3A-12 requires the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. The applicant's CZC application must clearly demonstrate how tills standard is met. Cross Access: The property to the south is dependent on access for interconnectivity and is directly tied with the existing Development Agreement for providing a frontage road to Ustick Road. The applicant has provided a design not showing any points of access witilln the immediate vicinity. These points of access are paramount on the success of the general area and staff feels a minimum of three points of cross access shall be provided to the east and one point of access to the south, willch shall all be designed to private street standards for pedestrian and vellicular traffic circulation. Strip Development: The purpose statement of the General Commercial District specifically reads, "shall not constitute strip commercial development and encourage clustering of commercial development" The comprehensive plan policies further reads, "Use the comprehensive plan, subdivision regulations, and zorung to discourage strip development, and encourage clustered, landscaped business or residential development on entryway corridors." There are six larger scale buildings and eight small scale buildings all attached on one or two walls. The overall length of the building is approximately 880 feet long of the approximately 1,330 feet of the entire length of the site wmch is over 2/3rds of the site. Adding on the approximate 230 feet of the building shown on lot 18 and the retail buildings fronting Ustick Road and the overall length of buildings approaches 1,200 feet and approximately 90 percent of the face of the site would be developed. Furthermore, the overall length of the parking lot would only exclude the 35' landscape buffer to Ustick Road and become an overall length of 98% of the site length as parking lot, approached in a north south direction. FUlihermore, if the parcel south of the site is developed in a similar fashion the City of Meridian would be seeing a parking lot Gateway Marketplace Subdivision PP-O6-002 page 11 CITY OF MERJDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2!l6/200G approacillng ~ mile in length. Tills constitutes a strip development. Staff would recommend the applicant break the parcel into clusters of small/medium/larger sites which would be connected by a backage road north south with an east west connection. 9b. Staff Recommendation: Based on the above analysis, staff finds the Preliminary Plat applications needs to be revised to confolll1 to the adopted DA, Comprehensive Plan policies and UDC standards. As noted under staff m1alysis we recommend the building elevations be submitted in compliance with the entryway corridor standards, the access point to Eagle Road be eliminated and redesigned, and a private street section for cross access provided to the south be added to the preliminary plat in place of the proposed Eagle Road access, the site be redesigned as not to constitute a strip development and an internal backage road be designed to facilitate vehicular and pedestrian traffic to the full access provided on Ustick Road. We recommend continuance of the application for redesign in order to meet the concerns of staff as detailed in this report subj ect to revision of the preliminary conditions shown in Exl1ibit B or del1ial of the application. Staff has not provided findings with tills staff report and will provide findings for approval or denial at the direction of the Commission. 10. EXHffiITS A. Drawings 1. Preliminary Plat (by The Land Group, dated November 15, 2005) 2. Landscape Plan (by The Land Group, dated September 15,2005) B. Legal Description C. Conditions of Approval 1. Planning Department 2. Public Works 3. Fire Department 4. Police Department 5. Parks Department 6. Sanitary Services 7. ACHD D. Required Findings from UDC 1. Prelilninary Plat-Pending Gateway Marketplace Subdivision PP-O6-002 page 12 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 Exbibit AI; Preliminary Plat PP~I(Tbe Land Group) Dated November 15, 2005 ""'-n'_,_,_, ..". - ..,,-..--- -, -------_m_- "-'-'-~-'-,-,,--_..,-, ~- I~ ',J::; I~ I.,: : I~~; !~ ',7 , I: ,;', ; ii m 10" i~ ',ci ',; ',' ' ':: I) , L--' 1--.'-- " -,.' ) , ..¡,Ú-:~'~1;t;"'-L'-': III! , r", Tn C;..J-'-T~~;~c"C-:I=,,:tii~~} /; !;; E:],-f¡i3 ;~ ~M:[J ¡~,,: :) "P" :;" ,; [j,1 ¡; !!ÇJ ';i I """,li!,..""",,,+:-¿i!',"I"""I"""~¡";Î,J'r""J;:ì"":"'--: ""-,,,¡-, r¡r.. iff, ; i ¡.j I-'¡' '¡~~ ¡r..-,,!ou II;" :[.'i ';~ 1)[:; I Lwi¡I"1t:-. !~¡IfTI: ¡ , .. " i : '/" r ¡; II;,..:' t ;~;:':'" ;\:...¡~.i .. ' \, """!, ' 'I " - ' ",~) ¡,...:""~ ,I .. , '~":' " ¡I,' i I ':M £:";'" ;11 ¡. '"1.. <, Ii -~r----L¡ ---~-L--r -.-i_r-:--j~; 1Þtí¡¡¡ ;;"f ' ,._~- --~XLJ ,",-",j ,;-'-L~..~,.Jc~' J~,: ¡---~ iL',~r::~,.q,:: ~:;~::iJ:';j\:p~,,; .. " . 1/ Wi I ill ii11" :j , . ,..., " :, ' '" ~, if "~ ,. ,. i: /,y, '^"" ¡ > ~ i' , î( !'f "I j-~~:: )","" ï ¡ ,,';, . r -~.~ '~ , , I: ; ê) '~ § 0 ,Ii!U ~.. ð r-' '" "< i~~f ~ ~ ;;: m '" ~ Œ " '.,..~] .1_-__- ,..1, ,~~: r'-~~~I~~;~~::~?~~~~l)' \"~~]J] ~l Gateway Marketplace Subdivision Exhibit A Page 1 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/J 6/2006 Exhibit A2: Landscape Plan L1.1(Thc Land Group) Dated September 15, 2005 -.,- -.n ""- -..,- :¡j/! ~: ' , :~ , . hi I"f;; /-,;i"~." "'...~ C;;,;w" M';k"P';';-~~-]-~~:!], i;'-~ r: : ,.4. -I:>;' ¡IiIlI ~'(.\~ì ¡PRELIMINARY PLAT LANDSCAPE PLAN! :'!;; ~.S :_'- --~- ---non_,' '- -~~=-.l--~~ n=-~_-.-~:~¡:-'_'~'~;fì~VI~) .- -, i .;: ¡: Gateway Marketplace Subdivision Exhibit A Page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/]6/2006 Exhibit ß: Legal Description daiborf1 ... woite consulti'19J.. F(: engineers 8, sur"~.von> 120 N. Curtis Rd. Boise, Idaho 83706 (208; 376.8555 Fax (208) 429-9862 P.N. 2279 October 20, 2005 PARCEL "A" US TICK PROPERTY REMAINDER PARCEL DESCRIPTION A parcel of land lying in the Northwest l/4 of Section 4, T.3N., RlE., B.M., Ada County, Idaho, and being more particularly described as foHows; Commencing at the Northwest comer of said Section 4, thence S 8g 49'08" E along the North boundary of said Section 4 and the centerline of Us tick Road for a distance of 97.62' feet; thence leaving said North boundary and centerline S or 50'52" W for a distance 0£77.96 feet to a point on the South right-of.way line of Us tick Road, being the REAL POINT OF BEGINNING; thence along said South right-of.way line for the following 13 courses; N44' 02'14"E foradistanceof47.06 feet; thence S 89' 49'08" E for a distance of262.81 feet; thence S 4Z 51'21" E for a distance of 41.18 feet; thence N 87 IT 1 0" E for a distance of 29.03 feet; thence N 4Z 43'35" E for a distance of 40.57 feet; thence N 89' ] 3 '34" E for a distance of 179.28 feel (fonnerly described as 179.20 feet); :Lcilu.:é.;ú:r :i5':;:;-'I:f,,¡..d;"I"iI'Av, j),';,¡¡eu. thence S 89' 49'08" E for a distance of 1000 feet; ¡/¡(' )('<:I\i (I,;'",,:-- t',I",¡.l!""",C:"lIrì~.4ik(:l. C:\Pmjec.1s\UstlcJcLLA (2279)lDocumenls\Paroc1 A.doc- I - Gateway Marketplace Subdivision Exhibit B Page] CITY OF MERIDJAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 claiborn. 4. waite consu'ting~ engineers & surveyors 120 N. Curtis Rd. Boise, IdAho 83706 (208) 376-8555 Fax (208) 429-9862 P.N. 2279 October 20, 2005 PARCEL "B" USTICK PROPERTY 5.51 ACRE SPLIT A parcel of land lying in the Northwest 1/4 of Section 4, T.3N., R. IE., B.M., Ada County, Idaho, and being more particularly described as follows: Commencing at the Northwest comer of said Section 4, thence S 89 49'08" E along the North boundary of said Section 4 and the centerHne of Us tick Road for a distance of 97.62' feet; thence leaving said North boundary and centerline S or 50'52" W for a distance 0£77.96 feet to a point on the East right-Qf~way line of Eagle Road; thence along said East right-of~way Hne S or 50'52" W for a distance of 1038.43 feet to the REAL POINT OF BEGINNING; thence continuing along said East right~of~way line S or 50'52" W for a distance of 154.90 feet; thence S 0(1 36') 3" W along said East right-of~way line for a distance of 114.17 feet; thence leaving said East right-of~way line S 89 51'00" E for a distance of 700.02 feet; thence N OU 36'13" E for a distance of93.77 feet to the South boundary of Government Lot 4 of said Section 4; thence S 89 51'00" E along said South boundary for a distance of 6135 feet; thJ>!"",'I"!",i!,!¡:, ~~¡d ~>l:'h 1:~):"-:t!::r:'l' nfY "c;"'O" r f",--" ,L¡":l\'". I".';-~"ï"""¡ ft:...:t, thence N 89' 51 '00" W for Ii distance of363.00 feet; tl,.TÇ-' (I() ,i'-(lC)' \V;~¡:,;J¡.,.I¡'i:\'lJfCVIf<'t-L C;\ProjectS\UstickLLA (2279)\Documents\Pan:eJ B,doc. 1 . Gateway Marketplace Subdivision Exhibit B Pagc 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 211612006 thence N 89" 51'00" W for a distance of 177. 00 feet; thence S oa 09'00" W for a distance of34.50 feet; thence N 89" 5] '00" W for a distance of218.67 feet to the REAL POINT OF BEGINNING; containing 5.51 acres of land, more or less. Prepared by; Todd R. Waite P.L.S. C:\Projects\USlickLLA (2279)\Documenls\ParccIA.doc-l - The landscape plan prepared by The Land Group, labeled Sheets LS 1.1, is not approved with these applications a landscape plan consistent with UDC 11-3B shall be submitted with the final plat which reflects any changes made to the prelhninary plat to redesign the subdivision consistent with approved access points. Including but not limited to full landscaping along Eagle Road which currently shows two access points. With the final plat application, submitted revised copies of the landscape plan with the changes listed above. 1.1.11 Maintenance of all common areas shall be the responsibility of the Gateway Marketplace Subdivision Business' Owners Association(s) 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 CTTY OF MERJDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE 01' 2116/2006 C. Conditions of Approval 1. Planning Department SITE SPECIFIC REQUIREMENTS- (Gateway Marketplace) ] .1.1 The preliminary plat labeled as PP-] prepared by The Land Group, dated November 15, 2005, shall be redesigned, with the conditions listed herein. All comments/conditions of the accompanying Annexation and Zoning (AZ-03-018) Development Agreement shall also be considered conditions of the Prelinlinary Plat. UDC 11- 3C-8 requires off-street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application for this project shall clearly demonstrate that adequate parking is available on site, located near the refuse/service area designed at the building. Grapillcally depict on the face of the plat, the required 35-foot wide landscape buffer along Ustick Road and Eagle Road. No direct lot access to Ustick Road or Eagle Road will be allowed. The existing driveways to Eagle Road may be for construction purposes if approved by lTD. At such time, direct access to Eagle Road shall be prol1ibited. 1.1.2 That prior to signature of the city engineer cross access to parcels east and south of the site be granted. The applicant shall provide at a minimum one commercial cross access drive to the properties east of the site wl1ich shall be designed according to private street standards as listed in UDC 11- 3F, with a minimum of 24' travel way, no parking backing on to the service drive, a one side five foot detached sidewalk with a 5' landscape buffer. The commercial cross access drive is to provide connection from the future Public Roadway (Ally Street) east of the site, through the Una Mas Annexation site, and provide the most direct veillcular traffic flow to a public road system. The applicant shall work with ACHD to determine if a public frontage road shall be provided at the southern boundary of the site. One half of a 42' public roadway design for a frontage/backage road shall be reserved at this site until such a time as ACHD staff provides a written statement refusing the reserved area. Depict on the face of the final plat a lO-foot wide landscape buffer along a f-uture cOllli11ercial access roadway to be designed along the easterly most access point to Ustick Road. Said landscape buffers shall be in either a COllli110n lot or an easement adjacent to the rights of way. 1.1.12 The applicant shall subnlit from the County Surveyors Office the appropriate documentation showing that usage of Gateway Marketplace as an approved subdivision name. Gateway Marketplace Subdivision Exhibit C Page I 1.1.18 1.1.19 1.1.20 1.1.21 1.1.22 1.1.23 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 1.1.13 Any roof-mounted mechanical equipment will be screened ÍÌ"om view from any public right-of- way. The applicant shall submit drawings at the time of CZC submission that demonstrate this condition is complied with. 1.1.14 The applicant shall comply with the outdoor lighting standards shown in UDC 11-3A-I1. 1.1.15 The awnings on the west and north elevations shall extend at least 20 feet beyond the entry doors, measured from the building face to the outer edge of the awl1Ìng for the retail buildings. The applicant shall sublnit a drawing at the tilne of CZC application subllÙssion to demonstrate compliance with tills condition. Comply with UDC 11-3A-12 regarding a screen for the refuse/service area. No irrigation pump station or facility is shown on the Site Plan. However, if one is proposed for the site, it must be located outside of any required street buffer. Impervious surfaces are proillbited in said buffers. Prior to the City Engineer's signature of the final plat, all existing structures shall be removed from the site. 1.1.16 1.1.17 Provide intemal cross access/cross parking agreement(s) for all lots in Gateway Marketplace Subdivision. All cross access drive aisles shall only approach the ACHD approved points of access to the public street system. Maintenance of the aisle and parking areas shall be provided for in a note on the face of the final plat, AND/OR in a document such as CCR's. Other than the points of access approved by ACHD, direct lot access to Ustick Road and Eagle Road is prollibited. A note shall be placed on the final plat restricting access to Eagle Road and UstickRoad. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 1.1.1 GENERAL REQUIREMENTS-PRELIMINARY PLAT 1.1.2 1.1.3 Sidewalks shall be installed within the subdivision and on the perimeter of the subdivision pursuant to City Code. All areas approved as open space shall be free of wet ponds or other such nuisances. All stormwater detention facilities incorporated into the approved open space are subject to UDC 11- 3A-18 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated surface materials shall not be used in open space lots, except as permitted under UDC 11-3A- 18. Where the applicant has submitted a preliminary landscape plan and where staff has reviewed such plan, the landscaping shall be consistent with the preliminary plan with modifications as proposed by staff. If the stormwater detention facility cannot be incorporated into the approved open space and still meet the standards of UDC 11- 3A-18, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of [mal construction. The applicant shall submit a detailed fencing plan with the final plat application for the subdivision. If permanent fencing is not provided, temporary construction fencing to contain Gateway Marketplaec Subdivision Exhibit C Page 2 2.3 2.4 2.5 2.6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/1 6/2006 1.1.4 debris must be installed around the perimeter prior to issuance of a building pennit. All fencing should be installed in accordance with City Code. Any tree over 4" in caliper that is removed from the propelty shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be mitigated. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per MCC 12-4-13, unless otherwise approved by the Irrigation District(s). Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can not be obtained, altemate plans will be reviewed and approved by the City Engineer prior to final plat signature. Staff's failure to cite specific ordinance provisions or terms of the approved Prelinlinary Plat does not relieve the applicant of responsibility for compliance. Preliminary plat approval shall be subject to the expiration provisions set forth in UDC 11 ~6A. 1.1.5 1.1.6 1.1.7 2. Public Works Department 2.1 Sanitary sewer service to this development is being proposed via extension of mains in U stick Road. The applicant shall install all mains necessary to provide service; applicant shall coordinate main size and routing with the Public Works Department, and execute standard fonns of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than altemate materials shall be used in confonnance of City of Meridian Public Works Departments Standard Specifications. Water service to tills site is being proposed via extension of mains in Ustick Road. The applicant shall be responsible to install water mains to and through tills development, coordinate main size and routing with Public Works. Due to the commercial uses on tills project, a connection to the water main in Eagle Road shall be required to guarmltee adequate fire flow. Coordinate main size and routing with the Public Works Department. The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easements shall not be dedicated via the plat. The description shall be consistent with the graphically depicted easements 011 the plat but be recorded as a separate document using the City of Meridian's standard fonns. Submit an executed easement (supplied by Public Works), a legal description, which must include the area of the easement (marked EXHffilT A) and an 81/2" x II" map with bearings and distmlces (marked EXHffiIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. . 2.2 The applicant has indicated the pressure irrigation system in tills development is to be maintained as a private system, therefore plans and specifications will be reviewed by the Public Works Department as part of the construction plan review. A "draft copy" of the operations and maintenance manual will be required prior to plan approval with the "final draft" being required prior to final plat signature on the last phase of this project. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round Gateway Marketplace Subdivision Exhibit C Page 3 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT fOR THE HEARING DATE OF 2/1612006 2.7 2.8 source of water (DOC ll-3A-6). The applicant should be required to use any existillg surface or well water for the primary source. If a surface or well source is not available, a single-point cOlmection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas plior to signature on the final plat by the City Engineer. All existing structures shall be removed prior to signature on the final plat by the City Engineer. Any existing domestic wells and/or septic systems witllin tills project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9~4-8. Wells may be used for non- domestic pU1þoses such as landscape irrigation. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, altemate plans shall be reviewed and approved by the Meridian City Engineer prior to tìnal plat signature. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm water treatment and disposal shall be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal illto surface water is prohibited unless the jurisdiction which has authority over the receiving streanl provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved and the Final Plat for tllis subdivision shall be recorded, prior to applying for building permits. A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, pressurized irrigation, samtary sewer, water, etc., prior to signature on the final plat. All development improvements, including but not limited to sewer, fencing, micro-paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. Applicant shall be responsible for application and compliance with any Section 404 Pennitting that may be required by the Anny Corps of Engineers. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. The engineer shall be required to certify that the street centerline elevations are set a minimum of 2.9 2.10 2.11 Gateway Marketplace Subdivision Ex11ibit C Page 4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2//6/2006 3-feet above the highest established peak groundwater elevation. 3. Meridian .Fire Department 3.1 Acceptance of the water supply for flre protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testi11g. 3.2 Final Approval of the flre hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrm1ts shall have the 4 )1/' outlet face the main street or parking lot aisle. b. The Fire hydrant shall not fàce a street willch does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works specifications. d. Fire Hydrants shall be placed on comers when spacing pennits. e. Fire hydrants shall not have any vertical obstructions to outlets within 10'. f. Fire hydrants shall be place 18" above finish grade. g. Fire hydrants shall be provided to meet the requirements of the IFC Section 509.5. h. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet of the project. 3.3 All entrance and internal roads and alleys shall have a tunling radius of 28' inside and 48' outside radius. 3.4 Provide a 20-foot wide Fire Lane for all intemal roadways all roadways shall be marked in accordance with Appendix D Section DI03.6 Signs. Operational flre hydrants, temporary or permm1ent street signs and access roads with an all weather surface are required before combustible construction is brought on site. Commercial and office Occupancies will require a fire-flow consistent with the Intemational Fire Code to service the proposed project. Fire hydrants shall be placed per Appendix D. The 23 office/commercial lots lot will have an unknown transient population and will have an unknown impact on Meridian Fire Department call volumes. The Meridian Fire Department has experienced 2612 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. Maintain a separation of 5' ITom the building to the dumpster enclosure. Provide a Knox box entry system for the complex prior to occupancy. The applicant shall work with Planning Department staff to provide an address identiflcation plan and a sign willch meets the requirements of the City of Meridian sign ordinance at the required intersection(s). The Fire Dept. has concerns about the ability to address the project and have the addresses visible from the street willch the project is addressed off of. Please contact Vicki Heugly at 898-5500 to address this concern prior to the public hearing. Gateway Marketplace Subdivision Exhibit C Page 5 3.15 3.16 3.17 3.18 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/1612006 3.12 All aspects of the building systems (including exiting systems), processes & storage practices shall be required to comply with the Intemational Fire Code. 3.13 Provide exterior egress lighting as required by the lntemational Building & Fire Codes. 3.14 \Where a p011ion of the facility or buildi11g hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). i. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ii. For buildi11gs equipped throughout with an approved automatic splinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). There shall be a fire hydrant witilln 100' of all Fire Department connections. Buildings over 30' in height are required to have access roads in accordance with Appendix D Section D 105. Side yard fences shall not be allowed. Buildings or facilities having a gross building area of more than 62,000 square feet (5760 m2) shall be provided with two separate and approved fire apparatus access roads. Exception: Projects having a gross building area of up to 124,000 square feet (11520 m2) that have a single approved fire apparatus access road when all buildings are equipped throughout with approved automatic sprinkler systems. (Remoteness Required) 4. Police Department 4.1 The police department supports the requirement for a frontage road as the length and bulk ofthe proposed buildings impedes serviceability to all sides of the proj ect. 5. Parks Department 5.1 Standard for Mitigation of trees: The standard established in the City of Meridian Landscape Ordinance 11-3B will be followed. 5.2 5.3 6. Standard Plan for Protection of Existing Trees during Construction: The sta11dard established in the City of Meridian Landscape Ordinance Tree Grate and Tree Box standard: The proposed tree grate shall be a 6 foot by 6 foot, cast iron, French pattem tree grate. This grate shall be placed in a 6 foot by 6 foot inside diameter tree box with a steel grate frame set in concrete. Prior to CZC approval, contact Meridian Parks and Recreation Department for specifications and tree box construction drawings. Sanitary Service Company Gateway Marketplace Subdivision Exhibit C Page 6 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 6.1 Please contact Bill Gregory at SSC (888-3999) for detailed review of your proposal and submit stamped (approved) plans with your certificate of zoning compliance application. Ada County Highway District 7. Site Specific Conditions of Approval 7.1 Re-construct the northem driveway, on the adjacent flag lot, as a curb return driveway with nlinimum ] 5~foot curb radii. This driveway shall be no wider than 30-feet. 7.2 Construct one new curb return driveway with minimum] 5-foot curb radii located approximately 120-feet north of the south property li11e as proposed on the revised site plan. This driveway shall be no wider than30-feet. 7.3 Close the existing curb cut driveway located approximately 96-feet south ofthe north property line with curb, gutter, and sidewalk to match existing improvements. 7.4 Comply with all Standard Conditions of Approval. Standard Conditions of Approval 7.5 Any existing irrigation facilities shall be relocated outside of the right-of-way. Private sewer or water systems are prohibited 1Ìom being located within any ACHD roadway or right-of-way. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. Comply with the District's Tree Planter Width Interim Policy. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. The applicant shall subnlit revised plans for staff approval, prior to issuance of building pennit (or other required permits), willch incorporates any required design changes. Construction, use and property development shall be in confonnance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. Gateway Marketplace Subdivision Exhibit C Page 7 7.14 7.15 7.16 7.17 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2116/2006 Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are comprOlnised during any phase of construction. No change in the terms and conditions of this approval shall be valid unless they m'e in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change fTom the Ada County Highway District. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subj ect property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Exhibit D. Required Findings from Unified Development Code Preliminary Plat Findings (UDC 11-6B-6): In determining the acceptance of a proposed subdivision, the Conunission and Council shall consider the objectives oftms Title and at least the following: A. The conformance of the subdivision with the Comprehensive Development Plan; In Chapter VII of the Comprehensive Plan, 'Mixed Use Regional' is defined as m'eas including commercial and residential development consistent with auto and service oriented uses. Staff finds that the requested General Commercial (C-G) zoning designation is in accord with the Comprehensive Plan's Future Land Use Map, which delineates the subject property as "Mixed Use- Regional". The purpose of the C-G district is "to provide for a review of the impact of proposed commercial uses which are auto and service oriented and are located in close proxinlity to major illghway or arterial streets; to fulfill the need of travel-related services as well as retail sales for the transient and permanent motoring public." Staff finds that the proposed zoning is in general confonnance with the comprehensive plan (please see Section 7 of the Staff Report for detailed analysis of specific comprehensive plan action items that apply to tills development). The applicant will need to revise the site design and allow staff time to complete a detailed analysis in relation to the interconnectivity of the site, compliance with the Eagle Road corridor provisions, and general classification for the site layout ( not constituting a strip development) ß. The availability of public services to accommodate the proposed development; The site is intended for commercial uses which, based on the Comprehensive Plan description, will have such uses as retail, wholesale, service and office uses, as well as appropriate public uses such as government offices. The applicant will be responsible for the extension of all utilities necessary to serve tills proposed development. Permanent sanitary sewer service to tills development is to be Gateway Marketplace Subdivision Exhibit C Page 8 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 provided by the extension of sewer in Ustick Road and extended south through the site to be looped with extensions in Eagle Road. The applicant will be responsible for the extension of utilities to and through tilis proposed development. Sizing and routing shall be coordinated with the Public Works Department. Other urban services, such as water, are near to tills site and the applicant should be able to extend such services to the site. The applicant and/or future property owners will be required to pay park and illghway impact fees. ACHD has subnlitted a staff report with site specific and standard conditions wllich will is attached as Exhibit C. On December 28, 2005, a joint agency/department COllli11ents meeting was held with representatives of key service providers to this property. Based on the joint agency/department meeting and other comments received from agencies/departments, staff finds that except for sanitary sewer, the public services listed above can be made available to accommodate the proposed development. The Commission and Council should reference any written and/or verbal testimony submitted by any public service provider, regarding their ability to adequately service this project. If approved, the developer will be financing the extension of sewer, water, local street infTastl1lcture, utilities and irrigation services to serve the project. The primary public costs to serve the future residents will be fire, police and school facilities and services. Staff finds there will not be excessive additional requirements at public cost and that the proposed zoning and subsequent development will not be detrimental to the community's economic welfare. C. The continuity of the proposed development with the capital improvement program; Because the developer is installing sewer, water, and utilities for the development at their cost, the subdivision will not require the expenditure of capital improvement funds. D. The public financial capability of supporting services for the proposed development; Please see Exillbit B for comments and conditions from other agencies and departments. E. The other health, safety or environmental problems that may be brought to the Commission's attention. Staff is not aware of any health, safety or general welfare problems associated with the development of tills subdivision that should be brought to the Councilor Commission's attention. ACHD considers road safety issues in their analysis. Staff recommends that the Commission and Council reference any public testimony that may be presented to determine whether or not the proposed subdivision may cause health, safety or environmental problems of willch staff is unaware. Staff would not find the existing design in the best interests of the City of Meridian due to the lack of interconnectivity to the surrounding properties. The lack of a frontage road isolates tills parcel as a strip development that does not provide the best product for future servicing of the site by fire, police and general citizens of the City of Meridian. Staff recommends redesign as detailed in tills report. F. The development preserves significant natural, scenic or historic features. Staff is not aware of any natural, scenic or historic features which require preservation. The applicant will be required to maintain, fence, and improve the waterways willch are existing on tills site. Kohl's CUP Application Exhibit F Page 1